44.00 m3/sec
1341.2 msl
Diversion Discharge
Design Discahrge for power
Q Flushing discharge
Diversionfrom Intake
1.24 m3/sec
0.19 m3/sec
1.43 m3/sec
15%
Qi
44 m3/sec
15 m
0.75
1.20 m
1.00
44 m3/sec
1.20 m
1.2
0.6
1.2
1.20 m
2.40
4.19 m3/sec
9.5%
1.2 m
1341.2 m
1340.0 m
Design Flood
Net Length of Spillway
No of Undersliuces
Sluice Dimension
Sluice Width
Sluice Gate opening
b
a
w
Ka
Kp
Pier shape
2/3*Cd*SQRT(G2)
Cc
SN
Eff. Head, m
1
2
3
4
0.50
1.00
1.20
1.70
44.00 m3/s
15 m
1 Nos
Energy
Level
1341.70
1342.20
1342.40
1342.90
Water level
1341.7
1342.2
1342.4
1342.9
1.2 m
1.2 m
Actual
level
1341.6
1342.0
1342.1
1342.5
1m
0.01
0.01
2.2
0.61
0.75 Cd
Underslice Co
Weir Conveyance
Eff. Length, Dis. Coeff, Discharge, Eff. Length, m
m
m3/s
14.99
14.98
15.98
15.97
0.65
0.69
0.71
0.75
10.19
30.57
43.84
78.06
1.18
1.16
1.15
1.13
5
6
7
8
9
10
2.20
2.70
3.20
3.70
4.20
4.70
1343.40
1343.90
1344.40
1344.90
1345.40
1345.90
1343.4
1343.9
1344.4
1344.9
1345.4
1345.9
1342.4 m
1342.4 m
1342.8
1343.1
1343.3
1343.5
1343.7
1343.9
16.96
16.95
17.94
17.93
18.92
19.91
0.79
0.83
0.87
0.91
0.95
0.99
128.59
183.60
262.86
341.71
455.31
591.16
1.11
1.09
1.07
1.05
1.03
1.01
43.84
5.28
49.12
Underslice Conveyance
Ratio, y/a
Dis. Coeff, Discharge, Total Disch,
Cu
m3/s
m3/s
1.42
1.83
2.00
2.42
0.510
0.528
0.534
0.545
4.24
5.00
5.28
5.92
14
36
49
84
Cd
29%
14%
11%
7%
0.09
0.21
0.27
0.42
1.92
2.04
2.09
2.21
2.83
3.25
3.67
4.08
4.50
4.92
m3/s
m3/s
cumecs
0.553
0.560
0.565
0.569
0.572
0.575
6.51
7.05
7.56
8.03
8.48
8.91
135
191
270
350
464
600
5%
4%
3%
2%
2%
1%
0.61
0.82
1.07
1.35
1.67
2.03
2.32
2.44
2.56
2.68
2.80
2.91
Vel Head
Vel
0.09
0.21
0.27
0.42
1.4
2.0
2.3
2.9
0.61
0.82
1.07
1.35
1.67
2.03
3.4
4.0
4.6
5.2
5.7
6.3
Design of Weir
Input Parameters:
100 Yr. design flood
Design Discharge (Q40%)
Length of Weir
Weir Crest Level
Discharge Coefficient (cd)
Side Contraction Factor
Undersluice width
Total Length of Waterway
44 (m3/Sec)
1.24 (m3/Sec)
15 m
1341.2 msl
0.78
1
1.2 m
16.2 m
Calculations
Flood Discharge to pass from weir
Head Over Crest
39 (m3/Sec)
1.50 m
63 (m3/Sec)
1342.8 msl
1m
1343.8 msl
Freeboard Provided
Crest of Flood wall Provided
A2. Design of Undersluice
1.20 m
0.6
1340.00 msl
2.7 m
1.2 m
4.7 (m3/Sec)
11%
1.2 m
1.2 m
44 m3/s
15 m
1 Nos
Sluice Width
Sluice Gate opening
b
a
SN
1.2 m
1.2 m
w
Ka
Kp
Pier shape
2/3*Cd*SQRT(G2)
Cc
Eff.
Energy
Head, m Level
1
2
3
4
5
1.2
1.5
1.8
2.1
2.4
1342.40
1342.70
1343.00
1343.30
1343.60
1.0 m
0.01
0.01
2.3
0.6
0.78 Cd
Weir Portion
Water Actual level Eff. Length, Dis. Coeff, Discharge
Eff.
level
m
, m3/s Length, m
1342.4
1342.7
1343.0
1343.3
1343.6
1342.40
1342.70
1343.00
1343.30
1343.60
14.98
14.97
14.96
14.96
14.95
0.72
0.74
0.76
0.79
0.81
42
60
82
106
133
1.15
1.14
1.13
1.12
1.10
Ratio
Underslice Portion
Dis. Coeff, Cu
2.00
2.25
2.50
2.75
3.00
Discharge,
m3/s
0.53
0.53
0.54
0.54
0.55
5
6
6
6
7
Hence,
1342.70 msl
1.00
1343.70 msl
10/18
Total
Disch,
m3/s
47
66
87
112
140
11/18
Design Discharge
Silt Flushing Discharge
Diversion Discharge
15%
Intake Crest
Discharge to pass
Q
Width of the crest
B
Discharge Coefficient
Cd
Head over crest
h
Factor for side Contraction
Discharge Capa Q=2/3Cd*sq(2g)H^(3/2)*B
Head over crest in Entrance Shill
Area Block with trashrack
Required DEPTH
Fos=1.25
Take Head over Crest
t
Z = kt
b
1.24 m3/sec
0.186 m3/sec
1.43 m3/sec
0.5
0.6
Qdiv
1.43
1.3
0.6
0.40
1.10
0.53
0.40
0.4
0.5
Say
1.43
2
0.6
tril with me
0.50
1.10
1.14
0.50
0.6
0.7
0.70
1.43 m3/sec
3m
0.6 Round lined with metal
tril with me tril with me
0.50 m
1.10
1.71 m3/sec
0.50 m
0.6 m
0.7 m
m
V
A
0.68 m/s
2.1 m2
b
t
kt
v0
100 mm
10 mm
2.34
vo
sin
2g
Trashrack opening
Thickness of trashrack bar
Factor depending on bar shapes
Velocity of approach in front of rack
Angle of bar inclination with horizontal 3:1
Head Loss in Trashrack
Z
Depth before Trashrack
Depth after Trashrack
Coefficient of opening
Width of Trashrack Required
bt
0.68 m/s
72 0
0.002 m
0.70 m
0.70 m
0.91
2.2 m
0.7 panel x3
Q
=
bt h
TR
2 gZ
where,
Coefficient of opening
Coeff for transvers approach of water
0.91
0.86
Contraction coefficient
Velocity coefficient
Width of Trashrack Required
bt
Height of Trashrack
High flood level at weir
Intake Invert Level
H
Difference in water level
Discharge through intake during high flood, Q
h
B
Cd
H
0.95
0.92
2.24 m
0.70 m
1342.80 m
1340.50
2.30 m
7.20 m3/s
0.66 m
3.0 m
0.58
0.30
2.79 m3/sec
Intake
Annex DC-03
Intake Design
Input Parameters
Design Discharge (Qd)
Diacharge Coefficient, Cd
Factor for side Contraction
Flushing Discharge, Qf
Width of Intake Crest
Calculations
Discharge to pass
Head over crest (W)
Discharge Capa Q=2/3Cd*sq(2g)H^(3/2)*B
Area Block with Trash Rack
Adopt FOS 1.2
Depth
Approach Velocity
Area of Opening
Course Trash Rack Sizing
Trashrack opening, b
Thickness of trashrack bar, t
Factor depending on bar shapes, kt
Velocity of approach in front of rack,Vo
Angle of bar inclination with horizontal 3:1,
Head Loss in Trashrack
Depth before Trashrack
Depth after Trashrack
Coefficient of opening
Width of Trashrack Required
Dimension of Intake
No. of Opening
Width of Intake
Height of Intake
1.24 m3/sec
0.6 Round lined with metal
1.1
15%
3m
1.426 m3/sec
0.70 m
2.8
0.77
0.92
0.7 m
0.68 m
2.10 m2
< 1 m/sec OK
100 mm
10 mm
2.34
0.68 m/s
72 0
0.002 m
0.70 m
0.70 m
0.91
2.2 m
0.7 m
Panels
2 Nos
1.5 m
0.70 m
1342.8 msl
1341.2 msl
1.60 m
3m
0.70 With Freeboard
1.9 m2
0.6
6.42 m3/s
16/18
Intake
17/18
SN
Particular
Quantity
SIZE
Height (m)
1 Sluice Gates
Sluice Gate Frame
Top channels 2 nos
Intake gate skin plate
Skin plate frame
Stiffner angles back side
Axle
Roller on back and sliding plate
Gear Box and plate, cover base or motor
Nuts and Bolts LS
Sub-total
2 Intake Gate
Gate Frame
Top channels 2 nos
Intake gate skin plate
4
2 L=
1
1.2
Thickness
1
1.2
2
1.0
1
4.5
6
weight/m
kg/m
weight
kg
9.2
12.8
39
31
4.8
4
4.5
15.7
15.7
22.2
30.0
LS
2
1
2
1
1
2
1
1
4
1
53
2
1
2
1
1
2
1
1
4
1
24
48
1
2
1
1
6
1
59
Total length
m
2
1
2
1
LS
KG
10 cm c/c
0.7
Thickness
0.7
0.7
1.3
9.5
3.6
39
39
5.4
5.4
1.3
2
15.7
15.7
15.7
6.3
10.0
LS
LS
LS
KG
10 cm c/c
2.4
1
Thickness
1.0
1.0
2.6
6
3
39
39
4.4
4.4
2.6
2
15.7
15.7
15.7
6.3
10.0
LS
LS
LS
KG
for 2
10 cm c/c
Nos
3.5
0.5
Thickness
0.5
0.5
3.5
7.5
1.6
39
39
2
2
3.5
3
16
16
22.2
6.3
30.0
LS
LS
LS
KG
for 2
10 cm c/c
75
63
100
180
450
48
1905 kg
1.91 T
373
141
176
85
85
20
12
60
100
119 kg
1171
236
118
113
69
69
41
10
40
350
106 kg
1151
2.3 T
294
63
27
31
31
78
16
120
350
48
1059 kg
2.1 T
4.20
9.6
39
377
414
0.41 MT
4.0
10
39
393
432
0.4 MT
Gate
361
402
226
1
2
Sub-total
6
Remarks
Remarks
Width (m)
18/18
234085540.xlsx