PAGE NO ITEM NO DESCRIPTION UNIT SECTION 1 BILL NO. 1 PRELIMINARIES CONDITIONS OF CONTRACT AND PRELIMINARIES The Conditions of Contract are the JBCC Series 2000 Principal Building Agreement inclusive of the Contract Data Addenda EC and CE (Edition 5.0 (reprint 1) of July 2007) prepared by the Joint Building Contracts Committee Inc amended as hereinafter described The ASAQS Preliminaries (August 2010 edition) published by the Association of South African Quantity Surveyors for use with the said JBCC Principal Building Agreement inclusive of the Contract Data Addenda EC and CE shall be deemed to be incorporated hereinafter Contractors are referred to the abovementioned documents for the full intent and meaning of each clause thereof These clauses are hereinafter referred to by clause number and heading only. Where standard clauses or alternatives are not entirely applicable to this agreement such modifications, corrections or supplements as will apply are given under each relevant clause heading and such modifications, corrections or supplements shall take precedence notwithstanding anything contrary contained in the abovementioned documents Where any item is not relevant to this specific agreement such item is marked not applicable PREAMBLES FOR TRADES The Model Preambles For Trades (2008 edition) as published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said Model Preambles will be entertained Supplementary preambles are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles shall take precedence over the provisions of the said Model Preambles The contractor's prices for all items throughout these bills of quantities must take account of and include for all of the obligations, requirements and specifications given in the said Model Preambles and in any supplementary preambles. PRICING OF PRELIMINARIES Should the contractor select Option A in terms of subclause 3.2.1 in the Contract Data (Part two: Data provided by the Contractor - CE) for the purpose of adjustment of these preliminaries, the amount entered into the amount column in these preliminaries is to be divided into one or more of the three categories provided namely Fixed (F), Value Related (V) and Time Related (T) SECTION A - PRINCIPAL BUILDING AGREEMENT Definitions 2 A Definitions and interpretation (clause 1.0) Item F:............................ V:........................... T:......................... Objective and Preparations 2 B Clause 2.0 - Offer, acceptance and performance obligations Item F:............................. V:............................ T:............................ 2 C Clause 3.0 - Documents Item The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any [3.9] F:............................. V:............................ T:............................ 2 D Clause 4.0 - Design responsibility Item F:............................. V:............................ T:............................ 2 E Clause 5.0 - Employer's agents Item F:............................. V:............................ T:............................ 2 F Clause 6.0 - Contractor's site representative Item F:............................. V:............................ T:............................ 2 G Clause 7.0 - Compliance with laws and regulations CONT 3 A Clause 8.0 - Works risk Item F:............................. V:............................ T:............................ 3 B Clause 9.0 - Indemnities Item F:............................. V:............................ T:............................ 3 C Clause 10.0 - General insurances Item F:........................... V:............................T:........................... 3 D Clause 11.0 - Special insurances Item F:............................. V:............................ T:........................... 3 E Clause 12.0 - Effecting insurances Item F:............................ V:............................T:.......................... 3 F Clause 13.0 - Assignment Item F:............................. V:............................ T:............................ 3 G Clause 14.0 - Security Item F:............................. V:............................ T:............................ Execution 3 H Clause 15.0 - Preparation for and execution of the works Item F:............................. V:............................ T:............................ 3 J Clause 16.0 - Site and access Item F:............................. V:............................ T:............................ 3 K Clause 17.0 - Contract instructions Item F:............................. V:............................ T:............................ 4 A Clause 18.0 - Setting out of the works Item The contractor shall notify the principal agent if any encroachments of adjoining foundations, buildings, structures, pavements, boundaries, etc. exist in order that the necessary arrangements may be made for the rectification of any such encroachments [18.1] F: ............................ V:...........................T:........................... 4 B Clause 19.0 - Temporary works and plant Item F:............................. V:............................ T:............................ 4 C Clause 20.0 - Nominated subcontractors Item Refer to the provisions on general attendance hereinafter F:............................. V:............................ T:............................ 4 D Clause 21.0 - Selected subcontractors Item General attendance of n/s subcontractors for pricing by the contractor shall be in accordance with the n/s agreement. Notwithstanding this provision, general attendance shall be deemed to include for the contractor to provide free of charge to any n/s subcontractor such scaffolding as may reasonably be required by such n/s subcontractor for the execution of the relevant subcontract work F:............................. V:............................ T:............................ 4 E Clause 22.0 - Employer's direct contractors Item The employer will have direct contractors on site within the practical completion dates. The contractor must provide them access to the site within reasonable terms. F:............................. V:............................ T:............................ 4 F Clause 23.0 - Contractor's domestic subcontractors Item F:............................. V:............................ T:............................ Completion 4 G Clause 24.0 - Practical completion Item F:............................. V:............................ T:............................ 5 A Clause 25.0 - Works completion Item F:............................. V:............................ T:............................ 5 B Clause 26.0 - Final completion Item F:............................. V:............................ T:............................ 5 C Clause 27.0 - Latent defects liability period Item F:............................. V:............................ T:............................ 5 D Clause 28.0 - Sectional completion Item To be advised by the client F:............................. V:............................ T:............................ 5 E Clause 29.0 - Revision of date for practical completion Item The removal and replacement of materials and/or workmanship which do not conform to specification or the contract drawings shall not constitute grounds for the extension of the construction period nor for the adjustment of the contract value [29.3] F:............................. V:............................ T:............................ 5 F Clause 30.0 - Penalty for late or noncompletion Item F:............................. V:............................ T:............................ Payment 6 A Clause 31.0 - Interim payment Item The contractor will be paid within 14 days from the date of issue of the payment certificate. The inclusion of materials and goods stored off site in the amount authorised for payment in terms of clause 31.4 shall be at the sole discretion of the principal agent and such inclusion shall only be considered upon the provision, by the contractor, of an approved guarantee issued by a registered commercial bank. Clause 31.6.5 is therefore not applicable [31.4.2, 31.6.5] All payments will be done in Nigeria into a bank account selected by the contractor. Payments will be done 100% in Nigerian Naira. F:............................. V:............................ T:............................ 6 B Clause 32.0 - Adjustment to the contract value Item All fluctuations in costs, with the exception of fluctuations in the rate of Value Added Tax, shall be for the account of the contractor [32.13] Where prices are submitted by the contractor or n/s subcontractor during the progress of the works in respect of contract instructions or in regard to a claim under the terms of the agreement and notwithstanding the fact that such prices may be used in an interim payment certificate, there is to be no presumption of acceptance. Should the principal agent wish to accept any such prices prior to the issue of the certificate of final completion, it shall be in writing F:............................. V:............................ T:............................ 6 C Clause 33.0 - Recovery of expense and loss Item F:............................. V:............................ T:............................ 6 D Clause 34.0 - Final account and final payment Item F:............................. V:............................ T:............................ 6 E Clause 35.0 - Payment to other parties Item F:............................. V:............................ T:............................ Termination 7 A Clause 36.0 - Termination by employer - contractor's default Item F:............................. V:............................ T:............................ 7 B Clause 37.0 - Termination by employer - loss and damage Item F:............................. V:............................ T:............................ 7 C Clause 38.0 - Termination by contractor - employer's default Item F:............................. V:............................ T:............................ 7 D Clause 39.0 - Termination - cessation of the works Item F:............................. V:............................ T:............................ Dispute 7 E Clause 40.0 - Settlement of disputes Item F:............................. V:............................ T:............................ Contract agreement 7 F Clause 41.0 - Post tender provisions Item The required post tender information shall be inserted in the post tender provisions after consultation with the contractor F:............................ V:........................... T:......................... 7 G Clause 42.0 - Contractual agreement Item The required information of the contracting parties and the amount of the accepted contract sum shall be inserted in the contractual agreement for signature of the agreement by the contracting parties F:............................ V:........................... T:......................... SECTION B - PRELIMINARIES Definitions and interpretation 7 H Clause 1.0 - Definitions and interpretation Item F:............................. V:............................ T:............................ Documents 8 A Clause 2.1 - Checking of documents Item F:............................. V:............................ T:............................ 8 B Clause 2.2 - Bills of quantities CONT The quantities are provisional Yes F:............................. V:............................ T:............................ Item 8 C Clause 2.3 - Availability of construction documentation Item Construction documentation is complete No The budgetary allowances and provisional amounts included in this agreement will be separately procured, based on multiple procurement of selected subcontractors during the construction period F:............................. V:............................ T:............................ Previous work and adjoining properties 8 D Clause 3.1 - Previous work - dimensional accuracy Item F:............................. V:............................ T:............................ 8 E Clause 3.2 - Previous work - defects Item F:............................. V:............................ T:............................ 8 F Clause 3.3 - Inspection of adjoining properties Item F:............................. V:............................ T:............................ Samples, shop drawings and manufacturer's instructions 8 G Clause 4.1 - Samples of materials Item F:............................. V:............................ T:............................ 8 H Clause 4.2 - Workmanship samples Item F:............................. V:............................ T:............................ 9 A Clause 4.3 - Shop drawings Item F:............................. V:............................ T:............................ 9 B Clause 4.4 - Compliance with manufacturer's instructions Item F:............................. V:............................ T:............................ Deposits and fees 9 C Clause 5.1 - Deposits and fees Item F:............................. V:............................ T:............................ Temporary services 9 D Clause 6.1 - Water Item F:............................. V:............................ T:............................ 9 E Clause 6.2 - Electricity Item The contractor is required to make a timeous application for builders supply. No claims in this regard will be entertained F:............................. V:............................ T:............................ 9 F Clause 6.3 - Telecommunication facilities Item F:............................. V:............................ T:............................ 9 G Clause 6.4 - Ablution facilities Item F:............................. V:............................ T:............................ Prime cost amounts 9 H Clause 7.1 - Responsibility for prime cost amounts Item F:............................. V:............................ T:............................ Special attendance on n/s subcontractors 9 J Clause 8.1 - Special attendance Item F:............................. V:............................ T:............................ General 10 A Clause 9.1 - Protection of the works Item F:............................. V:............................ T:............................ 10 B Clause 9.2 - Protection/isolation of existing/sectionally occupied Item works F:............................. V:............................ T:............................ 10 C Clause 9.3 - Security of the works Item F:............................. V:............................ T:............................ 10 D Clause 9.4 - Notice before covering work Item F:............................. V:............................ T:............................ 10 E Clause 9.5 - Disturbance Item F:............................. V:............................ T:............................ 10 F Clause 9.6 - Environmental disturbance Item F:............................. V:............................ T: ......................... 10 G Clause 9.7 - Works cleaning and clearing Item F:............................. V:............................ T:............................ 10 H Clause 9.8 - Vermin Item F:............................. V:............................ T:............................ 10 J Clause 9.9 - Overhand work Item F:............................. V:............................ T:............................ SECTION C - SPECIFIC PRELIMINARIES 10 K Site instructions Item Contract instructions issued on site are to be recorded in triplicate in a site instruction book which is to be maintained on site by the contractor F:............................. V:............................ T:............................ 11 A Warranties for material and workmanship Item Where warranties for materials and/or workmanship are called for, the contractor shall obtain a written warranty, addressed to the employer, from the firm supplying the materials and/or doing the work and shall deliver same to the principal agent on the final completion of the contract. The warranty shall state that workmanship, materials and installation are warranteed for a specified period from the date of final completion and that any defects that may arise during the specified period shall be made good at the expense of the firm supplying the materials and/or doing the work, upon written notice to do so. The warranty will not be enforced if the work is damaged by defects in the construction of the building in which case the responsibility for replacement shall rest entirely with the contractor F:.......................V:.........................T:............................ 11 B Co-operation of the contractor for cost management Item It is specifically agreed that the contractor accepts the obligation of assisting the principal agent in implementing proper cost management. The contractor will be advised by the principal agent of all cost management procedures which will be implemented to ensure that the final building cost does not exceed the budget. The principal agent undertakes to make available to the contractor all budgetary allowances and cost assessments/reports to enable the proper procedure to be implemented and the contractor shall attend all cost plan review and cost management meetings. The contractor undertakes to extend these procedures, as necessary, to all subcontractors F:...........................V:.........................T:......................... 11 C Propping of floors below Item The contractor is advised that propping of floors below may be required if he wishes to use any areas of completed suspended reinforced concrete slabs for vehicle access, storage of materials and goods and location of plant, scaffolding, etc. The location of these areas and any necessary propping shall be approved by the principal agent and the cost thereof shall be borne by the contractor F:......................... V:........................... T:.......................... 12 A Testing of windows for watertightness Item Each window shall be tested for watertightness with water sprayed on using adequate pressure. If in the opinion of the principal agent, the pressure proves to be inadequate, then the pressure shall be boosted by means of compressed air or other approved means F:....................... V:......................... T:......................... 12 B Testing of flat roof waterproofing for watertightness Item Flat roof waterproof areas shall be prepared with small sand dykes around them of a size and enclosing an area approved by the principal agent, flooded with water and kept "ponded" for at least 36 hours as a test to ensure the watertightness of the waterproofing and before any further construction work is carried out above the waterproofing F:....................... V:........................... T:............................ 12 C Confidentiality Item The contractor undertakes to maintain in confidence any and all information regarding this project and shall obtain appropriate similar undertakings from all subcontractors and suppliers. Such information shall not be used in any way except in connection with the execution of the works No information regarding the project shall be published or disclosed without the prior written consent of the employer F:............................ V:........................... T:......................... 12 D Tender Drawings Item The following is a list of all the tender drawings that was measured to compile these Bills of Quantities. Architect: Wetworks Package drawings Revision A Structural: P2108-S-001 Rev.F P2108-S-002 Rev.E P2108-S-003 Rev.E P2108-S-004 Rev.E SUMMARY OF CATEGORIES 13 Category: Fixed Category: Value Category: Time SECTION 2 BILL NO 1 FOUNDATIONS EARTHWORKS Excavate in pickable material as described not exceeding 2m deep below natural or reduced ground level including the closing off and removal of any drains or pipes encountered in the excavations and deposit remainder of excavated material on site (backfilling of trenches measured elsewhere) 15 A Excavate for strip footings m3 15 B Excavate for retaining wall footings m3 15 C Excavate for thickening of surface beds m3 15 D Excavate for pile caps m3 15 E Excavate for lift pit m3 Excavate back vertical face of excavation in pickable material including all backfilling, compaction, etc, as described not exceeding 1.5m deep for placing and removal of formwork to 15 F Sides of strip footings against excavated face m2 15 G Sides of retaining wall footings against excavated face m2 15 H Sides of pile caps against excavated face m2 Excavate back vertical face of excavation in pickable material including all backfilling, compaction, etc, as described exceeding 1.5m but not exceeding 3m deep for placing and removal of formwork to 15 J Sides of lift shaft base against excavated face m2 Extra over all excavations for carting away 15 K Extra over all excavations for carting away excavated material m3 to a dumping site to be loctaed by the contractor (Contractor must allow for bulking) Extra over trenches and holes excavation in earth for excavation in 16 A Soft rock m3 16 B Hard rock m3 Extra over working space excavations in earth for excavation in 16 C Soft rock m2 16 D Hard rock m2 Risk of collapse of excavations 16 E Sides of trench and hole excavations not exceeding 1,5m deep m2 16 F Ditto, but exceeding 1,5m and not exceeding 3m deep m2 Keeping excavations free of water 16 G Allow for baling, pumping or otherwise keeping the excavations Item free from water FILLING, ETC Clean earth or stone filling from the excavations in backfilling to trenches and holes, levelled, watered, rammed and consolidated in layers not exceeding 225mm thick to 100% Modified AASHTO density 16 H Backfilling to strip footings m3 16 J Backfilling to retaining wall footings m3 16 K Backfilling to pile caps m3 16 L Backfilling behind walls in lift pit m3 Filling below solid floors 16 M 150mm Thick layer of approved clean sand filling evenly raked m2 under solid floors and compacted to 100% Modified AASHTO density Compaction of surfaces 17 A Compaction of ground surfaces under floors/ slabs, etc, m2 including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Modified AASHTO including testing of compaction levels CONCRETE NOTE All cement used in concrete are to be approved Ordinary Portland Cement (OPC) as specified by the Engineer. ------------- Mass concrete 10MPa at 28 days in 17 B Filling to cavities of cavity walls m3 Mass concrete 15MPa at 28 days in 17 C Blinding under strip footings m3 17 D Blinding under retaining wall footings m3 17 E Blinding under pile caps m3 17 F Blinding under lift shaft bases m3 Reinforced concrete 25MPa/19 at 28 days in 17 G Strip footings m3 17 H Retaining wall footings m3 17 J Columns m3 17 K Liftshaft walls m3 17 L Retaining walls m3 17 M Pile caps m3 17 N Lift shaft bases m3 TRIMMING ETC Cutting off and removing excess length of precast concrete pile for an average length of 1 600mm high, including stripping back for a height not exceeding 600mm to expose reinforcement, trimming to defined level and bending reinforcement as necessary for casting into pile cap 18 A 500mm Diamter piles No Extra over cutting off for carting away 18 B 500mm Diameter piles with average length of 1 600mm No FORMWORK Rough formwork (degree of accuracy III) to sides of 18 C Strip footings m2 18 D Retaining wall footings m2 18 E Retaining walls m3 18 F Pile caps m2 18 G Stair case bases m2 18 H Lift shaft bases m2 18 J Inner face of liftshaft walls m2 18 K Outer face of liftshaft walls m2 18 L Square columns m2 18 M Rectangular columns m2 18 N Circular columns 450mm high No WATERPROOFING Clean down and prepare surfaces, prime with bitumen primer and supply and fix 4mm thick Derbigum SP4 or other approved special polyester torch fused double reinforced waterproofing membrane with 75mm side and 100mm end laps and 10 x 10mm triangular bitumen mastic asphalt along terminating edges abutting concrete or brick surfaces, laid by an approved firm of Specialists who shall provide a ten year guarantee 18 P Lift shaft base and walls m2 19 A Retaining walls and footings m2 Flintkote emulsion waterproofing to 19 B Concrete columns, beams, etc m2 10mm Softboard protection to waterproofing 19 C 10mm Softboard behind retaining walls as protection m2 MOVEMENT JOINTS, ETC Expansion joints with jointex or other equal approved compressible material 19 D 10mm Jointex vertically between brickwork and concrete m JOINT SEALERS, ETC Sikaflex Pro 2HP or similar approved polyurathane joint sealant dressed into joint, including cleaning an priming both sides with Sikaflex primer - 3 strip or similar approved product all in accordance with manufacturer's instructions 19 E 10mm wide x 8mm Deep dressed into expansion joint between m concrete and brickwork vertical surfaces REINFORCEMENT Reinforcement for FOUNDATIONS included with Concrete, Formwork and Reinforcement. ------------- BLOCKWORK Refer to the MASONRY trade for Supplementary Preambles Hollow sandcrete blocks in class II mortar 19 F 230mm Walls m2 Blockwork reinforcement 19 G 150mm wide Reinforcement bulit in horizontally m Galvanised hoop iron cramps, ties, etc 19 H 30 x 1,6mm Wall tie 500mm long with one end fixed to concrete No column and other end built into blockwork PLASTERING EXTERNAL PLASTER One coat cement plaster to blockwork to 20 A Walls m2 SECTION 2 BILL NO 2 CONCRETE, FORMWORK AND REINFORCEMENT SUPPLEMENTARY PREAMBLES Cost of tests The costs of making, storing and testing concrete test cubes as required under clause 7 Tests of SABS 1200 G, shall include the cost of providing cube moulds necessary for this purpose, for testing costs and for submitting reports on the tests to the Architect. The testing shall be undertaken by an independent firm or institution nominated by the Contractor to the approval of the Architect. (Test cubes are measured separately). Formwork Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for re-conditioning as necessary before re-use. The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself. Formwork to soffits of solid slabs, etc, shall be deemed to be to slabs not exceeding 275mm thick unless otherwise described. Formwork to sides of bases, pile caps, ground beams, etc, will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, for which provision is made in "Earthworks". ------------- TEST CUBES 23 A Allow for preparing a set of six concrete strength test cubes, Sets each size 150 x 150 x 150mm, sending them to an approved laboratory for testing and paying all charges in connection therewith CONCRETE NOTE All cement used in concrete is to be approved Ordinary Portland Cement (OPC) as specified by the Engineer. Mass concrete 25MPa at 28 days 23 B Surface beds cast in panels m3 Reinforced concrete 25MPa/19mm at 28 days in 23 C Surface beds cast in panels m3 23 D Slabs including beams and inverted beams m3 23 E Ramps including beams and inverted beams m3 23 F Isolated beams m3 23 G Walls m3 23 H Lift shaft walls m3 23 J Columns m3 CONCRETE SUNDRIES Finishing top surface of concrete smooth with a power float 23 K Surface beds, slabs, etc m2 Finishing top surfaces of concrete smooth with a wood float 23 L Slabs m2 23 M Ramps m2 SLEEVES AND HOLES Plastic sleeves for pipes not exceeding 100mm diameter 24 A Sleeve not exceeding 250mm long No 24 B Sleeves exceeding 250mm and not exceeding 500mm long No
Plastic sleeves for pipes exceeding 100mm and not exceeding 200mm diameter 24 C Sleeve not exceeding 250mm long No 24 D Sleeve exceeding 250mm and not exceeding 500mm long No Core drill holes 24 E 25mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 24 F 50mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 24 G 75mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 24 H 100mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 24 J 150mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 24 K 200mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick FORMWORK FORMWORK (DEGREE OF ACCURACY III) Formwork to sides 24 L Square columns exceeding 5m not exceeding 6,5m high m2 24 M Ditto, but exceeding 9,5m and not exceeding 11m above m2 bearing level 24 N Rectangular columns exceeding 5m not exceeding 6,5m high m2 24 P Ditto, but exceeding 9,5m not exceeding 11m high m2 24 Q Outer face of lift shaft walls exceeding 5m and not exceeding m2 6,5m high 25 A Inner face of lift shaft walls exceeding 14m and not exceeding m2 15,5m high 25 B Walls exceeding 5m not exceeding 6,5m high m2 25 C Isolated beams exceeding 5m and not exceeding 6,5m high m2 25 D Ditto, but exceeding 22,5m and not exceeding 24m high m2 25 E Beams below concrete m2 25 F Ditto, but circular on plan m2 25 G Beams below concrete exceeding 5m and not exceeding 6,5m m2 high 25 H Ditto, but circular on plan m2 25 J Ramps m2 25 K Ditto, but circular on plan m2 25 L Slabs m2 25 M Ditto, but circular on plan m2 25 N Slabs exceeding 5m and not exceeding 6,5m high m2 25 P Ditto, but circular on plan m2 25 Q Beams above concrete m2 25 R Ditto, but circular on plan m2 25 S Beams above concrete exceeding 5m and not exceeding 6,5m m2 high 25 T Ditto, but circular on plan m2 25 U Special beam type 4 exceeding 22,5m not exceeding 24m high m (Refer drawing A600-05 Rev. A) 25 V Ditto, but circular on plan m 25 W Edges, risers, ends and reveals not exceeding 300mm wide or m high 25 X Ditto, exceeding 5 and not exceeding 6,5m above bearing level m 25 Y Ditto, but circular on plan m Formwork to soffits 26 A Isolated beams exceeding 5m and not exceeding 6,5m high m2 26 B Beams below concrete exceeding 5m and not exceeding 6,5m m2 high 26 C Ditto, but circular on plan m2 26 D Beams below concrete not exceeding 300mm wide m 26 E Ditto, but circular on plan m 26 F Isolated beams exceeding 5m and not exceeding 6,5m high, m not exceeding 300mm wide 26 G Isolated beams exceeding 22,5m and not exceeding 24m high, m not exceeding 300mm wide Soffit of slabs not exceeding 280mm thick 26 H Ramps propped up exceeding 1.5m and not exceeding 3.5m m2 high 26 J Slabs propped up exceeding 1.5m and not exceeding 3.5m m2 high 26 K Slabs propped up exceeding 5m and not exceeding 6,5m m2 26 Formwork to circular columns 26 L 500mm Diameter column 5220mm high No Boxing out formwork to form 26 M 320mm Wide x 280mm High toe to edge of slab m 26 N Ditto, but circular on plan m Boxing in formwork to form 26 P 300mm Wide x 200mm High recess to edge of isolated beam m MOVEMENT JOINTS Two layers of 375 micron dampproof course in slip joints between horizontal concrete and brick surfaces including cement mortar bed 26 Q Not exceeding 300mm wide m Soft joints with 10mm Jointex or similar approved closed cell expanded polyethylene pre-formed expansion joint filler between brickwork and concrete surfaces, including blocking piece for tearing out later 27 A Not exceeding 300mm wide m Jointex or other approved closed cell expanded polyethylene pre-formed expansion joint filler including necessary blocking piece for tearing out later 27 B 10mm Joints not exceeding 300mm wide m Saw cut joints 27 C 3 x 30mm Saw cut joint in top of concrete m Toggle joints (Construction joint) H2 27 D Toggle joint formed in surface beds not exceeding 300mm thick m including any necessary formwork, etc, with Flintkote or other approved emulsion waterproofing to one surface, with and including polysulphide sealer dressed into toggle joint, etc STEEL REINFORCEMENT Mild steel reinforcement to structural concrete work 27 E R8 Diameter bars t High tensile steel reinforcement to structural concrete work 27 F Y32 Diameter bars t 27 G Y25 Diameter bars t 27 H Y20 Diameter bars t 27 J Y16 Diameter bars t 27 K Y12 Diameter bars t 27 L Y10 Diameter bars t SECTION 2 BILL NO 3 MASONRY SUPPLEMENTARY PREAMBLES BLOCKWORK Concrete masonry units Blocks are to be either solid or hollow modular dense concrete masonry units having a compressive strength of 7MPa Wall ties for blockwork Wall ties shall be polypropylene ties complying with BS 76377. Ties for hollow walls shall be of sufficient length to allow not less than 75mm of each end to be built into the blockwork. Ties are to be spaced at intervals of not more than 1m in the horizontal direction and not more than 400mm staggered in the vertical direction except at openings, vertical joints or ends of walls where they are to be placed vertically above each other Blockwork Blockwork shall comply with SANS 10145 "Concrete Masonry Construction" Surfaces to be plastered shall have joints raked out to a depth of at least 10mm to provide a key. Cavities of hollow walls shall be kept free of mortar droppings or other undesirable matter. Every second perpend of the bottom course of the external skin of hollow walls shall be left open as a weep hole Standard complementary blocks Descriptions of blockwork shall be deemed to include standard complementary blocks such as corner, three-quarter, half and quarter blocks required in the construction of corners, reveals, jambs, ends, etc to solid and hollow walls and for bonding as necessary Hollow walls Descriptions of hollow walls shall be deemed to include leaving every fifth perpend of the bottom course of the external skin open as a weep hole BLOCKWORK Hollow sandcrete blocks in class II mortar 30 A 150mm Walls m2 30 B 150mm Walls circular on plan m2 30 C 190mm Walls upstand on concrete roof m2 30 D 230mm Walls m2 30 E 480mm Walls in upstand wall on concrete roof m2 30 F 230mm Walls in beamfilling m2 BLOCKWORK SUNDRIES 2,5mm Blockwork reinforcement 30 G 75mm Wide reinforcement built in horizontally m 30 H 150mm Wide reinforcement built in horizontally m Galvanised hoop iron cramps, ties, etc 30 J 30 x 1,6mm Wall tie 500mm long with one end shot pinned to No concrete and other end built into blockwork Wall bonding ties 30 K 70mm Wide galvanised expanded steel wall bonding tie No 500mm long built horizontally into blockwork at wall intersections, construction joints, etc PRECAST CONCRETE Copings 30 L Precast concrete parapet or wall coping size 300mm wide x m 100mm high overall with sloping top (One side 100mm high and other side 50mm high) SECTION 2 BILL NO 4 WATERPROOFING SUPPLEMENTARY PREAMBLES Note: Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Description of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs. DAMPPROOFING WALLS AND FLOORS Pro-struct Bituthene 3000 or similar self adhesive membrane laid with minimum 150mm overlaps, joints to be sealed with pressure sensitive double sided tape applied over the leading edge of the joint, all in accordance with the manufacturer's instructions 32 A In walls, under sills, etc m2 One layer 500 micron green polyethylene waterproofing membrane to 32 B Under surface beds/ slabs m2 Prepare and apply Super Laykold or similar approved flexible, fibre reinforced waterproofing system, all in accordance with the manufacturer's instructions 32 C On walls m2 Prepare and apply Super Laycryl acrylic waterproofing system or similar approved, all in accordance with the manufacturer's instructions 32 D On walls m2 WATERPROOFING TO FLAT ROOFS, PARAPETS, ETC NOTE Waterproofing shall be Derbigum or other approved waterproofing membrane to approved finishing colour, applied by an approved specialist waterproofing Contractor, who shall provide a guarantee, all in accordance with the methods specified and materials supplied by Messrs Derbigum. --------------- Clean down and prepare surfaces, prime with Bituprime and apply first layer abe. Index Vis P 4mm non-woven polyester reinforced waterproofing membrane and apply the second layer abe. Index Fidia P 4mm on top of the first layer, ensuring both layers are fully bonded by means of torch-fusion having side laps of 100mm and 150mm respectively and 100 x 100mm gussets along terminating edges abutting concrete or brick surfaces, laid by an approved firm of Specialists who shall provide a ten year guarantee 33 A To smooth finished screed (elsewhere) on concrete roof to m2 slopes, including up- and downturns 33 B Ditto, but to ramps m2 33 C Extra over for working waterproofing around fullbore outlet No Protection 33 D 70mm Thick crushed stone layer on top of waterproofing m2 (Provisional) WATER STOPS Continuous Expandite Supercast Watafoil PVC waterstop or equal approved 33 E 150mm Waterstop m 33 F 200mm Ditto m 33 G 225mm Ditto m Galvanised Mild Steel Waterstops 33 H 150 x 0.8mm Waterstop m SEALING STRIPS, JOINT SEALANTS, ETC Approved polysulphide joint sealant dressed into joint, including protecting adjoining surfaces with masking tape 34 A 10 x 10mm In vertical joints between concrete and brickwork m including raking out expansion joint filler as necessary JOINT SEALERS, ETC Dow Corning DC 888 silicone sealing compound 34 B Horizontal joint between walls m Polysulphide heavy duty joint sealer including preparation of joint and filling with primer, etc, in strict accordance with the manufacturer's specification 34 C 3 x 10mm In saw cut joints in floor m 34 D 10 x 10mm In horizontal expansion joints including raking out m expansion joint filler as necessary SECTION 2 BILL NO 5 METALWORK SUPPLEMENTARY PREAMBLES Descriptions of bolts shall be deemed to include nuts and washers Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete GALVANISED MILD STEEL Cover flashing 36 A 2mm Thick galvanised steel flashing four times bent with m 700mm girth, including all fixing, etc. ALUMINIUM Watertight expansion joint systems 36 B MIGUTAN or similar approved expansion joint FP 80/35 NI Is m complete as per manufatures installations SECTION 2 BILL NO 6 PLASTERING SCREEDS 3:1 Cement screed on concrete 37 A 60mm Thick average laid to falls on concrete to receive m2 waterproofing (elsewhere) EXTERNAL PLASTER One coat cement plaster to blockwork (part on concrete) to 37 B Walls inclusive of flush columns m2 37 C Narrow widths not exceeding 300mm wide m2 One coat cement plaster to concrete to 37 D Walls m2 37 E Columns m2 37 F Top of 250mm wide concrete beam to form slope to one side m 37 G Ditto, but 280mm wide m 37 H Ditto, but 450mm wide m 37 J Ditto, but 500mm wide m 37 K Top of 500mm wide block wall to form slope to one side m INTERNAL PLASTER Cement plaster on blockwork (part on concrete) 37 L Walls m2 37 M On circular walls m2 37 N Columns m2 37 P On narrow widths m2 SECTION 2 BILL NO 7 BUILDERSWORK, ETC ELECTRICAL OPENINGS THROUGH WALLS, ETC Cutting through floors, walls and ceilings 38 A Cutting floor chasings 30mm wide into surface beds m 38 B Cutting floor chasings 30mm wide into concrete slab m 38 C Cutting vertical chasings 30mm wide into blockwork m 38 D Ditto, but 40mm wide m Making good internal cement plaster 38 E 30mm Wide vertical chasings m 38 F Ditto, but 40mm wide m 38 Making good concrete surface beds and screeds 38 G Floor surfaces where 30mm wide chasings were cut m2 Breaking out and forming opening for cable installation through block walls including necessary precast concrete lintels, close up opening around duct and making good all trades 38 H Opening 200 x 300mm through 230mm thick block wall No 38 J Ditto, but through 150mm thick block wall No SLEEVES, ETC Pipes 38 K 25mm Diameter PVC sleeve with draw wire laid in ground m under solid floors not exceeding 1m deep 38 L 25mm Diameter PVC sleeve with draw wire fixed to soffit of m concrete slab 39 A 110mm Diameter uPVC sleeve pipes including draw wires, laid m in ground not exceeding 1m deep under floors, roads and parking areas Fittings 39 B Extra for 25mm bend No 39 C Ditto, 110mm bend No AIR-CONDITIONING AND SMOKE VENTILATION PLINTHS 39 D Reinforced concrete plinth on roof slab size 5000 x 5000 x 10 No 0mm thick of 25MPa concrete including all necessary formwork and waterproofing and 55kg of R15 reinforcing. 39 E Ditto, but on natural ground level No OPENINGS THROUGH WALLS, ETC Breaking out and forming opening for air conditioning ducts through block walls including necessary precast concrete lintels, close up opening around duct and making good all trades 39 F Opening 100 x 100mm through 230mm thick block wall No 39 G Ditto, but 1000 x 500mm opening No 39 H Ditto, but 1200 x 1200mm opening No 39 J Opening 100 x 100mm through 150mm thick block wall No 39 K Ditto, but 1000 x 500mm opening No Penetrations through concrete slab including making good 39 L 200 x 200mm opening No 39 M 500 x 500mm opening No 39 N 1200 x 1200mm opening No 39 Penetrations through roof sheeting including making good 39 P 500 x 500mm opening No 39 Q 1200 x 1200mm opening No 0,6mm Galvanised sheetmetal flashings 40 A Baffle flashing at headwall 375mm girth m 40 B Counter flashing at headwall 155mm girth m REFRIGERATION H3 OPENINGS THROUGH WALLS, ETC Penetrations through 230mm thick block walls 40 C 100 x 800mm opening No 40 D 300 x 300mm opening No FIRE AND SPRINKLERS OPENINGS THROUGH WALLS, ETC Penetrations through 230mm thick block walls 40 E 80mm diameter opening No 40 F 150mm diameter opening No 40 G 250mm diameter opening No Penetrations through 150mm thick block walls 40 H 80mm diameter opening No 40 J 150mm diameter opening No 40 K 250mm diameter opening No Core drill holes 40 L 60mm Diameter hole through reinforced concrete exceeding No 200mm and not exceeding 300mm thick 40 M Ditto, but 150mm diameter hole No 40 N Ditto, but 250mm diameter hole No TRADE SUMMARY 42 1 FOUNDATIONS Page 2 CONCRETE, FORMWORK AND REINFORCEMENT Page 3 MASONRY Page 4 WATERPROOFING Page 5 METALWORK Page 6 PLASTERING Page 7 BUILDERSWORK ITEMS ON PROVISIONAL AMOUNTS Page FINAL SUMMARY 43 1 STANDARD PRELIMINARIES Page 2 THE PALMS EXTENSION : WETWORKS Page TOTAL OF BUILDING WORKS CONTINGENCIES Allow the sum of N 0.00 (Zero Naira) for Contingencies to be Item expended as directed by the Developer or deducted in whole or in part from the Contract Amount TOTAL OF BUILDING WORKS & CONTINGENCIES VALUE ADDED TAX at the rate of 5% VAT
QUANTITY RATE AMOUNT 114 98 89 1679 235 128 125 1762 93 1955 222 111 211 105 4028 187 1 23 11 170 56 20971 20971 7 11 4 62 6 68 81 45 33 13 1432 60 1053 1053 85 109 113 1558 47 25 151 139 300 110 11 309 386 1113 197 67 67 139 734 351 108 425 3100 129 14211 250 78 484 236 933 41692 17748 628 50 Rate only 50 Rate only 50 Rate only 50 Rate only 100 Rate only 100 Rate only 50 Rate only 100 Rate only 50 Rate only 50 Rate only 5747 124 1531 240 1177 1334 4210 187 130 90 11 9806 135 323 14 218 40 2687 202 374 32 279 57 75 20 686 136 60 30 4602 99 93 15 40 53 703 1208 37261 22 204 40 67 1136 2152 397 2502 0 2502 110 110 110 440 550 550 330 2737 639 57 10510 55 620 10276 33601 2411 120 559 Rate only 143 20971 1639 1639 17680 249 82 9406 800 Rate only 800 Rate only 800 Rate only 250 Rate only 1500 654 2503 724 327 70 17748 5930 8 4028 2306 270 559 85 167 127 21791 1277 3843 142 200 Rate only 200 Rate only 250 Rate only 250 Rate only 250 Rate only 250 Rate only 12 Rate only 35 Rate only 35 Rate only 400 Rate only 800 Rate only 300 Rate only 250 Rate only 35 Rate only 5 Rate only 3 Rate only 45 Rate only 25 Rate only 10 Rate only 35 Rate only 15 Rate only 15 Rate only 15 Rate only 10 Rate only 10 Rate only 10 Rate only 100 Rate only 100 Rate only 0 10 Rate only 10 Rate only 35 Rate only 15 Rate only 15 Rate only 50 Rate only 25 Rate only 15 Rate only 45 Rate only 10 Rate only 10 Rate only -21- -28- -31- -35- -36- -37- -41- -14- -42- 5