Project Report Six Months Summer
Training
Posted in Project Reports | Email This Post |
Here is the project report of a civil engineering student who has spent 6 months on a training site.Due to
security reasons,the project details, estimation, some portion of design and quantity calculations have been
omitted.But to help the civil engineering students we had shown all the necessary works..
SEQUENCE OF STRUCTURE WORK
1) Site Clearance
2) Demarcation of Site
3) Positioning of Central coordinate ie (0,0,0) as per grid plan
4) Surveying and layout
5) Excavation
6) Laying of PCC
7) Bar Binding and placement of foundation steel
8 ) Shuttering and Scaffolding
9) Concreting
10) Electrical and Plumbing
11) Deshuttering
12) Brickwork
13) Doors and windows frames along with lintels
14) Wiring for electrical purposes
15) Plastering
16) Flooring and tiling work
17) Painting
18) Final Completion and handing over the project
CONSTRUCTION PROCESS AND MATERIALS USED
Site Clearance- The very first step is site clearance which involves removal of grass and vegetation along with any other objections which might be there in the site
location.
Demarcation of Site- The whole area on which construction is to be done is marked so as to identify the construction zone. In our project, a plot of 450*350 sq
ft was chosen and the respective marking was done.
Positioning of Central coordinate and layout- The centre point was marked with the help of a thread and plumb bob as per the grid drawing. With respect to
this center point, all the other points of columns were to be decided so its exact position is very critical.
Excavation
Excavation was carried out both manually as well as mechanically. Normally 1-2 earth excavators (JCBs) were used for excavating the soil. Adequate precautions
are taken to see that the excavation operations do not damage the adjoining structures. Excavation is carried out providing adequate side slopes and dressing of
excavation bottom. The soil present beneath the surface was too clayey so it was dumped and was not used for back filling. The filling is done in layer not exceeding
20 cm layer and than its compacted. Depth of excavation was 54 from Ground Level.
17 Like
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 2/12
PCC Plain Cement Concrete
After the process of excavation, laying of plain cement concrete that is PCC is done. A layer of 4 inches was made in such a manner that it was not mixed with the
soil. It provides a solid bas for the raft foundation and a mix of 1:5:10 that is, 1 part of cement to 5 parts of fine aggregates and 10 parts of coarse aggregates by
volume were used in it. Plain concrete is vibrated to achieve full compaction. Concrete placed below ground should be protected from falling earth during and after
placing. Concrete placed in ground containing deleterious substances should be kept free from contact with such a ground and with water draining there from during
placing and for a period of seven days. When joint in a layer of concrete are unavoidable, and end is sloped at an angle of 30 and junctions of different layers break
joint in laying upper layer of concrete. The lower surface is made rough and clean watered before upper layer is laid.
LAYING OF FOUNDATION
At our site, Raft foundations are used to spread the load from a structure over a large area, normally the entire area of the structure. Normally raft foundation is
used when large load is to be distributed and it is not possible to provide individual footings due to space constraints that is they would overlap on each other. Raft
foundations have the advantage of reducing differential settlements as the concrete slab resists differential movements between loading positions. They are often
needed on soft or loose soils with low bearing capacity as they can spread the loads over a larger area.
In laying of raft foundation, special care is taken in the reinforcement and construction of plinth beams and columns. It is the main portion on which ultimately whole
of the structure load is to come. So a slightest error can cause huge problems and therefore all this is checked and passed by the engineer in charge of the site.
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 3/12
Apart from raft foundation, individual footings were used in the mess area which was extended beyond the C and D blocks.
CEMENT
Portland cement is composed of calcium silicates and aluminate and aluminoferrite It is obtained by blending predetermined proportions limestone clay and other
minerals in small quantities which is pulverized and heated at high temperature around 1500 deg centigrade to produce clinker. The clinker is then ground with
small quantities of gypsum to produce a fine powder called Ordinary Portland Cement (OPC). When mixed with water, sand and stone, it combines slowly with the
water to form a hard mass called concrete. Cement is a hygroscopic material meaning that it absorbs moisture In presence of moisture it undergoes chemical
reaction termed as hydration. Therefore cement remains in good condition as long as it does not come in contact with moisture. If cement is more than three months
old then it should be tested for its strength before being taken into use.
The Bureau of Indian Standards (BIS) has classified OPC in three different grades The classification is mainly based on the compressive strength of cement-sand
mortar cubes of face area 50 cm2 composed of 1 part of cement to 3 parts of standard sand by weight with a water-cement ratio arrived at by a specified
procedure. The grades are
(i) 33 grade
(ii) 43 grade
(iii) 53 grade
The grade number indicates the minimum compressive strength of cement sand mortar in N/mm2 at 28 days, as tested by above mentioned procedure.
Portland Pozzolana Cement (PPC) is obtained by either intergrinding a pozzolanic material with clinker and gypsum, or by blending ground pozzolana with Portland
cement. Nowadays good quality fly ash is available from Thermal Power Plants, which are processed and used in manufacturing of PPC.
ADVANTAGES OF USING PORTLAND POZZOLANA CEMENT OVER OPC
Pozzolana combines with lime and alkali in cement when water is added and forms compounds which contribute to strength, impermeability and sulphate resistance.
It also contributes to workability, reduced bleeding and controls destructive expansion from alkali-aggregate reaction. It reduces heat of hydration thereby
controlling temperature differentials, which causes thermal strain and resultant cracking n mass concrete structures like dams. The colour of PPC comes from the
colour of the pozzolanic material used. PPC containing fly ash as a pozzolana will invariably be slightly different colour than the OPC.One thing should be kept in
mind that is the quality of cement depends upon the raw materials used and the quality control measures adopted during its manufacture, and not on the shade of the
cement. The cement gets its colour from the nature and colour of raw materials used, which will be different from factory to factory, and may even differ in the
different batches of cement produced in a factory. Further, the colour of the finished concrete is affected also by the colour of the aggregates, and to a lesser extent
by the colour of the cement. Preference for any cement on the basis of colour alone is technically misplaced.
SETTLING OF CEMENT
When water is mixed with cement, the paste so formed remains pliable and plastic for a short time. During this period it is possible to disturb the paste and remit it
without any deleterious effects. As the reaction between water and cement continues, the paste loses its plasticity. This early period in the hardening of cement is
referred to as setting of cement.
INITIAL AND FINAL SETTING TIME OF CEMENT
Initial set is when the cement paste loses its plasticity and stiffens considerably. Final set is the point when the paste hardens and can sustain some minor load. Both
are arbitrary points and these are determined by Vicat needle penetration resistance
Slow or fast setting normally depends on the nature of cement. It could also be due to extraneous factors not related to the cement. The ambient conditions play an
important role. In hot weather, the setting is faster, in cold weather, setting is delayed Some types of salts, chemicals, clay, etc if inadvertently get mixed with the
sand, aggregate and water could accelerate or delay the setting of concrete.
STORAGE OF CEMENT
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 4/12
It needs extra care or else can lead to loss not only in terms of financial loss but also in terms of loss in the quality. Following are the dont that should be followed -
(i) Do not store bags in a building or a godown in which the walls, roof and floor are not completely weatherproof.
(ii) Do not store bags in a new warehouse until the interior has thoroughly dried out.
(iii) Do not be content with badly fitting windows and doors, make sure they fit properly and ensure that they are kept shut.
(iv) Do not stack bags against the wall. Similarly, dont pile them on the floor unless it is a dry concrete floor. If not, bags should be stacked on wooden planks or
sleepers.
(v) Do not forget to pile the bags close together
(vi) Do not pile more than 15 bags high and arrange the bags in a header-and-stretcher fashion.
(vii) Do not disturb the stored cement until it is to be taken out for use.
(viii) Do not take out bags from one tier only. Step back two or three tiers.
(ix) Do not keep dead storage. The principle of first-in first-out should be followed in removing bags.
(x) Do not stack bags on the ground for temporary storage at work site. Pile them on a raised, dry platform and cover with tarpaulin or polythene sheet.
COARSE AGGREGATE
Coarse aggregate for the works should be river gravel or crushed stone .It should be hard, strong, dense, durable, clean, and free from clay or loamy admixtures or
quarry refuse or vegetable matter. The pieces of aggregates should be cubical, or rounded shaped and should have granular or crystalline or smooth (but not glossy)
non-powdery surfaces.Aggregates should be properly screened and if necessary washed clean before use.
Coarse aggregates containing flat, elongated or flaky pieces or mica should be rejected. The grading of coarse aggregates should be as per specifications of IS-383.
After 24-hrs immersion in water, a previously dried sample of the coarse aggregate should not gain in weight more than 5%.
Aggregates should be stored in such a way as to prevent segregation of sizes and avoid contamination with fines.
Depending upon the coarse aggregate color, there quality can be determined as:
Black => very good quality
Blue => good
Whitish =>bad quality

FINE AGGREGATE
Aggregate which is passed through 4.75 IS Sieve is termed as fine aggregate. Fine aggregate is added to concrete to assist workability and to bring uniformity in
mixture. Usually, the natural river sand is used as fine aggregate. Important thing to be considered is that fine aggregates should be free from coagulated lumps.
Grading of natural sand or crushed stone i.e. fine aggregates shall be such that not more than 5 percent shall exceed 5 mm in size, not more than 10% shall IS sieve
No. 150 not less than 45% or more than 85% shall pass IS sieve No. 1.18 mm and not less than 25% or more than 60% shall pass IS sieve No. 600 micron.
BRICKWORK
Brickwork is masonry done with bricks and mortar and is generally used to build partition walls. In our site, all the external walls were of concrete and most of the
internal walls were made of bricks. English bond was used and a ration of 1:4 (1 cement: 4 coarse sand) and 1:6 were used depending upon whether the wall is 4.5
inches or 9 inches. The reinforcement shall be 2 nos. M.S. round bars or as indicated. The diameter of bars was 8mm. The first layer of reinforcement was used at
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 5/12
second course and then at every fourth course of brick work. The bars were properly anchored at their ends where the portions and or where these walls join with
other walls. The in laid steel reinforcement was completely embedded in mortar.
Bricks can be of two types. These are:
1) Traditional Bricks-The dimension if traditional bricks vary from 21 cm to 25cm in length,10 to 13 cm in width and 7.5 cm in height in different parts of country
.The commonly adopted normal size of traditional brick is 23 * 11.5*7.5 cm with a view to achieve uniformity in size of bricks all over country.
2) Modular Bricks- Indian standard institution has established a standard size of bricks such a brick is known as a modular brick. The normal size of brick is
taken as 20*10*10 cm whereas its actual dimensions are 19*9*9 cm masonry with modular bricks workout to be cheaper there is saving in the consumption of
bricks, mortar and labour as compared with masonry with traditional bricks.
STRENGTH OF BRICK MASONRY
The permissible compressive stress in brick masonry depends upon the following factors:
1. Type and strength of brick.
2. Mix of motor.
3. Size and shape of masonry construction.
The strength of brick masonry depends upon the strength of bricks used in the masonry construction. The strength of bricks depends upon the nature of soil used
for making and the method adopted for molding and burning of bricks .since the nature of soil varies from region to region ,the average strength of bricks varies
from as low as 30kg/sq cm to 150 kg /sq cm the basic compressive stress are different crushing strength.
There are many checks that can be applied to see the quality of bricks used on the site.Normally the bricks are tested for Compressive strength, water absorption,
dimensional tolerances and efflorescence. However at small construction sites the quality of bricks can be assessed based on following, which is prevalent in many
sites.
Visual check Bricks should be well burnt and of uniform size and color.
Striking of two bricks together should produce a metallic ringing sound.
It should have surface so hard that cant be scratched by the fingernails.
A good brick should not break if dropped in standing position from one metre above ground level.
A good brick shouldnt absorb moisture of more than 15-20% by weight, when soaked in water For example; a good brick of 2 kg shouldnt weigh more than
2.3 to 2.4 kg if immersed in water for 24 hours.
PRECAUTIONS TO BE TAKEN IN BRICK MASONRY WORK
Bricks should be soaked in water for adequate period so that the water penetrates
to its full thickness. Normally 6 to 8 hours of wetting is sufficient.
A systematic bond must be maintained throughout the brickwork. Vertical joints
shouldnt be continuous but staggered.
The joint thickness shouldnt exceed 1 cm. It should be thoroughly filled with the
cement mortar 1:4 to 1:6 (Cement: Sand by volume)
All bricks should be placed on their bed with frogs on top (depression on top of the
brick for providing bond with mortar).
Thread, plumb bob and spirit level should be used for alignment, verticality and
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 6/12
horizontality of construction.
Joints should be raked and properly finished with trowel or float, to provide good bond.
A maximum of one metre wall height should be constructed in a day.
Brickwork should be properly cured for at least 10 days
REINFORCEMENT
Steel reinforcements are used, generally, in the form of bars of circular cross section in concrete structure. They are like a skeleton in human body. Plain concrete
without steel or any other reinforcement is strong in compression but weak in tension. Steel is one of the best forms of reinforcements, to take care of those stresses
and to strengthen concrete to bear all kinds of loads
Mild steel bars conforming to IS: 432 (Part I) and Cold-worked steel high strength deformed bars conforming to IS: 1786 (grade Fe 415 and grade Fe 500, where
415 and 500 indicate yield stresses 415 N/mm2 and 500 N/mm2 respectively) are commonly used. Grade Fe 415 is being used most commonly nowadays. This
has limited the use of plain mild steel bars because of higher yield stress and bond strength resulting in saving of steel quantity. Some companies have brought
thermo mechanically treated (TMT) and corrosion resistant steel (CRS) bars with added features.
Bars range in diameter from 6 to 50 mm. Cold-worked steel high strength deformed bars start from 8 mm diameter. For general house constructions, bars of
diameter 6 to 20 mm are used
Transverse reinforcements are very important. They not only take care of structural requirements but also help main reinforcements to remain in desired position.
They play a very significant role while abrupt changes or reversal of stresses like earthquake etc.
They should be closely spaced as per the drawing and properly tied to the main/longitudinal reinforcement
TERMS USED IN REINFORCEMENT
BAR-BENDING-SCHEDULE
Bar-bending-schedule is the schedule of reinforcement bars prepared in advance before cutting and bending of rebars. This schedule contains all details of size,
shape and dimension of rebars to be cut.
LAP LENGTH
Lap length is the length overlap of bars tied to extend the reinforcement length.. Lap length about 50 times the diameter of the bar is considered safe. Laps of
neighboring bar lengths should be staggered and should not be provided at one level/line. At one cross section, a maximum of 50% bars should be lapped. In case,
required lap length is not available at junction because of space and other constraints, bars can be joined with couplers or welded (with correct choice of method of
welding).
ANCHORAGE LENGTH
This is the additional length of steel of one structure required to be inserted in other at the junction. For example, main bars of beam in column at beam column
junction, column bars in footing etc. The length requirement is similar to the lap length mentioned in previous question or as per the design instructions
COVER BLOCK
Cover blocks are placed to prevent the steel rods from touching the shuttering plates and there by providing a minimum cover and fix the reinforcements as per the
design drawings. Sometimes it is commonly seen that the cover gets misplaced during the concreting activity. To prevent this, tying of cover with steel bars using thin
steel wires called binding wires (projected from cover surface and placed during making or casting of cover blocks) is recommended. Covers should be made of
cement sand mortar (1:3). Ideally, cover should have strength similar to the surrounding concrete, with the least perimeter so that chances of water to penetrate
through periphery will be minimized. Provision of minimum covers as per the Indian standards for durability of the whole structure should be ensured.
Shape of the cover blocks could be cubical or cylindrical. However, cover indicates thickness of the cover block. Normally, cubical cover blocks are used. As a
thumb rule, minimum cover of 2 in footings, 1.5 in columns and 1 for other structures may be ensured.
Structural element Cover to reinforcement (mm)
Footings 40
Columns 40
Slabs 15
Beams 25
Retaining wall 25 for earth face
20 for other face
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 7/12
THINGS TO NOTE
Reinforcement should be free from loose rust, oil paints, mud etc. it should be cut, bent and fixed properly. The reinforcement shall be placed and maintained in
position by providing proper cover blocks, spacers, supporting bars, laps etc. Reinforcements shall be placed and tied such that concrete placement is possible
without segregation, and compaction possible by an immersion vibrator.
For any steel reinforcement bar, weight per running meter is equal to d*d/162 Kg, where d is diameter of the bar in mm. For example, 10 mm diameter bar will
weigh 1010/162 = 0.617 Kg/m
Three types of bars were used in reinforcement of a slab. These include straight bars, crank bar and an extra bar. The main steel is placed in which the straight steel
is binded first, then the crank steel is placed and extra steel is placed in the end. The extra steel comes over the support while crank is encountered at distance of
(1-distance between the supports) from the surroundings supports.
For providing nominal cover to the steel in beam, cover blocks were used which were made of concrete and were casted with a thin steel wire in the center which
projects outward. These keep the reinforcement at a distance from bottom of shuttering. For maintaining the gap between the main steel and the distribution steel,
steel chairs are placed between them
SHUTTERING AND SCAFFOLDING
DEFINITION
The term SHUTTERING or FORMWORK includes all forms, moulds, sheeting, shuttering planks, walrus, poles, posts, standards, leizers, V-Heads, struts,
and structure, ties, prights, walling steel rods, bolts, wedges, and all other temporary supports to the concrete during the process of sheeting.
FORM WORK
Forms or moulds or shutters are the receptacles in which concrete is placed, so that it will have the desired shape or outline when hardened. Once the concrete
develops adequate strength, the forms are removed. Forms are generally made of the materials like timber, plywood, steel, etc.
Generally camber is provided in the formwork for horizontal members to counteract the effect of deflection caused due to the weight of reinforcement and concrete
placed over that. A proper lubrication of shuttering plates is also done before the placement of reinforcement. The oil film sandwiched between concrete and
formwork surface not only helps in easy removal of shuttering but also prevents loss of moisture from the concrete through absorption and evaporation.
The steel form work was designed and constructed to the shapes, lines and dimensions shown on the drawings. All forms were sufficiently water tight to prevent
leakage of mortar. Forms were so constructed as to be removable in sections. One side of the column forms were left open and the open side filled in board by
board successively as the concrete is placed and compacted except when vibrators are used. A key was made at the end of each casting in concrete columns of
appropriate size to give proper bondings to columns and walls as per relevant IS.
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 8/12
CLEANING AND TREATMENT OF FORMS
All rubbish, particularly chippings, shavings and saw dust, was removed from the interior of the forms (steel) before the concrete is placed. The form work in
contact with the concrete was cleaned and thoroughly wetted or treated with an approved composition to prevent adhesion between form work and concrete. Care
was taken that such approved composition is kept out of contact with the reinforcement.
DESIGN
The form-work should be designed and constructed such that the concrete can be properly placed and thoroughly compacted to obtain the required shape,
position, and levels subject
ERECTION OF FORMWORK
The following applies to all formwork:
a) Care should be taken that all formwork is set to plumb and true to line and level.
b) When reinforcement passes through the formwork care should be taken to ensure close
fitting joints against the steel bars so as to avoid loss of fines during the compaction of
concrete.
c) If formwork is held together by bolts or wires, these should be so fixed that no iron is
exposed on surface against which concrete is to be laid.
d) Provision is made in the shuttering for beams, columns and walls for a port hole of
convenient size so that all extraneous materials that may be collected could be
removed just prior to concreting.
e) Formwork is so arranged as to permit removal of forms without jarring the concrete.
Wedges, clamps, and bolts should be used where practicable instead of nails.
f) Surfaces of forms in contact with concrete are oiled with a mould oil of approved
quality. The use of oil, which darkens the surface of the concrete, is not allowed. Oiling
is done before reinforcement is placed and care taken that no oil comes in contact with
the reinforcement while it is placed in position. The formwork is kept thoroughly wet
during concreting and the whole time that it is left in place.
Immediately before concreting is commenced, the formwork is carefully examined to ensure the following:
a) Removal of all dirt, shavings, sawdust and other refuse by brushing and washing.
b) The tightness of joint between panels of sheathing and between these and any hardened core.
c) The correct location of tie bars bracing and spacers, and especially connections of
bracing.
d) That all wedges are secured and firm in position.
e) That provision is made for traffic on formwork not to bear directly on reinforcement
steel.
VERTICALITY OF THE STUCTURE
All the outer columns of the frame were checked for plumb by plumb-bob as the work proceeds to upper floors. Internal columns were checked by taking
measurements from outer row of columns for their exact position. Jack were used to lift the supporting rods called props
STRIPPING TIME OR REMOVAL OF FORMWORK
Forms were not struck until the concrete has attained a strength at least twice the stress to which the concrete may be subjected at the time of removal of form
work. The strength referred is that of concrete using the same cement and aggregates with the same proportions and cured under conditions of temperature and
moisture similar to those existing on the work. Where so required, form work was left longer in normal circumstances
Form work was removed in such a manner as would not cause any shock or vibration that would damage the concrete. Before removal of props, concrete surface
was exposed to ascertain that the concrete has sufficiently hardened. Where the shape of element is such that form work has re-entrant angles, the form work was
removed as soon as possible after the concrete has set, to avoid shrinkage cracking occurring due to the restraint imposed. As a guideline, with temperature above
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 9/12
20 degree following time limits should be followed:
Structural Component Age
Footings 1 day
Sides of beams, columns, lintels, wall 2 days
Underside of beams spanning less than 6m 14 days
Underside of beams spanning over 6m 21 days
Underside of slabs spanning less than 4m 7 days
Underside of slabs spanning more than 4m 14 days
Flat slab bottom 21 days
More Entries :
What are the Tolerance Limits on Construction Site?
Mix Design For M35 Grade Of Concrete
What are the problems if reinforcement is in contact with internal vibrators?
What the preferable size of cover blocks?
How can heating assist in rebending of steel reinforcement?
Things Site Engineers Must Know
How can permeable formwork improve the quality of concrete?
Things Site Engineers Must Know About Reinforcement and Steel Bars
Comments
rupa mahato May 14, 2012 at 6:02 am
indeed it is very useful for students..
Reply Link Quote
paresh naik June 13, 2012 at 9:10 am
Its very useful for beginners doing a project .keep up the good work ,all the best
Reply Link Quote
yashpal singh July 5, 2012 at 2:23 am
it is most important and useful to new egg . s
Reply Link Quote
SUNIL KUMAR August 5, 2012 at 8:30 am
its good for second year students and its helps us very much.
Reply Link Quote
Yashwant sahu August 15, 2012 at 3:18 am
It is such a nice thing given in it. Which will help to all the students and faculties to suggests about the project work.
Reply Link Quote
varun August 20, 2012 at 9:29 am
it was a big help
Reply Link Quote
vivek kumar August 25, 2012 at 10:16 am
thanxx for u ,u upload useful information for civil engineering students about construction.
Reply Link Quote
subhashis patra September 5, 2012 at 10:54 am
wow its a vry help ful idea for us..
Reply Link Quote
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 10/12
Asif Jamal September 13, 2012 at 10:46 pm
Very beautifully done this job
Reply Link Quote
rahul Acharjee October 13, 2012 at 12:08 pm
thankzzzzzzzzzz
Reply Link Quote
akshay jain March 3, 2013 at 7:52 am
tell me about influence line diagarm of different cases with shear force assumptions.
Reply Link Quote
Trinath kanna May 12, 2013 at 5:20 am
So helpful to me.
Reply Link Quote
Faiz jafri August 6, 2013 at 12:25 pm
Very nice thing. Plz u upload a training report of a stdnt in 6 months training of a road project .
Reply Link Quote
k.suryaprakash December 26, 2013 at 7:40 am
use full for your reports
Reply Link Quote
kedar nath April 21, 2014 at 5:59 am
thanks for sharing your information about your experience
Reply Link Quote
Post a comment
Name
Email
Website
Post your comment
1 2 3 4
Share Information
Submit Content
Ask An Expert
What is Civil Engineering
Civil Engineering Home
Civil Engineering Disciplines
Civil Engineering History
Journals Books And Softwares
Free Civil Engineering Magazines and White Papers
Civil Engineering Books
Civil Engineering Journals
Civil Engineering Softwares
Branches Of Civil Engineering
Building
Bridge Engineering
Concrete Engineering
Highway Engineering
Hydraulics
Marine Engineering
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 11/12
Piles Engineering
Prestress Engineering
Soil Engineering
Steelworks
Surveying
Timber Engineering
Civil Engineering Jobs
Civil Engineering Jobs
Follow Us On FB
Knowledge Center
Construction Equipments
Civil Engineering Disasters
Civil Engineering Events
Civil Engineering Facts
Civil Engineering Information
Civil Engineering Notes From Universities
Civil Engineering Presentations
Civil Engineering Quotes
Civil Engineering Videos
Civil Engineering Wonders
Construction Terms
Famous Civil Engineers
Interviews
Material and Site Testing
Measurement Units
Mix Design
Project Reports
Research Papers
Student Corner
Help Others
Civil Engineering Universities/Events
Civil Engineering Universities
Aakaar 2014 , IIT Bombay
Infrastructure Project Risk Management
INACES 2014
Advertise Your Event Here
Gallery - Civil Engineering Pictures
Bridges
Civil Engineers And Workers
Construction Equipments
Construction Site
Roads And Highways
Skyscrapers
Search
Search
15/7/2014 Project Report Six Months Summer Training
http://www.engineeringcivil.com/project-report-six-months-summer-training-2.html 12/12
Top Contributors
You can list yourself here by submitting civil engineering related topics to us.
Er. Harpal Aujla
Er. Raj M. Khan
Er. Vikrant
Ramasesh Iyer
Er. Kaushal Kishore
Vincent T. H. CHU
Yahoo Group - Civil Engineering Portal
Subscribe to EngineeringCivil.com Enter email address
Powered by groups.yahoo.com
Recently Added
Groundwater Recharge by Waste Water
Advance Construction Material Micro Silica In Concrete
General Concepts Earthquake Resistant Design
The Mumbai Metro Project Important Things You Should Know
Ferrocement Dams
Behaviour of Open and Closed End Pile Groups Subjected To Vertical Loading : A Comparative Study
Study Of The Strength Geopolymer Concrete With Alkaline Solution Of Varying Molarity
Concrete Mix Design ITS Acceptance
An Idea Of Connecting Solar Panels With The Tower Of A Wind Turbine Where The Blades Of The Turbine And The Solar Panels Are Both Made From
Singled-walled Carbon Nanotubes
INACES 2014, INTERNATIONAL CONFERENCE
Civil Engineering Links
Gemini Geek
The Bigger
Civil Engr. Software Database
Impressive Buildings
Civil Engineering Links
Follow Us On FB
About Us | Contact Us | Disclaimer | Copyright Policy | Privacy Policy | Media | Testimonials
All Rights Reserved:2007-2014 |

Вам также может понравиться