Вы находитесь на странице: 1из 68

Sr.

No.
Name & Address
Capital
Investment
Applied For Section Page No. Remarks
1 M/s. Hindalco Industries Ltd., (Exp.
Project) Sr. No. 95/1, 95/2, Vill-
Daheli, Tal- Mouda, Dist - Nagpur
197.34 Crs Establish
(Expansion)
J D(APC) 1 to 34
2 M/s. J SW J aigad Port Ltd.,
Dhamankhol Bay, A/p- J aigad, Tal &
Dist - Ratnagiri
1644.10 Crs Establish
(Expansion)
J D(APC) 35 to 53
3 M/s. Trinity Landmarks LLP. S. No.
339 & Ors., Village Bhugaon, Tal.
Mulshi, Dist. Pune
470.00 Crs. Establish RO(HQ) 54 to 61
4 M/s. Kirloskar Ferrous Industries
Ltd., Gat No. 12 to 18/1 +2 and
25/1, Shivshahi Solapur, Tal- North,
Solapur
138.58 Crs Renewal J D(APC) 62 to 76
5 M/s. Godrej & Boyce Mfg. Co. Ltd.,
Gat No. 600,601,605, a/p- Wing, Tal-
Khandala, Dist - Satara
137.78 Crs Renewal
(Expansion)
J D(APC) 77 to 95
6 M/s. Thyssenkrupp Electric Steel
India Pvt. Ltd., A/p- Gonde, Vill-
Wadivarhe, Tal- Igatpuri, Dist -
Nashik
474.13 Crs Renewal J D(APC) 96 to 112
1 M/s. GE India Industrial Pvt. Ltd.,
Part of Plot No. F-27, Ranjangaon
MIDC, Tal- Shirur, Dist - Pune
90.21 Crs 1st operate
(Expansion
&
Amalgamatio
n)
J D(APC) 113 to 122
Resubmitted Agenda
List of Cases to be submitted before 2nd Consent Appraisal Committee Meeting
of 2013 scheduled on 31.05.2013 at 11.00 am
Fresh Agenda
2 M/s. Enkel Wheels ( India) Ltd., Gat
No. 1425, Vill- Shikrapur, Tal-
Shirur, Dist - Pune
178.75 Crs Establish
(Expansion)
J D(APC) 123 to 129
3 M/s. J SW Infrastructure Ltd., Vill-
Nandgaon, Dist - Thane
117.50 Crs Establish J D(APC) 130 to139
4 M/s. Bekaert Industries Pvt. Ltd., B-
1, MIDC Ranjangaon, Tal- Shirur,
Dist - Pune
346.06 Crs Establish
(Expansion)
J D(APC) 140 to 149
5 M/s. Bekaert Industries Pvt. Ltd., B-
1, MIDC Ranjangaon , Tal- Shirur,
Dist - Pune
249.26 Crs Renewal and
1st operate
for expansion
J D(APC) 150 to 158
6 M/s. MITC Rolling Mills Pvt. Ltd., B-
1, MIDC Palkhed, Tal- Dindori, Dist -
Nashik
92.3 Crs Establish J D(APC) 159 to 166
7 M/s. Hindustan National Glass &
Industries Ltd., F-1, MIDC Malegaon
Sinnar, Nashik
719.06 Crs Establish for
change in
fuel
J D(APC) 167 to 175
8 M/s. Sudal Industries Ltd., B-11,
MIDC Nardana, Tal-0 Sindhkheda,
Dist - Dhule
104.55 Crs Establish J D(APC) 176 to 187
9 M/s. RSB Transmissions (I) Ltd.,
Gat No. 908, Nagar Road, Vill-
Sanaswadi, Tal- Shirur, Dist - Pune
79.25 Crs 1st operate
with
amalgamatio
n
J D(APC) 188 to 197
10 M/s.Varroc Polymers Pvt. Ltd.,
(VPPL-II), E-88, MIDC Ranjangaon,
Tal- Shirur, Dist - Pune
82.88 Crs Renewal with
expansion
J D(APC) 198 to 206
11 M/s. Piaggio Vehicles Pvt. Ltd., E-2
& E-1, MIDC Baramti, Tal-
Baramati, Dist - Pune
740.28 Crs Renewal J D(APC) 207 to 220
12 M/s. Sandvik Asia Pvt. Ltd., Mumbai
Pune Road, Dapodi, Pune
647.16 Crs Renewal J D(APC) 221 to 228
13 M/s. Piaggio Vehicles Pvt. Ltd., F-
19, MIDC Baramati, Tal- Baramati,
Dist - Pune
168.40 Crs Renewal J D(APC) 229 to 242
14 M/s. Forbes Marshal Pvt. Ltd., A-
34/35, B- 15/16, H-Block, MIDC
Pimpri, Pune
81.73 Crs Renewal J D(APC) 243 to 250
15 M/s. Viraj Profiles Ltd., Gut No. G-
1/2, 1/3,2, MIDC Boisar-Tarapur,
Tal- Palghar, Dist - Thane
299.03 Crs Renewal J D(APC) 251 to 260
16 M/s. Mutual Industries Pvt. Ltd., Gut
No. 546/4 & 5, Vill- Shikrapur,
Malthan Road, Tal- Shirur, Dist -
Pune
84.06 Crs Renewal and
1st operate
for expansion
J D(APC) 261 to 270
17 M/s. Semco Electric Pvt. Ltd., (Unit-
II), A-2, MIDC Chakan, Tal- Khed,
Dist - Pune
82.65 Crs Renewal J D(APC) 271 to 282
18 M/s. Walchandnagar Industries Ltd.,
Walchandnagar, Tal- Indapur, Dist -
Pune
186.17 Crs Renewal with
expansion
J D(APC) 283 to 298
19 M/s. ISMT Ltd., ( Tube Plant) (B). B-
13, MIDC Baramati, Tal- Baramati,
Dist - Pune
713.51 Crs Renewal J D(APC) 299 to 306
20 M/s. J BM MA Automotive Pvt. Ltd.,
C-1, (Part) MIDC Chakan Talegaon
Road, Tal- Khed, Dist - Pune
214.53 Crs Renewal with
expansion
J D(APC) 307 to 314
21 M/s. Innoventive Industries Ltd., Gat
No. 56/3,4,5, Shikrapur Chakan
Road, Pimpale J agtap, Tal- Shirur
Dist - Pune
349.28 Crs Renewal and
1st operate
for expansion
J D(APC) 315 to 326
22 M/s. Tata Autocomp Systems Ltd.,
(Interior and Plastic Division), S No.
280 and 281, Vill- Man, Tal- Mulshi,
Dist - Pune
75.41 Crs Renewal J D(APC) 327 to 334
23 M/s. Crompton Greaves Ltd., S. No.
1005, 1007-9,
1011,1013,1014,1019, Kanjurmarg
E t M b i
280.06 Crs Renewal J D(APC) 335 to 353
24 M/s. Mahindra & Mahindra Ltd.,
Tractor Division, Akurli Road,
Kandivali, Mumbai
783.79 Crs Renewal J D(APC) 354 to 372
25 M/s. Mahindra & Mahindra Ltd., S.
No. 368,369 part 372 to 376, A/p-
Talegaon, Tal- Iagatpuri, Dist -
Nashik
319.77 Crs Renewal J D(APC) 373 to 382
26 M/s. ABB Ltd., Formerly known as
ABB Global Services Ltd., Plot No.
79, MIDC Satpur, Tal & Dist -
Nashik
106.76 Crs Renewal J D(APC) 383 to 390
27 M/s. Larsen and Toubro Ltd.,
Engineering Powai West Campus,
Saki Vihar Road , Powai, Mumbai
347.50 Crs Renewal J D(APC) 391 to 406
28 M/s. Larsen and Toubro Ltd.,
Engineering Powai West Campus,
Saki Vihar Road, Powai, Mumbai
286.27 Crs Renewal J D(APC) 407 to 420
29 M/s. J ayaswal Neco Ltd.,
(Automotive Casting Division), Kh
No. 70, 71-A, 71B and 76, Vill-
Rhikhairi, 28/9, Mile Stone, Po-
168.79 Crs Renewal J D(APC) 421 to 431
30 M/s. Durabuild Technologies Pvt.
Ltd., B-32/1, MIDC Area,
Ranjangaon, Tal- Shirur, Dist - Pune
81.61 Crs Renewal J D(APC) 432 to 439
31 M/s. Virgo Engineers, Plot No. 278,
Raisoni Park, Tal- Mulshi, Dist -
Pune
92.05 Crs Renewal with
expansion
J D(APC) 440 to 447
32 M/s. AAM India Mfg. Corporation
Pvt. Ltd., Gat No. 787 & 788,
Hanga, Tal- Parner, Dist -
Ahmednagar
168.35 Crs Renewal J D(APC) 448 to 461
33 M/s. Everest Industries Ltd., 152 &
153, Lakhmapur, Tal- Dindori,
Nashik
127.73 Crs Renewal J D(APC) 462 to 471
34 M/s. Endurance Technologies Ltd.,
Plot No. B-20, Chakan Indl. Area,
Vill- Nighoje, Tal- Khed, Dist - Pune
86.34 Crs Renewal J D(APC) 472 to 481
35 M/s. Endurance Technologies Pvt.
Ltd., L-6/3, MIDC Waluj,
Aurangabad
98.10 Crs 1st operate
(Expansion)
J D(APC) 482 to 491
36 M/s. Pimpri Chinchwad Municipal
Corporation , EWS Project, Sector
17 & 19 (P), Chikhali, Pune
396.34 Crs. Operate
(Part)
RO(HQ) 492 to 505
37 M/s. Pimpri Chinchwad Municipal
Corporation Nigadi Project, Sector
22 at Nigadi, Pune
372.15 Crs. 1st Operate RO(HQ) 506 to 513
38 M/s. DSK Vishwa (D.D. Kulkarni
Developers Ltd.), Kirkatwadi,
Dhayri, Pune
331.73 Crs. 1st Operate
(Part)
RO(HQ) 514 to 520
39 M/s.Amit Enterprises Promoters &
Builders Pvt. Ltd., Plot No. 16-1 to
16-32 and 16part, 16C part, 16J H
part, 16part, 16KH part, 16G part,
16B part, 16CHH part, 16T part &
161 part, Baner, Pune
563.00 Crs. Establish RO(HQ) 521 to 528
40 M/s. Magus Estate & Hotels Ltd.,
CS No. 114 & extension on 1/136,
1A/136(pt), 1C/136, 1D/136, 1A/136
& 133(pt) & relocation of amenity
plots +13 pt, G/South ward, West,
Mumbai
450.00 Crs. Establish RO(HQ) 529 to 540
41 M/s. N Kumar Projects & Infra Pvt.
Ltd., VIP Road, Near Alankar
Theater, Nagpur
77.98 Crs. Establish RO(HQ) 541 to 552
42 M/s. Neelam Hotel Pvt. Ltd.,
(Holiday Inn Shirdi), P. No. 106/2-3-
4, Nimgaon Korhale, Shirdi, Tal.
Rahata, Dist. Ahmednagar
93.18 Crs. Establish RO(HQ) 553 to 560
43 M/s. Nish Developers Pvt. Ltd.,
CTS No. 711/71..3/52 to 53, New
Islam Mill Compound Mahadev
Palav Marg (Curry Road), Mumbai
595.10 Crs. Operate RO(HQ) 561 to 567
44 M/s. Eon Kharadi Infrastructure Pvt.
Ltd., Plot No. 1, S, No, 77, Kharadi
Knowledge Park, Kharadi, Pune
882.74 Crs. Renewal RO(HQ) 568 to 579
45 M/s. The Lalit Mumbai, M/s. Bharat
Hotels Ltd., Sahara Airport Road,
Andheri (E), Mumbai
241.08 Crs. Renewal RO(HQ) 580 to 588
46 M/s. Vamona Developers Pvt. Ltd.,
S. No. 33/2A/2, 33/ 2B/2 of Wadgon
Sheri, Vimannagar, Opp. Giga
Space, Pune
673.61 Crs. Renewal RO(HQ) 589 to 601
47 M/s. Eco Motel Hotels Ltd. (Hotel
Mercure), S. No. 78(pt) 3, Dasave
Circle, Village Dasave, Tal. Mulshi,
Dist. Pune
25.68 Crs, Operate AS(T) Lavasa
48 M/s. Ekaant Resort, S. No. 8/1,
Village Padlaghar, Tal. Mulshi, Dist.
Pune
6.79 Crs. Operate AS(T) Lavasa
49 M/s. Fortune Hotels Ltd., S. No.
42(pt), 43(pt), Vllage Dasave,
Tal. Mulshi, Dist. Pune
40.15 Crs. Operate AS(T) Lavasa
50 M/s. Lavasa Bamboo Crafts Ltd., S.
No. 60, Post Pathershet, Village
Mugaon, Tal. Mulshi, Dist. Pune
1.56 Crs. Operate AS(T) Lavasa
51 M/s. Lavasa Corporation Ltd. (Hot
Mix Plant), S. No. 3., Village
Koloshi, Tal. Mulshi, Dist. Pune
30.68 Lacs Operate AS(T) Lavasa
52 M/s. Lavasa Corporation Ltd.
(Ready Mix Concrete Plant), S. No.
30/4&5, Village Dasave, Tal. Mulshi,
Dist. Pune
50.65 Lacs Operate AS(T) Lavasa
53 M/s. Spotless Laundary Services
Ltd., S. No. 28, Village Bhoini, Tal.
Mulshi, Dist. Pune
18.17 Crs. Operate AS(T) Lavasa
54 M/s. J W Marriot Hotel of J uhu
Beach Resort Ltd., J uhu-Tara Road,
Mumbai
350.36 Crs. Renewal RO(HQ) 678 to 685
55 M/s. Tata Consultancy Services
Ltd., Yantra Park, Pokharan road
No. 2, Thane
360.40 Crs. Renewal RO(HQ) 686 to 695
56 M/s. Upper Penganga Project (Sapli
Dam), Sapli, Akkade, Belapur, Tal.
Kalamnam, Dist. Hingoli
601.57 Crs. Establish RO(HQ) 696 to 703
57 M/s. Calcite Properties Developers
Pvt. Ltd., Survey No. 145/2 & 2444,
Vill. Nagaon, Tal. Alibag, Dist.
118.50 Crs. Establish RO(HQ) 704 to 711
602 to 677
58 M/s. Bharati Vidyapeeth Educational
Complex, Gat No. 1, Mauje Levale,
Tal. Mulshi, Pune
451.00 Crs. Establish RO(HQ) 712 to 719
59 M/s. Syntel International P. Ltd.,B-1,
B-2, Software Technology Park,
Talwade, MIDC, Tal. Haveli, Dist.
Pune
599.62 Crs. Renewal RO(HQ) 720 to 727
Section No. of Cases
J D(APC) 40
J D(WPC) 0
AST 7
RO(HQ) 18
Total 65

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 1
RESUBMISSION AGENDA

CAC Item No. 01
Name of the Industry: M/s. Hindalco Industries Limited (Expansion Project),
Sr. No.95/1, 95/2, Village Daheli, Tal: Mouda,
Dist: Nagpur.

Applied for Consent to Establish for Expansion.
1. Discussed in CAC dated 24.09.2012 and it was decided to review the
assessment of pollution load proforma submitted by Industry thorough IIT,
Mumbai regarding Certification on No increase in pollution load due to
expansion.
2. The communication received from the unit on 29.11.2012 submitted that IIT
Mumbai does not validate the pollution load increase and will take much time.
The unit has requested for grant of consent to Establish based on commitment
given by the industry and ready to undertake / implement any additional
condition imposed by MPCB prior to commission of new equipment on the
basis of IIT Mumbai at latter stage.
3. The case was again discussed in CAC dated 24.12.2012 and decided to keep
the case in abeyance till self assessment report of industry for no increase in
pollution load is received.
4. The was again discussed in CAC dated 5.3.2013 and it was decided to keep
the case in abeyance and resubmit in next CAC after obtaining opinion from
Shri Rakesh Kumar, NEERI regarding no increase in pollution load.
5. The proposal is examined by Dr. Rakesh Kumar, NEERI, Mumbai and
informed that it is in line.

In view of above, we may put the modified proposal before CAC for further
consideration on the grounds that there will not be any change in production
quantity as per earlier granted one and decrease in water consumption.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 2
CAC Item No. 02

Name of Industry:- M/s. JSW Jaigad Port Limited,
Dhamankhol Bay, A/P:- Jaigad,
Tal & Dist:- Ratnagiri

The said case was discussed in CAC meeting haeld on 31/1/2012 & 14/2/2012. The
case was approved in CAC meeting of 31/1/2012 and was decided to grant the
consent to establish for Expansion. But the case was again discussed in CAC
meeting of 14/2/2012 as ther is applicability of Moratorium in Ratnagiri district and it
was decided to return the application as Board is unable to consider the case due to
moratorium. Now industry have resubmitted application alongwith the letter of MoEF
& Minutes of 122 Expert Appraisal committee, where in it is stated that this project is
considered as of National importance & is exempted from Moratoruim.
We may place the case before CAC for further discussions.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 3

CAC Item No. 03
Name & Address M/s. Trinity Landmarks LLP,
S. No. 339 and others, Village Bhugaon,
Tal. Mulshi, Dist. Pune


1. Applied for C to E, residential and commercial complex for;
Total Plot Area- 264939.00 M
2

Total BUA - 425982.00 M
2


2. Application received at 21/01/2013 and at HQ 26.03.2013

3. Water Requirement - 2187.00M
3
/day
Sewage generation - 1750.00 M
3
/day
8 STPs proposed - 1760 M
3
/day

4. Solid Waste generation: Kg/Day
Biodegradable- 6458.00
Onsite segregation and Mechanical composting proposed.
Nonbiodegradable- 2768.0
Sale to authorized recycler.

5. RO has recommended the Case for C to E subject to condition of obtaining EC

6. The firm has not submitted/obtained EC.

7. The cases falls in the purview of CAC, and if considered, may be granted with BG of Rs. 10
lacs for providing STP and MSW processing plant, and no effective steps till EC is
obtained.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 4

CAC Item No. 04
Name of the Industry:-
M/s. Kirloskar Ferrous Industries Ltd.
Gat No. 12 to 18/1 + 2 and 25/1
Shivshahi Solapur Tal. North Solapur 413 002


Applied renewal of consent
Application received at SRO- Solapur on dtd 10/12/2012 and at HQ on
28/01/2013.
Industrial effluent (cooling) is 4.87 for which ETP provided
Domestic effluent is 50 CMD from which they have provided STP
Ventury scrubber to core oven section and wind turbo ventilators provided to
different section for control of air pollution
RO Pune has recommended for grant of consent to operate
The case was discussed in CAC dt. 19/03/2013 and it was decided to keep the
case in abeyance and put up in next CAC with clarification regarding increase
in Capital investment and details of Bank guarantee. Accordingly, industry has
submitted the same.
We may grant of consent to operate up to 31/01/2016 with operational BG of
Rs. 5/- Lakhs
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 5

CAC Item No. 05
Name of the industry :- M/s. Godrej & Boyce mfg. Co. Ltd.
Gat No. 600,601,605, A/P. Wing,
Tal. Khandala, Dist. Satara 412 801


Applied for renewal of consent with expansion
Application received at SRO- Satara on dtd 01/11/2011 and at HQ on
03/11/2012
Existing unit consent was valid up to 30/09/2012 & applied for renewal of
consent
Industry located @ 1.3 KM away from A-II class River NIRA. Not satisfy the
RRZ distance criteria.
Industrial Effluent Generation is Nil (existing 65 CMD) for which effluent
treatment plant provided.
Domestic Effluent Generation is NIL (existing 65 CMD) for which sewage
treatment plant provided
J VS analysis result of ETP dated 24/01/2012, 31/03/2012 and 15/10/2011are
under prescribed limit.
Adequate height of stack provided to DG set & various stack of existing unit &
no additional air pollution control system are required as there is no additional
fuel requirement.
RO Pune has recommended the case for grant Consent
The case has been discussed in the Consent Appraisal Committee meeting
held on 31/01/2013 and decided to issue SCN for refusal for the unit running
without consent for last 3 years for the product. SRO Satara submitted the
reply 04/04/2013
We may issue plain renewal of consent & refuse the expansion due to RRZ
issue
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 6

CAC Item No. 06
Name of the Industry: Thyssenkrupp Electric Steel India Pvt Ltd.
A/p Gonde, Vill: Wadivarhe,
Tal: Igatpuri, Dist: Nashik.

1. Applied for grant of renewal of Consent to Operate on 24.12.2012.
2. Application grant of renewal of Consent to operate at H.Q. on 28.01.2013.
3. Paid Consent fee of Rs.48, 66,310/-.
4. Water Cess paid up to Sept-2012.
5. Environment Statement for the year 2011-2012 submitted.
6. SRO/RO Nashik recommended for grant of renewal of Consent to Operate up to
28.02.2018.
7. This case was discussed in the CAC meeting held on 19.03.2013 and it was
decided to keep case in abeyance and put up in next CAC with verification of C.I.
8. Industry has submitted justification vide letter dated 05.04.2013.Copy of letter is
enclosed.
9. Recommended for grant of renewal of consent to operate up to 28.02.2018 with
submission of operational BG of RS.10 Lakhs.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 7

FRESH AGENDA
CAC Item No. 01
Name of the industry: - M/s. GE India Industrial Private Ltd
Part of Plot No. F-27, Ranjangaon MIDC,
Tal. Shirur, Dist. Pune



Applied 1st Consent operate for expansion with amalgamtion
Application received at SRO- Pune on dtd 28/01/2013 on 16/03/2013
Existing plant Consent is valid upto 30/04/2015 in GREEN Category & C to E
for expansion granted on 27/12/2012
Industry is located @ 10 KM away from A-II Class River Ghod. Satisfy river
distance criteria
Industrial effluent will be generated from washing activity for which primary
treatment is proposed and the treated effluent will be discharged into CETP
Ranjangaon.
For domestic effluent STP of the capacity 15 CMD, treated sewage used on
land for gardening within premises.
Adequate height provided to existing DG Set.
Industry obtained the member of CHWTSDF MEPL Ranjangaon.
Regional Officer, Pune, has recommended for the 1st Consent operate for
expansion
We may grant 1st consent to operate for expansion with amalgamation up to
30/04/2014 with imposing BG of 5/- Lakhs towards Operation & Maintenance
of pollution control system
We may place the consent application before CC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 8

CAC Item No. 02
Name of the industry :- M/s. Enkel Wheel (India ) Ltd.
Gat No. 1425, Village Shikrapur,
Tal. Shirur, Dist Pune 412 208



Applied for consent to establish for expansion
Application received at SRO- Pune on dtd 06/02/2013 and at HQ on
14/03/2013
Existing consent is valid up to 30/04/2014
Existing domestic effluent qty is 80 CMD( Proposed 1.0 CMD) which will be
treated in existing STP having capacity 125 CMD.
APCS will be provided to Furnace and new DG Set.
SRO reported that As per existing consent condition industry submitted
operational BG of Rs 5/- lacs which is valid up to 30.04.2014.
Regional officer Pune has recommended the case for grant of C to E for
expansion.
We may grant the consent to establish for expansion.
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 9

CAC Item No. 03
Name of the Industry: M/s. JSW Infrastructure Ltd.,
Vill. Nandgaon, Dist. Thane.


1. Applied for Consent to establish for construction of cargo Port requiring total
plot area is 470 Ha (390 Ha for port and 80 Ha for connectivity by road & rail.).
2. Application received at SRO-Tarapur-I on dtd 13/9/2012 and at HQ on dtd
07/01/2013.
3. Industrial effluent will be nil.
4. Domestic effluent will be 75 CMD. Provided STP.
5. Proposed to provide composting facility for treatment MSW.
6. Boisar Vikas Manch has submitted the letter dtd 16.11.2012 in regards,
environmental violation inability of MPCB of grant NOC to Nangaon Port
Project of M/s. J SW infrastructure Ltd..
7. SRO reported, project proponent has applied to MoEF for EC accordingly
public hearing is conducted on 7.10.2012. And work of construction is not yet
started.
8. This office issued query Letter to
industry dtd. 12.3.2013 for submission of MMB document & industry has
submitted the same.
9. RO/SRO recommended for grant of consent to establish with subject to
obtaining EC from MoEF with a condition that Project proponent shall not take
any effective step before obtaining EC.
10. HOD Remark we may grant of consent to establish subject to E.C /
MCZMA approval.
We may pace the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 10

CAC Item No. 04
Name of the industry :- M/s. Bekaert Industries Pvt. Ltd.
Plot No. B-1, MIDC Ranjagaon,
Tal. Shirur, Dist. Pune


Applied for consent to establish for expansion
Application received at SRO- Pune on dtd 27/02/2012 and at HQ on
18/04/2012
Previous consent was valid up to 31/03/2013
Industry is located @ Ranjangaon MIDC which is 10.0 K.M. from notified river
Ghod(Class-A-II) which satisfying RRZ criteria
Industrial effluent generation will be increased by 6.0 CMD for which they have
proposed to install additional Multi Effective Evaporator of 10 CMD capacity.
Existing industrial effluent generation is 8 CMD for which they have already
provided MEE of 10 CMD capacity.
Domestic effluent generation will be increased by 2.0 CMD for which existing
STP of 50 CMD capacity will be used for treatment. STP comprises of Bar
Screen, Oil & Grease Trap, Equalization cum Holding Tank, MBBR Reactor,
Tube Settler, PSF, ACF, Chlorination, Treated Water Tank. Treated industrial
and domestic effluent will be used on land for gardening.
As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs
which is valid upto 30.09.2013 towards operation and maintenance of ETP and
air pollution control devices.
RO Pune has recommended the case for grant of consent to establish for
expansion
We may grant consent to establish for expansion
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 11

CAC Item No. 05
Name of the industry :- M/s. Bekaert Industries Pvt. Ltd.
Plot No. B-1, MIDC Ranjagaon,
Tal. Shirur, Dist. Pune


HOD Remarks:-
Applied for renewal of consent and 1st operate for expansion (Partly) with
amalgamation
Application received at SRO- Pune on dtd 29/01/2012 and at HQ on
15/03/2012
Previous consent was valid up to 31/03/2013
Industry obtained consent to establish for expansion on dated 09/02/2009
Industry stopped the Mfg of one product i.e. Filter cartridges/filter candles/filter
elements
Industrial effluent generation is 8 CMD for which they have provided multiple
effect evaporator of capacity 10 CMD
Sewage generation is 47 CMD for which industry has provided STP of capacity
50 CMD. Treated industrial and domestic effluent is used on land for
gardening. Total Land available @ 6.0 Hector
Industry has LPG base furnace with 18 Mtrs stack height. Further, 2 D. G. Set
of 750 KVA and 500 KVA, are provided with HSD as fuel with 18 Mtrs stack
height.
As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs
which is valid upto 30.09.2013.
RO Pune has recommended the case for grant of renewal of consent & 1st
operate for expansion with amalgamation for the period upto 31.03.2014.
We may grant renewal of consent with expansion with extension of existing of
Rs. 5/- Lakh up to consent validity
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 12

CAC Item No. 06

Name of Industry : M/s MITC Rolling Mills Pvt.Ltd,
Plot no.B-1, MIDC Palkhed,
Tal: Dindori, Dist: Nashik.

1. Application for grant of renewal of consent to operate submitted by industry on
04.11.2012.
2. Application received at H.Q. on 09.01.2013.
3. Recommended case for grant of consent to establish subject to Industry shall
obtain Environmental Clearance

Recommended for grant of consent to establish subject to Industry shall obtain
Environmental Clearance.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 13

CAC Item No. 07
Name of Industry : M/s Hindustan National Glass & Industries Ltd,
Plot no.F-1, MIDC Malegaon, Sinner,
Nashik, Dist: Nashik.

1. Application for consent to establish for change in fuel submitted by industry on
04.12.2012.
2. Application received at H.Q. on 28.01.2013.
3. Industry is having valid consent up to 31.10.2013.
4. SRO- Nashik has recommended case for consent to establish.
5. Recommended case for grant of consent to establish for change in fuel with
condition that industry shall submit the BG of Rs.5 Lakhs towards compliances
of consent conditions


Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 14

CAC Item No. 08
Name of the Industry: M/s. Sudal Industries Ltd.
Plot no.B-11, MIDC, Nardana,
Tal :Sindhkheda,Dist:Dhule.

1. Applied on 10.12.2012 for grant of consent to establish.
2. Application received to HQ on 02.02.2013.
3. RO-Nashik recommended for grant of consent to establish with the
condition of EC.
4. Industry has applied for mfg of Aluminium Alloy, rods, Billets, clad steel
wire products - 96,000 T/Year.[>30,000 T/A].In the mfg process they
have proposed to use Alluminium ingot and Alluminium Scrap as a raw
material. mainly The mfg process mainly consisting furnace charging
,degassing/grain refiring and hot top casting activity. They have propose
to use 4 nos. of oil fired skelner type furnace capacity of each furnace -
15 T ,Hence case was referred to committee constituted by the Board to
confirm applicability of EC .
5. Consent to establish may be granted after decision of Boards EC
committee regarding applicability of EC.


Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 15

CAC Item No. 09
Name of Industry : M/s. RSB Transmissions (I) Ltd.,
Gat No. 908 Nagar Road, Village Sanaswadi,
Tal. Shirur, Dist. Pune 412 208


Applied for 1st consent to operate with amalgamation
Application received at SRO- Pune on dtd 24/12/2012 and at HQ on
13/02/2013.
Existing consent is valid up to 30/06/2013 of M/s RSB Transmission.
Now M/s Harnam Engineering merged with M/s RSB and M/s RSB has
applied for 1st consent to operate for expansion
The effluent generated from pre washing and post washing components,
industry has provided ETP of 12 CMD capacity comprising collection, oil
skimmer, filtration, treated effluent used on land for gardening.
For domestic effluent STP of 30 CMD is provided and by clubbing M/s Harnam
Engineering there is only increase in effluent by 1.6 CMD and total effluent is
now become 26.6 CMD.
Industry has provided fume extraction system with 30 mtrs stack height for
existing heat treatment furnace and new addition of 4 furnaces, DG Set & shot
blasting adequate height of stack provided.
Shot blasting unit provided with in built dust collector. Dry paint booth provided
with close room and vent.
M/s Harnam Engineering submitted BG of Rs. 25000/- which is valid
upto24.06.2013.
Regional Officer, Pune, has forwarded the case regarding amalgamation of
consent may be taken at HQ level.
We may grant 1st consent to operate up to with amalgamation up to
30/06/2013 with forfeiting of exiting BG of Rs. 25000/- & taking another BG of
Rs. 5/- Lakhs towards Operation & maintenance
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 16

CAC Item No. 10

Name of the industry: M/s. Varroc Polymers Pvt. Ltd. (VPPL-II).
E-88, MIDC Ranjangaon, Tal-Shirur,
Dist-Pune.412 220


Applied for renewal of consent with expansion
Application received at SRO- Pune II on dtd 07/06/2012 and at HQ on
13/02/2013
Previously consent was valid up to 31/05/2012
Generation of Industrial effluent is 2.5 CMD & domestic effluent 61 CMD for
which they have provided combine ETP & STP (Capacity of 70.0 CMD).
APCS is provided to DG Set. Industry has shown the paint booth in application
form, but as per visit report & their request letter they have stopped the
painting activity.
SRO Pune II reported that, industry has already carried out expansion of the
unit and started production without Boards consent to establish.
Regional officer Pune has forwarded the case for Decision regarding grant of
consent may be taken at HQ level as the industry has done expansion without
obtaining consent to establish from the Board.
We may issue SCN for refusal of consent
We may place the consent application before CC for further consideration.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 17

CAC Item No. 11
Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd.
E-2 & F-1, MIDC Baramati, Tal. Baramati,
Dist. Pune 413 133


Applied for renewal of consent
Previous consent was valid up to 31/03/2013
Application received at SRO-Pune-I on dtd 27/02/2013 and at HQ on
02/04/2013.
Trade effluent generation is 623 CMD for which effluent treatment plant
consisting of primary, secondary and tertiary treatment system provided.
For domestic effluent 288 CMD sewage treatment plant provided
Water curtain with scrubber to paint booth section provided.
As per earlier consent condition industry has submitted B.G of 2.0Lakhs for
provision of APC to paint booth which is valid up to 29/05/2013.
Regional officer Pune recommended the case for grant of renewal of consent
by imposing appropriate Bank guarantee towards operation & maintenance of
ETP
We may grant of renewal of consent with operational BG of Rs. 5/- Lakhs
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 18

CAC Item No. 12

Name of the Industry: M/s. Sandvik Asia Privet Limited.,
Mumbai-Pune Road,
Dapodi, Pune 412 220


Applied renewal of consent
Application received at SRO- PC on dtd 19/01/2013 and at HQ on 28/02/2013.
Industry located @ 0.1 KM away from river Pawana (A-IV Class) attract RRZ
Industrial effluent is 70.0 CMD & Domestic effluent is 180.0 CMD for which
they have provided combine ETP & STP.
Analysis results of J VS dated 30/03/2012,20/04/2012 are within the prescribed
consent limits (copy enclosed).
APCs are provided to DG Set, process stack & paint booth section
RO Pune has forwarded the case to HQ for Decision regarding grant of
renewal of consent to operate with enhancement in C.I.
We may issue SCN for refusal of consent.
We may place the consent application before CAC for further consideration.







Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 19

CAC Item No. 13

Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd.
F-19, MIDC Baramati, Tal. Baramati,
Dist. Pune 413 133


Applied for renewal of consent
Application received at SRO-Pune-I on dtd 28/01/2013 and at HQ on
25/03/2013.
Previous consent was valid up to 31/03/2013
Indl. Effluent quantity increased from 60.30 CMD to 115 CMD for which they
have provided effluent treatment plant and Dom. Effluent increased from 45
CMD to 65 CMD provided sewage treatment plant.
Industry has provided water curtain with scrubber to paint booth section as
APC.
Regional officer Pune Recommended for grant of consent after submission
details for increase in Indl. and Dom. Effluent
We may grant of renewal of consent 31/03/2014 With operational BG OF Rs.
5/- Lakhs
We may place the consent application before CAC for further consideration.






Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 20

CAC Item No. 14

Name of the industry: M/s. Forbes Marshal Pvt.Ltd.
Plot No.A-34/35,B-15/16,H-Block
MIDC Pimpri,Dist-Pune 411 018


Applied for renewal of consent
Application received at SRO- Pune on dtd 20/12/2012 and at HQ on
28/01/2013
Previously consent was valid up to 30/04/2011
Generation of Industrial effluent is NIL
Domestic effluent generation is 18 CMD. SRO Reported that industry has
started the work of STP of capacity 30 CMD & said work will be completed by
15/01/2013.
Industry is having closed dry type paint booth & to which bag filteration dust
collector provided.
Regional officer Pune has recommended for grant of renewal of consent to
operate for period upto 30.04.2017.
We may grant renewal of consent up to 30/04/2016 with operational BG of Rs.
5/- Lakhs & Company Board Resolution
We may place the consent application before CC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 21


CAC Item No. 15
Name of the Industry: M/s Viraj Profiles Ltd.,
Gut No. G 1/2, 1/3, 2, MIDC Boisar Tarapur,
Tal. Palghar, Dist. Thane.

1. Applied for renewal of Consent to operate.
2. Application received at SRO-Tarapur-I on dtd 28.12.2012 and at HQ on dtd
20.2.2013.
3. Previous consent was valid upto 31/12/2012.
4. Industrial effluent is 61 CMD. Provided ETP disposal of MIDC drain connected
to CETP.
5. J VS results of Water sample on dtd 27.6.2012, 11.07.2012,. Which is
consented limit.
6. Domestic effluent is 9 CMD. Provided Septic tank and soak pit.
7. Industry has provided scrubber, dust collector & bag filter.
8. SRO reported that, 1) The industry is replacing the old induction furnace with
latest advance technology AVP auto induction furnace to control Air pollution.
2) P.D was issued vide No. MPCB/ROT/PD/80 dtd 10.01.2012 for fugitive
emission and causing air pollution & Interim direction was issued vide no.
MPCB/ROT/ID/B-333 dtd 7.02.2012 and submitted of B.G. of Rs. 8 lacs.
9. This office issued query Letter to
industry dtd. 22/2/2013 for submission of consent fee & industry has submitted
the same.
10. SRO recommended that grant of consent for 31.12.2013.
11. HOD Remark we may grant renewal of consent upto 31/12/2013 with
the condition of extension of B.G. upto consent validity period.
12. We may pace the consent application before CAC for further
consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 22

CAC Item No. 16
Name of the Industry: M/s. Mutual Industries Pvt.Ltd.
Gut no.546/4 & 5,Village-Shikrapur,Malthan Rd.
Tal-Shirur,Dist-Pune 412 208


Applied for renewal of consent and 1st consent to operate for expansion with
amalgamation
Application received at SRO- Pune on dtd 30/01/2013 and at HQ on
02/04/2013.
Previous consent was valid up to 31/01/2013 and obtained C to E for
expansion on 10/10/2012.
Industrial effluent generation is 19 CMD for which ETP of capacity 25 CMD
consist of primary followed by tertiary treatment provided.
Domestic effluent generation 6 CMD for STP Provided
Treated industrial effluent is use for gardening along with treated domestic
effluent.
Adequate height of stack provided to DG Sets, water curtain with adequate
height of stack provided to paint booth.
Regional officer has recommended for grant of renewal of consent with
amalgamation for expansion
We may grant of renewal of consent with amalgamation with operational BG of
Rs. 5/- Lakhs
We may place the consent application before CAC for further consideration.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 23
CAC Item No. 17

Name of the Industry: M/s. Semco Electric Pvt. Ltd. (Unit II),
Plot No. A-2, MIDC Chakan,
Tal- Khed, Dist- Pune 410 501


Applied renewal of consent
Application received at SRO- Pune on dtd 01/02/2013 and at HQ on
25/03/2013.
Previous consent is valid up to 31/03/2013
Generation of Industrial effluent is 97.70 CMD and Domestic Effluent
generation is 100.90 CMD for which they have provided combine ETP for the
treatment of industrial as well as domestic effluent. For the effluent generating
from painting activities they have provided primary ETP and then it is taken to
secondary and tertiary treatment. ETP consist of collection tank, oil trapper,
reaction tank, tube settler, bio reactor, clarifier, treated water tank, pressure
sand filter and SDB. Out of 97.7 CMD Treated effluent, 85 CMD recycled in
process and remaining 12.7 CMD is used on land for gardening within
premises
Industry has provided water curtain with stack to paint booth, adequate height
of stack to DG Set, Oven, meting furnace, shot blasting provided with dust
collector and scrubber provided to pretreatment section.
RO Pune has recommended the case for grant of renewal of consent to
operate for the period upto 31.03.2014.
We may grant consent to operate with imposing BG of 5/- Lakhs towards
Operation & Maintenance of pollution control system
We may place the consent application before CAC for further consideration.


Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 24
CAC Item No. 18
Name of the industry : M/s. Walchandnagar Industries Ltd.
Walchandnagar,Tal-Indapur,Dist-Pune 413 114


Applied for renewal of consent with expansion
Application received at SRO- Pune on dtd 09/08/2012 and at HQ on
02/04/2013
Previous consent was valid up to 31/07/2011 in GREEN category.
Generation industrial effluent such as coolent (Quantity not mentioned). SRO
Pune -I reported that at present coolent is being discharged without treatment
with domestic effluent.
SRO reported that as per the consent, water consumption for domestic
purpose is 2800 CMD and effluent generation is 454 CMD whereas actual
water consumption for domestic purpose is an average 5728 CMD as per
irrigation bill for the month of Nov. to Feb. 2012.
Industry has near about 60-70 acres of land available for gardening purpose.
For domestic effluent industry has provided following treatment facility at 06
locations.
J VS result of on 30/10/2012 submitted in which one location parameter of BOD
(140) COD (288) is exceeded the consented standards
Industry has 02 nos.LDO fired furnace followed by 14 mtrs. Chimney.
Industry has carried out shot blasting activity in temporary shed without any air
pollution control system.
RO Pune recommended for grant for renewal of consent after obtaining
undertaking along with time bound programme form the industry to provide full-
fledged STP for treatment of domestic sewerage generated from the industry.
We may issue SCN for refusal of consent
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 25

CAC Item No. 19
Name of the Industry: M/s. ISMT Ltd. Tube Plant (B),
Plot No. B-13, MIDC Baramati, Tal- Baramati,
Dist Pune 413133

Applied renewal of consent
Application received at SRO- Pune on dtd 17/01/2013 and at HQ on
14/03/2013.
Previous consent was valid up to 31/10/2011
Industrial effluent generation is 150 CMD for which ETP is provided with
primary, secondary and tertiary treatment, SRO reported that tertiary treatment
is not in operation.
For 32 CMD domestic effluent industry has provided septic tank & soak pit.
SRO Pune I reported that industry has not provided STP, even after issuance
of notices/instructions, industry has not submitted the compliance of the same.
J VS analysis result on 27/09/2012,22/08/2012 and 18/07/2012 submitted.
parameter of pH, TDS,Chloride and sulphate not meeting the prescribed
standards
Industry has one Rotary Hearth Furnace,Thermic Fluid Heater,Quenching and
Tempering furnaces each one is with adequate stack heights.
Industry has installed scrubber at pickling section
Industry has two nos. of D.G sets with adequate stack heights
SRO Pune I reported that As per previous consent condition No.11 Industry
has submitted BG of Rs1/- Lac which is valid up to 31/03/2013.
RO Pune/SRO Pune-I recommended the case for grant of consent to renewal,
subject to provision of STP, existing ETP upgradation and appropriate B.G for
O&M of ETP and satisfactory reply of query
We may place the consent application before CAC for further discussion.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 26

CAC Item No. 20

Name of the Industry: M/s. JBM MA AUTOMOTIVE PVT.LTD.,
C - 1 (Part) MIDC Chakan Talegaon Road
Tal - Khed Dist Pune 410 501


Applied renewal of consent with expansion
Application received at SRO- Pune on dtd 07/01/2013 and at HQ on
14/03/2013.
Previous consent was valid up to 30/04/2012 in GREEN Category
Now as per the revised CPCB guidelines sheet metal components with
fabrication is under red category.
Industry located @ 3.0 KM away from River Indrayani (A-II Class) Satisfy the
distance criteria
Industrial effluent generation is NIL
For 40 CMD domestic effluent industry has provided septic tank & soak pit
STP & industry has started work of STP and it will be completed up to April
end
RO Pune recommended the case for grant of Renewal of consent with
expansion by obtaining BG for providing STP in time bound manner.
As work is not completed of STP we may issue SCN for refusal of consent.
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 27

CAC Item No. 21
Name of the industry : M/s. Innoventive Industries Ltd.
Gat No. 56/3,4,5, Shikrapur Chakan Road,
Pimpale Jagtap, Tal. Shirur, Dist Pune 412 208


Applied for renewal of consent and 1st consent to operate for expansion with
amalgamation
Application received at SRO- Pune on dtd 31/01/2013 and at HQ on
16/03/2013
Existing plant consent was valid up to 30/01/2013 in Orange category
Industry has obtained consent to establish for expansion 1st on 04/12/2012
Industry located @ 2.5 KM away from River VEL. Satisfy the distance criteria.
Industrial effluent generation is NIL (Existing NIL)
Domestic effluent generation is 45 CMD for which sewage treatment plant
provided.
APCS in the form of stack of adequate height provided to DG Sets and Hot
water generator.
As per existing consent industry has submitted BG of Rs. 5 lac for O & M
which is valid up to 28/05/2013 and also submitted Board resolution.
We may grant renewal of consent with 1st consent to operate for expansion
with amalgamation up to 31/12/2014
We may place the consent application before CAC for further consideration.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 28
CAC Item No. 22

Name of the industry : M/s. Tata Autocomp Systems Ltd. (Interior and Plastic
Division), S.No. 280 and 281, Village- Mann,
Tal- Mulshi, Dist- Pune 411 057



Applied for renewal of consent
Application received at SRO- Pune on dtd 02/02/2013 and at HQ on
16/03/2013
Previous consent was valid up to 31/03/2013
Industrial effluent is 1.5 CMD for which they have provided ETP comprising of
Primary, Secondary & Tertiary treatment.
Domestic effluent is 28.0 CMD for which they have provided STP comprising
primary, secondary & tertiary treatment facility.
Industry has provided stack of 10.0 mtrs ht each for paint booth.
DG Sets of 500 KVA- 2 Nos & 250 KVA installed for which stack of 4.5 mtrs
above roof each provided along with aquatics enclosure.
RO Pune has recommended the case for grant of renewal with enhancement
in CI.
We may grant renewal of consent upto 31/03/2016 with operational BG of Rs.
5/- Lakh
We may place the consent application before CAC for further consideration.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 29


CAC Item No. 23
Name of Industry : M/s. Crompton Greaves Ltd,
Survey no.1005, 1007-9, 1011, 1013,1014,1017,1019
Kanjurmarg East, Mumbai-400042.

1. Application for grant of renewal of consent to operate submitted by industry on
21.12.2012.
2. Application received at H.Q. on 09.04.2013.
3. Industry has submitted Environmental statement for the period 2011-2012.
4. RO- Mumbai has recommended case for grant of consent to operate subject to
verification of no increase in production quantity.
5. Recommended to issue SCN for refusal for grant of consent to operate for non
provision of STP, Non submission of no increase in pollution load.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 30

CAC Item No. 24
Name of Industry : M/s. Mahindra and Mahindra Ltd [Tractor Division],
Akurli Road,
Kandivali (E) Mumbai-400101.


1. Application for grant of renewal of consent to operate submitted by industry on
08.03.2013.
2. Application received at H.Q. on 18.04.2013.
3. Industry has submitted Environmental statement for the period 2011-2012.
4. RO- Mumbai has recommended case for grant of consent to operate up to
30.04.2015.

Recommended case for grant of renewal of consent to operate for up to 30.04.2015
with extension of existing BG up to consent validity period.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 31

CAC Item No. 25

Name of Industry : M/s. Mahindra and Mahindra Ltd,
Survey no.368, 369 part 372 to 376
A/p Talegaon, Tal: Igatpuri, Dist: Nashik


1. Application for grant of renewal of consent to operate submitted by industry on
13.03.2013.
2. Application received at H.Q. on 09.04.2013.
3. Industry has submitted Environmental statement for the period 2011-2012.
4. RO- Nashik has recommended case for grant of consent to operate up to
30.09.2014 subject to submission of additional consent fees as per Sectorial
approach circular.
5. Recommended case for grant of renewal of consent to operate for up to
30.09.2014 with condition that industry shall submit additional consent fees
towards increase in CI and BG of Rs.5 Lakhs towards compliances of consent
conditions.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 32


CAC Item No. 26
Name of Industry : M/s. ABB Ltd,
[Formerly known as ABB Global Services Ltd]
Plot no.79, MIDC, Satpur, Tal & Dist: Nashik


1. Application for grant of renewal of consent to operate submitted by industry on
02.02.2013.
2. Application received at H.Q. on 18.04.2013.
3. Industry has submitted Environmental statement for the period 2011-2012.
4. RO- Nashik has recommended case for grant of consent to operate up to
30.04.2016 subject to submission of additional consent fees.
5. Recommended case for grant of renewal of consent to operate for up to
30.04.2016 with condition that industry shall submit additional consent fees and
extension of existing BG up to 30.04.2016.



Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 33

CAC Item No. 27
Name of Industry : M/s. Larsen and Toubro Ltd.
Powai East compus, Saki Vihar Road,
Powai, Mumbai-400 072.


1. Application for renewal of consent to operate submitted by industry on
11.02.2013.
2. Application received at H.Q.on14.03.2013.
3. Industry has paid water cess up to 31.05.2012.
4. Industry has submitted Environment Statement for year 2011-12.
5. RO-Mumbai has recommended case for renewal of consent to operate up to
28.02.2015.

Recommended case for grant of renewal of consent to operate up to 28.02.2015 with
condition that industry shall submit BG of Rs.5 Lakhs towards O &M of pollution
control systems and submission of additional consent fees.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 34

CAC Item No. 28

Name of Industry : M/s. Larsen and Toubro Ltd.
Powai West compus, Saki Vihar Road,
Powai, Mumbai-400 072.


1. Application for renewal of consent to operate submitted by industry on
07.12.2013.
2. Application received at H.Q. on 14.03.2013.
3. Industry has paid water cess up to 31.05.2012.
4. Industry has submitted Environment Statement for year 2011-12.
5. RO-Mumbai has recommended case for renewal of consent to operate subject
to submission of necessary information from industry.
6. Recommended case for grant of renewal of consent to operate up to
31.12.2015. With submission of BG of Rs.5 Lakhs towards operational and
maintenance of pollution control systems and compliance of consent condition.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 35


CAC Item No. 29
Name of the Industry: M/s. Jayaswal Neco Limited (Automotive Casting
Division)Kh. Nos.70,71-A, 71B and 76, Vill: Ruikhairi,
28/9, Mile Stone, Mouza: Ruikhairi, PO: Butibori,
Wardha Road, Dist: Nagpur. .

Applied for renewal of consent.
1. Earlier consent was valid up to 31.01.2013.
2. J VS results are exceeding the standards.

We may grant renewal up to 31.12.2014 with condition of forfeiting of existing
Bank Guarantee due to exceeding of J VS results and obtain additional Bank
Guarantee of Rs. 5/- Lakhs towards Operation and Maintenance of air pollution
control system. .

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 36

CAC Item No. 30

Name of the industry: M/s. Durabuild Technologies Pvt. Ltd.
B-32/1, MIDC Aera , Ranjangoan, Tal. Shirur,
Dist. Pune 412 220


Applied for renewal of consent
Application received at SRO-Pune-I on dtd 01/04/2013 and at HQ on
23/04/2013.
Previous consent was valid up to 28/02/2013
Indl. Effluent quantity 1.5 CMD for which they have provided effluent treatment
plant and Dom. Effluent 7.5CMD provided sewage treatment plant.
Industry has provided LPG base boiler with 14 Mtrs stack height. D. G. Set of
250 KVA with HSD as fuel with 6.0 Mtrs., stack height. Industry has two
chambered incinerator having stack height of 20 Mtrs.
Regional officer Pune recommended for grant of renewal of consent to operate
with enhancement in C.I. for the period upto 28.02.2014
We may grant of renewal of consent 28/02/2014 With operational BG OF Rs.
5/- Lakhs
We may place the consent application before CAC for further consideration.






Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 37

CAC Item No. 31
Name of the industry: M/s. Virgo Engineers,
Plot No. 278, Raisoni Park, Tal:- Mulshi,
Dist:- Pune 411057


Applied for renewal of consent with expansion.
Application received at SRO-Pune-I on dtd 22/02/2013 and at HQ on
18/04/2013.
Previous consent was valid up to 30/09/2011
Indl. Effluent quantity 4.5 CMD for which they have provided effluent treatment
plant of 5.0 CMD capacity and Dom. Effluent 41.0 CMD provided sewage
treatment plant of 55 CMD capacity.
Industry has provided APCs to paint booth, shot blasting unit and DG sets.
Regional officer Pune recommended for grant of renewal of consent with
expansion subject to submission of reply to queries raised by SRO.
We may issue SCN for refusal of consent .
We may place the consent application before CAC for further consideration.








Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 38

CAC Item No. 32
Name of the Industry: M/s AAM India Manufacturing Corporation Pvt Ltd ,
Gat No. 787 & 788, Hanga,
Tal- Parner Dist: Ahmadnagar.

1. Applied for grant of renewal of consent to operate with Amalgamation at SRO
Ahmednagar on 18.02.2013.
2. Application for grant of consent to operate received to HQ on 18.04.2013.
3. Industry is having valid consent up to 31.10.2013 and consent to establish.
4. SRO- Nashik has recommended case for grant of Renewal of consent to
operate and decision regarding the expansion may be taken at H.Q.level..
5. Renewal of consent to operate with expansion may be granted up to
31.03.2016 with the condition that submission of BG of Rs.5 Lakhs towards the
operation and maintenance of pollution control system.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 39

CAC Item No. 33
Name of the Industry: M/s Everest Industries Ltd., 152 & 153,
Lakhmapur, Tal- Dindori, Dist: Nashik.

1. Applied for grant of renewal of consent to operate with RO-Nashik on
29.01.2013.
2. Application for grant of consent to operate received to HQ on 09.04.2013.
3. Industry is having valid consent up to 31.10.2013.
4. Industry has paid water cess up to Aug-2012.
5. Industry has submitted Environmental statement for year 2011-2012.
6. Recommended grant of Renewal of consent to operate upto 31.03.2016 with
the condition that submission of BG of towards the operation and maintenance
of STP.
7. Recommended to issue SCN for refusal for grant of renewal of consent to
operate.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 40

CAC Item No. 34

Name of the Industry: M/s. Endurance Technologies Ltd.
Plot no. B-20, Chakan Industrial Area,
Vill-Nighoje, Tal-Khed, Dist:- Pune 410 501


Applied for renewal operate
Application received at SRO- Pune on dtd 21/01/2013 and at HQ on
16/03/2013.
Generation of Industrial effluent is 40.0 CMD
Domestic Effluent is 45.0 CMD
Combined ETP provided for the treatment of industrial and domestic effluent.
Treated effluent is used for toilet flushing and remaining used on land for
gardening within premises
APCS in form of water curtain with stack provided to paint booth, dust collector
followed by stack provided to shot blasting section, for degreasing fume
extraction system with adequate height stack provided, acoustic enclosure with
stack provided to DG Set,
RO Pune has recommended the case for grant of renewal of consent to
operate by imposing operational BG.
We may grant consent to operate up to 28/02/2016 with imposing BG of 5/-
Lakhs towards Operation & Maintenance of pollution control system
We may place the consent application before CAC for further consideration.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 41


CAC Item No. 35

Name of Industry: M/s. Endurance Technologies Pvt. Ltd. ,
Plot No. L-6/3, MIDC Waluj, Aurangabad.

1. Applied for renewal of consent with first operate for expansion.
2. Existing consent valid upto 28/2/2013 and have obtained consent to establish
for expansion.
3. The CI is Rs. 98.10 crores and existing CI including expansion was Rs. 85.5
crores, increase is of Rs. 12.60 crores, it is due to actual cost of expansion,
4. Provided ETP, J VS results are within limit.
5. Stack air monitoring results are exceeding the limits.
6. Ro recommended forfeiture of existing BG of Rs. 1.0 lacs and to obtain fresh
BG of Rs. 2.0 lacs.
7. We may forfeit the existing BG and obtain fresh BG of Rs. 5.0 lacs.
8. We may place the case before CAC for further discussions.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 42

CAC Item No. 36
Name of the Industry: Pimpri Chinchwad Municipal Corporation EWS
Project
Sector 17 and 19 (P) Chikhali, Pune

1. Application for consent to 1
st
Operate 114 nos. of buildings
Plot Area 2,53,018.50 M
2
Total BUA (FSI) not furnished
Total Construction Area not furnished

2. Application received at SRO 16/02/2013 at HQ on 16/04/2013

3. Water Consumption
Water requirement is - 4536 CMD
Sewage generation is 3629 CMD
Separate STP is not provided and Corporation has proposed to treat the sewage generated at
this site in their designated STPs provided for the area.

4. The Solid Waste generation -
Biodegradable -8232 kg/day- Composting
Non- Biodegradable -3528 kg/day
Separate MSW processing plant is not provided and Corporation has proposed to treat the
MSW generated at this site in their designated Composting Plant at Moshi.

5. Consent may be granted with standard condition of BG



Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 43

CAC Item No. 37
Name of the Industry: Pimpri Chinchwad Municipal Corporation Nigad
Project
Sector 22, Nigadi, Pune

1. Application for consent to 1
st
Operate for for 35 Nos. of Buildings on;
Plot Area 3,98,624.06 M
2
Total BUA (FSI) not furnished
Total Construction Area not furnished

4. Application received at SRO 18/02/2013 at HQ on 16/04/2013

5. Water Consumption
Water requirement is - 1930.71 CMD
Sewage generation is 1544.57 CMD
Separate STP is not provided and Corporation has proposed to treat the sewage generated at
this site in their designated STPs provided for the area.

4. The Solid Waste generation -
Biodegradable -1960 kg/day- Composting
Non- Biodegradable -840 kg/day
Separate MSW processing plant is not provided and Corporation has proposed to treat the
MSW generated at this site in their designated Composting Plant at Moshi.

5. Consent may be granted with standard condition of BG



Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 44

CAC Item No. 38
Name of the Industry: M/s DSK Vishwa (D.D. Kulkarni Developers Ltd.)
Kirkatwadi, Dhyari, Pune

1. Application for consent to 1
st
Operate in part for

Plot Area 3,73,754.20 M
2
Total Construction Area 2,28,727.37 M
2


2. Application received at RO 04/03/2013 at HQ on 10/04/2013

3. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for;
Plot Area 3,73,754.20 M
2
Total BUA (FSI) 3,08,143.20 M
2

Total Construction Area 4,61,458.32 M
2

4. Water Consumption
Water requirement is 1889.00 CMD
Sewage generation is 1511.00 CMD
STP provided 2 STPs of capacity - 1000.00 +1250 .00 CMD

5. The Solid Waste generation -
Biodegradable 4405 kg/day-
Onsite Composting provided
Non- Biodegradable 1907 kg/day

6. Ro has recommended the case for grant of consent to operate in part.

7. The case may considered with BG of Rs. 10 lacs for provision of MSW processing plant
and STP





Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 45


CAC Item No. 39
Name of Industry: M/s. Amit Enterprises Promoters & Builders Pvt. Ltd. , Plot.
No. 16-1to16-32 and 16part, 16C part, 16J H part, 16part,
16KH part, 16G part, 16B part, 16CHH part, 16T part &
16J part, Baner, Pune.


1. Application for consent to establish for:
Total Plot area 70482.00 M
2

Total Built up area 136720.95 M
2

Total Construction Area 138261.00 M
2


2. Application received at SRO on 02/03/2013 and at HQ on 16/04/2013

3. EC obtained vide No. SEAC-2011/CR-971/TC-2 dt. 27/11/2012 for;

Total Plot area 70482.00 M
2

BUA 136720.95 M
2

4. Water requirement is -698 CMD
Sewage generation is -539 CMD
2 Nos. of STPs proposed of capacity 400 CMD and 175 CMD.

5. MSW generation:
Non Biodegradable Waste - 784.8 kg/day
Biodegradable Waste -1177.0 kg/day
Onsite MSW processing plant is proposed.

6. Regional Officer has recommended the case for establish.

7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for providing MSW
processing plant and STP.








Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 46

CAC Item No. 40

Name of Industry: M/s. Magus Estate & Hotels Ltd.
S. No. 114 and extension on
1/136,1A/136(pt),1C/136,1D/136,1A/136 &133(pt)
relocation of amenity plots+133 pt, G/South ward,
Worli, Mumbai

1. Application for consent to establish (II Phase) for:
Total Plot area 17,243.43 M
2

Total BUA (FSI) 36,142.00 M
2

Total Construction Area 80,155.08 M
2
(Height 187.17 M)

CI - 45000.00 Lacs

2. Application received at SRO on 11/03/2013 and at HQ on 12/04/2013

3. EC obtained vide No. SEAC-2010/CR.562/TC.2 dt. 20/10/2011 for;
Plot Area 17,243.43 M
2
Total BUA (FSI) 36,142.00 M
2

Total Construction Area 80,155.00 M
2
(Height 186.17 M)


CI - 100000.00 Lacs




4. Water requirement is -127 CMD
Sewage generation is - CMD
STP proposed -320 CMD

5. MSW generation:
Biodegradable -233.43 kg/day- (Onsite composting proposed)
Non- Biodegradable -213.56 kg/day

6. SRO reports that the firm has reduced the height of the building from 370 mtrs. to 187.17
mtrs. due to restriction by civil aviation, hence proposed capital investment in the II Phase of
the project has been decreased to 450 Crs.

7. However EC is granted for 186.17 mtrs. with CI of Rs. 1000 Crs.

8. The firm has not submitted the details of existing Hotel activity such as;
a) Total plot and construction areas
b) Whether any previous consent has been obtained or not,
c) Details STP and MSW plant and
d) Reduction in C.I.
9. RO has recommended the case for Establish

10. Submitted before CAC for decision

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 47

CAC Item No. 41
Name & Address of Industry M/s. N Kumar Projects & Infra. Pvt. Ltd VIP Road,
Near Alankar Theater, Nagpur

1. Red/LSI/Proposed construction of Hotel, Restaurant and Swimming Pool activity (114
rooms) for:
Total Plot area is Not furnished
Total Built up area - Not furnished

2. Application received at SRO on 04/05/2012 and at HQ on 19/05/2012

Water Consumption
Domestic 153 CMD
Sewage generation 98 CMD
STP Proposed Capacity not furnished
Cooling 30 CMD

3. The Solid Waste generation -24 Kg/Day

4. The case was placed before CC, meeting held on 04/01/2013. SCN was issued as per
directions of CC on 01/02/2013. Thereafter reminder was issued on 08/04/2013, reply still
awaited.

5. SRO has recommended the case for grant of consent to establish.

6. Application may be refused for non submission of reply to SCN and Reminder.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 48

CAC Item No. 42
Name of the Industry: M/s. Neelam Hotel Pvt. Ltd.
(Holiday Inn Shirdi), P.No. 106/2-3-4, Nimgaon
Korhale, Shirdi,
Tal- Rahata, Dist- Ahmednagar

1. Application for consent to Establsih for
Construction of Hotel Five Star with laundry and Swimming Pool activity (152 rooms) for:
Total Plot area is 18,600.00 M
2

Total Built up area - 6784.00 M
2


3. Application received at SRO 20/03/2013 at HQ on 05/04/2013

4. Water Consumption
Domestic - 115 CMD
Sewage generation - 55 CMD
Industrial - 151 CMD
Effluent Gen. 34 CMD
STP Proposed 200 CMD

5. The Solid Waste generation -
Bio degradable- 500 Kg/Day
Composting Proposed
Dry Garbage- 500 Kg/Day

6. Ro has recommended the case for C to E.

7. Consent may be granted with BG of Rs. 10 lacs for providing MSW processing plant and STP.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 49

CAC Item No. 43
Name & Address of the Industry M/s. Nish Developers Pvt. Ltd.
CTS No. 71 1/71. 3/52 to 53, New Islam Mill
Compound, Mahadev Palav Marg (Curry Road)
Mumbai


1. Application for 1
st
consent to operate in part.

2. Application received at SRO on 25/03/2012 and at HQ 05/04/2013

3. C to E issued vide No.379 dt.11/09/2008 for;
Total Plot area 34,697.00 M
2

BUA 1,38,787.74 M
2


4. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for;
Total Plot area 34,697.00 M
2

BUA 1,38,787.74 M
2

Total Construction Area 3,75,113.13 M
2

5. Now applied for:
Plot Area 26,247.12 M
2

Construction Area 18,627.62 M
2


5. Water requirement is 380.00 CMD
Sewage generation is 350.00 CMD
STP provided capacity not furnished

6. MSW generation: quantities not furnished

7. RO has recommended the case for grant of consent to operate in part.

8. Consent may be granted with BG of Rs. 10 Lakhs for O & M of STP and provision and thereafter
operation of MSW plant and submission of undertaking on part construction.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 50

CAC Item No. 44
Name of Industry: M/s Eon Kharadi Infrastructure Pvt.
Ltd., Plot no. 1`, S.No. 77, Kharadi
Knowledge Park, Kharadi, Pune-411014


1. Proposal of Ro Pune for 1st C to O.
2. The application of the firm is not received with the proposal from the Pune. Letter has
been issued to Ro Pune on 12/12/2011
3. Application Received at SRO on 23/12/10 and the proposal of Ro Pune is received at HQ
on 30/11/2011.
4. The project proponent has obtained EC of GOI vide No. 21-57/2006-IA.III dt.
17/05/2006.

5. The C to E is issued on 09/08/2010

6. Industry has provided adequate STP.
7. RO has recommended the case for grant of consent to operate.
8. Consent may be granted condition of obtaining BG of Rs. 10 lacs and necessary fees as
per GR dt.25/08/2011.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 51

CAC Item No. 45
Name of Industry: The Lalit Mumbai,
M/s. Bharat Hotels Ltd.
Sahara Airport Road, Andheri (E),
Mumbai


1. Resubmission case was placed before 31/01/2013; it was decided to issue SCN for refusal
regarding clarification for ETP and decrease in CI.

2. Application received at SRO on 30/11/2012 and at HQ on 21/12/2012

3. The firm has replied to SCN vide letter dated 05/03/2013; wherein there is no clarification on
the reasons for decrease in CI, shifting to ozonisation Method for Swimming Pool and also
firm has not provided MSW processing plant.

4. RO has recommended upto 31/05/2014 after receipt of fees of rs. 2,41,080/-

5. Consent may be renewed with the condition of obtaining BG of Rs. 10 Lacs for operation and
maintenance of STP and MSW processing plant and shifting to Ozonisation methods for
Swimming Pool.


Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 52

CAC Item No. 46
Name of Industry: M/s Vamona Developers Pvt. Ltd. ,
S.No. 33/ 2A/2, 33/ 2B/2 of Wadgon Sheri,
Vimannagar, Opp. Giga Space, Pune

1. Application for renewal of consent for
Total Plot area -- 79,881.00 M
2

Total Construction area --60,436.28 M
2


2. Application received at SRO on 28/02/2012 and at HQ on

3. Previous consent valid upto31/03/2013 for;
Total Plot area - 79,881.00 M
2

Total Construction area - 60,436.28 M
2


3. The firm has obtained EC vide No. SEAC 2010/CR.62/TC.2 dt. 30/06/2010.

4. The firm has not complied with the previous consent conditions of
a. Submitting Affidavit on built up area and total construction area in consensus with
Environmental Clearance.
b. Environmental Statement
c. Water analysis report
d. Payment of CESS
e. Details on 80 % water recycling and affixing of separate meter therein for records.

5. The firm has shown increase in C.I. of the project from 54976 to Rs. 673.61 Crs., without
any justification.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 53

CAC Item No. 47 to CAC Item No. 53 (LAVASA)

Name of Industry: M/s. Lavasa Corporation Ltd., (Parent Organization)
Tal. Mulshi & Velhe, Dist. Pune.

Sub-Units/ Industries in development of Phase-I of Hill Station over 2,000 Ha.
Area:

1.M/s Eco Motel Hotels Ltd. (Hotel Mercure ), S.No. 78(pt),3, Dasave Circle,
Village Dasave,
2.M/s Ekaant Resort, S.No. 8/1, Village Padlaghar,
3.M/s Fortune Hotels Ltd., S.No. 42(pt),43(pt), Village Dasave,
4.M/s Lavasa Bamboo Crafts Ltd., S.No. 60, Post Pathershet, Village Mugaon,
5.M/s Lavasa Corporation Ltd.(Hot Mix Plant), S.No.3, Village Koloshi,
6.M/s Lavasa Corporation Ltd.(RMC Plant), S.No.30/4&5, Village Dasave,
7.M/s Spotless Laundary Services Ltd., S.No.28, Village Bhoini,

1. Application for grant of Consent to Establish/Operate for various Sub-Units /
Industries in Phase-I of Lavasa Hill Station over 2,000 Ha. area by M/s Lavasa
Corporation Ltd. at
Tal. Mulshi Dist. Pune were received at R.O. (Pune) in between 9
th
J uly 2010 and
8
th
May 2012.
2. Board vide Consent No. BO/Pune-2/O/CC-3 dtd. 5/01/2005 has granted Consent to
Operate under Orange category with the validity upto 30/04/2014 to M/s Lavasa
Corporation Ltd. for development of land of 17 villages as a Tourism Project on
6181.3743 Hectares with incidental utilities and services.
3. MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 has accorded
Environmental Clearance for development of 1
st
phase of Hill Station Township on a plot
area of 2,000 Hectares at village Mulshi and Velhe Talukas, Dist. Pune, Maharashtra by
M/s Lavasa Corporation Ltd.
4. Applications of the Hotels (3 Nos.) were handled by A.S.(Tech.) Section; applications of
Hot Mix Plant, RMC Plant and Bamboo Craft Works were handled by J .D. (APC)
Section and that of Laundry was handled by R.O.(HQ) Section.
5. These files were routed to Legal wing for opinion about applicability of RRZ Policy / EC
and kept pending due to action initiated by MoEF on M/s Lavasa Corpn., Court cases
and absence of guidelines.
6. Upon receipt of written request dtd. 27/12/2012 from Chief Planner, Lavasa Corp. Ltd.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 54
Honble Chairman & Member Secretary has instructed to expedite the disposal of
pending applications.
7. Honble Member Secretary discussed the issues of pendency with SLO, AS(T),
J D(APC) & RO(HQ) on 28/02/13 and entrusted job of preparing guidelines for quick
disposal of the applications with SLO.
8. SLO has prepared guidelines on 14/03/13 and forwarded to Member Secretary
through RO(HQ)/J D(APC)/J D(WPC).
9. Honble Member Secretary instructed AS(T) on 2/04/13 to prepare combined agenda
of the pending 7 Nos. applications of M/s Lavasa Corporation Ltd., Phase-I Hill
station project for placing these cases in the ensuing CAC meeting for taking further
decision of grant of Consent to Operate to these units.
10. R.O.(Pune) has forwarded these cases for taking suitable decision as the
matter is also pending at CJ M, Pune and High Court, Mumbai.
11. It is felt that we may treat M/S Lawasa Corporation Ltd. as a township and the
activities which are being operated under separate management can be given
separate consent as we issued in the corporation areas, as per the delegation of
power. The remaining activities can be covered under Lawasa Corporation and can
be issued combine consent for the entire project. The policy decision in this regards
may be taken in CAC.
12. As far as responsibility for omission or non compliances in respect of waste
management will be jointly and several. Also as per the consent condition no. 12, the
proponent is suppose to pay the consent fees every after two year based on the
investment made. However they have failed to do so. Hence as per the present fee
calculations, the proponent needs to pay the consent fee of Rs. 27,23,500/-.
13. The consent to operate issued earlier to M/s. Lawasa Corporation Ltd. needs
to be amended as per the E.C. granted to them. Fresh Consent to Operate may be
granted pto 30/04/2014 to parent Company M/s Lavasa Corporation Ltd. for
development of the Phase-I of the Hill Station over 2,000 Ha area as per Environmental
Clearance granted by MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 with
overriding effects over earlier Consent to Operate granted by the Board dtd. 5/01/2005
after recovering difference of the Consent fees of Rs. 27,23,500/- subject to condition of
compliance of the EC conditions and submission of B.G. of Rs. 10.0 Lakhs towards
compliance of Consent conditions / 0&M of pollution control facility. Consent to Operate
may also be granted for 7 Nos. sub-units / industries in Phase-I of Lavasa upto
30/04/2014 after recovering difference of the Consent fees as per Chart enclosed.



Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 55

CAC Item No. 54
Name of Industry: M/s J W Marriot Hotel of Juhu Beach Resort Ltd, ,
Juhu - Tara Road, Mumbai-49


1. Application for Renewal of consent
2. Application received at SRO on 29/12/2012 and at HQ at 20/03/2013.
3. Resubmission Case, was placed before CAC of 19/03/2013, wherein it was decided
to keep the case in abeyance and put up to next CAC with reply to letters dated
04/01/2013, 16/01/2013 and 07/02/2013
4. Reminder letter written issued on 04/05/2013, reply awaited.
5. Submitted before CAC for decision







Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 56

CAC Item No. 55
Name of Industry : M/s Tata Consultancy Services Ltd. , Yantra
Park, Pokharan Road No.02, Thane



1. Application for renewal of consent
2. Application received at SRO on 30/09/2011 and at HQ on 30/03/2012.
3. Resubmission case was placed before CAC of 22/03/2013, wherein it was
decided to keep the case in abeyance and put up to next CAC after
examination of applicability of EIA notification
3. In minutes of discussion held in legal dept, on 25/02/2013 it is mentioned that the
plinth has been completed prior to 2004 and on that basis Board has informed to firm
that the project does not attracts EIA notification and MPCB has already granted
consent to operate on 23/03/2010 valid upto 23/03/2012.
4. Submitted before CAC.



Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 57

CAC Item No. 56
Name and Address of the Industry: Upper Penganga Project (Sapli Dam)
Sapli, Akhada Balapur, Tq. Kalamnuri,
Dist. Hingoli

HOD Remarks:

1. Applied for consent to establish for proposed Sapli Dam, Upper Penganga Project.

2. Application received at SRO on 14/01/2013 and at HQ 01/02/2013

3. The firm has not obtained EC.

4. Waste water generation is Nil

5. Solid waste generation is Nil.

6. RO has recommended the case for C to E subject to condition of obtaining EC

7. Consent may be granted with BG of Rs. 10 lakhs for consent conditions and not ot take any
effective steps till EC is obtained.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 58

CAC Item No. 57
Name & Address of the Industry: Calcite Proprerties developer Pvt Ltd,
Survey No. 1452/2 & 2444,
Vill. Nagaon, Tal. Alibag, Dist. Raigad



HOD Remarks


1. Resubmission Case was placed before CAC of 12/03/2013, wherein it was decided to get
clarification regarding recycling of effluent and plantation.

2. The application recived at SRO on 22/01/2013 and at HQ on 20/03/2013

3. The firm has sufficient land for reuse the treated effluent.

4. The firm has obtained EC vide No.11-62/2010-1A-III dated 26/12/2012

5. RO has recommended the case for grant of C to E

6. Consent may be granted with BG of Rs. 10 lakhs for provision of MSW processing plant and STP.




Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 59

CAC Item No. 58
Name & Address M/s. Bharati Vidyapeeth Educational Complex,
Gat No. 1, Mauje Levale, Tal- Mulshi, Pune

1. Applied for C to E, Education complex Project
Total Plot Area- 11,29,100 M
2

Total Construction area - 18,526.98 M
2


2. Application received at 08/11/2012 and at HQ 18/12/2012

3. Water Requirement: 1082 CMD

Effluent Generation: 710 CMD
STP Proposed 710 CMD

4. Solid Waste generation:
Bio degradable: 1980.50 Kg/D
OWC Proposed.
Non-biodegradable: 1980.50 Kg/D
Sale to authorized party
STP Sludge: 710 Kg/D
Use as Manure

5. RO has recommended the Case for C to E.

6. RRZ clearance not submitted.

7. Consent may be granted with the condition of obtaining BG of Rs. 10 lakhs for Provision
of STP and MSW processing plant and submission of RRZ clearance.

Webagendaof2
nd
CACmeetingof201314dtd31.05.2013 60

CAC Item No. 59
Name of the Industry: M/s Syntel International P. Ltd.
B-1, B-2, Softaware Technology Park,
Talwade, MIDC, Tal. Haveli, Dist. Pune


1. Resubmission Case, was placed before CAC of 08/01/2013 with decision to issue SCN for
non Payment of Cess, non Submission of Environmental Statement, non submission of RRZ
clearance, and not providing adequate Sewage treatment plant.
2. Application received at SRO on 20/09/2012 and at HQ 18/12/2012
3. The industry has replied vide letter dated 19/02/2013 wherein it is mentioned that, they have
paid Cess, have submitted Env. Statement, Env. Clearance and rectified the problem involved
with STP. The solid waste disposal arrangement is with PCMC for which they are paying the
requisite fees to PCMC annually.
4. The project proponent has obtained EC vide No. SEAC 2010/CR.858/TC.2 dt.12/06/2012.
5. RO has Recommended for renewal of consent.
6. RRZ clearance not submitted.
7. Submitted before CAC further decision