Вы находитесь на странице: 1из 34

Name Of Contractor :- M/S L.R.C. Builders Pvt Ltd Baddi (Govt. Contractor)Baddi Distt. Solan H.P.

Name Of Work :- Rehabilitation of Kundlu Bridge on PBNS Road NH-21A at R.D 21/650 ,Bag Bania Bridge at R.D. 28/700 And Ratta Bridge at R.D. 24/150.
Agreement No. :- 5 of 2010-11
Date Of Written Order To Commence the Work :- 29-06-2010
Date of actual completion of Work :- 12-07-2011
S.No. Item Of Work Unit As Per Quantity As per Agreement
Agreement
S. No. Quantity Rate
1 2 4 5 6 7
1 Execavation in foundation and trenches etc in earth work
including spade work , pick work , jumper work, blasting
work in soft, hard rock and their intermediate classifica-
tion of soil including chiseling and wedging out of rock
within all depths and heights. Stacking the usefull mat-
erial and disposal of unservicable material including lo-
ading in truck and carriage the unservicable material with
in all lead & lifts. If the foundation of the structure is in
an area stagnant water or water is met within theexcava-
tion due to spring seepage rain and other causes it shall
be removed by suitable diversion bailing out or pumping
as directed and the area of the foundation or embankm-
ent shall be kept dry. Any loss to public or private proper-
ty during the course of execution shall be the whole res-
ponsibility of the contractor, which shall have to be dully
compensated by him at his cost in all course. The work
shall be carried out as per MORT & H Specifications
( Latest Revision ) as per entire satisfaction and direction
of Er- Incharge. Cu-m 1 11739.90 29.00
2 P/l. cement concret work in 1: 4:8 ( One cement : Four Sand
: Eight crushed coarse aggregate 40 mm nominal size )
in all depths mechanically mixed and vibrated and pla-
cing in foundation ensuring non seggrigation with curing
and form work of steel in all leads & liftsand carriage of
material,mechanical tools and plants to the site of work
even with mechanical means in confirmity with the
MORT & H Specifications( Latest Revision ) as per entire
satisfaction and direction . Cu-m 2 252.00 1850.00
3 P/l. cement concret work in 1:3:6( One cement :Three Sand
:Six crushed coarse aggregate 40 mm nominal size )
in all depths mechanically mixed and vibrated and pla-
cing in foundation ensuring non seggrigation with curing
and form work of steel in all leads & liftsand carriage of
material,mechanical tools and plants to the site of work
even with mechanical means in confirmity with the
MORT & H Specifications( Latest Revision ) as per entire
satisfaction and direction . Cu-m 3 3465.86 2100.00
4 P/l. pLain cement concret work in M-20 grade
in all depths mechanically mixed and vibrated and pla-
cing in foundation ensuring non seggrigation with curing
and form work of steel in all leads & liftsand carriage of
material,mechanical tools and plants to the site of work
even with mechanical means in confirmity with the
MORT & H Specifications( Latest Revision ) as per entire
satisfaction and direction . Cu-m 4 4896.07 2650.00
5 P/l. pLain cement concret work in M-30 grade
in all depths mechanically mixed and vibrated and pla-
cing in foundation ensuring non seggrigation with curing
and form work of steel in all leads & liftsand carriage of
material,mechanical tools and plants to the site of work
even with mechanical means in confirmity with the
MORT & H Specifications( Latest Revision ) as per entire
satisfaction and direction . Cu-m 5 1381.35 3200.00
6 squared Rubble masonary coursed with hard stone of
approved quality in all heights and depths in cement
mortar 1:3 I/C racking out joints and curing complete i/c
scaffolding wherever required conforming to MORT & H
specification (latest revision ) I/C carriae of material with
in all leads and lifts by all means of transport and as per
direction of Er- Incharge. Cu-m 6 55.72 1200.00
7 Stone filling behind retaining walls with gravely filter
media behind structure in all heights and depths in lay-
ers conforming to clause 2504.2.2 of MORT & H
specification (latest revision ) I/C carriae of material with
in all leads and lifts by all means of transport and as per
direction of Er- Incharge. Cu-m 7 13792 200.00
8 P/L of boulder apron laid in wire crates made with 4mm
dia G.I. wire conforming to IS 280 and IS 4826 in 100 X 100
MM mesh weaved diagonally i/c 10 % extra for laps and
joints laid with stone boulders weighing not less than
40 kg each as per MORT & Hspecification (latest revision )
I/C carriae of material within all leads and lifts by all
means of transport and as per direction of Er- Incharge. Cu-m 8 576.69 1000.00
,Bag Bania Bridge at R.D. 28/700 And Ratta Bridge at R.D. 24/150.
Quantity As per Agreement Quantity Proposed to be paid within Deviation Proposed To be Placed Under Clause
agreemental qty. without deviation 12 (I ) 12 ( II ) 12 ( III )
Amount Quantity Rate Amount Qty . Rate Amount Qty . Rate Amount Qty . Rate Amount Qty .
8 9 10 11 12 13 14 15 16 17 18 19 20 21
340457.1 7294.49 29.00 211540.21 .. .. . .. .... . .
466200 252.00 1850.00 466200 .. .. . .. .... . .
7278306 3461.78 2100.00 7269738 .. .. . .. .... . .
12974585.5 4860.64 2650.00 12880696 .. .. . .. .... . .
4420320 1217.58 3200.00 3896256 .. .. . .. .... . .
66864 0 1200.00 0 .. .. . .. .... . .
2758400 11981.32 200.00 2396264 .. .. . .. .... . .
576690 662.88 1000.00 662880 .. .. . .. .... . .
28881822.6 27783574.21
Total Work Proposed Addition As Per Extra
12 ( IV ) 12 ( V ) 12 ( VI ) To Be Execute Agreement (31 -8) Item
Rate Amount Qty . Rate Amount Qty . Rate Amount Qty . Amount When 31 > 8 Amount
22 23 24 25 26 27 28 29 30 31 32 33
. . .. .. .. 7294.49 211540.21 0.00 ----
. . .. .. .. 252.00 466200 0.00 ..
. . .. .. .. 3461.78 7269738.00 0.00 .
. . .. .. .. 4860.64 12880696.00 0.00 ..
. . .. .. .. 1217.58 3896256.00 0.00 ..
. . .. .. .. 0.00 0.00 0.00 ..
. . .. .. .. 11981.32 2396264.00 0.00 ..
. . .. .. .. 662.88 662880.00 86190.00
27783574.21 86190.00
`
Substitute Item Total Total Deduction Reason Of Deviation
Amount Agr. Item Against Addition When 31 < 8 ( 8 - 31 )
Which Substitute ( + ) ( - )
34 35 36 37 38
The work executed as per site requirements.
Less quantity executed due to excessive
errosionin the recent rainy season on the
down stream of the bridge.
--- --- --- 128916.89
. 0.00
. . .. 8568.00 The work executed as per site requirements.
The work executed as per site requirements &
site restrictions due to private land dispute
. 93890.00 on valley side.
The work executed as per site requirements &
site restrictions due to private land dispute
. 524064.00 on valley side.
Stone masonary was not required at site as it
was hidden and was replaced by cement
. 66864.00 concrete 1:3:6 mix.
. 362136.00 The work executed as per site requirements.
As per site requirement extra layer was
essential on the valley side in froint of
. . 86190.00 0.00 launching apron due to heavy scouring.
86190.00 1184438.89
Remarks
39
Name Of Contractor :- M/S L.R.C. Builders Pvt Ltd Baddi Pvt. Ltd. (Govt. Contractor)Baddi Distt. Solan H.P.
Name Of Work :- Rehabilitation of Kundlu Bridge on PBNS Road NH-21A at R.D 21/650
Agreement No. :- 5 of 2010-11
Date Of Written Order To Commence the Work :- 29-06-2010
Date of actual completion of Work :- 12-07-2011
S.No. Item Of Work Unit As Per Quantity As per Agreement
Agreement
S. No. Quantity Rate Amount
1 2 4 5 6 7 8
Pvt. Ltd. (Govt. Contractor)Baddi Distt. Solan H.P.
,Bag Bania Bridge at R.D. 28/700 And Ratta Bridge at R.D. 24/150.
Quantity Proposed to be paid within Deviation Proposed To be Placed Under Clause
agreemental qty. without deviation 12 (I ) 12 ( II )
Quantity Rate Amount Qty . Rate Amount Qty . Rate Amount
9 10 11 12 13 14 15 16 17
12 ( III ) 12 ( IV ) 12 ( V )
Qty . Rate Amount Qty . Rate Amount Qty . Rate Amount
18 19 20 21 22 23 24 25 26
Total Work Proposed To Be Execute Addition As Per Extra
12 ( VI ) Agreement (31 -8) Item
Qty . Rate Amount Qty . Amount When 31 > 8 Amount
27 28 29 30 31 32 33
Substitute Item Total Total Deduction When 31 < 8
Amount Agr. Item Against Addition ( 8 - 31 )
Which Substitute ( + ) ( - )
34 35 36 37
Reason Of Deviation Remarks
38 39

Вам также может понравиться