Jubail Commercial Port Subbstation No.

2, Jubail City
corner Northing Easting Latitude Departure
1 - 2 36,472.595 71,567.287 (85.962) 91.424
2 - 3 36,386.633 71,658.711 (44.698) (41.608)
3 - 4 36,341.935 71,617.103 67.741 (108.554)
4 - 1 36,409.676 71,508.549 62.919 58.738
- -
TOTAL VOLUME OF 15,553.640 (loose volume)
BACKFILL 18,298.400 (compacted volume)
Use Class D - "General Fill"
(59.730) 47.230
(26.030) (15.640)
26.180 (45.070)
59.580 13.480
Substation Building: length (mm) width (mm)
Area 1 16,470.00 6,200.00 1,000.00
Excavation Works:
height
(elevation)
Coordinates
Area 2 57,380.00 25,240.00 1,000.00
Area 3 3,670.00 19,440.00 1,000.00
16,676.67
Transformer Area: length (mm) width (mm)
XFMR 1 7,550.00 8,550.00 1,800.00
XFMR 2 7,550.00 8,550.00 1,800.00
XFMR 3 7,550.00 8,550.00 1,800.00
Cable Trench: length (mm) width (mm)
CT1 11,600.00 3,683.00 1,750.00
CT2 11,600.00 4,583.00 1,750.00
CT3 11,600.00 4,583.00 1,750.00
Duct Bank: length (mm) width (mm)
DB1 24,000.00 4,000.00 1,000.00
DB2 24,000.00 4,000.00 1,000.00
DB3 31,360.00 4,000.00 1,000.00
DB4 6,600.00 1,300.00 1,000.00
DB5 6,600.00 1,300.00 1,000.00
DB6 6,600.00 1,300.00 1,000.00
DB7 24,000.00 4,420.00 1,000.00
DB8 44,080.00 4,420.00 1,000.00
DB9 26,000.00 3,980.00 1,000.00
DB10 21,000.00 4,420.00 1,000.00
DB11 31,580.00 4,420.00 1,000.00
DB12 13,260.00 1,300.00 1,000.00
DB13 27,260.00 1,500.00 1,000.00
DB14 6,660.00 1,300.00 1,000.00
DB15 6,660.00 1,300.00 1,000.00
height
(elevation)
height
(elevation)
height
(elevation)
Capacitor Bank: length (mm) width (mm)
CB1
CB2
CB3
Manhole Area: length (mm) width (mm)
EMH-01 3,560.00 3,560.00 1,800.00
EMH-02 5,080.00 5,080.00 1,800.00
EMH-03 1,700.00 1,700.00 1,800.00
EMH-04 1,700.00 1,700.00 1,800.00
EMH-05 1,960.00 1,960.00 1,800.00
EMH-06 5,080.00 5,080.00 1,800.00
EHH-01 1,760.00 1,760.00 1,000.00
EHH-02 1,000.00 1,000.00 1,000.00
length (mm) width (mm) no.
16,000.00 6,000.00 1.00
height
(elevation)
Gate House & Toilet
Area :
height
(elevation)
Bearing Azimuth by DPD
15,747.813 125.490 S 46 45' 48.77" E 313 14' 45.48" (85.962)
3,729.137 61.067 S 42 56' 59.52" W 42 56' 59.52" (216.622)
16,372.814 127.956 N 58 02' 04.19" W 144 19' 59.10" (193.579)
7,408.953 86.075 N 43 01' 53.35" E (62.919)
15,553.640
(compacted volume) 18,298.400
Use Class D - "General Fill"
47.230 (2,821.048) (59.730) (2,821.048)
78.820 (2,051.685) (145.490) 2,275.464
18.110 474.120 (145.340) 6,550.474
(13.480) (803.138) (59.580) (803.138)
474.120 8,825.937
(5,675.871) (3,624.186)
(5,201.751) 5,201.751
(2,600.876) 2,600.876
remarks
Area (mm2) Area (m2)
102,114,000,000.00 102.114 102,114,000.00 102.114
Total volume for
excavation (mm3)
Distance
Total volume for
excavation (m3)
1,448,271,200,000.00 1,448.271 1,448,271,200.00 1,448.271
71,344,800,000.00 71.345 71,344,800.00 71.345 Substation Building:
1,621.730 1,621.730
remarks
Area (mm2) Area (m2)
116,194,500,000.00 116.195 64,552,500.00 64.553
116,194,500,000.00 116.195 64,552,500.00 64.553
116,194,500,000.00 116.195 64,552,500.00 64.553
348.584 193.66
remarks
74,764,900,000.00 74.765 gate house & toilet:
93,034,900,000.00 93.035 with bending
93,034,900,000.00 93.035 with bending
260.835
remarks
96,000,000,000.00 96.000
96,000,000,000.00 96.000
125,440,000,000.00 125.440 including EMH-01
8,580,000,000.00 8.580
8,580,000,000.00 8.580
8,580,000,000.00 8.580
106,080,000,000.00 106.080
194,833,600,000.00 194.834 including EMH-06
103,480,000,000.00 103.480
92,820,000,000.00 92.820
139,583,600,000.00 139.584 including EMH-02
17,238,000,000.00 17.238 including EHH-05
40,890,000,000.00 40.890 including EHH-01
8,658,000,000.00 8.658 including EHH-04
8,658,000,000.00 8.658 including EHH-03
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
1,055.421
remarks
Area (mm2) Area (m2)
- -
- -
- -
-
manhole no. area (mm2) area (m2)
22,812,480,000.00 22.812 1.00 12,673,600.00 12.67
46,451,520,000.00 46.452 1.00 25,806,400.00 25.81
5,202,000,000.00 5.202 1.00 2,890,000.00 2.89
5,202,000,000.00 5.202 1.00 2,890,000.00 2.89
6,914,880,000.00 6.915 1.00 3,841,600.00 3.84
46,451,520,000.00 46.452 1.00 25,806,400.00 25.81
3,097,600,000.00 3.098 1.00 3,097,600.00 3.10
1,000,000,000.00 3.000 3.00 3,000,000.00 3.00
139.132
80.01
area (mm2) area (m2)
96,000,000.00 96.00
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
1.0
by DMD DA (DMD) DA (by DPD) 2.0
91.424 (7,858.990) (7,858.990) 3.0
141.240 (6,313.146) 9,013.208 4.0
(8.922) (604.385) 21,013.775 5.0
(58.738) (3,695.736) (3,695.736) 6.0
(18,472.257) 30,026.983 7.0
(11,554.726) 8.0
Total Area: 9,236.128 9,236.128 9.0
10.0
Summary:
Earth Works Total Volume Unit remark/s
Back Fill: 18,298.40 m3 compacted volume
Substation Building: 1,621.730 m3 to be excavated
Transformer Area: 348.584 m3 to be excavated
Cable Trench: 260.835 m3 to be excavated
Duct Bank: 1,055.421 m3 to be excavated
3,286.569
Backfill: 18,298.40 m3 compacted volume
Excavation: 3,286.57 m3 to be excavated
Asphalt Works: remark/s
Total Area: 9,236.13
less:
substation: 1,621.73
gate house & toilet: 96.00
telecom area: 90.00
manholes: 80.01
transformer area: 193.66
2,081.39
Total Volume: Area (m2) Thickness (m) Total Volume (m3) remark/s
Asphalt: 7,154.74 0.102 729.78 Total
Road
Yard
Base Course: 7,154.74 1.875 13,415.13 to be laid @ every 30cm; to be watered and compacted
Equipment
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Dewatering pumps (electrically driven) and/or submersible pumps 9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
Communication equipment; radios, mobiles for better coordination
Excavator (backhoe)
Dozers
Road Rollers/Compactors
Dump Trucks
Bobcats
Sheet Piling Materials
Survey Equipment
Water Tankers
to be laid @ every 30cm; to be watered and compacted
Manpower Quality
1.0
Construction Manager 1.0
QA/QC Manager 1.0
Safety Manager 1.0
Civil Field Engineer 1.0
Quality Control Engineer 1.0
Safety Officer 1.0
Civil Supervisor 1.0
Civil Foreman 2.0
Excavator Operator 2.0
Dozer Operator 1.0
Bobcat Operator 2.0
Road Roller / Compactor Operator 1.0
Dump Truck Driver 6.0
Labor / Helper 12.0
Riggers 2.0
Sheet Piling Erector 8.0
44.0
Project Manager
Jubail Commercial Port Subbstation No. 2, Jubail City
corner Northing Easting Latitude Departure
1 - 2 36,472.595 71,567.287 (85.962) 91.424
2 - 3 36,386.633 71,658.711 (44.698) (41.608)
3 - 4 36,341.935 71,617.103 67.741 (108.554)
4 - 1 36,409.676 71,508.549 62.919 58.738
- -
TOTAL VOLUME OF 15,553.640 (loose volume)
BACKFILL 18,298.400 (compacted volume)
Use Class D - "General Fill"
(59.730) 47.230
(26.030) (15.640)
26.180 (45.070)
59.580 13.480
Summary:
Earth Works Total Volume Unit
Back Fill: 18,298.40 m3 compacted volume
Substation Building: 1,621.730 m3 to be excavated
Transformer Area: 391.640 m3 to be excavated
Cable Trench: 260.835 m3 to be excavated
Duct Bank: 1,055.421 m3 to be excavated
Capacitor Bank: 64.971 m3 to be excavated
Manhole: 139.132 m3 to be excavated
3,533.73
Backfill: 18,298.40 m3 compacted volume
Excavation: 3,533.73 m3 to be excavated
Excavation Works:
height
(elevation)
remark/s
Coordinates
Substation Building: length (mm) width (mm)
Area 1 16,470.00 6,200.00 1,000.00
Area 2 57,380.00 25,240.00 1,000.00
Area 3 3,670.00 19,440.00 1,000.00
16,676.67
Transformer Area: length (mm) width (mm)
XFMR 1 7,550.00 8,550.00 1,800.00
XFMR 2 7,550.00 8,550.00 1,800.00
XFMR 3 7,550.00 8,550.00 1,800.00
XFMR 4 4,600.00 3,600.00 1,300.00
XFMR 5 4,600.00 3,600.00 1,300.00
Cable Trench: length (mm) width (mm)
CT1 11,600.00 3,683.00 1,750.00
CT2 11,600.00 4,583.00 1,750.00
CT3 11,600.00 4,583.00 1,750.00
Duct Bank: length (mm) width (mm)
DB1 24,000.00 4,000.00 1,000.00
DB2 24,000.00 4,000.00 1,000.00
DB3 31,360.00 4,000.00 1,000.00
DB4 6,600.00 1,300.00 1,000.00
DB5 6,600.00 1,300.00 1,000.00
DB6 6,600.00 1,300.00 1,000.00
DB7 24,000.00 4,420.00 1,000.00
DB8 44,080.00 4,420.00 1,000.00
DB9 26,000.00 3,980.00 1,000.00
DB10 21,000.00 4,420.00 1,000.00
height
(elevation)
height
(elevation)
height
(elevation)
height
(elevation)
DB11 31,580.00 4,420.00 1,000.00
DB12 13,260.00 1,300.00 1,000.00
DB13 27,260.00 1,500.00 1,000.00
DB14 6,660.00 1,300.00 1,000.00
DB15 6,660.00 1,300.00 1,000.00
Capacitor Bank: length (mm) width (mm)
CBa1 3,500.00 3,500.00 1,000.0
CBa2 2,700.00 2,700.00 1,000.0
CBa3 1,455.00 1,455.00 1,000.0
Manhole Area: length (mm) width (mm)
EMH-01 3,560.00 3,560.00 1,800.00
EMH-02 5,080.00 5,080.00 1,800.00
EMH-03 1,700.00 1,700.00 1,800.00
EMH-04 1,700.00 1,700.00 1,800.00
EMH-05 1,960.00 1,960.00 1,800.00
EMH-06 5,080.00 5,080.00 1,800.00
EHH-01 1,760.00 1,760.00 1,000.00
EHH-02 1,000.00 1,000.00 1,000.00
length (mm) width (mm) no.
16,000.00 6,000.00 1.00
Gate House & Toilet
Area :
height
(elevation)
height
(elevation)
Bearing Azimuth
15,747.813 125.490 S 46 45' 48.77" E 313 14' 45.48"
3,729.137 61.067 S 42 56' 59.52" W 42 56' 59.52"
16,372.814 127.956 N 58 02' 04.19" W 144 19' 59.10"
7,408.953 86.075 N 43 01' 53.35" E
15,553.640
(compacted volume) 18,298.400
Use Class D - "General Fill"
47.230 (2,821.048) (59.730) (2,821.048)
78.820 (2,051.685) (145.490) 2,275.464
18.110 474.120 (145.340) 6,550.474
(13.480) (803.138) (59.580) (803.138)
474.120 8,825.937
(5,675.871) (3,624.186)
(5,201.751) 5,201.751
(2,600.876) 2,600.876
compacted volume Asphalt Works:
to be excavated Total Area: 9,236.13
to be excavated less:
to be excavated substation: 1,621.73
to be excavated gate house & toilet: 96.00
to be excavated telecom area: 90.00
to be excavated manholes: 80.01
transformer area: 226.78
capacitor bank: 21.66
compacted volume 514.44
to be excavated
remarks
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
remark/s
Distance
Area (mm2) Area (m2)
102,114,000,000.00 102.114 102,114,000.00 102.114
1,448,271,200,000.00 1,448.271 1,448,271,200.00 1,448.271
71,344,800,000.00 71.345 71,344,800.00 71.345
1,621.730 1,621.730
remarks
Area (mm2) Area (m2)
116,194,500,000.00 116.195 64,552,500.00 64.553
116,194,500,000.00 116.195 64,552,500.00 64.553
116,194,500,000.00 116.195 64,552,500.00 64.553
21,528,000,000.00 21.528 16,560,000.00 16.560
21,528,000,000.00 21.528 16,560,000.00 16.560
391.640 226.78
remarks
74,764,900,000.00 74.765
93,034,900,000.00 93.035 with bending
93,034,900,000.00 93.035 with bending
260.835
remarks
96,000,000,000.00 96.000
96,000,000,000.00 96.000
125,440,000,000.00 125.440 including EMH-01
8,580,000,000.00 8.580
8,580,000,000.00 8.580
8,580,000,000.00 8.580
106,080,000,000.00 106.080
194,833,600,000.00 194.834 including EMH-06
103,480,000,000.00 103.480
92,820,000,000.00 92.820
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
139,583,600,000.00 139.584 including EMH-02
17,238,000,000.00 17.238 including EHH-05
40,890,000,000.00 40.890 including EHH-01
8,658,000,000.00 8.658 including EHH-04
8,658,000,000.00 8.658 including EHH-03
1,055.421
remarks
no. of capacitor bank Area (mm2)
3.00 36,750,000,000.00 36.750 12,250,000.00
3.00 21,870,000,000.00 21.870 7,290,000.00
3.00 6,351,075,000.00 6.351 2,117,025.00
64.97
manhole no. area (mm2)
22,812,480,000.00 22.812 1.00 12,673,600.00
46,451,520,000.00 46.452 1.00 25,806,400.00
5,202,000,000.00 5.202 1.00 2,890,000.00
5,202,000,000.00 5.202 1.00 2,890,000.00
6,914,880,000.00 6.915 1.00 3,841,600.00
46,451,520,000.00 46.452 1.00 25,806,400.00
3,097,600,000.00 3.098 1.00 3,097,600.00
1,000,000,000.00 3.000 3.00 3,000,000.00
139.132
area (mm2) area (m2)
96,000,000.00 96.00
Total volume for
excavation (m3)
Total volume for
excavation (mm3)
Total volume for
excavation (mm3)
Total volume for
excavation (m3)
by DPD by DMD DA (DMD) DA (by DPD)
(85.962) 91.424 (7,858.990) (7,858.990)
(216.622) 141.240 (6,313.146) 9,013.208
(193.579) (8.922) (604.385) 21,013.775
(62.919) (58.738) (3,695.736) (3,695.736)
(18,472.257) 30,026.983
(11,554.726)
Total Area: 9,236.128 9,236.128
Total Volume: Area (m2) Thickness (m) Total Volume (m3) remark/s
Asphalt: 8,721.69 0.102 889.61 Total
2,110.30 Road
6,611.39 Yard
Base Course: 9,214.47 1.875 17,277.13 to be laid @ every 30cm; to be watered and compacted
Area (m2)
12.250
7.290
2.117
21.66
area (m2)
12.67
25.81
2.89
2.89
3.84
25.81
3.10
3.00
80.01
Equipment
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0 Dewatering pumps (electrically driven) and/or submersible pumps
10.0
to be laid @ every 30cm; to be watered and compacted
Dump Trucks
Bobcats
Sheet Piling Materials
Survey Equipment
Water Tankers
Communication equipment; radios, mobiles for better coordination
Road Rollers/Compactors
Excavator (backhoe)
Dozers
remark/s
Manpower Quality
1.0 1.0
2.0 Construction Manager 1.0
3.0 QA/QC Manager 1.0
4.0 Safety Manager 1.0
5.0 Civil Field Engineer 1.0
6.0 Quality Control Engineer 1.0
7.0 Safety Officer 1.0
8.0 Civil Supervisor 1.0
9.0 Civil Foreman 2.0
10.0 Excavator Operator 2.0
11.0 Dozer Operator 1.0
12.0 Bobcat Operator 2.0
13.0 Road Roller / Compactor Operator 1.0
14.0 Dump Truck Driver 6.0
15.0 Labor / Helper 12.0
16.0 Riggers 2.0
17.0 Sheet Piling Erector 8.0
44.0
Project Manager
Jubail Commercial Port Subbstation No. 2, Jubail City