The document provides specifications for laying concrete floors. It describes laying concrete in two layers, with a bottom layer of 25mm or 30mm thickness using 10mm to 6mm stone aggregates and a top layer of 15mm or 20mm thickness using 6mm and smaller aggregates. The top layer is to be thoroughly tamped, spread, troweled, and finished smooth with a floating coat of neat cement. The surface is to be kept well watered for 8 days after drying and a floor hardener may be added if specified.
The document provides specifications for laying concrete floors. It describes laying concrete in two layers, with a bottom layer of 25mm or 30mm thickness using 10mm to 6mm stone aggregates and a top layer of 15mm or 20mm thickness using 6mm and smaller aggregates. The top layer is to be thoroughly tamped, spread, troweled, and finished smooth with a floating coat of neat cement. The surface is to be kept well watered for 8 days after drying and a floor hardener may be added if specified.
The document provides specifications for laying concrete floors. It describes laying concrete in two layers, with a bottom layer of 25mm or 30mm thickness using 10mm to 6mm stone aggregates and a top layer of 15mm or 20mm thickness using 6mm and smaller aggregates. The top layer is to be thoroughly tamped, spread, troweled, and finished smooth with a floating coat of neat cement. The surface is to be kept well watered for 8 days after drying and a floor hardener may be added if specified.
A.10.1 Concrete (1:2:4) with water cement ratio of 0.5 shall be laid in bays of suitable sizes but not exceeding 6 sq.m. each, and to required slope in a chess board alternate panel fashion and neatly finished smooth in red colour with lines drawn as directed. Concrete shall be laid in two layers. Bottom layer shall be 25 mm thick with 10 mm to 6mm graded stone aggregates and shall be finished rough. Top layer shall be 15 mm thick with 6 mm and down size aggregates. This layer shall be thoroughly tamped, spread, trowelled and finished smooth with a floating coat of neat cement. The concrete shall be coast against teakwood stop-off boards, which shall be removed only after the concrete is set. No dry cement shall be allowed to be used for finishing the surface. Mechanical mixing of concrete may be resorted to. The surface shall be kept well watered after it is dry for a period of 8 days. Where specified a floor hardner (ironite powder) of approved quality shall be supplied and used as recommended by the manufacturer. A.10.2 Concrete (1:2:4) with water cement ratio of 0.5 shall be laid in bays of suitable sizes but not exceeding 6 sq.m. each, and to required slope in a chess board alternate panel fashion and neatly finished smooth in red colour with lines drawn as directed. Concrete shall be laid in two layers. Bottom layer shall be 30 mm thick with 10 mm to 6mm graded stone aggregates and shall be finished rough. Top layer shall be 20 mm thick with 6 mm and down size aggregates. This layer shall be thoroughly tamped, spread, trowelled and finished smooth with a floating coat of neat cement. The concrete shall be coast against teakwood stop-off boards, which shall be removed only after the concrete is set. No dry cement shall be allowed to be used for finishing the surface. Mechanical mixing of concrete may be resorted to. The surface shall be kept well watered after it is dry for a period of 8 days. Where specified a floor hardner (ironite powder) of approved quality shall be supplied and used as recommended by the manufacturer.
The Complete HVAC BIBLE for Beginners: The Most Practical & Updated Guide to Heating, Ventilation, and Air Conditioning Systems | Installation, Troubleshooting and Repair | Residential & Commercial
The Complete Guide to Alternative Home Building Materials & Methods: Including Sod, Compressed Earth, Plaster, Straw, Beer Cans, Bottles, Cordwood, and Many Other Low Cost Materials