Академический Документы
Профессиональный Документы
Культура Документы
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
Service Information
Customer Company Name:
Customer Representative:
Service Company Name:
Service Representative:
Well Name:
Well Location:
Service Type:
Design Date:
PDVSA
CLAUDIA FARIAS
CPVEN
JOSE LUIS ESTRADA PAZ
MOT-61A
CEMENTACION PRIMARIA LINER DE 7"
Well Summary
Well Depth:
Shoe Depth:
Cement Top:
Previous Shoe Depth:
Surface Temperature:
BH Static Temperature:
BH Circulating Temperature:
MD
(ft)
TVD
(ft)
9613.00
9610.00
7668.56
8369.00
9611.13
9608.13
7667.55
8367.67
80degF
220degF
170degF
MD
(ft)
TVD
(ft)
Hole
Diam
(in)
7869.0
8369.0
9610.0
9613.0
7867.9
8367.7
9608.1
9611.1
8.53
8.53
8.38
8.38
Pore Pressure
Frac Pressure
(psi)
(psi/ft)
(ppg)
(psi)
(psi/ft)
(ppg)
2203.01
2342.95
2690.28
2691.12
0.28
0.28
0.28
0.28
5.4
5.4
5.4
5.4
5035.452
5355.312
6149.203
6151.123
0.64
0.64
0.64
0.64
12.3
12.3
12.3
12.3
Casing Description
Casing
Type
Ext Casing
Packer
Liner
Landing
Collar
Liner
Liner Shoe
Drill Pipe
OD
(in)
ID
(in)
Weight
(lb/ft)
Grade
Length
(ft)
5.00
4.28
19.50
P-110
26.00
7843.00
7869.00
7.00
7.00
6.00
4.00
35.00
35.00
P-110
P-110
1695.00
3.00
7869.00
9564.00
9564.00
9567.00
7.00
7.00
5.00
6.00
4.00
4.28
35.00
35.00
146.00
P-110
H-40
P-110
41.00
2.00
7843.00
9567.00
9608.00
0.00
9608.00
9610.00
7843.00
CEMENTPRO Report
Top MD Bottom MD
(ft)
(ft)
Well Name:
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
61442 lbs
53992 lbs
Meas.
Depth
(ft)
Vert.
Depth
(ft)
8369.0
9613.0
7500.0
8300.0
9613.0
8367.7
9611.1
7499.1
8298.7
9611.1
Pore Pressure
Hydrostatic
Pressure
Frac Pressure
(psi)
(ppg)
(psi)
(ppg)
(psi)
(ppg)
2343
2691
2100
2324
2691
5.38
5.38
5.38
5.38
5.38
3699
4578
3125
3650
4578
8.50
9.16
8.01
8.46
9.16
5355
6151
4799
5311
6151
12.31
12.31
12.31
12.31
12.31
LECHADA UNICA
CUE-116
CE-111
CLAV-1
MUD
8.38
8.38
8.38
8.38
8.38
7.00
7.00
7.00
7.00
7.00
5.00
5.00
5.00
5.00
5.00
154
15233
415
16713
867
67.79
0.98
25.74
1.77
12.50
Qmax
plug
(bpm)
3.64
0.03
1.90
0.29
1.32
3000
100
Foam Schedule
Stage Length
(min)
Flow Rate
(bpm)
N2 Rate
(scfm)
Fluid Type
7.00
5.00
6.00
10.35
5.00
1.50
24.40
7.50
9.00
7.97
5.00
5.00
5.00
5.00
0.00
2.00
5.00
2.00
5.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CUE-116
CLAV-1
CE-111
LECHADA UNICA
*SHUT-IN*
CE-111
MUD
MUD
MUD
MUD
CEMENTPRO Report
Well Name:
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
Centralizer Placement
Interval
Top MD:
Bottom MD:
Length:
7669.00 ft
9613.00 ft
1944.00 ft
Standoff
Minimum Standoff Required:
85.0 %
Minimum Standoff Achieved:
97.9 % at 7903.00 ft
Rigid Centralizers:
Description: RIGIDO LINER 7 X 8,375" Manufacturer:
Model:
7.00 in
From MD
(ft)
To MD
(ft)
Spacing
(ft)
Number of
Centralizers
7843.00
8443.00
120.00
Rigid
8443.00
9563.00
80.00
14
Rigid
Inner Diameter:
Type
Description
RIGIDO LINER 7
X 8,375"
RIGIDO LINER 7
X 8,375"
Cumulative
Volume
(bbls)
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
94.93
99.85
104.78
109.71
114.63
119.56
CEMENTPRO Report
Pumping
Flowrate
(bpm)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Slurry
Density
(ppg)
Wellhead
Pressure
(psi)
7.20
7.20
7.20
7.20
7.20
7.20
7.20
8.40
8.40
8.40
8.40
8.40
9.00
9.00
9.00
9.00
9.00
9.00
13.61
13.61
13.61
13.61
13.61
13.61
469.59
478.96
488.33
497.70
507.07
516.44
525.81
521.20
513.86
506.52
499.18
491.85
557.99
548.04
538.10
528.16
518.22
508.27
564.30
514.47
464.65
414.82
364.99
315.17
Bottomhole
ECD (ppg)
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.63
4.62
4.62
4.62
4.62
4.62
4.62
Free Fall
Depth (ft)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Well Name:
Well Location:
Design Date:
MOT-61A
Time (min)
Cumulative
Volume
(bbls)
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00
60.00
61.00
62.00
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
74.00
75.00
76.00
124.48
129.41
134.34
139.26
141.73
141.73
141.73
141.73
141.73
142.73
144.73
149.71
154.69
159.67
164.65
169.62
174.60
179.58
184.56
189.54
194.52
199.50
204.48
209.46
214.44
219.42
224.40
229.38
234.36
239.34
244.32
249.30
254.28
259.26
264.24
267.73
269.73
271.73
273.73
275.73
277.73
279.73
281.73
286.73
291.73
296.73
301.73
306.73
311.73
316.73
321.73
326.73
CEMENTPRO Report
Date
Formation Name:
Ancillary:
Pumping
Flowrate
(bpm)
5.00
5.00
5.00
5.00
0
0
0
0
0
2.00
2.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Slurry
Density
(ppg)
Wellhead
Pressure
(psi)
13.61
13.61
13.61
13.61
13.61
13.61
13.61
13.61
13.61
9.00
9.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
265.34
215.52
241.08
241.08
0
0
0
0
0
19.60
19.60
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
99.59
20.29
20.29
20.29
20.29
20.29
20.29
20.29
20.29
233.74
288.53
488.24
687.98
869.04
1041.14
1213.24
1385.34
1577.91
18/04/2012
CPVEN
Bottomhole
ECD (ppg)
4.62
4.62
4.64
4.65
4.63
4.60
4.59
4.57
4.56
4.56
4.57
4.59
4.60
4.61
4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.61
4.59
4.57
4.55
4.53
4.51
4.49
4.48
4.48
4.49
4.49
4.50
4.52
4.54
4.55
4.55
4.55
4.56
4.57
4.57
4.58
4.59
4.71
4.76
4.94
5.12
5.28
5.43
5.59
5.74
5.91
Free Fall
Depth (ft)
0
0
47.44
119.13
314.88
545.16
700.48
803.62
871.60
873.23
843.65
704.38
614.45
557.33
522.35
499.20
481.04
466.21
453.68
442.58
435.00
444.18
467.07
499.44
538.39
581.89
619.80
635.76
627.03
595.32
550.36
498.07
438.57
359.14
268.49
237.38
234.97
210.66
176.89
139.78
103.10
66.70
31.66
0
0
0
0
0
0
0
0
0
Well Name:
Well Location:
Design Date:
MOT-61A
Time (min)
Cumulative
Volume
(bbls)
77.00
78.00
79.00
80.00
81.00
82.00
83.00
83.71
328.72
330.71
332.70
334.70
336.69
338.68
340.67
342.10
CEMENTPRO Report
Date
Formation Name:
Ancillary:
Pumping
Flowrate
(bpm)
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
Slurry
Density
(ppg)
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
Wellhead
Pressure
(psi)
1219.01
1280.81
1342.60
1382.99
1413.17
1443.35
1473.53
1495.30
18/04/2012
CPVEN
Bottomhole
ECD (ppg)
5.61
5.67
5.72
5.75
5.77
5.79
5.80
5.82
Free Fall
Depth (ft)
0
0
0
0
0
0
0
0
Well Name:
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
8000
6400
4800
3200
1600
0
0
20
40
60
80
100
Time (min)
Bottomhole ECD (ppg)
60000
4.80
48000
3.60
36000
2.40
24000
1.20
12000
20
40
60
80
100
Time (min)
CEMENTPRO Report
Well Name:
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
6
8
18/04/2012
CPVEN
4.80
6.40
16
3.60
4.80
12
2.40
3.20
1.20
1.60
0
00
0
20.5
41.0
61.5
82.1
103
Time (min)
Pumping Flowrate (bpm)
Return Flowrate (bpm)
Free Fall Depth (ft)
0e-307
2e+01
4e+01
6e+01
8e+01
1e+02
6.50
9
2000
5
7
1200
3.50
5
400
2
3
-400
0.50
1
-1200
-1
-1
-2000
CEMENTPRO Report
Time (min)
Well Name:
Well Location:
Design Date:
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
Standoff (%)
0
Lateral Force (lbf) 0
7000
7800
Depth (ft)
8600
9400
10200
11000
0
CEMENTPRO Report
24
48
72
96
120
Well Name:
Well Location:
Design Date:
6
6.50
MOT-61A
Date
Formation Name:
Ancillary:
18/04/2012
CPVEN
4.80
5.20
1600
3.60
3.90
1200
2.40
2.60
800
1.20
1.30
400
0
00
0
30
60
90
120
150
Time (min)
CEMENTPRO Report