EMPLOYER:

CONSULTANT:
CONTRACTOR:
PROJECT:
LOCATION:
Qty L/W/D Product
10 3.00
TAKE OFF SHEET No. 001
BLOCK: LIME STATION
SUB STRUCTURE
__________________________
Contractor
______________________________
Supervisor
Qty L/W/D Product
3.60
1.50
162.00
2 2.30
2.30
1.50 15.87
Total Qty
10 3.00
3.60
1.08
116.10
2 2.30
2.30
1.08 11.37
Total Qty
2 9.23
1.00
2.00 36.92
2 5.69
1.00
2.00 22.76
Total Qty
24.00
14.00
0.78 260.40
177.87
127.47
59.68
365.02
10 2.70
3.30
0.40 (35.64)
2 2.00
__________________________
Contractor
______________________________
Supervisor
Qty L/W/D Product
2.00
0.33 (2.60)
10 0.55
0.45
2.88 (7.12)
2 0.40
0.40
2.88 (0.92)
19.43
0.30
0.45 (2.62)
10.34
0.30
0.45 (1.40)
Total Qty
2 2.00
2.00 8.00
8 3.60
2.70 77.76
Total Qty
72.00
1.00 72.00
Total Qty
19.93
9.975 198.80175
Total Qty
2 47.06
0.30 28.24
Total Qty
2 2.00
2.00
0.33 2.60
8 3.60
2.70
0.40 31.10
__________________________
Contractor
______________________________
Supervisor
Qty L/W/D Product
Total Qty
2 0.40
0.40
3.25 1.04
8 0.73
0.43
3.25 8.01
Total Qty
37.91
0.45
0.30 5.12
9.15
0.45
0.30 1.24
Total Qty
37.91
0.45
0.30 5.12
9.15
0.45
0.30 1.24
Total Qty
0.14
72.00 10.08
Total Qty
400 mm
150mm
19.93
9.975 198.80175
Total Qty
__________________________
Contractor
______________________________
Supervisor
Qty L/W/D Product
2 8.00
0.33 5.20
8 12.60
0.40 40.32
Total Qty
2 1.60
3.25 10.40
8 2.50
3.25 65.00
Total Qty
37.91
0.90 34.12
Total Qty
37.91
0.90 34.12
Total Qty
72
0.4 28.8
Total Qty
Total Qty
Total Qty
Total Qty
Total Qty
__________________________
Contractor
______________________________
Supervisor
METEC
SHAHID ASSOCIATES
AWASH CONSTRUCTION
KESEM SUGAR FACTORY
SABURE
Sum
TAKE OFF SHEET No. 001
BLOCK: LIME STATION
SUB STRUCTURE
__________________________
Contractor
______________________________
Supervisor
Sum
177.87
127.47
59.68
__________________________
Contractor
______________________________
Supervisor
Sum
314.73
575.13
85.76
72.00
198.80
28.24
__________________________
Contractor
______________________________
Supervisor
Sum
33.70
9.05
6.35
6.35
55.46
Typical Aprone Section
198.80
__________________________
Contractor
______________________________
Supervisor
Sum
45.52
75.40
34.12
34.119
28.80
3,788.32
3,788.32
610.08
610.08
2,287.35
2,287.35
59.81
__________________________
Contractor
______________________________
Supervisor
SHAHID ASSOCIATES
AWASH CONSTRUCTION
KESEM SUGAR FACTORY

1. EXCAVATION & EARTHWORK
01. Pit Excavation for footing foundation to a depth not exceeding 150 cm
from reduced level
TAKE OFF SHEET No. 001
BLOCK: LIME STATION
SUB STRUCTURE
__________________________
Contractor
______________________________
Supervisor

F1
F2
m
3
02. Ditto but exceeding 150 cm but not exceeding 300 cm(PQ)
F1
F2
m
3
03. Trench foundation excavation in ordinary soil to a depth not exceeding
100cm (PQ)
(Trench length along axis A&B =3.615x2+4=11.23m)
Axis A&B
(Trench length along axis 1&4 =2.0375x2=4.075m)
Axis 1&4
m
3
04. Fill under hard core and around footing with selected material and
compact in layers not exceeding 200mm (compaction up to 95% proctor
density)(PQ)
Under Hardcore
Fill under hard core and under aprone and above EL 0.00
Around footing and strip beam
Excavation for footing and trench
Item 01
Item 02
Item 03
Total footing excavation
deduction-pad & column
Footing Pad
F1
__________________________
Contractor
______________________________
Supervisor

F2
Footing column
C1
C2
Foundation beam
FB 1
FB 2
fill around footing and trench
m
3
Backfill
2.CONCRETE WORK
2.1 7.5cm thick blind concrete quality grade"D" under
a) Under Foundation pad.
F1
F2
m
2
b) Under aprone
m2
c) Under Floor Slab
m2
d) Under Foundation and Plinth Beam
Total length =37.91+9.15=47.06m
m
2
2.2 Reinforced concrete quality grade "A", filled in to form
work and vibrated around rod reinforcement (Formwork and
reinforcement measured separately)
a) In footing pad
Footing Pad
F1
F2
__________________________
Contractor
______________________________
Supervisor

m
3
b) In Footing Column
Footing column
C1
C2
m
3
c) In Foundation beam
2*18.955=37.91m
m
3
d) In plinth beam
Total beam length
m
3
e) In aprone
Area=0.14m
2
m
3
Typical Aprone Section
1000 mm
75 mm
Area=0.14m
2
2.3 150mm thick Reinforced concrete quality grade "B", in
floor slab
m
2
3.Provide, cut and fix in position sawn structural wood or steel
formwork which ever is appropriate.
__________________________
Contractor
______________________________
Supervisor

a) In footing pad
F1
F2
m
2
b) In foundation column
C1
C2
m
2
c) In Foundation beam
m
2
d) In Plinth beam
(Plinth beam lenth=37.91m)
m
2
e) In Aprone
m
2
4.Mild steel Reinforcement according to structural drawings
a) Diam.19 mm
Kg
b) Diam.13 mm
Kg
c) Diam.10 mm
Kg
5.13mm thick premolded compressible joint filler with
elastometric sealent in isolaton joint between grade beam and
RC slab painted with two coats of asphalt
Ml
__________________________
Contractor
______________________________
Supervisor
EMPLOYER:
CONSULTANT:
CONTRACTOR:
Qty L/W/D Product Sum
1. CONCRETE WORK
Reinforced concrete class C-25
68.30 01) in elevation column
34.80 2,376.84
27.78
2.70 75.01
7.30
2.70 19.71
37.15
1.30 48.30
49.15
1.30 63.90
54.20
1.30 70.46
Total Qty 2,654.21 m
2
1.A.1.2, Trees more than 80 mm in dia
5.00
Total Qty 5.00 No.
68.30 1.A.1.3, Site clearing to remove top soil 20 cm.
34.80
2,376.84
Total Qty 2,376.84 m
2
1 68.30 1.A.1.4, Bulk excavation over the site to reduce ground up to an average
34.80 depth of 100cm from stripped ground level.
0.50 1,188.42
Total Qty 1,188.42 m
3
1.A.1.8,Excavate for trench masonry foundation for
22 3.70 masonry and entrance step wall to a depth not exceeding
1.00 150cm starting from stripped ground level.
1.55 126.17 On axis Y1 & Y6
12 4.20
1.00
1.55 78.12 On axis X1 & X12
2 1.75
1.00
TAKE OFF SHEET No. 001
PROJECT: SUGAR FACTORY
LOCATION: KESEM
BLOCK: FEEDING TABLE
SUPER STRUCTURE
1.55 5.43 Between existing building
Total Qty 209.72 m
3
1.A.1.9,Excavate for Isolated foundation footing
34 2.30 to a depth not exceeding
2.30 150cm starting from stripped ground level.
0.06 10.79
Total Qty 10.79 m
3
34 2.30 1.A.1.10ditto but from 150 to 300m
2.30 from stripped ground level.
1.55 278.78
Total Qty 278.78 m
3
1.A.1.11,Fill over Excavated ground up to the bottom level
1 65.70 of the lean concrete with satisfactory soil (selected material)
32.20
1.04 (From Masonry to Masonry in side, the longest side is 65.7m & Shorter
2,200.16 side is 32.2m)
2 0.30 deduct columns
0.40
1.04 (0.25)
32 0.40
0.70
1.04 (9.32)
Total Qty 2,190.59 m
3 ( total fill under H.C)
1.A.1.12, Ditto as above item but around isolated
Foundation footing.
34 2.30 (depth d=2.94m from 0.00.)
2.30
1.81 325.55
34 1.80
1.80
0.50
(55.08) ddt (pad + lean C)area=50cm
32 0.70
0.40
1.81 (2-0.5=1.5)
(16.22) ddt coln C1 area
2 0.30
0.40
1.81
(0.43) ddt coln C2 area
Total Qty 253.81 m
3
1.A.1.13, Ditto as above item but around
masonry foundation
44 5.60 Total trench excavation volume
0.25
1.50 92.40
12 6.10
0.25
1.50 27.45
2 2.00
0.25
1.50 1.50
Total Qty 121.35 m
3
1.A.1.15,Ridge from Spoil heap & cart away surplus
excavated materials to a distance not exceeding
5km from site.
475.37 Item 1.A.1.3
1,188.42 Item 1.A.1.4.
209.72 Item 1.A.1.8.
10.79 Item 1.A.1.9.
278.78 Item 1.A.1.10
1.25
Total Qty 2,703.85 m
3
1.A.1.16 Ditto as above item but to surpluses.
excavated material of item no. 1.A.1.01.
398.13 Item 1.A.1.01 X0.2.
Total Qty 398.13 m
3
1.A.1.18,Allow lump sum amount of dewatering
from excavation pit.
Total Qty 1.00 ls
1.A.2.CONCRETE WORK
1.A.2.1, C-5 lean concrete,5cm thick
34 1.90 A)under footing Foundation pad.
1.90
122.74
Total Qty 122.74 m
2
C)under stone masonry.
22 5.60 (6-0.4=5.6m)
0.60
73.92
12 6.10 (6.5-0.4=6.1m)
0.60
43.92
2 2.00 Between existing block
0.60
2.40
Total Qty 120.24 m
2
1.A.2.3, C-25 reinforced concrete
A) In Concrete pad
A.1, Isolated footing pad
34 1.800
1.80
0.45
49.57
Total Qty 49.57 m
3
B,In foundation column
32 2.30 B.1, From footing pad to ground floor.
0.70 (3-0.46=2.55m)
0.40
20.61
2 2.30
0.40
0.30
0.55
Total Qty 21.16 m
3
1.A.2.4 Form work
A) For concrete pad
136 1.800 A.1, Isolated footing pad
0.45 (34*4=136)
110.16
Total Qty 110.16 m
2
B, For foundation column
(C1=32*2=64), (3-2*0.45=2.1)
64 2.30
0.70
103.04
64 2.30
0.40
58.88
4 2.30 (C2, Size=30*40)
0.40
3.68
4 2.30
0.30
2.76
Total Qty 168.36 m
2
1.A.2.7 Reinforcement bar
1,115.04 A) Diam.8 mm
Total Qty 1,115.04 Kg
2,073.46 D) Diam. 14 mm
Total Qty 2,073.46 Kg
2,454.06 E) Diam. 16 mm
Total Qty 2,454.06 Kg
1.A.4, MASONRY WORK
3.01 50cm thick stone masonry work
1.A.4.2, Construct 50cm thick hard trachitic or equivalent stone
masonry foundation wall
A, Below Natural ground floor level (BNGL)
(6.5-0.35-0.2=5.95)wall on axis X1&X12,between axises Y1,Y2 &
Y5,Y6.
(6.5-0.35-0.2=5.95)wall on axis X1&X12,between axises Y1,Y2 &
22 5.60
2.15 (6-0.4=5.6)
0.50
132.44 wall on axis Y1 & Y6
6 6.10
1.50 (6.5-2*0.2=6.1
0.50
27.45
6 5.95 (6.5-0.2-0.35=5.95) See figure above.
2.15
0.50
38.38
2 2.00 Part of masonry which is constructed aligned with the four corner colns
2.15 15cm thick
0.50 (1.61-0.5=1.11m)
4.30
Total Qty 202.57 m
3
1.A.4.3, Ditto but for Steps and above natural ground level
(99cm given to be above NGL.
22 5.60
0.29
0.50
17.86
6 6.10
0.29
0.50
5.31
6 5.95
0.29
0.50
5.18
2 2.00
0.29
0.50
0.58 Part of masonry Aligned on corner column.
Total Qty 28.93 m
3