TP/TPD/PFS/TPC/QP-12
QUALITYPROCEDURE
TITLE
REF. NO.
: TP/TPD/PFS/TPC/QP- 12
COPY NO
AMENDMENT
ISSUE /
REVISIO
N
NO.
1/0
2/0
Issue : 2
REVIEWED BY
AUTHORIZED BY
& SIGNATURE
DATE
& SIGNATURE
Rev:0
07-12-11
Date: 07.12.2011
Page 1 of 15
TP/TPD/PFS/TPC/QP-12
CONTENTS
1.0
PURPOSE
2.0
SCOPE
3.0
DEFINITIONS
4.0
CROSS REFERENCES
5.0
RESPONSIBILITY
6.0
PROCEDURE
7.0
RECORDS
8.0
DISTRIBUTION
9.0
ATTACHMENTS
Issue : 2
Rev:0
Date: 07.12.2011
Page 2 of 15
TP/TPD/PFS/TPC/QP-12
1.0 PURPOSE
The purpose of this procedure is to explain in detail, the steps to be followed for
testing of distance protection relay to ensure the relay & Scheme healthiness.
2.0 SCOPE
This procedure covers the testing of distance protection relay with its scheme in
132kV,400kV new substations and remote end substations in DEWA network.
3.0 DEFINITION
3.1.
Approved drawing
3.2.
Approved Setting
3.3.
BI
: Binary Input
3.4.
BO
: Binary Output
3.5.
CB
: Circuit Breaker
3.6.
CBF
3.7.
CH
: Communication Channel
3.8.
CM-TPC
3.9.
CS/CR
3.10.
CT
: Current Transformer
3.11.
DEF
3.12.
DEWA
3.13.
DO
3.14.
DR
: Disturbances Recorder
3.15.
EF
: Earth Fault
3.16.
ER
: Events Recorder
3.17.
FWD/REV
: Forward/Reverse (Fault)
3.18.
F21
Issue : 2
Rev:0
Date: 07.12.2011
Page 3 of 15
TP/TPD/PFS/TPC/QP-12
3.19.
ITU
: Intertrip Unit
3.20.
M-TPC
3.21.
PCS
3.22.
POT
3.23.
PSB
3.24.
PU
: Pick-Up Value
3.25.
PUR
3.26.
RSI
3.27.
SCS
3.28.
SCADA
3.29.
SOTF
: Switch on to fault
3.30.
Testing Engineer
3.31.
TP
3.32.
TPD
3.33.
TPE
3.34.
VT
: Voltage Transformer
3.35.
VP-TP
3.36.
WD
3.37.
Witness Engineer
3.38.
Z (n)
3.39.
ZX
: Zone extension
Issue : 2
VP-TP: VP-TP is responsible for the approval and modification of this procedure
M-TPC: M-TPC is responsible for over all implementation of this procedure
CM TPC: CM-TPC is responsible to plan / schedule the testing activities and
confirm the availability of other resources required at site
Witness Engineer: Witness engineer is responsible to follow this procedure and
witness the testing.
Rev:0
Date: 07.12.2011
Page 4 of 15
TP/TPD/PFS/TPC/QP-12
6.0 PROCEDURE
6.1 General:
Note: Working in live stations procedure (TP/TPD/PFS/TPC/QP-06) to be
strictly followed in live substations.
Witness Engineer shall confirm the availability of following prior to starting the
testing
Approved settings
Required tools
6.1.2.
Down load the default settings from the relay to computer and adopt approved
settings, date, time and configure the input / output contacts as per the
approved schematic drawings and send to relay.
6.1.3.
Generate RIO file from relay and use it in omicron to generate the zone reach
test module & time test module for both Phase and Earth faults for the active
Zones.
6.1.4.
All tests are to be carried out as mentioned in test report (Refer attached test
report TP/TPD/PFS/TPC/QP-12:A01) and to be ensured that observed
readings are with in limits as per test report.
6.2.1.1.
Issue : 2
General Data:
Rev:0
Date: 07.12.2011
Page 5 of 15
TP/TPD/PFS/TPC/QP-12
The testing engineer has to fill the General data (relay type, rating, serial
No, firmware version, rated current etc.) as mentioned in the test format.
6.2.1.2.
6.2.1.4.
LED tests:
6.2.1.5.
Run the Zone reach test module for both Phase and Earth faults (auto test)
which is created as per Clause 6.1.3., save the results.
Run the Timing test plan which is created as per Clause 6.1.3., save the
results.
Ensure the reach and timing results are within limits. Print the auto test
results and attach with the test report.
6.2.1.6.
Fault Locator:
Calculate the expected fault location in % according to the total line length,
impedance per kilometre, reactance value (to be applied) which covers all
zones for phase to phase and phase to earth fault.
Apply a fault loop in Phase to phase fault. After the relay trips, percentage
of line length shall be observed from relay display and record the same.
Repeat the same tests for Phase to Earth faults.
6.2.1.7.
Issue : 2
Rev:0
Date: 07.12.2011
Page 6 of 15
TP/TPD/PFS/TPC/QP-12
Create a fault in Z1B reach more than the reach of Z1, without CR signal
input to the relay and ensure the relay trips in Zone 2 timing and CS output
operated.
Create a fault in Z1B reach and with CR signal input to the relay, ensure
the relay trips instantaneously (i.e., Zone 2 time bypassed) and CS signal
operated.
6.2.1.8.
Current Reversal :
Create a fault in reverse reach for more than the transient bock set time
(according to address 2109A-Transient block: Duration external fault 40mSec.) and record the operated time.
Then change the fault state to Z1B forward reach with CR signal input to
the relay for less than the transient bock set time (according to address
2110A-Transient block: Block time after the external fault - 150mSec.) and
ensure that CS output is not operated. Record the measured operating
time of the relay.
6.2.1.9.
Directional Earth fault is act as a backup while Distance is not picked up for
high impedance faults.
To check the DEF element pickup and drop off current, gradually increase
the earth fault current in forward direction (with maximum torque angle,
with polarizing voltage) until the pickup of DEF and record the current value
, then reduce the current until the drop off of DEF element and record the
drop off current.
To test the operating time, apply the earth fault current two times of set
value (with polarizing voltage and in maximum torque angle) and record the
DEF operating time.
To check the relay operating angle, apply the earth fault current in reverse
direction with polarizing voltage, then increase the angle in test kit in steps
of two degrees and record the angle where DEF element picks up and
Issue : 2
Rev:0
Date: 07.12.2011
Page 7 of 15
TP/TPD/PFS/TPC/QP-12
decrease the angle and record the angle where DEF element drops off. By
using same method check and record the pickup and drop off angle of
reverse direction.
6.2.1.10. Earth Fault Tele protection scheme(Aided trip) :
Note: (Remote end scheme: Non Directional Earth fault for DEWA feeders and
Directional Earth Fault for ENG feeders).
When Directional Earth fault element pickup for the forward fault, it sends
CS signal to remote end and trips after the set time delay (as per IDMTL
characteristics for DEWA feeders and 5 Sec. as per CFC logic for ENG
feeders). If CR is received from remote end with local end relay picks up in
forward fault, relay will bypass the delay and trip the breaker. (Setting800mS. in CFC logic for ENG feeders and instantaneous for other feeders
as per setting).
Create a fault for DEF operation, without CR signal input to the relay and
ensure CS output operated and the relay trips after the delay as per
setting.
Create a fault for DEF operation with CR signal input to the relay, ensure
the relay bypasses the delay trips instantaneously (i.e., 800mS. for ENG
feeders and instantaneous for DEWA feeders as per setting) and CS signal
operated.
Issue : 2
Rev:0
Date: 07.12.2011
Page 8 of 15
TP/TPD/PFS/TPC/QP-12
Apply 3 phase rated voltage, 3 phase current( equal magnitude )from the test
kit, then remove any one phase voltage (according to address 2911A
Minimum Voltage Threshold : 30 V) and check the instantaneous operation of
VT Fuse Failure(Function number 170). Also resume the removed phase
within 10Sec. and ensure the VT fuse fail resets instantly.
Apply 3 phase rated voltage, 3 phase current (should be more than Pole Open
Threshold current according to address 1130A: 0.10A) from the test kit, then
reduce all three phase voltages to less than 5V (according to address 2913AMaximum Voltage Threshold U<(3 Phase) : 5V) and check the operation of
VT Fuse Failure (Function number 168) after 3 Sec.(According to address
2916A-Delay Voltage Failure Supervision : 3 Sec.) and blocks the relay
operation. If relay pickup for a fault with in 3 Sec. it will allow for the tripping.
Also by initiating the Failure: Feeder VT(MCB Tripped) BI and ensure the
operation of VT fuse failure.
Relay measures the power swing vector in 5ms. intervals. If the swing
continues for 5mSec. power swing will block the distance protection operation.
If the fault recognized within 5ms, then power swing function will be blocked by
distance protection and the respective zone will clear the fault.
Set and start the rate of change of impedance vector slowly from outermost
Zone to inner zones (Rate of change of impedance should be more than 5ms),
ensure the non operation of Power swing and non blocking of distance
protection and the operation of respective zone.
Set and start the rate of change of impedance vector slowly from outermost
Zone to inner zones (Rate of change of impedance should be less than 5ms),
Issue : 2
Rev:0
Date: 07.12.2011
Page 9 of 15
TP/TPD/PFS/TPC/QP-12
and ensure the operation of power swing and confirm that all zones are
blocked by power swing.(According to address 2002-Power swing operation
mode : All zones blocked )
6.2.1.14. ECHO feature:
Keep the 3 phase voltage less than setting value according to address 2505Under voltage (ph-e), activate CR BI, and ensure the operation of Echo signal.
From the secondary injection test kit, inject 1 A current in R phase, record the
primary and secondary current from the relay display. Repeat the injection for
the other phases and record the values in test report.
Inject 63V in all three phases, record the primary and secondary voltage from
the relay display.
Inject both voltage(63V in all three phases) and current (1A in all three
phases) according to the test report and measure the active power, reactive
power, power factor measurement and power flow direction measurement one
by one.
Pre fault condition: From the test kit, inject healthy voltage (63V) and current
(1A) in all three phases for 1 sec.
Fault: Reduce 3 phase voltage to zero with increase of current to 2A in all
three phase in forward direction and ensure the operation of Forward Zone
operated. Record in test report.
Repeat the same injection as reverse direction and ensure the operation of
Reverse Zone operated. Record in test report.
6.2.1.17. Others:
Issue : 2
Rev:0
Date: 07.12.2011
Page 10 of 15
TP/TPD/PFS/TPC/QP-12
Download the Disturbance recorder, event log and trip log values from the
relay to the computer (laptop) and the printout to be attached with the test
report.
Setting and configuration file should be received from the relay and
saved/printed with the filename (as provided on the footer of the PCS setting).
The setting sheet to be duly signed by the contractor and the witness engineer.
The soft setting file and PDF format of setting is to be forwarded to PCS.
The end to end test shall be performed only after completion of final setting
test and the testing of inter trip unit. Approved drawing to be used for scheme
test.
Local end engineer and remote engineer shall be in coordination via telephone
(DEWA network telephone/cell phone) communication, till the completion of
the end to end test. Local end and remote end engineers shall fill the results
for their respective substation in test report.
GPS synchronized test equipments should be used for testing. All tests are to
be tested and recorded in the test report.
6.3.1
6.3.1.1.
Test 1: At local end simulate Zone 1 fault continuously and ensure presence of CR
LED in relay at remote end. Remove CS link at local and reset the LED at remote
to ensure the link.
6.3.1.2.
Test 2.Repeat the clause 6.3.1.1 from remote, check the CR LED in relay at local
end.
Note: Switch off the second ITU which is allotted for distance.
6.3.1.3.
Test 3: Keep the Inter trip send selector switch in test position in both ends.
Press Test push button at local end and confirm the illumination of Inter trip
receive indication lamp is lit in remote. Then press the push button at remote and
Issue : 2
Rev:0
Date: 07.12.2011
Page 11 of 15
TP/TPD/PFS/TPC/QP-12
confirm the illumination of Inter trip receive indication lamp is lit at local end.
Normalize the switch at both ends.
6.3.1.4.
Close the breaker at remote end and continue the testing from clause 6.3.1.5
up to 6.3.1.12.
6.3.1.5.
Test 5: Simulate the Z1B fault at local end and ensure that the relay is operated in
Z1B operating time and ensure the operation of General Trip, Z1B operated and
CR LEDs.
6.3.1.6.
6.3.1.7.
6.3.1.8.
Test 8: Simulate the Z1B fault at local end and reverse fault at remote end and
ensure that the relay is operated in Z2 operating time and ensure the operation of
General Trip and Z2 trip LEDs.
Note: Clause 6.3.1.9. to 6.3.1.13 shall be performed at remote end and respective
LED indications are to be recorded at local end test report.
6.3.1.9.
Test 9: Repeat the clause 6.3.1.8 with the simulation of both ends.
6.3.1.10. Test 10: Repeat the clause 6.3.1.7 with the simulation of both ends.
6.3.1.11. Test 11: Repeat the clause 6.3.1.6 with the simulation of both ends.
6.3.1.12. Test 12: Repeat the clause 6.3.1.5 with the simulation at remote end.
Issue : 2
Rev:0
Date: 07.12.2011
Page 12 of 15
TP/TPD/PFS/TPC/QP-12
6.3.1.13. Test 13: Repeat the clause 6.3.1.4 with the simulation at remote end.
Note:
Open the breaker at local end.
Normalize the second ITU and switch off DC of first ITU which is allotted for
distance.
6.3.1.14. Test 14 to test 24 shall be completed by repeating the clauses from 6.3.1.3 to
6.3.1.13.
6.3.2
6.3.2.1.
Test 1: At local end simulate DEF fault continuously and ensure presence of DEF
CR LED in relay at remote end. Remove DEF CS link at local and reset the LED at
remote to ensure the link.
6.3.2.2.
Test 2.Same way when simulating DEF fault from remote and check the DEF CR
LED in relay at local end.
Note: Switch off the second ITU which is allotted for DEF.
6.3.2.3.
Test 3: Keep the DEF send selector switch in test position in both ends. Press Test
push button at local end and confirm the illumination of DEF Received
illumination lamp is lit in remote. Then press the push button at remote and confirm
the illumination of DEF Received illumination lamp is lit at local end. Normalize
the switch at both ends.
6.3.2.4.
Test 4:
For ENG Feeders:
Simulate the DEF forward fault at local end, DEF reverse fault at remote end and
ensure that the relay is operated as per set delay in CFC logic and ensure the
operation of General Trip and DEF operated LEDs.
For DEWA feeders :( Aided trip)
Simulate the DEF forward fault at local end, reverse fault at remote end and
ensure that the relay is operated instantaneously and ensure the operation of
General Trip, DEF operated and CR LEDs.
6.3.2.5.
Issue : 2
Rev:0
Date: 07.12.2011
Page 13 of 15
TP/TPD/PFS/TPC/QP-12
Simulate the DEF forward fault at local end and h ends and ensure the
instantaneous operation of the relay and ensure the operation of General Trip,
DEF Aided trip CS and CR LEDs.
6.3.2.6.
Test 6-Echo:
At local end simulate the DEF reverse fault and at remote end simulate DEF
forward fault and ensure that the relay is operated in DEF (echo) and ensure the
operation of General Trip, DEF operated LEDs.
6.3.2.7.
Test 7: Clause 6.3.2.4 shall be performed at remote end and local end LED
indications are to be recorded at local end test report.
Note:
Normalize the second ITU and switch off DC of first ITU.
6.3.2.8.
6.4
6.4.1
Risk assessment to be carried before the testing activity to identify areas of risk for
both personal and equipment safety while doing the testing activity.
6.4.2
6.4.3
6.4.4
Regarding the activity mentioned in the QP, The risk assessment & safety
Precautions are identified in,
6.5
KPI / measurements.
KPI are identified, measured & results analysed to monitor the process/activity
and implement actions to achieve planned results and work for continual
improvement.
Issue : 2
Rev:0
Date: 07.12.2011
Page 14 of 15
6.5.1
TP/TPD/PFS/TPC/QP-12
7.0 RECORDS
The test report shall be signed and kept in concerned file.
8.0 DISTRIBUTION
TPD Quality file
TPC Section Quality file
9.0 ATTACHMENTS
9.1
Final Settings and End to end test report of Distance Protection Relay Type7SA522. (TP/TPD/PFS/TPC/QP-12:A01) -14 pages.
Issue : 2
Rev:0
Date: 07.12.2011
Page 15 of 15
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
A- Final Settings Tests of Distance Protection Relay Type- 7SA522
ELECTROSTATIC DISCHARGE (ESD): The relay incorporate CMOS static sensitive devices, which
may be damaged by static electricity discharged from the body. When handling, care should be taken to
avoid contact with components and electrical connections. If the relay is removed from its case for any
period of time, it should be placed in an electrically conducting anti-static bag. If making measurements
on the internal electronic circuitry, its preferable you are earthed to the case with a conductive strap
having a resistance to ground between 0.5 M10 M.
1 REFERENCE DOCUMENT
SIPROTEC DISTANCE PROTECTION 7SA 522 V 4.6 Manual No. C 53000-G1176-C155-4.
2 GENERAL DATA AND INFORMATION
Type
7SA5221-4NB22-4QN4
Relay Position
Make
SIEMENS
Relay SI No
Rated Voltage
Auxiliary Voltage
Panel No
Aux. Transformer
N/A
Rated Current
1A
110 V DC
Digsi Version
3 GENERAL INSPECTION
Visual checks
Installation & wiring correctness to relevant drawings: ..
Serial number on case, module and checked:......................................... ..
Relay case earthing connection checked ................................................ ..
Auxiliary voltage at relay terminals .......................................................... .. V dc
TP/TPD/PFS/TPC/QP-12: A01
Page 1 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
4 COMMISSIONING TESTS
4.1 Binary Inputs Tests
Input Number
Function
Terminal no.
Input BI 1
K17 K18
Input BI 2
Manual Close
J1 J2
Input BI 3
Spare
J3 J5
Input BI 4
1P Trip Permissive
J4 J5
Input BI 5
Spare
J6 J5
Input BI 6
CB 3 pole Closed
J7 J8
Input BI 7
J9 J10
Input BI 8
Relay out
J11 J12
Input BI 9
P17 P18
Input BI 10
EF Carrier Received
N1 N2
Input BI 11
Spare
N3 N5
Input BI 12
Spare
N4 N5
Input BI 13
Spare
N6 N5
Input BI 14
CB 3Pole Open
N7 N8
Input BI 15
Spare
N9 N10
Input BI 16
Spare
N11 N12
Test result
BO No.
BO 1:
Function
NO Relay General Trip
BO 2:
NO Dist Send/ECHO
K7 K5
BO 3:
K8 K5
BO 4:
NO Relay Trip L1
K9 K10
BO 5:
NO Relay Trip L2
K11 K12
BO 6:
NO Relay Trip L3
K13 K14
BO 7:
K15 K16
TP/TPD/PFS/TPC/QP-12: A01
Terminal No.
K6 K5
Test result
Page 2 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
SCADA No:
Date:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
BO 8:
NO Relay Pick Up
R1 R5
BO 9:
R2 R5
BO 10:
R3 R5
BO 11:
R4 R5
BO 12:
NO
R6 R5
BO 13:
R7 R8
BO 14:
R9 R10
BO 15:
R11 R12
BO 16:
P3 P4
BO 17:
P6 P5
BO 18:
P7 P5
BO 19:
P8 P5
BO 20:
P9 P10
BO 21:
P11 P12
BO 22:
NO
P13 P14
BO 23:
NO
Spare
P15 P16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
TP/TPD/PFS/TPC/QP-12: A01
Function
Test result
DIST. FAULT L1
DIST. FAULT L2
DIST. FAULT L3
DIST. Z1 TRIP
DIST. Z1B TRIP
DIST. Z2 TRIP
DIST. Z4 TRIP
DIST PICK UP Z5
EF TRIP
DIST CARRIER RECD
DIST SEND / ECHO
POWER SWING
SOTF
RELAY BLOCK
Page 3 of 14
Main Contractor
Name of Bay:
Consultant:
Manufacturer
Equipment:
SIEMENS
SCADA No:
Date:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
5.1
Distance Protection
Z1B
Z2
Z4 (Fwd)
Z5 (Fwd)
Z5 (Rev)
Type of Fault
Fault Impedance
Set (Ohms)
R
X
Measured Impedance
(Ohms)
R
X
%
Error
LED Indication
RN
YN
BN
RN
YN
BN
RN
YN
BN
RN
YN
BN
RN
YN
BN
RN
YN
BN
TP/TPD/PFS/TPC/QP-12: A01
Page 4 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
TESTING OF PHASE FAULT ON ZONE 1, 1B, 2, 4 & 5:
Require Reach
Zone
Fault Impedance
Set (Ohms)
R
X
Type of Fault
Z1
Z1B
Z2
Z4 (Fwd)
Z5 (Fwd)
Z5 (Rev)
Measured Impedance
(Ohms)
R
X
%
Error
LED Indication
RY
YB
BR
RY
YB
BR
RY
YB
BR
RY
YB
BR
RY
YB
BR
RY
YB
BR
NOTE: As per final setting, Z5 time is set . However, to test the reach of Z5, temporarily, 1.2 sec time is set which is later normalized to .
TIMING TEST
Zone of Reach
Z1
Z1B
Z2
Z4 (Fwd)
Measurement
RY
Actual
Expected
Actual
Expected
Actual
Expected
Actual
Expected
BN
350
350
350
350
350
350
800
800
800
800
800
800
TP/TPD/PFS/TPC/QP-12: A01
:
:
km
Page 5 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
Fault type
Applied Reactance
Calculated distance
(Km) / %
RN
YN
BN
RY
YB
BR
5.3 Distance Teleprotection Scheme:
{POTT Scheme Checking Relay sends carrier for faults within Z1B only. Relay trips in Z1B time with carrier receive for faults in Z1B else in Z2
time without carrier receive}.
Measured :
mSecs
: 150mSecs
Measured :
mSecs
Directional Earth Fault acts as a back-up protection while distance is failed to pick-up to detect high impedance
faults.
3Io> (NON DIRECTIONAL)
TP/TPD/PFS/TPC/QP-12: A01
Page 6 of 14
Main Contractor
Name of Bay:
Consultant:
Manufacturer
Equipment:
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
Relay
setting
Io >
(A)
Drop Off
Pick Up
0.2
3Io (CHARACTERISTICS - LOGARITHMIC INVERSE)
Trip time t = T3I0Pmax T3I0P.ln (I/3I0P)
Relay
setting
Io >
(A)
Drop Off
Set Angle
Obtained Angle
338 130
0.2
Actual
4.864
5.7
SOTF:
Relay
setting
(A)
Actual
2.5
10
Distance SOTF checked: Z1B Unidirectional
TP/TPD/PFS/TPC/QP-12: A01
Page 7 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
SOTF Schemes:
Verification of various Line Closer criteria as per setting address 1134 as below:
CB Aux
Current Flow
Manual Close
Voltage
Confirm the operation of SOTF with 70% of Nominal voltage.
5.8
VT Fuse Fail:
Voltage Failure
1 failure
3
5.9
Checked
Power Swing:
ECHO FEATURE:
Relay should not detect any fault. ECHO will be sent on receipt of carrier (If there is a fault, ECHO will not be sent, If there is a
Forward fault, no ECHO will be sent but carrier will be sent for Teleprotection).
Relay sends ECHO signal with the receipt of CR only when there is no fault detection by the distance
protection function:
Trip / ECHO delay after carrier receipt checked :
Trip Extension / ECHO Inpulse Time checked :
mSecs
mSecs
6- Metering Test
TP/TPD/PFS/TPC/QP-12: A01
Page 8 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
Primary Current Measurements
Phase
Injected
R
1.0
1.0
1.0
R
Y
1.00
1.00
1.00
63.509
231
63.509
231
63.509
231
63.509
63.509
63.509
63.509
63.509
63.509
110.0
1.0
0
-30
-90
Actual Reading
(GW)
Expected Reading
(GVAR)
Actual Reading
(GVAR)
110.0
1.0
TP/TPD/PFS/TPC/QP-12: A01
Phase Angle
(Degrees)
0
-30
Page 9 of 14
Main Contractor
Name of Bay:
Consultant:
Manufacturer
Equipment:
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
-90
Expected Reading
110.0
1.0
0
-30
-90
1.00
0.86
0.0
Actual Reading
110.0
1.0
Phase Angle
(Degrees)
0
FOR
FOR
FOR
180
REV
REV
REV
Remarks
Measurement Supervision:
a) VT fuse fail:
Verification of fuse fail criteria as per address 2911A:
Set Value (V)
30.0
Verification of fuse fail criteria as per address 2912A:
Set Value (A)
0.1
Checked
1 failure
3
TP/TPD/PFS/TPC/QP-12: A01
Page 10 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
Also, fuse fail feature is checked by energizing binary input Fail Feeder VT b) Fail Current Balance:
Prefault period of 1 second (healthy Voltage 63.51 V per phase and healthy Current 1A per phase) is followed by fault
with three phase voltage collapse for forward fault (all three phase voltages are zero and current is 2 A for all the
phases and current flow is forward)
Prefault period of 1 second (healthy Voltage 63.51 V per phase and healthy Current 1A per phase) is followed by fault
with three phase voltage collapse for reverse fault (all three phase voltages are zero and current is 2 A for all the
phases and current flow is reverse)
Make
Tested By (Manufacturer)
Type
Sr.No.
Witnessed By (DEWA)
Signature
Name
B. End to End TESTS BY SEC. INJ. for DISTANCE PROTECTION RELAY 7SA522
1. DISTANCE PROTECTION PERMISSIVE OVERREACH TRANSFER TRIP (POTT) WITH ECHO FUNCTION
ITU.. (Ch. .) and ITU.. (Ch. ., .)
1
Apply Z1 at END-1 for extended time. Confirm that LED Distance Carrier Receive is lit on F21 relay in END2. Remove the proper link at END-1 and confirm the LED at END-2 can be reset. Normalize the link and
confirm that LED is lit.
Apply Z1 at END-2 for extended time. Confirm that LED Distance Carrier Receive is lit on F21 relay in END1. Remove the proper links at END-2 and confirm the LED at END-1 can be reset. Normalize the link and
confirm that LED is lit.
Switch-off (second)ITU.. Confirm ITU..(first) is active
Test
4
Put the proper Selector Switch (Inter trip send) as per the drawings in TEST position at both ends. Press the
proper push button (send) at END-1 and confirm (Inter trip received) Illumination Lamp in END-2 is lit. Press
the push button as per the scheme (send) at END-2 and confirm (Inter trip received) Illumination Lamp is lit
in END-1. Normalize the switches.
END-1
END-2
END-1
END-2
LED
LED
Fault at
Fault at
Actual/Expec Actual/Expe
END-1
END-2
CB status
CB status
At END-1
At END-2
t
ct
Z1B
Closed
TP/TPD/PFS/TPC/QP-12: A01
Open
35
Result
Page 11 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
SCADA No:
Date:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
5
6
8
9
Z1B
Z1B
Rev
Z1B
Z1B
Reverse
10
Z1B
11
12
Z1
-
13
14
Test
Z1
Z1B
Closed
Closed
Closed
Reverse
Z1B
Rev
Z1B
Z1B
Z1B
Closed
Closed
Closed
Closed
Closed
Closed
80
35
180
350
550
180
Closed
Closed
Open the breaker at END-1 Station
Z1B
Open
Closed
Normalize(second) ITU. and switch-off ITU.(first). Confirm ITU. is active
Closed
Closed
35
80
35
Put the proper Selector Switch (Inter trip send) as per the drawings in TEST position at both ends. Press the
proper push button (send) at END-1 and confirm (Inter trip received) Illumination Lamp in END-2 is lit. Press
the push button as per the scheme (send) at END-2 and confirm (Inter trip received) Illumination Lamp is lit
in END-1. Normalize the switches.
Operating
Operating
END-1
END-2
LED
LED
Fault at
Fault at
time at ENDtime at
END-1
END-2
CB status
CB status
At END-1
At END-2
1
END-2
15
Z1B
16
17
Z1
Z1B
19
20
Z1B
Z1B
Rev
Z1B
Z1B
Reverse
21
Z1B
22
23
24
18
Closed
Open
Close the breaker at END-2 STATION
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Z1
-
Reverse
Z1B
Rev
Z1B
Z1B
Z1B
Z1B
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open the breaker at END-1 Station
Closed
35
80
35
180
350
550
180
35
80
35
Result
2. DIRECTIONAL EARTHFAULT PROTECTION PERMISSIVE OVERREACH TRANSFER TRIP (POTT) ITU.. (Ch. .) and ITU.. (Ch. ., .)
TP/TPD/PFS/TPC/QP-12: A01
Page 12 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SIEMENS
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
1
Apply forward fault at END-1 for extended time. Confirm that LED for D.E.F. Carrier Receive is present in
spontaneous annunciation of F21 relay in END-2. Remove the proper link at END-1 and confirm the
annunciation at END-2 got reset.
Apply forward fault at END-2 for extended time. Confirm that LED for D.E.F. Carrier Receive is present in
spontaneous annunciations of F21 relay in END-1. Remove the proper links at END-2 and confirm the
annunciation at END-1 got reset.
Switch-off (second)ITU.. Confirm ITU..(first) is active
Test
Put the proper Selector Switch (DEF trip send) as per the drawings in TEST position at both ends. Press the
proper push button (send) at END-1 and confirm (DEF received) Illumination Lamp in END-2 is lit. Press the
push button as per the scheme (send) at END-2 and confirm (Inter trip received) Illumination Lamp is lit in
END-1. Normalize the switches.
LED
LED
Operating
Operating
Fault at END-1 Fault at END-2
at END-1
at END-2
time at END-1
time at END-2
Forward
Reverse
Forward
Forward
Reverse
Reverse
Reverse
Forward
NO TRIP
Result
NO TRIP
Test
Put the proper Selector Switch (DEF trip send) as per the drawings in TEST position at both ends. Press
the proper push button (send) at END-1 and confirm (DEF received) Illumination Lamp in END-2 is lit.
Press the push button as per the scheme (send) at END-2 and confirm (Inter trip received) Illumination
Lamp is lit in END-1. Normalize the switches.
LED
LED
Operating
Operating
Fault at END-1 Fault at END-2
at END-1
at END-2
time at END-1
time at END-2
Forward
Reverse
10
Forward
Forward
11
Reverse
Reverse
No trip
12
Reverse
Forward
-----
TP/TPD/PFS/TPC/QP-12: A01
Result
----
No trip-
Page 13 of 14
Main Contractor
Name of Bay:
Consultant:
Equipment:
SIEMENS
Manufacturer
Date:
SCADA No:
Final Settings and End to end test report of Distance Protection Relay Type- 7SA522.
(RSI:.)
Make
Type
Tested By (Manufacturer)
Sr.No.
Witnessed By (DEWA)
Signature
Name
TP/TPD/PFS/TPC/QP-12: A01
Page 14 of 14