geographical size. This means there is a need for efficient means for distance transportation. The long distance road network is very poorly developed in most parts of India. As cities grow in size, the number of vehicular trips on road system goes up. This necessitates a pragmatic policy shift to discourage private modes and encourage public transport once the level of traffic along any travel corridor in one direction exceeds 20,000 persons per hour. It has been observed that in developed countries, planning for mass transit system starts when city population size exceeds a limit. In developing countries including India, because of paucity of funds planning and implementation of rail based Mass Rapid Transit Systems has been lagging far behind the requirements. Today the traffic on roads is a heterogeneous mix of cycles scooters buses cars and rickshaws jostling with each other. This has resulted in a chaotic situation so much so that due to road accidents, the average number of persons killed per day has increased to 5 and of those injured to 13. The position is expected to deteriorate further in the years to come.
SIGNIFICANCE OF PROJECT In this emerging world of computers all most all manual system automated and computerized but maximum of them are so complex and a common user is unable to operate that software system. We are developing the Online Metro Rail Management System to model the present system and to remove the drawbacks. This project explores how computer technology can be used to solve the problem of user. We specifically props way to computerize the administration and engineering offices of a metro rail system. A high speed communication network needs to be developed for interconnecting these offices. This same communication network can be used to provide high speed internet connection to the public and leas out network capacity to internet service providers.
SCOPE OF STUDY The scope of project define the project feasibility the technology , finance , time and resources best define in technology weather the defects can be reduced in the project and up which level financially, weather the overall project cost is affordable. Time describe the weather the projection finishing point will be achieve on time or before time resources required should be available at the rate of cost and time To reduce complexity of existing system. Effective management of time. To make work easy, simple and error free. Effective utilization of available resource. To enhance the efficiency and diversification of services activities. User friendly. Interactive graphical user interface.
FIELD OF APPLICATION
The proposed system is designed to overcome the problems in the old system and is streamlined to deliver optimum performance while keeping simplicity
Using Genre Theory To Understand Internet Trolling in Various Online Communities: Representations of Wales in Transgressive Humour On The World Wide Web