SOUS-DETAIL DE PRIX SEC

IMPRIME :

PAGE :

DATE:

N ETUDE:
ARTICLE:

QUANTITE:
LIBELLE :

Main d'uvre:
Matriaux:

UNITE:

Dcapage de la terre vgtale

Ep = 25 cm

MO

FOUR

MC

MS

S/TOTAL

Non

Non
Matriels Spcifiques
1/- Bull:
0.10 mn
1m
480 mn
Q/J
Q/J = 480 mn/J x 1. m =4 800 m/J
0.10 mn
I1 = Cu/J =
Q/J
2/- Chargeur:
0.10 mn
480 mn

19 994.21 DA/J
4 800 m/J
I1 = 4.16 DA /m

4,16

1m
Q/J

Q/J = 480 mn/J x 1. m =4 800 m/J


0.10 mn
I2 = Cu/J =
Q/J

19 801.85 DA/J
4 800 m/J
I2 = 4.12 DA /m

3/- Camion 10T


0.30 mn
480 mn

4,12

1m
Q/J

Q/J = 480 mn/J x 1. m =1 600 m/J


0.30 mn
I3 = Cu/J =
Q/J

8 465.29 DA/J
1 600 m/J
I3 = 5.29 DA /m

5,29

TOTAL

13,57

197

14,05

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
Main d'uvre:
Redressement des parois et
et fond des fouilles
OQ: 0.03 h/m3 x 81.20 DA/h
Matriaux:
Non
Matriels Spcifiques
1/- Pelle hydraulique:
5 mn
1m3
480 mn
Q/J

UNITE:
M3
MO

PAGE :
Fouill en puis

FOUR

MC

MS

S/TOTAL

2,44

3
Q/J = 480 mn/J x 1. m = 96 m/J
5 mn

I1 = Cu/J =
Q/J

17 126.50 DA/J
96 m3/J
I1 = 178.40 DA /m3

178,40

TOTAL

2,44

198

178,40

180,84

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

M3
MO

LIBELLE :

Main d'uvre:
Redressement des parois et
et fond des fouilles
OQ: 0.04 h/m3 x 81.20 DA/h
Matriaux:
Non
Matriels Spcifiques
1/- Pelle hydraulique:
5 mn
1m3
480 mn
Q/J
Q/J =

UNITE:

PAGE :
Fouill en Tranche

FOUR

MC

MS

S/TOTAL

3,25

480 mn/J x 1 m3
.
= 96 m3/J
5 mn

I1 = Cu/J =
Q/J

17 126.50 DA/J
96 m3/J
I1 = 178.40 DA /m3

178,40

480 mn/J
15.00
Cu/J
Q/J

TOTAL

3,25

199

178,40

181,65

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

UNITE:
M3
MO

LIBELLE :

Main d'uvre:
Redressement des parois et
et fond des fouilles
M0:1.70 h/m3 x 71.10 DA/h

PAGE :
Fouill en Rigole

FOUR

MC

MS

S/TOTAL

120,87

Matriaux:
Non
Matriels Spcifiques
Non

480 mn/J
15.00
TOTAL

120,87

200

120,87

Cu/J
Q/J

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

Main d'uvre:

UNITE:
M3
MO

PAGE :
Fouill en excavation

FOUR

MC

MS

S/TOTAL

Non

Non

Matriels Spcifiques
1/- Bull:
1.20 mn
480 mn

1m3
Q/J

480 mn/J x 1 m3
.
=400 m3/J
1.20 mn

I1 = Cu/J =
Q/J
2/- Chargeur:
0.70 mn
480 mn
Q/J =

QUANTITE:

LIBELLE :

Matriaux:

Q/J =

SOUS-DETAIL DE PRIX SEC

19 994.21 DA/J
400 m3/J
I1 = 49.98 DA /m3

49,98

1m3
Q/J

480 mn/J x 1 m3
.
=685.71 m3/J
0.70 mn

I2 = Cu/J =
Q/J

19 801.85 DA/J
685.71 m3/J
I2 = 28.87 DA /m3

3/- Pelle hydraulique


2.00 mn
480 mn

28,87

1m3
Q/J

480 mn/J
4.00

480 mn/J x 1 m3
=240 m3/J
Q/J =
2.00 mn.
Cu/J
I3 =
Q/J =

Cu/J
Q/J

17 126.50 DA/J
240 m3/J
I3 = 71.36 DA /m3

71,36

TOTAL

150,21

201

150,21

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

M3
MO

LIBELLE :
Matriels Spcifiques
1/- Bull:
0.80 mn
1m3
480 mn
Q/J
Q/J =

UNITE:

PAGE :
Deblais mis en ramblai

FOUR

MC

MS

S/TOTAL

480 mn/J x 1 m3
.
=600 m3/J
0.80 mn

I1 = Cu/J = 19 994.2123 DA/J


600 m /J
Q/J
I1 = 33.32 DA /m3
2/- Nivleuse:
1.50 mn
480 mn
Q/J =

33,32

1m3
Q/J

480 mn/J x 1 m3
.
=560 m3/J
1.50 mn

I2 = Cu/J =
Q/J

22 283.82 DA/J
560 m3/J
I2 = 39.79 DA /m3

3/- Camion citrne


2.00 mn
480 mn
Q/J =

39,79

1m3
Q/J

480 mn/J x 1 m3
.
=240 m3/J
2.00 mn

I3 = Cu/J =
Q/J

7 131.00 DA/J
240 m3/J
I3 = 29.71 DA /m3

480 mn/J
7.00

29,71

Cu/J
Q/J

TOTAL

102,82

202

102,82

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

M3
MO

LIBELLE :
Matriels Spcifiques
1/- Chargeur:
2.00 mn
1m3
480 mn
Q/J
Q/J =

UNITE:

PAGE :

Transport la (D.P) distance = 2 Km


FOUR

MC

MS

S/TOTAL

480 mn/J x 1 m3
.
=240 m3/J
2.00 mn

I1 = Cu/J =
Q/J

19 801.85 DA/J
240 m3/J
I1 = 82.50 DA /m3

82,50

2/- Camion de 10T


10.00 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1 m3
.
=48 m3/J
10.00 mn

I2 = Cu/J =
Q/J

8 465.29 DA/J
48 m3/J
I2 = 176.36 DA /m3

176,36

480 mn/J
3.00
Cu/J
Q/J

TOTAL

258,86

203

258,86

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

UNITE:
M3
MO

LIBELLE :
1/- Main d'uvre:
MO : 0.59 h/m3 x 71.10 DA/h

PAGE :

Gros Bton dos a 150 kg/m3 de CPJ325


FOUR

MC

MS

S/TOTAL

41,95

2/- Fournitures
Gros bton dos 250 kg/m3

2 379,77

Pertes 5%

118,99

480 mn/J
10.60
Cu/J
Q/J

TOTAL

41,95

204

2 498,76

2 540,71

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO : 0.22 h/m3 x 71.10 DA/h
OQ : 0.25 h/m3 x 81.20 DA/h

UNITE:
M3
MO

PAGE :

Gros Bton dos a 250 kg/m3 de CPJ325


FOUR

MC

MS

S/TOTAL

15,64
20,30

2/- Fournitures
Gros bton dos 250 kg/m3

2 840,98

Pertes 5%

142,05

480 mn/J
5.00
TOTAL

35,94

205

2 983,03

3 018,97

Cu/J
Q/J

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC

QUANTITE:
156,562
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.18 h/m3 x 71.10 DA/h
OQ : 0.56 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.20 h/m3 x 71.10 DA/h x 1.90 m/m3
OQ : 0.45 h/m3 x 81.20 DA/h x 1.90 m/m3
Ferraillage:
OQ : 0.03 h/kg x 81.20 DA/h x 61.05 kg/m3

UNITE:
M3
MO

Bton arm dos a 350 kg / m3


pour semelles isole
FOUR
MC
MS
S/TOTAL

12,80
45,47
27,02
69,43
148,72

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

PAGE :

3302,20
90,43

237.97 DA / m x 1.90 m/m3


5

Armatures
T12: 29.08 DA/kg x 17.70 kg / m3
T14: 29.08 DA/kg x 43.36 kg / m3

514,72
1260,91

Les Pertes 5%

258,41

3/- Matires consomable


Pointes:65.82DA/kgx0.16kg/mx1.90m/m3
Fil d'attache:62.63DA/kg x 0.35 kg /m3

20,01
21,92

Les Pertes 5%

2,10

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9,85

TOTAL

IMPRIME :

303,43

5 426,67

SOUS-DETAIL DE PRIX SEC

206

44,03

9,85

PAGE :

5 783,97

N ETUDE:
ARTICLE:

DATE:

QUANTITE:
40,168
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.35 h/m3 x 71.10 DA/h
OQ : 0.68 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.20 h/m3 x 71.10 DA/h x 2.88 m/m3
OQ : 0.45 h/m3 x 81.20 DA/h x 2.88 m/m3
Ferraillage:
OQ : 0.04 h/kg x 81.20 DA/h x 60.06 kg/m3

UNITE:
3

M
MO
24,89
55,22
40,95
105,24
195,07

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

Bton arm dos a 350 kg / m3


pour semelles filantes
FOUR
MC
MS
S/TOTAL

3 302,20
137,07

237.97 DA / m x 2.88 m/m3


5

Armatures
T10: 43.73 DA/kg x 60.06 kg / m3

2446,24

Les Pertes 5%

294,28

3/- Matires consomable


Pointes:65.82DA/kgx0.16kg/mx2.88m/m3
Fil d'attache:62.63DA/kg x 0.30 kg /m3

30,33
18,79

Les Pertes 5%

2,46

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9,85

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

421,36

6 179,79

SOUS-DETAIL DE PRIX SEC


QUANTITE:

UNITE:

207

51,57

9,85

6 662,58

PAGE :

Bton arm dos a 350 kg / m3

42,178

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.46 h/m3 x 71.10 DA/h
OQ : 0.68 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.40 h/m3 x 71.10 DA/h x 8.48 m/m3
OQ : 0.44 h/m3 x 81.20 DA/h x 8.48 m/m3
Ferraillage:
OQ :0.02 h/kg x 81.20 DA/h x 287.89 kg/m3

M3
MO
32,71
55,22
241,17
302,97
467,53

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

pour amorces poteaux


FOUR
MC
MS
S/TOTAL

3 302,20
403,60

237.97 DA / m x 8.48 m/m3


5

Armatures
T8: 51.31 DA/kg x 48.20 kg / m3
T16: 29.03 DA/kg x 24.32 kg / m3
T20: 31.45 DA/kg x 195.86 kg / m3
T25: 45.75 DA/kg x 19.51 kg / m3

2473,14
706,01
6159,80
892,58

Les Pertes 5%

696,87

3/- Matires consomable


Pointes:65.82DA/kgx0.25kg/mx8.48m/m3
Fil d'attache:62.63DA/kg x 8.24 kg /m3

139,54
516,07

Les Pertes 5%

32,78

4/- Matriels spicifique:


Vibreur:
15.00 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1 m3
.
=32 m3/J
15.00 mn
945.69 DA/J
32 m3/J

I1 = Cu/J =
Q/J

I1 = 29.55 DA /m3

29,55

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

1099,60

14 634,19

SOUS-DETAIL DE PRIX SEC

QUANTITE:
142,472
LIBELLE :

UNITE:
M3
MO
208

688,39

29,55

16 451,73

PAGE :

Bton arm dos a 350 kg / m3


pour amorces voiles
FOUR
MC
MS
S/TOTAL

1/- Main d'uvre:


Bton:
MO : 0.35 h/m3 x 71.10 DA/h
OQ : 0.78 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.36 h/m3 x 71.10 DA/h x 12.21 m/m3
OQ : 0.41 h/m3 x 81.20 DA/h x 12.21 m/m3
Ferraillage:
OQ :0.06 h/kg x 81.20 DA/h x 94.74 kg/m3

24,89
63,34
312,53
406,50
461,57

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ

3 302,20
581,12

237.97 DA / m x 12.21 m/m3


Bois de Coffrage=
5

Armatures
T8: 51.31 DA/kg x 94.74 kg / m3

4861,11

Les Pertes 5%

437,22

3/- Matires consomable


Pointes:65.82DA/kgx0.25kg/mx12.21m/m3
Fil d'attache:62.63DA/kg x 8.24 kg /m3

200,92
516,07

Les Pertes 5%

35,85

4/- Matriels spicifique:


Vibreur:
15.00 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1 m3
.
=32 m3/J
15.00 mn
945.69 DA/J
32 m3/J

I1 = Cu/J =
Q/J

I1 = 29.55 DA /m3

29,55

TOTAL 1 268,82

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

9 181,65

SOUS-DETAIL DE PRIX SEC

QUANTITE:
170,398
LIBELLE :
1/- Main d'uvre:
Bton:

UNITE:
3

M
MO

209

752,84

29,55

11 232,86

PAGE :

Bton arm dos a 350 kg / m3


longrines
FOUR
MC
MS
S/TOTAL

MO : 0.35 h/m3 x 71.10 DA/h


OQ : 0.68 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.10 h/m3 x 71.10 DA/h x 5.64 m/m3
OQ : 0.29 h/m3 x 81.20 DA/h x 5.64 m/m3
Ferraillage:
OQ :0.02 h/kg x 81.20 DA/h x 112.23 kg/m3

24,89
55,22
40,10
132,81
182,26

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

237.97 DA / m x 5.64
5

3 302,20
268,43

m/m3

Armatures
T8: 51.31 DA/kg x 43.26 kg / m3
T12: 29.08 DA/kg x 6.36 kg / m3
T14: 29.08 DA/kg x 38.14 kg / m3
T16: 29.03 DA/kg x 3.72 kg / m3
T20: 31.45 DA/kg x 20.76 kg / m3

2 219,67
184,95
1 109,11
107,99
652,90

Les Pertes 5%

392,26

3/- Matires consomable


Pointes:65.82DA/kgx0.16kg/mx5.64m/m3
Fil d'attache:62.63DA/kg x 0.12 kg /m3

92,81
7,52

Les Pertes 5%

5,02

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9,85

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

435,27

8 237,52

SOUS-DETAIL DE PRIX SEC

QUANTITE:
233,875
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.22 h/m3 x 71.10 DA/h

UNITE:
3

M
MO
15,64

210

105,34

9,85

8 787,98

PAGE :

Bton arm dos a 350 kg / m3


pour dalle pleine des gradins EP = 15 cm
FOUR
MC
MS
S/TOTAL

OQ : 0.25 h/m3 x 81.20 DA/h


Coffrage:
MO : 0.30 h/m2 x 71.10 DA/h x 0.16 m/m3
OQ : 0.72 h/m2 x 81.20 DA/h x 0.16 m/m3
Ferraillage:
OQ :0.11 h/kg x 81.20 DA/h x 19.30 kg/m3
TS:
OQ :0.03 h/kg x 81.20 DA/h x 9.66 kg/m3

20,30
3,41
9,35
172,39
23,53

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
237.97 DA / m x 0.16
5

Bois de Coffrage=

3 302,20
07,62

m/m3

Armatures
T8: 51.31 DA/kg x 19.30 kg / m3
TS : 37.31DA /m x 3.27 m/m3

990,28
122,00

Les Pertes 5%

55,61

3/- Matires consomable


Pointes:65.82DA/kgx0.16kg/mx5.64m/m3
Fil d'attache:62.63DA/kg x 0.12 kg /m3

92,81
7,52

Les Pertes 5%

5,02

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9,85

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

244,63

4 477,72

105,34

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO : 0.81 h/m2 x 71.10 DA/h

UNITE:
M2
MO
57,59

2/- Fournitures

211

9,85

4 837,53

PAGE :

Herisson. en pirres sches EP = 15cm


FOUR

MC

MS

S/TOTAL

Pirre seche:
409.30 DA / m3 x 0.15 m3 /m

61,40

Les Pertes 8%

3,07

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

57,59

64,46

SOUS-DETAIL DE PRIX SEC

QUANTITE:
233,875
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.17 h/m2 x 71.10 DA/h
OQ : 0.41 h/m2 x 81.20 DA/h

UNITE:
M2
MO
12,09
33,29

Ferraillage TS:

212

122,06

PAGE :

Forme en bton sur hirrisson.


Ep = 12 cm
FOUR
MC
MS
S/TOTAL

OQ :0.03 h/kg x 81.20 DA/h x 1.45 kg/m2

3,53

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
TS : 37.31 DA / m

220,15
37,31

Les Pertes 5%

12,87

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9,85

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

48,91

270,33

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

237.97 DA / m x 2.16 m/ U
5

832,15

213

329,09

PAGE :

Confection des regards


( 60 x 60 x 90 )
FOUR
MC
MS
S/TOTAL

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.252 m3 / U

9,85

Bois de coff.=

102,80

237.97 DA / m x 2.16 m/ U
5

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

50,35

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J
3

I1 = 9.85 DA /m3

9.85 DA / m x 0.252 m3 / U

2,48

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

752,90
91,38

237.97 DA / m x 1.92 m/ U
5

214

82,95

2,48

2 098,67

PAGE :

Confection des regards


( 60 x 60 x 80 )
FOUR
MC
MS
S/TOTAL

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.228 m3 / U
Bois de coff.=

1 728,72

Bois de coff.=

237.97 DA / m x 1.92 m/ U
5

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

47,63

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.228 m3 / U

2,25

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

610,91
76,15

237.97 DA / m x 1.60 m/ U
5

Acier

215

82,95

2,25

2 005,04

PAGE :

Confection des regards


( 50 x 50 x 80 )
FOUR
MC
MS
S/TOTAL

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.185 m3 / U
Bois de coff.=

1 635,32

T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

42,91

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.185 m3 / U

1,82

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

577,89
71,39

237.97 DA / m x 1.50 m/ U
5

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

216

82,95

1,82

1 842,67

PAGE :

Confection des regards


( 50 x 50 x 75 )
FOUR
MC
MS
S/TOTAL

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.175 m3 / U
Bois de coff.=

1 473,38

Les Pertes 3%

41,78

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.175 m3 / U

1,72

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

544,86
66,63

237.97 DA / m x 1.40 m/ U
5

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

40,65

217

82,95

1,72

1 803,66

PAGE :

Confection des regards


( 50 x 50 x 70 )
FOUR
MC
MS
S/TOTAL

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.165 m3 / U
Bois de coff.=

1 434,47

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.165 m3 / U

1,63

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

82,95

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

57,11

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

38,38

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U

59,24

218

1 764,64

Confection des regards


( 50 x 50 x 60 )
FOUR
MC
MS
S/TOTAL

478,82

237.97 DA / m x 1.20 m/ U
5

1,63

PAGE :

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.145 m3 / U
Bois de coff.=

1 395,55

Fil d'attache:62.63DA/kg x 0.34 kg /m3

21,29

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J
3

I1 = 9.85 DA /m3

9.85 DA / m x 0.145 m3 / U

1,43

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

82,95

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

57,11

Grille metalique : 680.00 DA / U


Acier
T10:43.73 DA / kg x 17 kg / U

680,00

Les Pertes 3%

58,78

743,41

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29
219

1 686,62

Confection des regards avec grille


metalique ( 50 x 50 x 60 )
FOUR
MC
MS
S/TOTAL

478,82

237.97 DA / m x 1.20 m/ U
5

1,43

PAGE :

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.145 m3 / U
Bois de coff.=

1 317,72

Les Pertes 3%

2,42

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.145 m3 / U

1,43

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

82,95

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

47,59

Acier
T10:43.73 DA / kg x 17 kg / U

743,41

Les Pertes 3%

36,11

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.9 kg / U
Fil d'attache:62.63DA/kg x 0.34 kg /m3

59,24
21,29

Les Pertes 3%

2,42

220
480 mn/J x 1 m3

2 387,02

Confection des regards


( 50 x 50 x 50 )
FOUR
MC
MS
S/TOTAL

412,78

237.97 DA / m x 1.00 m/ U
5

1,43

PAGE :

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.125 m3 / U
Bois de coff.=

2 018,12

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn
945.69 DA/J
96 m3/J

I1 = Cu/J =
Q/J

I1 = 9.85 DA /m3

9.85 DA / m3 x 0.125 m3 / U

1,23

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

82,95

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/U x 71.10 DA/h
OQ : 3.25 h/U x 81.20 DA/h

UNITE:
U
MO

45,69

Acier
T10:43.73 DA / kg x 12 kg / U

524,76

Les Pertes 3%

28,21

3/- Matires consomable


Pointes: 65.82 DA / kg x 0.7 kg / U
Fil d'attache:62.63DA/kg x 0.24 kg /m3

46,07
15,03

Les Pertes 3%

1,83

4/- Matriels spicifique:


Vibreur:

480 mn/J x 1 m3
5.00 mn

221

1 608,59

Confection des regards


( 40 x 40 x 60 )
FOUR
MC
MS
S/TOTAL

369,85

237.97 DA / m x 0.96 m/ U
5

1,23

PAGE :

20,62
263,90

2/- Fournitures:
Bton dose 350 kg / m3 etanche
3 302.20 DA / m3 x 0.112 m3 / U
Bois de coff.=

1 239,89

5.00 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

9.85 DA / m3 x 0.112 m3 / U

1,10

TOTAL

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

284,52

0 968,51

62,94

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO : 0.10 h/U x 71.10 DA/h
OQ : 0.25 h/U x 81.20 DA/h

UNITE:
U
MO

FOUR

81,26

222

1 317,07

PAGE :
Siphon de Sole 100

7,11
20,30

2/- Fournitures
Siphon de Sole
81.26 DA / U

1,10

MC

MS

S/TOTAL

TOTAL

27,41

223

81,26

108,67

SOUS-DETAIL DE PRIX SEC

IMPRIME :
N ETUDE:
ARTICLE:

PAGE :

DATE:
QUANTITE:
LIBELLE :

UNITE:

Pose de tuyaux en ciment comprim

ML

200

MO

1/- Main d'uvre:


MO : 0.23 h/ml x 71.10 DA/h
OQ : 0.58 h/ml x 81.20 DA/h

FOUR

MC

MS

S/TOTAL

16,35
47,10

2/- Fournitures
Mortier etanche
2 827.10 DA / m3 x 0.004 m3 /ml

11,31

Tuyaux 200 190.65 DA / ml

190,65

Lit de sable
989.48 DA / m3 x 0.12 m3 / ml

118,74

Pertes 2%

6,41

TOTAL

63,45

224

327,11

390,56

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO : 0.23 h/ml x 71.10 DA/h
OQ : 0.58 h/ml x 81.20 DA/h

UNITE:
ML
MO

PAGE :

Pose de tuyaux en ciment comprim


250
FOUR
MC
MS
S/TOTAL

16,35
47,10

2/- Fournitures
Mortier etanche
2 827.10 DA / m3 x 0.005 m3 /ml

14,14

Tuyaux 250 230.94 DA / ml

230,94

Lit de sable
989.48 DA / m3 x 0.15 m3 / ml

148,42

Pertes 2%

7,87

TOTAL

63,45

225

401,37

464,82

IMPRIME :
N ETUDE:
ARTICLE:

SOUS-DETAIL DE PRIX SEC

DATE:

QUANTITE:
115,195
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.42 h/m3 x 71.10 DA/h
OQ : 0.68 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.32 h/m3 x 71.10 DA/h x 11.14 m/m3
OQ : 0.39 h/m3 x 81.20 DA/h x 11.14 m/m3
Ferraillage:
OQ:0.02h/kg x 81.20DA/h x 193.94 kg/m3

UNITE:
M3
MO

PAGE :

Bton arm dos a 350 kg / m3


Poteaux
FOUR
MC
MS
S/TOTAL

29,86
55,22
253,46
352,78
319,83

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ

3 302,20
530,20

237.97 DA / m x 11.14 m/m3


Bois de Coffrage=
5

Armatures
T8: 51.31 DA/kg x 61.16 kg / m3
T16: 29.03 DA/kg x 43.57 kg / m3

3138,12
1264,84

T20: 31.45 DA/kg x 62.67 kg / m3


T25: 45.75 DA/kg x 16.96 kg / m3

6159,80
775,92

Les Pertes 5%

758,55

3/- Matires consomable


Pointes:65.82DA/kgx0.25kg/mx11.14m/m3
Fil d'attache:62.63DA/kg x 2.69 kg /m3

18,76
168,47

Les Pertes 5%

9,36

4/- Matriels spicifique:


Vibreur:
15.00 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1 m3
.
=32 m3/J
15.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
32 m3/J
I1 = 29.55 DA /m3

29,55

TOTAL

1011,15

226

15 929,62

196,60

29,55

17 166,92

IMPRIME :
N ETUDE:
ARTICLE:

SOUS-DETAIL DE PRIX SEC

DATE:

QUANTITE:
359,821
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.62 h/m3 x 71.10 DA/h
OQ : 1.36 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.30 h/m3 x 71.10 DA/h x 6.99 m/m3
OQ : 0.65 h/m3 x 81.20 DA/h x 6.99 m/m3
Ferraillage:
OQ:0.02 h/kg x 81.20 DA/h x 89.93 kg/m3

UNITE:
M3
MO

Bton arm dos a 350 kg / m3


Pour Poutres & chainages
FOUR
MC
MS
S/TOTAL

44,08
110,43
149,10
368,93
146,05

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

3 302,20
332,68

237.97 DA / m x 6.99 m/m3


5

Armatures
T8: 51.31 DA/kg x 29.42 kg / m3
T12: 29.08 DA/kg x 3.24 kg / m4
T14: 29.08 DA/kg x 7.86 kg / m5
T16: 29.03 DA/kg x 5.86 kg / m3
T20: 31.45 DA/kg x 36.38 kg / m3
T25: 45.75 DA/kg x 7.14 kg / m3

1509,54
94,22
228,57
170,12
1144,15
326,66

Les Pertes 5%

355,41

3/- Matires consomable


Pointes:65.82DA/kgx0.30kg/mx 6.99m/m3
Fil d'attache:62.63DA/kg x 0.77 kg /m3

138,02
48,23

Les Pertes 5%

9,31

4/- Matriels spicifique:


Vibreur:
15.00 mn
480 mn
Q/J =

PAGE :

1m3
Q/J

480 mn/J x 1 m3
.
=32 m3/J
15.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
32 m3/J
I1 = 29.55 DA /m3

29,55

TOTAL

818,59

227

7 463,54

195,56

29,55

8 507,24

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC

QUANTITE:
33,860
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.26 h/m3 x 71.10 DA/h
OQ : 0.59 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.30 h/m3 x 71.10 DA/h x 12.42 m/m3
OQ : 0.95 h/m3 x 81.20 DA/h x 12.42 m/m3
Ferraillage:
OQ:0.05 h/kg x 81.20 DA/h x 108.38 kg/m3

UNITE:
M3
MO

PAGE :

Bton arm dos a 350 kg / m3


Acrotres
FOUR
MC
MS
S/TOTAL

18,49
47,91
264,92
958,08
440,02

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ

3 302,20
591,12

237.97 DA / m x 12.42 m/m3


Bois de Coffrage=
5

Armatures
T8: 51.31 DA/kg x 28.77 kg / m3
T10: 43.73 DA/kg x 79.60 kg / m3

1 476,19
3 480,91

Les Pertes 5%

442,52

3/- Matires consomable


Pointes:65.82DA/kgx0.30kg/mx 8.18m/m3
Fil d'attache:62.63DA/kg x 2.30 kg /m3

161,52
144,05

Les Pertes 5%

15,28

4/- Matriels spicifique:


Vibreur:
4.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=120 m3/J
4.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
120 m3/J
I1 = 7.88 DA /m3

7,88

TOTAL

1729,41

228

9 292,93

320,85

7,88

11 351,08

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC

QUANTITE:
11,792
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.29 h/m3 x 71.10 DA/h
OQ : 0.59 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.30 h/m2 x 71.10 DA/h x 5.95 m/m3
OQ : 0.72 h/m2 x 81.20 DA/h x 5.95 m/m3
Ferraillage:
OQ:0.08 h/kg x 81.20 DA/h x 69.54 kg/m3

UNITE:
M3
MO

PAGE :

Bton arm dos a 350 kg / m3


pour scalier
FOUR
MC
MS
S/TOTAL

20,62
47,91
126,91
347,86
451,73

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

3 302,20
283,18

237.97 DA / m x 5.95 m/m3


5

Armatures
T10: 43.37 DA/kg x 28.77 kg / m3
T12: 29.08 DA/kg x 79.60 kg / m3

1 247,75
2 314,77

Les Pertes 5%

357,40

3/- Matires consomable


Pointes:65.82DA/kgx0.30kg/mx 7.26m/m3
Fil d'attache:62.63DA/kg x 2.30 kg /m3

143,36
144,05

Les Pertes 5%

14,37

4/- Matriels spicifique:


Vibreur:
7.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1. m3 =68.57 m3/J


7.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
68.57 m3/J
I1 = 13.79 DA /m3

13,79

TOTAL

995,03

229

7 505,30

301,78

13,79

8 815,90

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC

QUANTITE:
627,320
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.62 h/ml x 71.10 DA/h
OQ : 0.59 h/ml x 81.20 DA/h

Ferraillage:
OQ:0.08 h/kg x 81.20 DA/h x 1.44 kg/ml

UNITE:
ML
MO

PAGE :

Bton moul dos a 350 kg / m3


pour linteaux et appuis de fenetre
FOUR
MC
MS
S/TOTAL

44,08
47,91

9,35

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
(3 302.20 DA / M3) / (60 ml/ m3)

55,04

Armatures
T8: 51.31 DA/kg x 0.78 kg / ml
T10: 43.37 DA/kg x 0.66 kg / ml

40,02
15,42

Les Pertes 5%

5,52

3/- Matires consomable


Fil d'attache:62.63DA/kg x 0.03 kg /ml

1,88

Les Pertes 5%

0,09

4/- Matriels spicifique:


Vibreur:
3.00 mn
1ml
480 mn
Q/J
Q/J = 480 mn/J x 1
. ml =160 ml /J
3.00 mn
I1 = Cu/J =
Q/J

945.69 DA/J
160 m3/J
I1 = 5.91 DA /ml

5,91

TOTAL

101,34

230

116,01

1,97

5,91

225,23

IMPRIME :
N ETUDE:
ARTICLE:

SOUS-DETAIL DE PRIX SEC

DATE:

QUANTITE:
99,976
LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.26 h/m3 x 71.10 DA/h
OQ : 0.59 h/m3 x 81.20 DA/h
Coffrage:
MO : 0.56 h/m2 x 71.10 DA/h x 4.92 m/m3
OQ : 0.72 h/m2 x 81.20 DA/h x 4.92 m/m3
Ferraillage:
OQ:0.05 h/kg x 81.20 DA/h x 119.49 kg/m3

UNITE:
M3
MO

Bton arm dos a 350 kg / m3


DALLE PLEINE EP = 15 cm
FOUR
MC
MS
S/TOTAL

18,49
47,91
195,89
287,64
485,13

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
Bois de Coffrage=

PAGE :

3 302,20
234,16

237.97 DA / m x 4.92 m/m3


5

Armatures
T12: 29.08 DA/kg x 45.65 kg / m3
T14: 29.08 DA/kg x 73.84 kg / m3

1 327,50
2 147,27

Les Pertes 5%

350,56

3/- Matires consomable


Pointes:65.82DA/kgx0.35kg/mx10.77m/m3
Fil d'attache:62.63DA/kg x 3.82 kg /m3

248,11
239,25

Les Pertes 5%

24,37

4/- Matriels spicifique:


Vibreur:
10.60 mn
480 mn
Q/J =

1m3
Q/J

480 mn/J x 1. m3 =45.28 m3/J


10.60 mn

I1 = Cu/J =
Q/J

945.69 DA/J
45.28 m3/J
I1 = 20.89 DA /m3

20,89

TOTAL

1035,06

231

7 361,69

511,72

20,89

8 929,36

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
Bton:
MO : 0.35 h/m3 x 71.10 DA/h x 0.04 m3/m
OQ : 0.76 h/m3 x 81.20 DA/h x 0.04 m3/m
Pose des poutrelles et hourdis
MO : 0.10 h/m2 x 71.10 DA/h
OQ : 0.29 h/m2 x 81.20 DA/h
Coffrage
MO : 0.35 h/m2 x 71.10 DA/h
OQ : 0.76 h/m2 x 81.20 DA/h
Ferraillage par un OQ:
? : 0.22 h/m3 x 71.10 DA/h x 1.54 kg/m
TS : 0.34 h/m3 x 81.20 DA/h x 11.09 kg/m

UNITE:
M2
MO

Plancher corp creux ( 16 + 04 )


FOUR

MC

MS

S/TOTAL

1,00
2,47
7,11
23,55
24,89
61,71
24,09
306,17

2/- Fournitures:
Bton deos a 350 kg / m3 de CPJ
3 302.2 DA / m3 x 0.6 m3 / m
Bois de Coffrage=

PAGE :

1 981,32
47,59

237.97 DA / m x 1.00 m/m2


5

Armatures
T8: 51.31 DA/kg x 4.01 kg / m2
T12: 29.08 DA/kg x 3.75 kg / m2
T14: 29.08 DA/kg x 3.33 kg / m2
TS :37.31 DA / m

205,75
109,05
96,84
37,31

Les Pertes 5%

123,89

3/- Matires consomable


Pointes:65.82 DA / kg x 0.20 kg / m
Fil d'attache:62.63 DA / kg x 0.12 kg /m3

13,16
7,52

Les Pertes 5%

1,03

4/- Matriels spicifique:


Vibreur:
5.00 mn
1m3
480 mn
Q/J
Q/J =

480 mn/J x 1 m3
.
=96 m3/J
5.00 mn

I1 = Cu/J =
Q/J

945.69 DA/J
96 m3/J
I1 = 9.85 DA /m3

TOTAL

450,98

232

2 601,76

21,71

9,85
9,85

3 084,30

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

SOUS DETAIL DE PRIX SEC


Monnerie

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.56 h/m x 71.10 DA/h
OQ: 1.05 h/m x 81.20 DA/h

UNITE:
M
MO

FOUR

MC

MS

S/TOTAL

39,82
85,26

2/- Fournitures:
Brique 8t: 11.29 DA/U x 17 U/m
Brique 12t: 12.59 DA/U x 17 U/m
Mortier de pose:
2 827.10 DA / m3 x 0.024 m3 / m

191,93
214,03
67,85

Pertes sur Four. 5%

23,69
TOTAL

ARTICLE:

Maonnerie en brique creuse EP=0.30m

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h
OQ: 0.42 h/m x 81.20 DA/h

125,08

UNITE:
M
MO

497,50

622,58

Maonnerie en brique creuse EP=0.10m


FOUR

MC

MS

S/TOTAL

19,20
34,10

2/- Fournitures:
Brique 8t: 11.29 DA/U x 17 U/m

191,93

Mortier de pose:
2 827.10 DA / m3 x 0.012 m3 / m

33,93

Pertes sur Four. 5%

11,29
TOTAL

53,30

233

237,15

290,45

SOUS DETAIL DE PRIX SEC


Les enduits
ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.10 h/m x 71.10 DA/h
OQ: 0.32 h/m x 81.20 DA/h

UNITE:
M
MO

Enduis au mortier de siment


sur murs extrieure
FOUR
MC
MS
S/TOTAL

7,11
25,98

2/- Fournitures:
Mortier de ciment:
2 827.10 DA / m3 x 0.025 m3 / m

70,68

Pertes sur Four. 2%

1,41
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.17 h/m x 71.10 DA/h
OQ: 0.31 h/m x 81.20 DA/h

33,09

UNITE:
M
MO

72,09

105,19

Enduis au mortier de siment


sur murs intrieure
FOUR
MC
MS
S/TOTAL

12,09
25,17

2/- Fournitures:
Mortier de ciment:
2 827.10 DA / m3 x 0.023 m3 / m

65,02

Pertes sur Four. 2%

1,30
TOTAL

37,26

234

66,32

103,58

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.21 h/m x 71.10 DA/h
OQ: 0.67 h/m x 81.20 DA/h

UNITE:
M
MO

Enduis au mortier de siment


sous plafonds
FOUR
MC
MS
S/TOTAL

14,93
54,40

2/- Fournitures:
Mortier de ciment:
2 827.10 DA / m3 x 0.023 m3 / m

65,02

Pertes sur Four. 2%

1,30
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.07 h/m x 71.10 DA/h
OQ: 0.21 h/m x 81.20 DA/h

69,34

UNITE:
M
MO

66,32

FOUR

135,66

Enduis au pltre
sur murs intrieure
MC
MS

S/TOTAL

4,98
17,05

2/- Fournitures:
EAU :116.09 DA / m3 x 0.02 m3 /m
Pltre
3 274.28 DA /T x 0.015 T / m

49,11

Pertes sur Four. 5%

1,03
TOTAL

2,32

22,03

235

50,14

72,17

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.08 h/m x 71.10 DA/h
OQ: 0.28 h/m x 81.20 DA/h

UNITE:
M
MO

FOUR

49,11

Pertes sur Four. 5%

1,03
TOTAL

ARTICLE:

S/TOTAL

5,69
22,74

2/- Fournitures:
EAU :116.09 DA / m3 x 0.02 m3 /m
Pltre
3 274.28 DA /T x 0.015 T / m

Revetements

Enduis au pltre
sous plafonds
MC
MS

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.20 h/m x 71.10 DA/h
OQ: 0.21 h/m x 81.20 DA/h

2,32

28,42

UNITE:
M
MO

50,14

78,57

Revetement en carreaux de
compacto-lisse ( 30 x 30 )
FOUR
MC
MS
S/TOTAL

14,22
17,05

2/- Fournitures:
Ciment:4 566.42 DA /T x 0.0004 T/m
Careaux ( 30 x 30 ) : 1 272.32 DA /m
Mortier: 2 596.49 DA/m3 x 0.02 m3/m

18,27
1272,32
51,93

Pertes sur Four. 5%

67,13
TOTAL

31,27

236

1409,64

1440,91

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.23 h/m x 71.10 DA/h
OQ: 0.78 h/m x 81.20 DA/h

UNITE:
M
MO

FOUR

16,35
63,34

2/- Fournitures:
Ciment:4 566.42 DA /T x 0.0004 T/m
1m = 5 787.32 DA /m
Mortier: 2 596.49 DA/m3 x 0.02 m3/m

18,27
5787,32
51,93

Pertes sur Four. 5%

292,88
TOTAL

ARTICLE:

Revetement en marbre
pour escalier
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.04 h/ml x 71.10 DA/h
OQ: 0.09 h/ml x 81.20 DA/h

79,69

UNITE:
ML
MO

6150,39

6230,08

Plinthe droites en terre cuite ( 7 x 20 )


FOUR

MC

MS

S/TOTAL

2,84
7,31

2/- Fournitures:
Plinthe: 5 U/ml x 15.95 DA/U
Ciment:4 566.42 DA /T x 0.0003 T/ml
Mortier: 2 596.49 DA/m3 x 0.025 m3/ml

79,75
1,37
64,91

Pertes sur Four. 5%

7,30
TOTAL

10,15

237

153,33

163,49

SOUS DETAIL DE PRIX SEC

IMPRIME :
N ETUDE:
ARTICLE:

DATE:

SOUS-DETAIL DE PRIX SEC


QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO : 0.26 h/m x 71.10 DA/h
OQ : 0.27 h/m x 81.20 DA/h

UNITE:
M
MO

PAGE :

Revetement en granito coul sur place


FOUR

MC

MS

S/TOTAL

18,49
21,92

2/- Fournitures
Bton pour chape:

716.15 DA / m

716,15

Perte 5%

35,81

3/- Matriels spicifique:


Ponseuse:
5.00 mn
1m
480 mn
Q/J
3
Q/J = 480 mn/J x 1. m =96 m/J
5.00 mn

I1 = Cu/J =
Q/J

820.69 DA/J
96 m2/J
I1 = 8.55 DA /m2

8,55

TOTAL

40,41

238

751,96

8,55

800,92

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.20 h/m x 71.10 DA/h
OQ: 0.21 h/m x 81.20 DA/h

UNITE:
M
MO

Faut plafond
FOUR

4,91
310,52
2,32

Pertes sur Four. 5%

15,89
TOTAL

ARTICLE:

MS

S/TOTAL

14,22
17,05

2/- Fournitures:
Pltre :3 274.28 DA /T x 0.0015 T / m
1 m : 310.52 DA /m
EAU :116.09 DA / m3 x 0.02 m3 /m

Pintures

MC

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.13 h/m x 81.20 DA/h

31,27

UNITE:
M
MO

333,64

364,91

Pinture laque execut en 3 couches


sure murs intrieure
FOUR
MC
MS
S/TOTAL

10,56

2/- Fournitures:
Pinture laque 88.79 DA/kg x 0.665 kg/m

59,05

Pertes sur Four. 3%

1,77
TOTAL

10,56

239

60,82

71,37

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.19 h/m x 81.20 DA/h

UNITE:
M
MO

Pinture laque execut en 3 couches


sous plafonds
FOUR
MC
MS
S/TOTAL

15,43

2/- Fournitures:
Pinture laque 88.79 DA/kg x 0.665 kg/m

59,05

Pertes sur Four. 3%

1,77
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.09 h/m x 81.20 DA/h

15,43

UNITE:
M
MO

60,82

76,24

Pinture Vinylique execut en 3 couches


sur faade
FOUR
MC
MS
S/TOTAL

7,31

2/- Fournitures:
Pinture vinylique 46.26 DA/kg x 0.75 kg/m

34,70

Pertes sur Four. 3%

1,04
TOTAL

7,31

240

35,74

43,04

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.10 h/m x 81.20 DA/h

UNITE:
M
MO

Pinture Vinylique execut en 3 couches


sur murs intrieur
FOUR
MC
MS
S/TOTAL

8,12

2/- Fournitures:
Pinture vinylique 46.26 DA/kg x 0.75 kg/m

34,70

Pertes sur Four. 3%

1,04
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.13 h/m x 81.20 DA/h

8,12

UNITE:
M
MO

35,74

43,86

Pinture Vinylique execut en 3 couches


sous plafond
FOUR
MC
MS
S/TOTAL

10,56

2/- Fournitures:
Pinture vinylique 46.26 DA/kg x 0.75 kg/m

34,70

Pertes sur Four. 3%

1,04
TOTAL

10,56

241

35,74

46,29

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.13 h/m x 81.20 DA/h

UNITE:
M
MO
10,56

2/- Fournitures:
Pinture a l'huile 145.36 DA/kg x 0.75 kg/m

109,02

Pertes sur Four. 3%

3,27
TOTAL

Etancheit

ARTICLE:

Pinture a l'huile execut en 3 couches


sur boiserie
FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.90 h/m x 71.10 DA/h
OQ: 1.70 h/m x 81.20 DA/h

10,56

UNITE:
M
MO

112,29

122,85

Forme de ponte en bton


dos 250 kg/m3
FOUR
MC
MS
S/TOTAL

63,99
138,04

2/- Fournitures:
Bton dos a 250 lg/m3 :
2 840.98 DA / m3 x 0.02 m3/m

56,82

Pertes sur Four. 5%

2,84
TOTAL

202,03

242

59,66

261,69

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.01 h/m x 71.10 DA/h
OQ: 0.02 h/m x 81.20 DA/h

UNITE:
M
MO

Par vapeur
FOUR

130,55
53,03

Pertes sur Four. 6%

11,01
TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.01 h/m x 71.10 DA/h
OQ: 0.03 h/m x 81.20 DA/h
2/- Fournitures:
Polysterne 4 cm d'ep.

MS

S/TOTAL

0,71
1,62

2/- Fournitures:
Feutre: 2.2 m/m x 59.34 DA/m
Bitume: 3.3 kg/m x 16.07 DA/kg

ARTICLE:

MC

2,34

UNITE:
M
MO

194,59

196,93

Isolation thermique en plaque


de polysterne
FOUR
MC
MS
S/TOTAL

0,71
2,44

175.25 DA /m

175,25

Pertes sur Four. 5%

8,76
TOTAL

3,15

243

184,01

187,16

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.03 h/m x 71.10 DA/h
OQ: 0.07 h/m x 81.20 DA/h

UNITE:
M
MO

Multicouche
FOUR

MS

S/TOTAL

2,13
5,68

2/- Fournitures:
Feutre 36 ST: 3.3 m/m x 59.34 DA/m
Bitume 90/40 : 4.7 kg/m x 16.07 DA/kg

195,82
75,53

Pertes sur Four. 6%

16,28
TOTAL

ARTICLE:

MC

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.04 h/ml x 71.10 DA/h
OQ: 0.12 h/ml x 81.20 DA/h

7,82

UNITE:
ML
MO

287,63

295,45

Relev d'tancheit de 0.5 m


en paxalumun
FOUR
MC
MS
S/TOTAL

2,84
9,74

2/- Fournitures:
Feutre 36 ST: 0.55 m/ml x 59.34 DA/m
Bitume 90/40 : 1.4 kg/ml x 16.07 DA/kg
Paxalumun: 204.89DA/ml

32,64
22,50
204,89

Pertes sur Four. 3%

7,80
TOTAL

12,59

244

267,83

280,41

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.28 h/U x 81.20 DA/h

UNITE:
U
MO

FOUR

MC

MS

S/TOTAL

22,74

2/- Fournitures:
Gargouille: 707.94 DA/U

707,94

TOTAL

ARTICLE:

Gargouille en plomb lumin

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.05 h/m x 81.20 DA/h

22,74

UNITE:
M
MO

707,94

730,68

Protection lourde en gravillon roul


FOUR

MC

MS

S/TOTAL

4,06

2/- Fournitures:
Gravier roul:
0.08 m3/m x 506.63 DA/m3

40,53

Pertes sur Four. 5%

2,03
TOTAL

4,06

245

42,56

46,62

SOUS DETAIL DE PRIX SEC


plombrie & sanitaire
ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.71 h/U x 71.10 DA/h
OQ: 1.37 h/U x 81.20 DA/h

UNITE:
U
MO

Sige l'Anglaise y compris


chasse d'eau
FOUR
MC
MS
S/TOTAL

50,48
111,24

2/- Fournitures:
Ciment:4 566.42 DA /T x 0.04 T/U
WC a l'anglaise: 1 154.91 DA/U
Chasse d'eau : 836.62 DA/U
Siphon de sole 110: 81.26 DA/U

182,66
1154,91
836,62
81,26

Pertes sur Four. 5%

112,77
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.42 h/U x 71.10 DA/h
OQ: 1.04 h/U x 81.20 DA/h

161,73

UNITE:
U
MO

2368,22

2529,94

Lavabo individuel
FOUR

MC

MS

S/TOTAL

29,86
113,68

2/- Fournitures:
Ciment:4 566.42 DA /T x 0.05 T/U
Lavabo individuel: 1 626.80 DA /U

228,32
1626,80

Pertes sur Four. 2%

37,10
TOTAL

143,54

246

1892,22

2035,77

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

UNITE:
U

Robinet

1/- Main d'oever:


OQ: 0.40 h/U x 81.20 DA/h = 32.48
MO

Four.

F. Mastic

Perte

PU

Vanne d'arrt 20/27

32,48

283,16

46,46

2,32

364,42

Robinet 15/20

32,48

143,78

46,46

2,32

225,04

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.22 h/ml x 71.10 DA/h
OQ: 0.40 h/ml x 81.20 DA/h

UNITE:
ML
MO

Tube en acier galvanis 20/27


FOUR

MC

MS

S/TOTAL

15,64
32,48

2/- Fournitures:
Tube en AG: 101.42 DA/ml
Colier Atlas: 1.25 U/ml x 15.23 DA/U
Ts en GA: 0.25 U/ml x 30.38 DA/ml
Coudes: 0.25 U/ml x 35.45 DA/U

101,42
19,04
7,60
8,86

Pertes sur Four. 5%

6,85
TOTAL

48,12

247

143,76

191,88

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.11 h/ml x 71.10 DA/h
OQ: 0.20 h/ml x 81.20 DA/h

UNITE:
ML
MO

FOUR

MC

MS

S/TOTAL

7,82
16,24

2/- Fournitures:
Tube en Cuivre: 121.62 DA/ml
Colier Atlas: 1.25 U/ml x 15.23 DA/U
Ts en Cuivre: 0.25 U/ml x 25.33 DA/ml

121,62
19,04
6,33

Pertes sur Four. 5%

7,35
TOTAL

ARTICLE:

Tube en Cuivre 12/14

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.08 h/ml x 71.10 DA/h
OQ: 0.14 h/ml x 81.20 DA/h

24,06

UNITE:
ML
MO

154,34

178,40

Tube en PVC 40
FOUR

MC

MS

S/TOTAL

5,69
11,37

2/- Fournitures:
Tube en PVC 40 :
38.17 DA/ml

38,17

Pertes sur Four. 5%

1,91
TOTAL

17,06

248

40,08

57,13

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.12 h/ml x 71.10 DA/h
OQ: 0.31 h/ml x 81.20 DA/h

UNITE:
ML
MO

MC

MS

S/TOTAL

138,07

Pertes sur Four. 5%

6,90
TOTAL

ARTICLE:

FOUR

8,53
25,17

2/- Fournitures:
Tube en PVC 110 :
138.07 DA/ml

Assainssement

Tube en PVC 110

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.23 h/m x 71.10 DA/h
OQ: 0.58 h/m x 81.20 DA/h

33,70

UNITE:
ML
MO

144,97

178,68

Buse en Bton comprim: 200


FOUR

MC

MS

S/TOTAL

16,35
47,10

2/- Fournitures:
sabel : 0.12 m3/ml x 989.48 DA /m3
Tuyaux 200 CC: 190.65 DA/ml
Mortier : 0.005 m3/ml x 2 827.10 DA/m3

118,74
190,65
14,14

Pertes sur Four. 2%

6,47
TOTAL

63,45

249

329,99

393,44

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.13 h/m x 71.10 DA/h
OQ: 0.90 h/m x 81.20 DA/h

UNITE:
ML
MO

MC

MS

S/TOTAL

148,42
230,94
28,27

Pertes sur Four. 2%

8,15
TOTAL

ARTICLE:

FOUR

9,24
73,08

2/- Fournitures:
sabel : 0.15 m3/ml x 989.48 DA /m3
Tuyaux 250 CC: 230.94 DA/ml
Mortier : 0.01 m3/ml x 2 827.10 DA/m3

Electricite

Buse en Bton comprim: 250

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 3 h/U x 71.10 DA/h
OQ: 5 h/U x 81.20 DA/h

82,32

UNITE:
ML
MO

415,79

FOUR

498,11

Armoire gnrale
CE 01, CE 02, CE 03
MC
MS
S/TOTAL

213,30
406,00

2/- Fournitures:
Armoire gnrale

88 218.94 DA/U

88218,94

Pertes sur Four. 1%

882,19
TOTAL

619,30

250

89101,13

89 720,43

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 2.82 h/U x 81.20 DA/h

UNITE:
ML
MO

Armoire secondaire
TC 01, TC 02, TC 03, TC 04
FOUR
MC
MS
S/TOTAL

228,98

2/- Fournitures:
Armoire secondaire

56 908.94DA /U

56908,94

Pertes sur Four. 1%

569,09
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 1.78 h/U x 81.20 DA/h

228,98

UNITE:
ML
MO

57478,03

57 707,01

Plafonier carr 60 x 60 avec


vasque en aluminium
FOUR
MC
MS
S/TOTAL

144,54

2/- Fournitures:
Plafonier carr 60 x 60: 1 323.05 DA/U
Visse + chevilles: 4 U/U x 1.5 DA/U

1323,05
6,00

Pertes sur Four. 3%


Pertes sur Visse + Chevilles. 10%

39,69
0,60
TOTAL

144,54

251

1369,34

1 513,88

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.21 h/U x 81.20 DA/h

UNITE:
ML
MO

Applique lavabo 100 W


FOUR

MS

S/TOTAL

17,05

2/- Fournitures:
Applique lavabo 100 W 904.11 DA/U
Visse + chevilles: 2 U/U x 1.5 DA/U

904,11
3,00

Pertes sur Four. 3%


Pertes sur Visse + Chevilles. 10%

27,12
0,30
TOTAL

ARTICLE:

MC

QUANTITE:

17,05

934,53

UNITE:
U

951,59

Interrepteurs et prises

1/- Main d'oever:


OQ: 0.37 h/U x 81.20 DA/h = 30.04

Prise monophas 2x16 A+T encastre


Interupteur simple alumage
Interupteur double alumage
Interupteur va et vient alumage

MO

Four.

Ch+Vis+P

Perte

PU

30,04
30,04
30,04
30,04

55,11
58,00
62,40
62,40

3,30
3,30
3,30
3,30

5,51
5,80
6,24
6,24

93,96
97,14
101,98
101,98

252

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 1.26 h/U x 81.20 DA/h

UNITE:
U
MO

Boite de drivation 100x100 encastr


FOUR

MS

S/TOTAL

102,31

2/- Fournitures:
Boite de drivation
Visse + chevilles: 4 U/U x 1.5 DA/U

22,92
6,00

Pertes sur Four. 5%


Pertes sur Visse + Chevilles. 10%

1,15
0,60
TOTAL

ARTICLE:

MC

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 1.26 h/U x 81.20 DA/h

102,31

UNITE:
U
MO

30,67

132,98

Boite de drivation 160x100 encastre


FOUR

MC

MS

S/TOTAL

102,31

2/- Fournitures:
Boite de drivation
Visse + chevilles: 4 U/U x 1.5 DA/U

26,02
6,00

Pertes sur Four. 5%


Pertes sur Visse + Chevilles. 10%

1,30
0,60
TOTAL

102,31

253

33,92

136,23

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.13 h/ml x 81.20 DA/h

UNITE:
ML
MO

Cble de mise a la terre


en cuivre nu 28 mm
FOUR
MC
MS
S/TOTAL

10,56

2/- Fournitures:
Cble de mise a la terre:
14.63 DA/ml

14,63

Pertes sur Four. 10%

1,46
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
OQ: 0.21 h/U x 81.20 DA/h

10,56

UNITE:
U
MO

16,09

26,65

spots orientable encastrs de 1x100 w


FOUR

MC

MS

S/TOTAL

17,05

2/- Fournitures:
spots orientable encastrs
190.55 DA/U

190,55

Pertes sur Four. 5%

9,53
TOTAL

17,05

254

200,08

217,13

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

UNITE:
U
MO

LIBELLE :
1/- Main d'uvre:
OQ: 0.21 h/U x 81.20 DA/h

Tube fluorissant 2 x 1.20 . 60W


FOUR

520,06

Pertes sur Four. 10%

52,01
TOTAL

QUANTITE:

1/- Main d'oever:


MO: 0.02 h/ml x 71.10 DA/h = 1.42
OQ: 0.05 h/ml x 81.20 DA/h = 4.06
Fil U 500 V
2 x 1.5 mm + prot Gaine ICD N 11
2 x 2.5 mm + prot Gaine ICD N 13
3 x 1.5 mm + prot Gaine ICD N 16

MS

S/TOTAL

17,05

2/- Fournitures:
Tube fluorissant 2 x 1.20 . 60W
520.06 DA/U

ARTICLE:

MC

17,05

572,07

UNITE:
ML

589,12

Fil lectrique

= 5.48 DA/ml
MO

Gaines

Fils

Perte10%

PU

5,48
5,48
5,48

5,73
6,78
9,30

6,52
5,72
6,52

1,23
1,25
1,58

18,96
19,23
22,88

255

SOUS DETAIL DE PRIX SEC


Menuiserie mtallique
ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 2.60 m
OQ: 0.59 h/m x 81.20 DA/h x 2.60 m

UNITE:
U
MO
49,91
124,56

2/- Fournitures:
PVA1( 1,20 x 2,17 ):
(1.20 x 2.17) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

22880,05
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

Porte vitre en aluminium


PVA1( 1,20 x 2,17 )
FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 1.96 m
OQ: 0.59 h/m x 81.20 DA/h x 1.96 m

174,47

UNITE:
U
MO

22888,78

23 063,25

Dme vitre en aluminium


DM1 ( 1,40 x 1,40 )
FOUR
MC
MS
S/TOTAL

37,63
93,90

2/- Fournitures:
DM1 ( 1,40 x 1,40 ):
(1.40 x 1.40) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

17221,54
8,48

Pertes sur Mortier 3%

0,25
TOTAL

131,53

256

17230,28

17 361,80

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 0.72 m
OQ: 0.59 h/m x 81.20 DA/h x 0.72 m

UNITE:
U
MO
13,82
34,49

2/- Fournitures:
CV1 ( 1,20 x 0,60 )
(1.20 x 0.60) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

6326,28
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

Chassis vitre en aluminium


CV1 ( 1,20 x 0,60 )
FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 51.45 m
OQ: 0.59 h/m x 81.20 DA/h x 51.45 m

48,32

UNITE:
U
MO

6335,02

6 383,33

Baie vitre en aluminium -1BVA1 ( 34,30 x 1,50 )


FOUR
MC
MS
S/TOTAL

987,69
2464,87

2/- Fournitures:
BVA1 ( 34,30 x 1,50 )
(34.30 x 1.50) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

452065,43
8,48

Pertes sur Mortier 3%

0,25
TOTAL

3452,55 452074,16

257

455 526,71

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 34.88 m
OQ: 0.59 h/m x 81.20 DA/h x 34.88 m

UNITE:
U
MO
669,59
1671,03

2/- Fournitures:
BVA1 ( 23.25 x 1,50 )
(23.25 x 1.50) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

306429,19
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

Baie vitre en aluminium -2BVA2 ( 23,25 x 1,50 )


FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 17.96 m
OQ: 0.59 h/m x 81.20 DA/h x 17.96 m

2340,62 306437,92

UNITE:
U
MO

308 778,55

Baie vitre en aluminium -3BVA3 ( 2,70 x 6,65 )


FOUR
MC
MS
S/TOTAL

344,78
956,24

2/- Fournitures:
BVA3 ( 2,70 x 6,65 )
(2.70 x 6.65) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

157761,61
8,48

Pertes sur Mortier 3%

0,25
TOTAL

1301,02 157770,34

258

159 071,37

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 5.30 m
OQ: 0.59 h/m x 81.20 DA/h x 5.30 m

UNITE:
U
MO
101,74
253,91

2/- Fournitures:
BVA4 (2,65 x2,00 )
(2.65 x 2.00) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

46568,45
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

Baie vitre en aluminium - 4BVA4 (2,65 x2,00 )


FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 7.20 m
OQ: 0.59 h/m x 81.20 DA/h x 7.20 m

355,66

UNITE:
U
MO

46577,19

46 932,84

Baie vitre en aluminium - 5BVA5( 3,60 x2,00 )


FOUR
MC
MS
S/TOTAL

138,22
344,94

2/- Fournitures:
BVA5( 3,60 x2,00 )
(3.60 x 2.00) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

63262,80
8,48

Pertes sur Mortier 3%

0,25
TOTAL

483,16

259

63271,54

63 754,69

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 103.74 m
OQ: 0.59 h/m x 81.20 DA/h x 103.74 m

UNITE:
U
MO
1991,50
4969,98

2/- Fournitures:
BVA6 ( 15,60 x 6,65 )
(15.60 x 6.65) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

911511,51
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

B.V en aluminium -6- + 2 pourte de 1,40 m


BVA6 ( 15,60 x 6,65 )
FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 3.04 m
OQ: 0.59 h/m x 81.20 DA/h x 3.04 m

6961,47 911520,25

UNITE:
U
MO

918 481,72

BV en aluminium -7- + porte de 0,94 m


BVA7( 1,40 x2,17)
FOUR
MC
MS
S/TOTAL

58,36
145,64

2/- Fournitures:
BVA7( 1,40 x2,17)
(1.40 x 2.17) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

26693,39
8,48

Pertes sur Mortier 3%

0,25
TOTAL

204,00

260

26702,12

26 906,12

SOUS DETAIL DE PRIX SEC


ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h x 24.79 m
OQ: 0.59 h/m x 81.20 DA/h x 24.79 m

UNITE:
U
MO
475,89
1187,64

2/- Fournitures:
BVA8 ( 7,40 x 3,35 )
(7.40 x 3.35) m x 8 786.50 DA /m
Mortier:0.003 m3/m x 2 827.10 DA / m3

217817,34
8,48

Pertes sur Mortier 3%

0,25
TOTAL

ARTICLE:

Baie vitre en aluminium -8BVA8 ( 7,40 x 3,35 )


FOUR
MC
MS
S/TOTAL

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.04 h/ml x 71.10 DA/h x 30.00 ml
OQ: 0.12 h/ml x 81.20 DA/h x 30.00 ml

1663,53 217826,07

UNITE:
U
MO

219 489,60

Garde corps escalier en fer forger


hoteur 0,90 m
FOUR
MC
MS
S/TOTAL

85,32
292,32

2/- Fournitures:
Garde corps:
69.78 DA /ml x 30.00ml
Mortier:0.003 m3/ml x 2 827.10 DA / m3

2093,40
8,48

Pertes sur Mortier 3%

0,25
TOTAL

377,64

261

2102,14

2 479,78

SOUS DETAIL DE PRIX SEC


Menuiserie en bois
ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h
OQ: 0.59 h/m x 81.20 DA/h

UNITE:
U
MO

porte isoplane en bois PI1 (0,90 x 2,17)


FOUR

MC

MS

S/TOTAL

19,20
47,91

2/- Fournitures:
PI1 (0,90 x 2,17):
Mortier:0.005 m3/m x 2 827.10 DA / m3

3266,72
14,14

Pertes sur Mortier 3%

0,42
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.62 h/m x 71.10 DA/h
OQ: 2.19 h/m x 81.20 DA/h

67,11

UNITE:
U
MO

3281,28

3 348,38

porte isoplane en bois PI2 (1,20 x 2,17)


FOUR

MC

MS

S/TOTAL

44,08
177,83

2/- Fournitures:
PI2 (1,20 x 2,17)
Mortier:0.005 m3/m x 2 827.10 DA / m3

10336,72
14,14

Pertes sur Mortier 3%

0,42
TOTAL

221,91

262

10351,28

10 573,19

SOUS DETAIL DE PRIX SEC

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.27 h/m x 71.10 DA/h
OQ: 0.59 h/m x 81.20 DA/h

UNITE:
U
MO

porte isoplane en bois P3 (0,84 x 2,17)


FOUR

MC

MS

S/TOTAL

19,20
47,91

2/- Fournitures:
P3 (0,84 x 2,17)
Mortier:0.005 m3/m x 2 827.10 DA / m3

2963,72
14,14

Pertes sur Mortier 3%

0,42
TOTAL

ARTICLE:

QUANTITE:

LIBELLE :
1/- Main d'uvre:
MO: 0.62 h/m x 71.10 DA/h
OQ: 2.19 h/m x 81.20 DA/h

67,11

UNITE:
U
MO

2978,28

3 045,38

porte pleine en bois PP1 (1,20 x 2,17)


FOUR

MC

MS

S/TOTAL

44,08
177,83

2/- Fournitures:
PP1 (1,20 x 2,17)
Mortier:0.005 m3/m x 2 827.10 DA / m3

15336,70
14,14

Pertes sur Mortier 3%

0,42
TOTAL

221,91

263

15351,26

15 573,17