BSC : Redhills Sl.No Description OK/NO/NA Remarks / Values 1 Entry to Site OK 2 Security availability NO 3 Access to lifts (if any) NO 4 Verify site registers & log books and update OK 5 Site Premises cleanliness OK 6 Any other issues Sl.No Description OK/NO/NA Remarks / Values 1 Aviation lamps working OK 2 LA Pole verticality OK 3 LA & supply cabling (physical look) OK 4 Door, Lock & Stopper Operation OK 5 Room Temperature & Humidity OK 6 AC functioning OK 7 Fire fighting Eqpt. OK 8 Bulk head lamp OK 9 All lights inside the shelter OK 10 Functinality of all external alarms from the site OK 11 Rain protection NO 12 Cleanliness of equipment room OK 13 Any other issues Sl.No Description OK/NO/NA Remarks / Values 1 Cooling effect OK 2 Auto / Manual mode Controller OK 3 Room Temperature OK 4 Visual inspection of AC cabling OK 5 PMU functioning OK 6 Auto / Manual mode functioning of PMU OK 7 Visual inspection of AC cabling OK 8 Earth pits properly maintained OK 9 Earth to Neutral Voltage (Measured value) OK 10 EB Power and DG Power (Measured Value) OK 11 DG Functioning and Condition OK 12 Electricity meter functinality OK 13 Power plant internal alarms OK 14 Current reading OK 15 Voltage reading OK 16 Battery bank capacity OK 17 Cell voltage (after discharging the battery 1/2 hour) OK 18 Visual inspection of Battery bank & Power plant OK 19 Check each rectifier Functioning OK 20 LVD setting done(LVD1/LVD2) OK 21 Any other issues Sl.No Description OK/NO/NA Remarks / Values 1 BTS Configuration OK 2 Check for input voltage OK 3 Check for Alarms OK 4 Check for LED status OK 5 Cabinet door locking OK 6 Alarm extension OK 7 Visual inspection OK 8 Check for dust accumulation, if required clean the filter OK 9 Cleanliness of DDF OK 10 RF Antenna & its pole Physical check OK Air conditioner & PowersUtilities PM Report Basic Details Infra Utilities BTS 11 RF Cabling physical look OK 12 Any other issues Sl.No Description OK/NO/NA Remarks / Values 1 TX Protection(1+0/1+1/ring) OK 2 Hop on NMS OK 3 Check for input voltage OK 4 Check for Alarms OK 5 Performance Moniter OK 6 Check the logs OK 7 Check for alarm extension if applicable OK 8 Check for node visibility on NMS OK 9 Check for patch code connection OK 10 Cleanliness of DDF OK 11 Whether DDF data updated ? OK 12 Check for dust accumulation, if required clean the filter OK 13 MW Antenna & its pole Physical check OK 14 Labelling done(pole/cable) OK 15 MW Cabling physical look OK 16 Receive level issue OK 17 Any other issues Far End ID Designed - Tx Power Rx level Achieved Rx Level Current-Tx Power - Rx level Punch Points NON DG site BSS Engineer Name : Signature P.RAVIKUMAR Microwave Radios Voltage Float 0 hours 0.5 hour 1 hour 1.5 hour 2 hour 2.5 hours 3 hours Voltage Float 0 hours 0.5 hour 1 hour 1.5 hour 2 hour 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 Total Total Panel Volt Panel Volt Amps Amps Engineer Name : Battery Bank 2 DISCHARGE TEST Battery Bank 1 Site Name: Site ID: BSC: Battery Capacity : Rectifier Capacity: Signature : 2.5 hours 3 hours Battery Bank 2 DISCHARGE TEST SITE NAME : SITE ID : BSC: DATE : Sl Nos Cable VSWR FREQUENCY(mhz) RL(db) 1 Tx0 OK 2 Tx1 OK 3 Tx2 OK 4 Rx0 OK 5 Rx1 OK 6 Rx2 OK Engineer Name :Y.Jaganmohanreddy Signature : 7/2/2013 VSWR MEASUREMENT New Colony,Miyapur APHY1081 KUKATPALLY Seq No. Alarm Status Loop Simulation 1 LLOP/HCT/Alternator Fault YES / NO 2 Mains Failure YES / NO 3 DG ON YES / NO 4 Low Fuel YES / NO 5 DG Fails to start YES / NO 6 DG Fails to stop YES / NO 7 Rectifier Fail alarm YES / NO 8 Mains Failure/Site on Battery YES / NO YES 9 Low Battery Voltage YES / NO 10 Battery Fuse Failure YES / NO 11 AC-1 Faulty YES / NO NO 12 AC-2 Faulty YES / NO NO 13 Both AC-1 & AC-2 faulty YES / NO NO 14 Fire & Smoke YES / NO 15 Door Open YES / NO 16 High Temperature YES / NO SITE ENGINEER :P.RAVIKUMAR External Alarm Verification SITE NAME: SITE ID: OMC ENGINEER :