FROM: EMBRAER Flight Operations Engineering & Support
SUBJECT: Flight ID Frozen APPLICABILITY: EMBRAER 170/175/190/195 EXPIRY DATE: The applicable AOM revision is released
February 20, 2014 FOL170-2014-008
EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2170 12227-901 - So Jos dos Campos So Paulo Brasil Phone: +55 12 3927-1706 opereng@embraer.com.br
In connection with the use of this document, Embraer does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose. The information contained herein is proprietary information of Embraer or third parties and shall not be used or disclosed to any third party nor copied or reproduced, whether in whole or in part, in any formor by any means whatsoever without the express written authorization of Embraer. The information contained in this document is intended only for the personal and confidential use of the designated recipients named above. If the reader of this message is not the intended recipient or an agent or employee responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error, and that any review, dissemination, distribution or copying of this message is strictly prohibited. If you received this communication in error, please notify us immediately by phone. Also note that all Embraers trademarks mentioned herein are registered or in process of registration and shall not be used without previous written consent of Embraer. Page 1 of 2
Dear Operator, Some operators have been reporting the occurrence of intermittent instances of Flight ID Frozen after Loads 25.3/25.4 installation. Embraer and Honeywell are investigating this issue, however as a mitigation action the CMF reset on ground is recommended. The AOM 13-60 (Ground Resets Procedures) will be revised as follows. Additionally, all the limitations and procedures referred on AOM Ground Resets chapter must be accomplished.
ATA MESSAGE/ CONDITION MSG LEVEL/ LOCATION PROCEDURES Effecti vity: Airplanes with CMF 1 installed. CAUTION MAKE SURE THAT THE INTEGRATED PITOT/STATIC/AOA SENSORS, TAT SENSORS, ICE DETECTORS AND STATIC PORTS HAVE NO COVERS ON THEM BEFORE ACCOMPLISHING THIS PROCEDURE. THESE COMPONENTS CAN BECOME HOT DURING THIS PROCEDURE DAMAGING THEM. NOTE: Refer to the MAU SAFETY PROCEDURES before accomplishing this procedure. Open the following CBs, wait 5 s , then reset: 23 Flight ID Frozen MCDU RHCBP MAU 3 PWR 2
COMPANY: All E-Jets Operators FROM: EMBRAER Flight Operations Engineering & Support SUBJECT: Flight ID Frozen APPLICABILITY: EMBRAER 170/175/190/195 EXPIRY DATE: The applicable AOM revision is released
February 20, 2014 FOL170-2014-008
EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2170 12227-901 - So Jos dos Campos So Paulo Brasil Phone: +55 12 3927-1706 opereng@embraer.com.br
In connection with the use of this document, Embraer does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose. The information contained herein is proprietary information of Embraer or third parties and shall not be used or disclosed to any third party nor copied or reproduced, whether in whole or in part, in any formor by any means whatsoever without the express written authorization of Embraer. The information contained in this document is intended only for the personal and confidential use of the designated recipients named above. If the reader of this message is not the intended recipient or an agent or employee responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error, and that any review, dissemination, distribution or copying of this message is strictly prohibited. If you received this communication in error, please notify us immediately by phone. Also note that all Embraers trademarks mentioned herein are registered or in process of registration and shall not be used without previous written consent of Embraer. Page 2 of 2 Effecti vity: Airplanes with CMF 1 and CMF 2 installed. CAUTION: MAKE SURE THAT THE INTEGRATED PITOT/STATIC/AOA SENSORS, TAT SENSORS, ICE DETECTORS AND STATIC PORTS HAVE NO COVERS ON THEM BEFORE ACCOMPLISHING THIS PROCEDURE. THESE COMPONENTS CAN BECOME HOT DURING THIS PROCEDURE DAMAGING THEM. CAUTION: WHEN POWER IS REMOVED FROM THE CMC MODULE FOR MORE THAN 10 SECONDS, THE CMC MODULE STARTS ITS SHUTDOWN PROCEDURE. WHEN POWER IS SUPPLIED TO THE CMC MODULE AGAIN, IT STARTS ITS POWER-UP PROCEDURE. THE FULL PROCESS TAKES APPROXIMATELY 5 MINUTES. NOTE: Refer to the MAU SAFETY PROCEDURES before accomplishing this procedure. Open the following CBs, wait 10 s , then reset: RHCBP MAU 3 PWR 2
LHCBP MAU 1 PWR 3
The next AOM revisions are schedule for July/2014 (ANAC/FAA) and September/2014 (EASA). This document does not constitute an operational approval. If Local Regulatory Authority approval is required, it should be obtained by the Operator. This FOL remains valid until the AOM revision is published. If you have any question, please do not hesitate to contact us. Best regards,
Ceclia Dias Lima EMBRAER Flight Operations Support