Вы находитесь на странице: 1из 18

Project Control No.

SD-WTC

A NGEL LA ZA RO & A SSOCIA TES INTERNA TIONA L


Consulting Engineers and Architects
160 Panay Ave., Cor EDSA, Quezon City
Tel. No. 928-6533 924-1865 415-8782 924-1931 Fax No. (632) 924-1887

Date :
Client :
Subject :

Mar-14
MANILA EXPOSITION CENTER COMPLEX INC.
CAPACITY WORKSHEET FOR MAT/RAFT FOUNDATION NOMENCLATURE

Calc. by : A.H.SINCONIEGUE
Chk'd. by : RHONDA RAPIRAP
Appr'd. by : ANGEL L. LAZARO III, Ph. D.

1.0. Design Data


Total Mat foundation width, BT =

76.00 ft

Total Mat foundation length, LT =

96.00 ft
72.00 ft
90.00 ft

Effective Mat Foundation width,B =


Effective Mat Foundation length,L =
Perimeter Critical Column Width, bP =
Perimeter Critical Column Depth, dP =

24.00 in
24.00 in

Interior Critical Column Width, bi =

24.00 in

Interior Critical Column Depth, di =

24.00
2.00
3.00
29.00
1.00

Offset of Mat parallel to y'-dir, b' =


Offset of Mat parallel to x'-dir, d' =
Thickness of Mat Foundation, t =
Ratio of long to short side for perimeter col., p =
Ratio of long to short side for interior col., i =
411.3.1.1
411.13.2.1

Modification factor for Normal Weight concret, =


Perimeter Column constant, s =

1.00
1.00
30.00

411.13.2.1

Interior Column constant, s =

40.00

410.3.7.3

Capacity Flexural reduction factor, F =

0.90

Compressive block depth factor, 1 =

0.85

in
ft
ft
in

2.0. Materials Data


Concrete compressive strenght, fc' =
Steel Yeild Strenght, fy =

3000 psi
60000 psi

3.0. Soil Properties


2
1.5 kip/ft

Allowable Bearing Capacity, qall =


4.0. Design Calculations for Soil Pressure
Moment of Inertia with respect to x- axis, Ix

4
5603328.00 ft

Ix = BT*LT3/12 =
Moment of Inertia with respect to y-axis, Iy

4
3511808.00 ft

Iy = LT*BT3/12 =
Total mat foundation area, A

2
7296.00 ft

A = BT*LT =
Table 4.0.
COLUMN
GRID
A-1
C-1
E-1
G-1
A-2
C-2
E-2
G-2
A-3
C-3
E-3
G-3
A-4
C-4
E-4
G-4

Calculation for Moments with respect to x' and y'-axis

DL (kip)
100.00
180.00
190.00
110.00
180.00
360.00
400.00
200.00
190.00
400.00
440.00
200.00
120.00
180.00
180.00
120.00

SERVICE LOAD
LL (kip)
60.00
120.00
120.00
70.00
120.00
200.00
250.00
120.00
130.00
240.00
300.00
120.00
70.00
120.00
120.00
70.00

P(kip)
160.00
300.00
310.00
180.00
300.00
560.00
650.00
320.00
320.00
640.00
740.00
320.00
190.00
300.00
300.00
190.00

ULTIMATE LOAD(Pu)
(1.4*DL) + (1.7*LL)
242.00
456.00
470.00
273.00
456.00
844.00
985.00
484.00
487.00
968.00
1126.00
484.00
287.00
456.00
456.00
287.00

TOTAL
5780.00
8761.00
Note: * this table can be revise dependent to the number of points.

x
(ft)
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00

x*P
(kip.ft)
0.00
7200.00
14880.00
12960.00
0.00
13440.00
31200.00
23040.00
0.00
15360.00
35520.00
23040.00
0.00
7200.00
14400.00
13680.00
211920

Calculation for resultant distance with respect to x' & y' axis, (x' & y')
x' = (x*P)/P =

36.664 ft

y' = (y*P)/P =

44.273 ft

y
(ft)
90.000
90.000
90.000
90.000
60.000
60.000
60.000
60.000
30.000
30.000
30.000
30.000
0.00
0.00
0.00
0.00

y*P
(kip.ft)
14400.00
27000.00
27900.00
16200.00
18000.00
33600.00
39000.00
19200.00
9600.00
19200.00
22200.00
9600.00
0.00
0.00
0.00
0.00
255900

COLUMN
DESIGNATION
Perimeter Column
Perimeter Column
Perimeter Column
Perimeter Column
Interior Column
Perimeter Column
Perimeter Column
Interior Column
Perimeter Column
Perimeter Column
Perimeter Column
Perimeter Column

Calculation for eccentricities with respect to x' & y' axis, (ex & ey)
ex = x' - B/2 =

0.664 m

ey = y' - L/2 =

0.727 m

Note:

* for this worksheet the calculation of eccentricities are converted to positive sign to come up with positive result
for locating the proper resultant location check it by using manual calculation.
Calculation for moment cause by eccentricities, Mx & My
Mx = Pu*ey =

6366.12 KN.m

My = Pu*ex =

5820.46 KN.m

Determination for soil contact pressure, qo


q0 = Pu/A My*x/Iy Mx*y/Ix =
qo =
Table 4.1.
Point
Location
A-1
B-1
C-1
D-1
E-1
F-1
G-1
G-4
F-4
E-4
D-4
C-4
B-4
A-4
Note:

1.20

0.0017

0.0011

Calculation for soil contact pressure q qall


Pu /A
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

x
(ft)
-38.00
-24.00
-12.00
0.00
12.00
24.00
38.00
38.00
24.00
12.00
0.00
-12.00
-24.00
-38.00

0.0017 *x
(kip/ft2)
-0.063
-0.040
-0.020
0.000
0.020
0.040
0.063
0.063
0.040
0.020
0.000
-0.020
-0.040
-0.063

y
(ft)
48.000
48.000
48.000
48.000
48.000
48.000
48.000
-48.000
-48.000
-48.000
-48.00
-48.00
-48.00
-48.00

0.0011 *y
(kip/ft2)
-0.055
-0.055
-0.055
-0.055
-0.055
-0.055
-0.055
0.055
0.055
0.055
0.055
0.055
0.055
0.055

q
(kip/ft2)

qall
(kip/ft2)

Remarks

1.083
1.106
1.126
1.146
1.166
1.186
1.209
1.318
1.295
1.275
1.255
1.235
1.216
1.192

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant

* if result is non-compliant revised or adjust the geometry of the mat foundation


* this table can be revised idependent to the number of points.

5.0. Check if Mat Foundation Thickness is adequate, t


Critical perimeter exterior column, DLP =

190.00 kip

Critical perimeter exterior column, LLP=

130.00 kip

Critical perimeter interior column, DLi =

440.00 kip

Critical perimeter interior column, LLi=

300.00 kip

Calculation for factored perimeter column load , Up


203.3.1

Up = 1.4*DLP + 1.7*LLP =

487.00 kip

Calculation for factored interior column load , Ui


203.3.1

Ui = 1.4*DLi + 1.7*LLi =
Location Type of Column for Critical Perimeter :

1126.00 kip
Type - 2

Calculation for Critical Perimeter at Punching Shear on Perimeter Col., bo


411.13.2.2

1.0. bo =N.A

N.A in

411.13.2.2

2.0. bo = b' + 2*bp + 2*dp + 2*t =

132 in

411.13.2.2

3.0. bo =N.A

N.A in

411.13.2.2

4.0. bo =N.A

N.A in

Therefor adopt, bo =

132 in

Calculation for Nominal Strength provided by concrete perimeter column, Vc


411.13.2.1

1.0. Vc = 1/6*( 1 + 2/)**sqrt(fc')*bo*t =

3315145.25 kip

411.13.2.1

2.0. Vc = 1/12*(s *d/bo + 2)**sqrt(fc')*bo*t =

4746685.24 kip

411.13.2.1

3.0. Vc = 1/3**sqrt(fc')*bo*t =

2210096.83 kip

Thefore adopt min., Vc =

2210096.83 kip

Compliant

Calculation for Critical Perimeter at Punching Shear for Interior Col., bo


411.13.2.2

bo = 2*bi + 2*di + 4*t =

212.00 ft

Calculation for Nominal Strength provided by concrete at interior column, Vc


411.13.2.1

1.0. Vc = 1/6*( 1 + 2/)**sqrt(fc')*bo*t =

5324324.18 kip

411.13.2.1

2.0. Vc = 1/12*(s *d/bo + 2)**sqrt(fc')*bo*t =

6630290.49 kip

411.13.2.1

3.0. Vc = 1/3**sqrt(fc')*bo*t =

3549549.45 kip

Thefore adopt min., Vc =

3549549.45 kip

Compliant

6.0. Check for the Mat soil reactions


Table. 6.1.Calculation for Soil Reactions
Strip point
Loc.

q1

q2

qave

Strip Width

Mat Width

(kip/ft2)

(kip/ft2)

(kip/ft2)

(ft)

(ft)

(kip)

1.095

1.204

1.149

14.000

96.000

1,544.81

1.126

1.235

1.181

24.000

96.000

2,720.808

1.166

1.275

1.221

24.000

96.000

2,812.455

1.198

1.307

1.252

14.000

96.000

1,682.922

(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)
Note:

Soil Reaction (SR)

*this table is revisable dependent to the configuration of the mat foundation.

Total Soil reaction, SRT =

8,761.00 kip

Compliant

Table. 6.2.Calculation for Modified soil pressure and loadings.


Strip

Strip Width

Point

q1 & q 2

qave

qave*Sw*LT

PuStrip

at edge
(ft)
(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

14
24
24
14

(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

(kip/ft2)
1.095
1.204
1.126
1.235
1.166
1.275
1.198
1.307

Column
Factor

A-1
1.025
0.999
C-1
E-1
0.963
1.051
G-1
A-2
1.025
0.999
C-2
E-2
0.963
1.051
G-2
A-3
1.025
0.999
C-3
0.963
E-3
1.051
G-3
1.025
A-4
0.999
C-4
0.963
E-4
G-4
1.051
Total load per strip
Length per strip
Uniform bot pressure

(AB-1)
(AB-4)

(BCD-1)
(BCD-4)

q1mod & q2mod


(kip/ft2)
1.069
1.176
1.127
1.236
1.213
1.326
1.143
1.247

(kip/ft2)

(kip)

(kip)

(kip)

1.149

1544.81

1472.00

1508.41

1.181

2720.81

2724.00

2722.40

1.221

2812.46

3037.00

2924.73

1.252

1682.92

1528.00

1605.46

Table 6.2.Calculation for modified column loads


Column
Mark

Average
Load

at edge

( DEF - 1 )
( DEF - 4 )

(FG-1)
(FG-4)

Strip
Length
(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

455.73
452.62
286.84
467.28
843.51
948.59
508.54
499.05

Left Top

Bot

Rigth Top

kip.ft/ft
30

kip.ft/ft
30

kip.ft/ft
30

40.43

87.41

40.43

76.49

120.94

18.65

66.81

161.48

13.91

53.31

24.57

42.40

967.43
1084.37
508.54
294.10
455.73
439.14
2722.404
96.00
28.358

2924.728
96.00
30.466

301.55
1605.461
96.00
16.724

Table. 6.3. Calculation for Total Steel Area

Strip

(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

Number of
Reinf. Bar
(pcs)

1.025
0.999
0.963
1.051

Table.6.3. Tabulation of Moment per strip to be use in design.

247.99

1508.407
96.00
15.713

Column Factor
(F)

Left Top Bars


Mid Bottom Bars
Rigth Top Bars
Steel
Number of
Steel
Number of
Steel
Steel Area
Steel Area
Steel Area
Diamater
Reinf. Bar Diamater
Reinf. Bar Diamater
(in)
(pcs)
(in)
(pcs)
(in)
(in2)
(in2)
(in2)

25

1.00

19.635

25

1.00

19.635

25

1.00

19.635

31

1.27

39.270

31

1.27

39.270

31

1.27

39.270

25

1.00

19.635

25

1.27

31.669

25

1.00

19.635

16

1.27

20.268

16

1.27

20.268

16

1.27

20.268

7.0. Check for reinforcement adequacy.


Calculation for concrete block depth, a (Consider 1.0 ft strip)
a2 - 2*t*a + 2*Mu/(*0.85*fc'*b) = 0

Strip

Concrete
block
depth,a

Quadratic
Equation
Parametes

Calculated
Value

AL

0.614

BL

-58

57.386

CL

35.24

in

(AB-1)

(BCD-1)

( DEF - 1 )

(FG-1)

Reinforcement
Capacity,Asc per 1ft
strip
(in2)

Strip
Width

Desing Steel Area, Asc

(ft)

(in2)

Min Steel
Existing
Reinf. Ase Area,Asmin

REMARKS

Left Top

0.313

24

7.515

19.635

1.16

Compliant

Mid Bot

0.686

24

16.457

19.635

1.16

Compliant

Rigth Bot

0.313

24

7.515

19.635

1.16

Compliant

Left Top

0.598

24

14.358

39.270

1.16

Compliant

Mid Bot

0.958

24

22.985

39.270

1.16

Compliant

Rigth Bot

0.144

24

3.446

39.270

1.16

Compliant

Left Top

0.521

24

12.508

19.635

1.16

Compliant

Mid Bot

1.294

24

31.057

31.669

1.16

Compliant

Rigth Bot

0.107

24

2.568

19.635

1.16

Compliant

Left Top

0.414

24

9.944

20.268

1.16

Compliant

Mid Bot

0.190

24

4.548

20.268

1.16

Compliant

Rigth Bot

0.329

24

7.885

20.268

1.16

Compliant

0.614

AM

1.345

BM

-58

56.655

CM

76.17

1.345

AR

0.614

BR

-58

57.386

CR

35.24

0.614

AL

1.173

BL

-58

56.827

CL

66.66

1.173

AM

1.878

BM

-58

56.122

CM

105.39

1.878

AR

0.282

BR

-58

57.718

CR

16.25

0.282

AL

1.022

BL

-58

56.978

CL

58.23

1.022

AM

2.537

BM

-58

55.463

CM

140.73

2.537

AR

0.210

BR

-58

57.790

CR

12.13

0.210

AL

0.812

BL

-58

57.188

CL

46.46

0.812

AM

0.372

BM

-58

57.628

CM

21.41

0.372

AR

0.644

BR

-58

57.356

CR

36.95

0.644

8.0. Investigation Refferences


National Structural Code of the Philippines (NSCP 2010), Volume 1 for vertival structures (Sixth Edition).
By: Association of Structural Engineers of the Philippines (ASEP)
Principle of Foundation Engineering (Sixth Edition)
By: Braja M. Das
Fundamentals of Reinforced Concrete Design (Second Edition)
By: Diego Inocencio T. Gellesania

Revision
No.

DISCRIPTION OF REVISION

CHECKED DATE

CHECKED BY

APPROVED DATE

APPROVED BY

Date:
Mar-14
Client:
MANILA EXPOSITION CENTER COMPLEX INC.
Location:
Subject: LOAD , SHEAR & MOMENT DIAGRAM NOMENCLATURE
1.0. INPUT DATA FOR STRIP -

Calc. by :
Chk'd. by :
Appr'd. by :
Date:

A.H.SINCONIEGUE
RHONDA RAPIRAP
ANGEL L. LAZARO III, Ph. D.
Apr-14

(AB-1)(AB-4)

Table.1.0 Value of Point Loads


Load Mark
Value

Pu1
247.99

Pu2
467.28

Pu3
499.05

Pu3
294.10

Pu4

Pu5

Pu6

Pu7

Pu8

Pu9

x6

x7

x8

x9

x10

x11

Table.1.1 Length per Span


x1

x2

x3

x4

x5

30

30

30

2.0. CALCULATIONS
Calculation for soil pressure at entire strip length, SPstrip =

15.713 kip/ft

3.0. PLOTTING OF LOAD, SHEAR & MOMENT DIAGRAM.

Table.3.0 Calculation of Shear & Moment


Dist
Shear
Dist
Moment
0.000
0.000
0.000
0.000
3.000
47.138
3.000
70.707
3.000
-200.848
12.783
-1212.972
33.000
270.530
33.000
1115.935
33.000
-196.749
45.522
-115.884
63.000
274.629
63.000
2284.130
63.000
-224.417
77.283
681.503
93.000
246.961
93.000
2622.292
93.000
-47.138
96.000
2480.879
96.000
0.000

Pu1
(C-1)
X1

Pu3

Pu2
(C-3)

(C-2)

X2

X3

X4

x3
x4

z2

12.522

ft

(x3-z2)

17.478

ft

z3

14.283

ft

(x4-z3)

15.717

ft

(C-4)
X5

SRstrip

V - Shear Diagram
274.629

270.530

Table.3.1. Calculation for shear intersection dist.


Span
Deisgnation
Dist.
Units
z1
12.783
ft
x2
(x2-z1)
17.217
ft

Pu3

47.138
0.000
0

30

0.000
90-47.138

60
-196.749

-200.848

246.961

-224.417

M-Moment Diagram
2,284.130

2,622.292
2,480.879

1,115.935
681.503
70.707
0.000
0

30
-1,212.972

-115.884

60

90

Date:
Mar-14
Client:
MANILA EXPOSITION CENTER COMPLEX INC.
Location:
Subject: LOAD , SHEAR & MOMENT DIAGRAM NOMENCLATURE
1.0. INPUT DATA FOR STRIP -

Calc. by :
Chk'd. by :
Appr'd. by :
Date:

A.H.SINCONIEGUE
RHONDA RAPIRAP
ANGEL L. LAZARO III, Ph. D.
Apr-14

(A'BB'-1)(A'BB"-4)

Table.1.0 Value of Point Loads


Load Mark
Value

Pu1
455.73

Pu2
843.51

Pu3
967.43

Pu3
455.73

Pu4

Pu5

Pu6

Pu7

Pu8

Pu9

x6

x7

x8

x9

x10

x11

Table.1.1 Length per Span


x1

x2

x3

x4

x5

30

30

30

2.0. CALCULATIONS
Calculation for soil pressure at entire strip length, SPstrip =

28.358 kip/ft

3.0. PLOTTING OF LOAD, SHEAR & MOMENT DIAGRAM.

Table.3.0 Calculation of Shear & Moment


Dist
Shear
Dist
0.000
0.000
0.000
3.000
85.075
3.000
3.000
-370.658
13.070
33.000
480.094
33.000
33.000
-363.412
45.815
63.000
487.339
63.000
63.000
-480.094
79.930
93.000
370.658
93.000
93.000
-85.075
96.000
96.000
0.000

Moment
0.000
127.613
-2294.725
1769.150
-559.408
3628.060
-435.815
1986.523
1731.297

Pu1
(C-1)
X1

Pu3

Pu2

Pu3

(C-3)

(C-2)

X2

X3

X4

(C-4)
X5

SRstrip

V - Shear Diagram
487.339

480.094

370.658

Table.3.1. Calculation for shear intersection dist.


Span
Deisgnation
Dist.
Units
z1
13.070
ft
x2
(x2-z1)
16.930
ft
x3
x4

z2

12.815

ft

(x3-z2)

17.185

ft

z3

16.930

ft

(x4-z3)

13.070

ft

85.075
0.000
0

30

0.000
90-85.075

60
-363.412

-370.658

-480.094

M-Moment Diagram
3,628.060

1,986.523
1,731.297

1,769.150

127.613
0.000
0

30

-2,294.725

-559.408 60

-435.815
90

Date:
Mar-14
Client:
MANILA EXPOSITION CENTER COMPLEX INC.
Location:
Subject: LOAD , SHEAR & MOMENT DIAGRAM NOMENCLATURE
1.0. INPUT DATA FOR STRIP -

Calc. by :
Chk'd. by :
Appr'd. by :
Date:

A.H.SINCONIEGUE
RHONDA RAPIRAP
ANGEL L. LAZARO III, Ph. D.
Apr-14

(A'BB'-1)(A'BB"-4)

Table.1.0 Value of Point Loads


Load Mark
Value

Pu1
452.62

Pu2
948.59

Pu3
1084.37

Pu3
439.14

Pu4

Pu5

Pu6

Pu7

Pu8

Pu9

x6

x7

x8

x9

x10

x11

Table.1.1 Length per Span


x1

x2

x3

x4

x5

30

30

30

2.0. CALCULATIONS
Calculation for soil pressure at entire strip length, SPstrip =

30.466 kip/ft

3.0. PLOTTING OF LOAD, SHEAR & MOMENT DIAGRAM.

Table.3.0 Calculation of Shear & Moment


Dist
Shear
Dist
0.000
0.000
0.000
3.000
91.398
3.000
3.000
-361.227
11.857
33.000
552.750
33.000
33.000
-395.836
45.993
63.000
518.141
63.000
63.000
-566.233
81.586
93.000
347.745
93.000
93.000
-91.398
96.000
96.000
0.000

Moment
0.000
137.097
-2004.397
3009.941
438.439
4844.517
-417.420
1567.199
1293.006

Pu1
(C-1)
X1

Pu3

Pu2

Pu3

(C-3)

(C-2)

X2

X3

X4

(C-4)
X5

SRstrip

V - Shear Diagram
552.750

518.141
347.745

Table.3.1. Calculation for shear intersection dist.


Span
Deisgnation
Dist.
Units
z1
11.857
ft
x2
(x2-z1)
18.143
ft
x3
x4

z2

12.993

ft

(x3-z2)

17.007

ft

z3

18.586

ft

(x4-z3)

11.414

ft

91.398
0.000

30
-361.227

0.000
-91.398
90

60
-395.836
-566.233

M-Moment Diagram
4,844.517
3,009.941

1,567.199
1,293.006
438.439

137.097
0.000

30
-2,004.397

60

-417.420
90

Date:
Mar-14
Client:
MANILA EXPOSITION CENTER COMPLEX INC.
Location:
Subject: LOAD , SHEAR & MOMENT DIAGRAM NOMENCLATURE
1.0. INPUT DATA FOR STRIP -

Calc. by :
Chk'd. by :
Appr'd. by :
Date:

A.H.SINCONIEGUE
RHONDA RAPIRAP
ANGEL L. LAZARO III, Ph. D.
Apr-14

(A'BB'-1)(A'BB"-4)

Table.1.0 Value of Point Loads


Load Mark
Value

Pu1
286.84

Pu2
508.54

Pu3
508.54

Pu3
301.55

Pu4

Pu5

Pu6

Pu7

Pu8

Pu9

x6

x7

x8

x9

x10

x11

Table.1.1 Length per Span


x1

x2

x3

x4

x5

30

30

30

2.0. CALCULATIONS
Calculation for soil pressure at entire strip length, SPstrip =

16.724 kip/ft

3.0. PLOTTING OF LOAD, SHEAR & MOMENT DIAGRAM.

Table.3.0 Calculation of Shear & Moment


Dist
Shear
Dist
0.000
0.000
0.000
3.000
50.171
3.000
3.000
-236.669
14.152
33.000
265.038
33.000
33.000
-243.498
47.560
63.000
258.208
63.000
63.000
-250.328
77.969
93.000
251.379
93.000
93.000
-50.171
96.000
96.000
0.000

Moment
0.000
75.256
-1599.393
500.787
-1271.907
721.433
-1152.095
737.193
586.682

Pu1
(C-1)
X1

Pu3

Pu2
(C-3)

(C-2)

X2

X3

X4

V - Shear Diagram

Table.3.1. Calculation for shear intersection dist.


Span
Deisgnation
Dist.
Units
z1
14.152
ft
x2
(x2-z1)
15.848
ft

x4

(C-4)
X5

SRstrip

265.038

x3

Pu3

z2

14.560

ft

(x3-z2)

15.440

ft

z3

14.969

ft

(x4-z3)

15.031

ft

258.208

50.171
0.000

30
-236.669

0.000
90-50.171

60
-243.498

251.379

-250.328

M-Moment Diagram
721.433

500.787

737.193
586.682

75.256
0.000

30

60

-1,271.907
-1,599.393

90

-1,152.095

Date:
Mar-14
Client:
MANILA EXPOSITION CENTER COMPLEX INC.
Location:
Subject: LOAD , SHEAR & MOMENT DIAGRAM
1.0. INPUT DATA FOR STRIP -

Calc. by :
Chk'd. by :
Appr'd. by :
Date:

A.H.SINCONIEGUE
RHONDA RAPIRAP
ANGEL L. LAZARO III, Ph. D.
Apr-14

(A'BB'-1)(A'BB"-4)

Table.1.0 Value of Point Loads


Load Mark
Value

Pu1
455.73

Pu2
843.51

Pu3
967.43

Pu3
455.73

Pu4

Pu5

Pu6

Pu7

Pu8

Pu9

x6

x7

x8

x9

x10

x11

Table.1.1 Length per Span


x1

x2

x3

x4

x5

30

30

30

2.0. CALCULATIONS
Calculation for soil pressure at entire strip length, SPstrip =

2722.404 kip/ft

3.0. PLOTTING OF LOAD, SHEAR & MOMENT DIAGRAM.

Table.3.0 Calculation of Shear & Moment


Dist
Shear
Dist
Moment
0.000
0.000
0.000
0.000
3.000
8167.212
3.000
12250.818
3.000
7711.479
-2.833
1329.053
33.000
89383.597
33.000 #########
33.000
88540.092
0.477
28892.856
63.000
170212.210
63.000 #########
63.000
169244.777
0.833
89207.533
93.000
250916.896
93.000 #########
93.000
250461.163
96.000 #########
96.000
258628.375

Pu1
(C-1)
X1

Pu3

Pu2

Pu3

(C-3)

(C-2)

X2

X3

X4

(C-4)
X5

SRstrip

V - Shear Diagram
258628.375
250916.896
250461.163

Table.3.1. Calculation for shear intersection dist.


Span
Deisgnation
Dist.
Units
z1
-2.833
ft
x2
(x2-z1)
32.833
ft
x3
x4

z2

-32.523

ft

(x3-z2)

62.523

ft

z3

-62.167

ft

(x4-z3)

92.167

ft

170212.210
169244.777

89383.597
88540.092
8167.212
7711.479
0.000

30

60

90

M-Moment Diagram
12,403,770.088
11,652,386.598

5,349,961.498

1,468,676.964
89,207.533
28,892.856
12,250.818
0.000

30

60

90

30

60

90

ANGEL L. LAZARO III, Ph. D.

Project Control No. :

SD-WTC

A NGEL LA ZA RO & A SSOCIA TES INTERNA TIONA L


Consulting Engineers and Architects
160 Panay Ave., Cor EDSA, Quezon City
Tel. No. 928-6533 924-1865 415-8782 924-1931 Fax No. (632) 924-1887

Date :
Client :
Subject :

Mar-14
MANILA EXPOSITION CENTER COMPLEX INC.
MAT FOUNDATION CAPACITY WORKSHEET

Calc. by : A.H.SINCONIEGUE
Chk'd. by : RHONDA RAPIRAP
Appr'd. by : ANGEL L. LAZARO III, Ph. D.

1.0. Design Data


Total Mat foundation width, BT =

16.50 m

Total Mat foundation length, LT =


Effective Mat Foundation width,B =
Effective Mat Foundation length,L =
Perimeter Critical Column Width, bP =

21.50 m
16.25 m
21.25 m

Perimeter Critical Column Depth, dP =

0.50 m
0.50 m

Interior Critical Column Width, bi =

0.50 m

Interior Critical Column Depth, di =

0.50
0.00
0.00
0.62
1.00

Offset of Mat parallel to y'-dir, b' =


Offset of Mat parallel to x'-dir, d' =
Thickness of Mat Foundation, t =
Ratio of long to short side for perimeter col., p =
Ratio of long to short side for interior col., i =
Modification factor for Normal Weight concret, =
Perimeter Column constant, s =

1.00
1.00
30.00

Interior Column constant, s =

40.00

m
m
m
m

2.0. Materials Data


Concrete compressive strenght, fc' =
Steel Yeild Strenght, fy =

24 Mpa
275 Mpa

3.0. Soil Properties


Allowable Bearing Capacity, qall =

60 kPa

4.0. Design Calculations for Soil Pressure


Moment of Inertia with respect to x- axis, Ix
4
13665.27 ft

Ix = BT*LT3/12 =
Moment of Inertia with respect to y-axis, Iy

4
8048.39 ft

Iy = LT*BT3/12 =
Total mat foundation area, A

2
354.75 ft

A = BT*LT =
Table 4.0.

Calculation for Moments with respect to x' and y'-axis

COLUMN
GRID
A-1
C-1
E-1
G-1
A-2
C-2
E-2
G-2
A-3
C-3
E-3
G-3
A-4
C-4
E-4
G-4

DL (kip)
100.00
180.00
190.00
110.00
180.00
360.00
400.00
200.00
190.00
400.00
440.00
200.00
120.00
180.00
180.00
120.00

SERVICE LOAD
LL (kip)
60.00
120.00
120.00
70.00
120.00
200.00
250.00
120.00
130.00
240.00
300.00
120.00
70.00
120.00
120.00
70.00

P(kip)
160.00
300.00
310.00
180.00
300.00
560.00
650.00
320.00
320.00
640.00
740.00
320.00
190.00
300.00
300.00
190.00

ULTIMATE LOAD(Pu)
(1.4*DL) + (1.7*LL)
242.00
456.00
470.00
273.00
456.00
844.00
985.00
484.00
487.00
968.00
1126.00
484.00
287.00
456.00
456.00
287.00

TOTAL
5780.00
8761.00
Note: * this table can be revise dependent to the number of points.

x
(ft)
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00
0.00
24.00
48.00
72.00

x*P
(kip.ft)
0.00
7200.00
14880.00
12960.00
0.00
13440.00
31200.00
23040.00
0.00
15360.00
35520.00
23040.00
0.00
7200.00
14400.00
13680.00
211920

Calculation for resultant distance with respect to x' & y' axis, (x' & y')
x' = (x*P)/P =

36.664 ft

y' = (y*P)/P =

44.273 ft

y
(ft)
90.000
90.000
90.000
90.000
60.000
60.000
60.000
60.000
30.000
30.000
30.000
30.000
0.00
0.00
0.00
0.00

y*P
(kip.ft)
14400.00
27000.00
27900.00
16200.00
18000.00
33600.00
39000.00
19200.00
9600.00
19200.00
22200.00
9600.00
0.00
0.00
0.00
0.00
255900

COLUMN
DESIGNATION
Perimeter Column
Perimeter Column
Perimeter Column
Perimeter Column
Interior Column
Perimeter Column
Perimeter Column
Interior Column
Perimeter Column
Perimeter Column
Perimeter Column
Perimeter Column

Calculation for eccentricities with respect to x' & y' axis, (ex & ey)
ex = x' - B/2 =

28.539 m

ey = y' - L/2 =

33.648 m

Note:

* for this worksheet the calculation of eccentricities are converted to positive sign to come up with positive result
for locating the proper resultant location check it by using manual calculation.
Calculation for moment cause by eccentricities, Mx & My
Mx = Pu*ey =

294793.25 KN.m

My = Pu*ex =

250033.33 KN.m

Determination for soil contact pressure, qo


q0 = Pu/A My*x/Iy Mx*y/Ix =
qo =
Table 4.1.
Point
Location
A-1
B-1
C-1
D-1
E-1
F-1
G-1
G-4
F-4
E-4
D-4
C-4
B-4
A-4
Note:

24.70

31.0663

21.5724

Calculation for soil contact pressure q qall


Pu /A

24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70
24.70

(ft)
-38.00
-24.00
-12.00
0.00
12.00
24.00
38.00
38.00
24.00
12.00
0.00
-12.00
-24.00
-38.00

31.0663 *x
(kip/ft2)
-1180.518
-745.590
-372.795
0.000
372.795
745.590
1180.518
1180.518
745.590
372.795
0.000
-372.795
-745.590
-1180.518

y
(ft)
48.000
48.000
48.000
48.000
48.000
48.000
48.000
-48.000
-48.000
-48.000
-48.00
-48.00
-48.00
-48.00

21.5724 *y
(kip/ft2)
-1035.478
-1035.478
-1035.478
-1035.478
-1035.478
-1035.478
-1035.478
1035.478
1035.478
1035.478
1035.478
1035.478
1035.478
1035.478

q
(kip/ft2)
-2191.299
-1756.371
-1383.576
-1010.781
-637.986
-265.191
169.736
2240.691
1805.764
1432.969
1060.174
687.379
314.584
-120.344

qall
(kip/ft2)
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00

Remarks
Compliant
Compliant
Compliant
Compliant
Compliant
Compliant
Non- compliant
Non- compliant
Non- compliant
Non- compliant
Non- compliant
Non- compliant
Non- compliant
Compliant

* if result is non-compliant revised or adjust the geometry of the mat foundation


* this table can be revised idependent to the number of points.

5.0. Check if Mat Foundation Thickness is adequate, t


Critical perimeter exterior column, DLP =

190.00 kip

Critical perimeter exterior column, LLP=

130.00 kip

Critical perimeter interior column, DLi =

440.00 kip

Critical perimeter interior column, LLi=

300.00 kip

Calculation for factored perimeter column load , Up


Up = 1.4*DLP + 1.7*LLP =

487.00 kip

Calculation for factored interior column load , Ui


Ui = 1.4*DLi + 1.7*LLi =
Location Type of Column for Critical Perimeter :

1126.00 kip
Type - 2

Calculation for Critical Perimeter at Punching Shear on Perimeter Col., bo


1.0. bo =N.A
2.0. bo = b' + 2*bp + 2*dp + 2*t =

N.A in
2.74 in

3.0. bo =N.A

N.A in

4.0. bo =N.A

N.A in

Therefor adopt, bo =

2.74 in

Calculation for Nominal Strength provided by concrete perimeter column, Vc


1.0. Vc = 1/6*( 1 + 2/)**sqrt(fc')*bo*t =

131.59 kip

2.0. Vc = 1/12*(s *d/bo + 2)**sqrt(fc')*bo*t =

192.74 kip

3.0. Vc = 1/3**sqrt(fc')*bo*t =

87.73 kip

Thefore adopt min., Vc =

87.73 kip

Non-compliant

Calculation for Critical Perimeter at Punching Shear for Interior Col., bo


bo = 2*bi + 2*di + 4*t =

4.48 ft

Calculation for Nominal Strength provided by concrete at interior column, Vc


1.0. Vc = 1/6*( 1 + 2/)**sqrt(fc')*bo*t =

215.15 kip

2.0. Vc = 1/12*(s *d/bo + 2)**sqrt(fc')*bo*t =

270.22 kip

3.0. Vc = 1/3**sqrt(fc')*bo*t =

143.43 kip

Thefore adopt min., Vc =

143.43 kip

Non-compliant

6.0. Check for the Mat soil reactions


Table. 6.1.Calculation for Soil Reactions
q1

q2

qave

Strip Width

Mat Width

(kip/ft2)

(kip/ft2)

(kip/ft2)

(ft)

(ft)

(kip)

-1,973.835

97.120

-938.358

14.000

96.000

-1,261,152.55

-1,383.576

687.379

-348.099

24.000

96.000

-802,019.542

-637.986

1,432.969

397.491

24.000

96.000

915,819.931

-47.727

2,023.228

987.750

14.000

96.000

1,327,536.106

Strip point
Loc.
(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)
Note:

Soil Reaction (SR)

*this table is revisable dependent to the configuration of the mat foundation.

Total Soil reaction, SRT =

180,183.95 kip

Non-compliant

Table. 6.2.Calculation for Modified soil pressure and loadings.


Strip

Strip Width

Point

q1 & q2

qave

qave*Sw*LT

PuStrip

at edge
(ft)
(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

14
24
24
14

(AB-1)
(AB-4)
(BCD-1)
(BCD-4)
( DEF - 1 )
( DEF - 4 )
(FG-1)
(FG-4)

(kip/ft2)
-1,973.835
97.120
-1,383.576
687.379
-637.986
1,432.969
-47.727
2,023.228

(kip/ft2)

(kip)

(kip)

(kip)

-938.358

-282445.62

1472.00

-140486.81

-348.099

-179618.96

2724.00

-88447.48

397.491

205105.51

3037.00

104071.25

987.750

297312.77

1528.00

149420.39

Table 6.2.Calculation for modified column loads


Column
Mark

Column
Factor

(AB-1)
(AB-4)

-95.439
A-1
-32.470
C-1
34.268
E-1
97.788
G-1
-95.439
A-2
-32.470
C-2
34.268
E-2
97.788
G-2
-95.439
A-3
-32.470
C-3
34.268
E-3
97.788
G-3
-95.439
A-4
-32.470
C-4
34.268
E-4
G-4
97.788
Pressure Distribution

-23096.34

(BCD-1)
(BCD-4)

( DEF - 1 )
( DEF - 4 )

(FG-1)
(FG-4)

-14806.19
16105.86
26696.18
-43520.37
-27404.43
33753.76
47329.49
-46478.99
-31430.68
38585.52
47329.49
-27391.11
-14806.19
15626.11
-6534.270

-4113.836

Average
Load

4840.523

28065.22
6949.785

q1mod & q2mod


at edge

Column Factor
(F)

(kip/ft )
-981.774
48.307
-681.297
338.477
-323.716
727.093
-23.986
1016.813

-95.439
-32.470
34.268
97.788