Installation Tools
Installation Modes
Requirements for Dimensions and Installation Space
Installing the BBU3900
Installing the RRU3702
Cable Connections
Installing the BBU3900 Cables
Installing the RRU3702 Cables
Installing the Outdoor Cable Transfer Box
Measuring the VSWR of the Antenna System
Reference
2
3
4
5
7
11
18
21
21
Contents
15
22
2
Installation Tools
3
Installation Modes
b
RRU3702 Installation Modes
BBU3900 Installation Modes
In the 19-inch indoor cabinet
In the APM200
On the pole
On the
channel steel
On the
angle steel
On the wall
On the
telegraph pole
a
A cabinet must be powered on within seven days after being unpacked, and
cannot be kept in the power-off status over 48 hours during maintenance.
A module must be powered on within 24 hours after being unpacked or after
being powered off for maintenance.
4
Requirements for Dimensions and Installation Space
Dimensions (unit: mm)
Dimensions of the RRU shell:
484 x 374 x 158
Dimensions of the RRU:
480 x 356 x 120
Dimensions of the BBU:
436 x 310 x 86
356
158
484
120
374
480
310
436
482
86
Space Requirements (unit: mm)
Space for installing the BBU in the
19-inch cabinet
25
25
70
a b
Space for installing the RRU
300

1
0
0

6
0
0

4
0
0
400 to 1200
500 to 800
200
5
Installing the BBU3900
Determine whether to reversely install the mounting ear according to the space
available at the installation site and the installation mode of the equipment in the
cabinet.
Remove the screws and mounting ears on both sides of the BBU3900.
Reinstall the mounting ears.
Hold the BBU3900 with your hands
and align the holes for mounting
ears with the cabinet installation
holes.
Slide the BBU3900 into the cabinet
slowly along the guide rails.
Fix the BBU3900 in the cabinet by
using four panel screws.
a Installing the BBU3900 in the 19-Inch Cabinet
Before installing the BBU, remove the two grounding screws on the right side of
the BBU panel for easy installation.
6
b
Installing the BBU3900 in the APM200
APM200
BBU3900
Panel screw
DIP switch setting of
the PMU
Set the DIP switches on the PMU according to the figure.
Put all cables through the cable-through hole of the APM200 before connecting the
cables to the BBU.
Loosen and remove the screws on the blank filler panel in the installation
position of the BBU.
Remove the blank filler panel and redundant slide rail in the installation position of
the BBU.
Remove the two grounding screws from the right side of the BBU panel.
Slide the BBU3900 into its position slowly and screw its panel.
Set the DIP switches
7
Auxiliary fixture
Main fixture
Long bolt
Main fixture
Strap
The Auxiliary Parts of the RRU
Fasten the
screws when
installing the
RRU and
loosen these
screws when
removing the
RRU
Installing the RRU3702
Logo on the cover plate Transfer pieces
Fasten the screws when
removing the RRU
a
The arrows on
the label of the
auxiliary fixture
face upwards
Installation position for
the auxiliary fixture
The arrows on the
label of the main
fixture face upwards
Installing the RRU3702 On the Pole(Diameter: 60 mm to 114 mm)
8
Installing Two RRU3702s On the Pole (Diameter: 60 mm to 114 mm) b
The arrows on the
main fixture face
upwards
Main fixture
40Nm
9
The process for installing the RRU on the channel steel is the same as that for
installing the RRU on a pole.
You are advised to install only one RRU on the channel steel.
Top views of the four
installation methods
Top views of the installation methods
The process for installing the RRU on the angle steel is the
same as that for installing the RRU on a pole.
You are advised to install only one RRU on the angle steel.
c Installing the RRU3702 on the Channel Steel
d
Installing the RRU3702 on the Angle Steel
Angle steel
6
3

m
m

t
o

8
0

m
m
6
3

m
m

t
o

8
0

m
m
50 mm to
100 mm
30 mm to
50 mm
Channel steel
10
You are advised to install
only one RRU on the
telegraph pole.
Bolt M10x65
Spring washer M10
Flat washer M10
Expansion tube
f
Installing the RRU3702 On the Wall
e
Installing the RRU3702 On the Telegraph Pole (Diameter: 300
mm to 390 mm)
The arrows
on the label
of the main
fixture face
upwards
Ensure that the
arrow on the
auxiliary fixture
is upward
Ensure that the
arrow on the main
fixture is upward
Plastic tube
After the expansion bolt is removed,
dispose of the plastic tube
The wall can bear the weight that is 4 times the weight of the RRU (20 kg/pcs).
When the RRU is mounted against the wall, the torque for tightening expansion bolts must
be 40 Nm, so that the expansion bolts can be fixed on the wall and the wall is not damaged.
11
Cable Connections
BBU power cable
PGND cable
of the BBU
RRU power
cable
PGND cable of
the RRU
CPRI optical cable
GPS clock
signal cable
Optical cable
Ethernet cable
To the Boolean
sensor
To the EMUA
or PMU
RF
jumper
RF
feeder
Connected through the optical
cable or Ethernet cable
BBU3900
ASN-GW
To provide -48 V DC power supply for the site, you need to install the DCDU-03C. The
DCDU-03C converts one -48 V DC power input to multiple 48 V DC power outputs for the
base station. The APM200 needs to be installed only when there is only 220 V AC power
supply at the site. The APM200 converts 220 V AC power input to multiple -48 V DC power
outputs for the base station.
Ensure that the power distribution equipment such as the APM200 and DCDU-03C has an
independent power switch to control the power-on and power-off of each BBU and RRU.
When the 2T2R is used, the remaining N-type connectors are protected by waterproof caps.
RRU3702
RRU3702
RRU3702
GPS
antenna
GLONASS
antenna
RF
jumper
Protect Surge
Lightning arrester
a Cable Connections
12
Cable Connections
1. 2T2R O1: One RRU for O1
2. 2T2R S1/1/1: Two RRUs for S1/1/1
b Connections of Typical Cables
CPRI_0 CPRI_0
ANT
ANT
ANT
External power
supply system
External power
supply system
CPRI_0
ANT
External power
supply system
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
13
CPRI_0
ANT
External power
supply system
ANT ANT ANT
External power
supply system
External power
supply system
3. 2T2R S2/2/2: Two RRUs for S2/2/2
4. 4T4R O1: One RRU for O1
b
Connections of Typical Cables
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
14
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
CPRI_0 CPRI_0 CPRI_0
ANT
External power
supply system
ANT ANT
External power
supply system
External power
supply system
PGND cable
Power cable
CPRI optical cable
Jumper
Feeder
5. 4T4R S1/1/1: Three RRUs for S1/1/1
6. 4T4R S2/2/2: Three RRUs for S2/2/2
b
Connections of Typical Cables
ANT ANT ANT
External power
supply system
External power
supply system
External power
supply system
15
The PGND cable of the BBU is
yellow-green or green. The sectional
area of the PGND cable is 6 mm
2
(10AWG).The PGND cable is
connected to the BBU through a OT
terminal or a two-hole OT terminal
(M4) and to the grounding bar
through an OT terminal. The PGND
cable of the BBU should be created
at the site.
Installing the BBU3900 Cables
a Installing the PGND Cable of the BBU3900
b
Installing the 48 V DC Power Cable of the BBU3900
When the BBUs are powered by the DCDU-03C, connect the BBUs to ports LOAD6 and
LOAD5 on the DCDU-03C in the sequence of LOAD6 to LOAD5.
When the BBU is powered by the APM200, connect the BBU to No.1 wire post of LOAD1.
DCDU-03C
PGND cable
of the BBU
BBU power cable
Connect the BBU to the DCDU-03C. Connect the BBU to the APM200.
APM200
Two-hole OT terminal OT terminal
16
d
Installing the CPRI Optical Cables Between the BBU and the RRU
Before installing the optical cable, you need to install removable optical modules.
Connect the longer exposed end of the optical cable to the BBU and wrap the end with a
tube, and connect the shorter exposed end to the RRU.
c Installing the FE/GE Ethernet Cable or Optical Cable
ASN-GW
Optical cable
Ethernet cable
BBU3900
Optical cable
Ethernet cable
CPRI Optical Cable
BBU3900
RRU3702
Use either the Ethernet cable or optical cable
to connect the transmission equipment or
gateway equipment.
Before installing the optical cable, you need
to install removable optical modules.
17
e Installing the GPS Clock Signal Cable
When the BBU3900 is configured with a USCU, the GPS clock signal cable is connected to
the GPS port on the USCU. When the BBU3900 is not configured with a USCU, the GPS
clock signal cable is connected to the GPS port on the BMPT.
Protect Surge
When the BBU is installed in a 19-inch cabinet, ground the surge protector. The
grounding cable should not be longer than 300 mm, and the cross-sectional area of the
grounding cable is 6 mm
2
. The grounding cable is terminated with OT terminals on both
ends.
GPS antenna
GLONASS
antenna
SMA male connector
N-type connector
f
Installing the Monitoring Signal Cable Between
the BBU3900 and the EMUA
GPS clock signal cable
Monitoring signal cable
GPS clock signal cable
g
EMUA
MON1
BBU3900
Lightning arrester
18
MON1
Monitoring signal cable
g
Installing the Monitoring Signal Cable Between the BBU3900 and the PMU
Label1 to Label4 are marked
RX-, RX+, TX-and TX+
APM200
E1/T1 E1/T1
Installing the RRU3702 Cables
a
Installing the PGND Cable of the RRU3702
PGND cable of the RRU
The PGND cable of the RRU is yellow-green
or green. The PGND cable is connected to
the RRU through a two-hole OT terminal (M6)
and to the grounding bar through an OT
terminal. The PGND cable of the BBU should
be created at the site.
16 mm
2
(6 AWG)
Two-hole OT terminal OT terminal
19
Grounding point for the shielding layer
of the power cable
b
b Installing the Power Cable of the RRU3702
DCDU-03C
RRU power cable
Connect the RRU to the DCDU-03C.
Connect the RRU to the APM200.
APM200
When the RRUs are powered by the DCDU-
03C, connect the RRUs in sequence to ports
LOAD0 through LOAD4 on the DCDU-03C.
When not more than three RRUs are used
and the RRUs are powered by the APM200,
connect the RRUs in sequence to No.4 wire
post of LOAD2, No.6 wire post of LOAD3, and
No.8 wire post of LOAD4. If not more than six
RRUs are used and the RRUs are powered by
the APM200, connect the RRUs in sequence to
No.4 wire post of LOAD2, No.6 wire post of
LOAD3, No.8 wire post of LOAD4, No.5 wire
post of LOAD2, No.7 wire post of LOAD3, and
No.9 wire post of LOAD4.
Installing the CPRI Optical Cable Between the BBU and the RRU
For details, see " Installing the CPRI Optical Cable Between the BBU and
the RRU" on Page 13.
c
Do not remove the
waterproof filler on the
cabling trough on which no
cables are routed when
closing the cabling cavity.
Waterpr-
oof filter
Close the
cabling cavity.
20
d Installing the RF Jumper of the RRU3702
Wrap a layer of insulating tape
Wrap three layers of waterproof tape
Wrap three layers of insulating tape
Fix the connector to the port using a wrench (Torque: 1Nm),and wrap
the insulating tape and waterproof tape
RF jumper
Before installing the RF jumper,
measure the VSWR of the antenna
system. For details, see "Measuring
the VSWR of the Antenna System"
on P21.
You need take
insulation and
waterproof
measures only for
the RF jumpers
connected to an
outdoor RRU.
Connection Relation between the 4T4R RRU and Four-port Antenna
Identify the RF ports with their silkscreens,
and connect the jumpers according to the
connection relation shown in the figure
above.
Installing the RF Jumper
21
Installing the Outdoor Cable Transfer Box
Measuring the VSWR of the Antenna System
When the distance between the RRU and the DCDU-03C or
APM200 ranges from 60 m to 180 m, install an outdoor cable
transfer box at the RRU.
The length of the cable which between the outdoor cable
transfer box and the RRU is 3 m to 5 m.
Measure the VSWR of the antenna system using the
Broadband Site Master.
Measure the VSWR in the position where the antenna
system is connected to the RF port of the RRU.
Never connect an antenna system with a VSWR of
1.5 or higher to the RRU.
-48 V DC RRU3702
NEG (-)
RTN (+)
Grounding
10 mm
2
(7 AWG) 3.3 mm
2
(12 AWG)
22
Reference
Hoist the RRU and other installation parts onto the tower.
Tie the installation parts with a rope at one end and tie the RRU with
the other end
Traction rope
Lifting rope
Do not lift only the handle.
Installers A climb onto the tower and
fixes the crown block onto the support of
the tower platform and puts the hoist
thread through the crown block.
Installer C uses the lifting rope to tie the
RRU and the installation parts according to
the figure and uses the traction rope to tie
a knot at the handle of the RRU.
Installer B pulls down the hoist thread,
and installer C pulls the leading thread
outwards to prevent the RRU and the
installation parts from colliding the tower.4.
Installers A and B hold the RRU and the
installation parts and loosen the knot.
When hoisting the RRU, prevent it from
colliding with the tower.
Lifting rope
Traction
rope
Crown block
A
B
C
Hoisting the RRU and Parts onto the Tower a
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
Peoples Republic of China
www.huawei.com

Вам также может понравиться