Вы находитесь на странице: 1из 2

Talisman Malaysia Limited

HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
JOB SAFETY ANALYSIS WORKSHEETS
JOB SAFETY ANALYSIS DATE PERMIT NO:
JOB Rig up project materials to location using crane
WORK TEAM Rigging Crew
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise Cold Work Permit for the job. Conflict with others activities.
2. Removal of project material from cargo basket. Unorganied lifting. Plan material for lifting.
!. "ransferring the material b# crane. $oad swings% load slips% load falls. Communication
failure.
Use tagline& do not stand under the load. Proper
communication with the operator.
'. $a#down the material at location b# crane. $oad swings% load slips% load falls. Use tagline& do not stand under the load. Proper
communication with the operator.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
(ave #ou done this job before) *
+re #ou knowledgeable with the job to be
performed)
*
(ave #ou referred to technical drawing*vendor
procedure*,,P)
* -s supervision*e.perienced assistance re/uired) *
PPE YES NO YES NO
(ard hat) * Work vest) *
,afet# 0lasses) * +pron) *
,afet# shoes) * 0oggle) *
1ar plugs) * 2ace shield) *
Right t#pe of gloves) * Respirator# protection) *
,afet# harness) *
POTENTIAL HAZARDS YES NO YES NO
,lipper# floor) * "rapped pressure) *
Congested area) * Pressuried e/uipment*vessel haard) *
"ripping) * 2ire*e.plosion haards) *
3verhead work) * 1scape route) *
Working at height) * ,hock*electricit#*static) *
,caffolding) * 4reaker rack out) *
,ecure ladder) * 5alve isolation) *
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
(eav# load) * 0uard rotating e/uipment) *
(ammer strikes) * Power tools haards) *
Pinch*trap finger% hand) * (igh noise area% double ear protection) *
4ack injur# haard) * ,park*hot slag) *
,winging object) * 4urn 6heat*chemical7) *
2alling object) * 8ear radioactive materials*sources) *
3thers closeb#) * * 1nvironmental spill) *
,harp object) * * (ose connection) *
1#e injur#) * Wind#) *
0rating*deck opening) * 9ust#) *
4locked drains) *
Prepared b#:;....................... ;; Reviewed b#: ;;;;;;;;;;.. Closed out: <<<<<<<<<<<<<<<<<<<<<<<<<
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0