Nombre de tarea

Previsto
25%
50%
PROYECTO DE VIVIENDAS/.
UNIFAMILIAR
36,773.50 1PISO
S/. 9,341.96
- (160 m2)S/. 22,014.50
1ra. Etapa
S/. 4,329.50 S/. 4,329.50
S/. 4,329.50
Inicio del proyecto
S/. 0.00
S/. 0.00
S/. 0.00
Estudio y diseo de ingenieria
S/. 1,500.00 S/. 1,500.00
S/. 1,500.00
Tramites
S/. 0.00
S/. 0.00
S/. 0.00
Limpieza de terreno
S/. 80.00
S/. 80.00
S/. 80.00
Trazo, nivelacion y replanteo
S/. 342.50
S/. 342.50
S/. 342.50
Excavacin pozo a tierra S/. 91.00
S/. 91.00
S/. 91.00
Excavacion cimentacion
S/. 1,775.00 S/. 1,775.00
S/. 1,775.00
Excavacion desague
S/. 408.00
S/. 408.00
S/. 408.00
Colocacion tubo de desague
S/. 133.00
S/. 133.00
S/. 133.00
d1
S/. 0.00
S/. 0.00
S/. 0.00
d2
S/. 0.00
S/. 0.00
S/. 0.00
Fin de la 1ra. Etapa
S/. 0.00
S/. 0.00
S/. 0.00
2da. Etapa
S/. 24,967.00 S/. 5,012.46 S/. 17,685.00
Construccion de cimientos
S/. 2,158.50 S/. 2,158.50
S/. 2,158.50
Construccion de columnas
S/. 3,487.50 S/. 2,241.96
S/. 3,487.50
Colocacion tuberia aguaS/.
en 271.00
piso
S/. 271.00
S/. 271.00
Colocacion tuberia para S/.
electricidad
341.00 enS/.
piso
341.00
y pozo a tierra
S/. 341.00
d3
S/. 0.00
S/. 0.00
S/. 0.00
d4
S/. 0.00
S/. 0.00
S/. 0.00
Construccion falso pisoS/. 1,178.00
S/. 0.00
S/. 1,178.00
Construccion de murosS/. 7,411.00
S/. 0.00
S/. 7,411.00
Colocacion tuberia aguaS/.
en 183.00
muro
S/. 0.00
S/. 183.00
Colocacion tuberia para S/.
electricidad
153.00 en muro
S/. 0.00
S/. 153.00
d5
S/. 0.00
S/. 0.00
S/. 0.00
d6
S/. 0.00
S/. 0.00
S/. 0.00
Construccion de Losa Aligerada
S/. 2,218.00
S/. 0.00
S/. 2,218.00
Colocacion tuberia y cajas
S/.para
284.00
electricidad
S/.en
0.00
losa aligerada
S/. 284.00
d7
S/. 0.00
S/. 0.00
S/. 0.00
Fraguado de Losa aligeradaS/. 0.00
S/. 0.00
S/. 0.00
Desencofrado Losa aligerada
S/. 100.00
S/. 0.00
S/. 0.00
Impermeabilizar Loza aligerada
S/. 404.00
S/. 0.00
S/. 0.00
Colocacion de marcos, ventanas
S/. 573.00
y puertasS/. 0.00
S/. 0.00
d8
S/. 0.00
S/. 0.00
S/. 0.00
Cableado electrico
S/. 590.00
S/. 0.00
S/. 0.00
Tarrajeo interiores S/. 3,804.00
S/. 0.00
S/. 0.00
Tarrajeo exteriores S/. 1,555.00
S/. 0.00
S/. 0.00
Derrame en puertas y ventanas
S/. 256.00
S/. 0.00
S/. 0.00
d9
S/. 0.00
S/. 0.00
S/. 0.00
d10
S/. 0.00
S/. 0.00
S/. 0.00
d11
S/. 0.00
S/. 0.00
S/. 0.00

Fin de la 2da Etapa


S/. 0.00
S/. 0.00
3ra Etapa
S/. 7,477.00
S/. 0.00
Colocacin de accesoriosS/.sanitarios
357.50
S/. 0.00
Colocacion de mayolica S/. 710.00
S/. 0.00
Acabado de piso interior
S/. 1,141.00
S/. 0.00
Acabado de piso exteriorS/. 546.00
S/. 0.00
d12
S/. 0.00
S/. 0.00
d13
S/. 0.00
S/. 0.00
Pintado exterior
S/. 889.00
S/. 0.00
Pintado interior
S/. 947.00
S/. 0.00
Colocacin de puertasS/.
y ventanas
1,900.00
S/. 0.00
d14
S/. 0.00
S/. 0.00
d15
S/. 0.00
S/. 0.00
Colocacin accesorios electricos
S/. 694.00
y luminarias
S/. 0.00
Jardineria
S/. 105.00
S/. 0.00
Limpieza general
S/. 187.50
S/. 0.00
Fin de la 3ra. Etapa (Fin delS/.
Proyecto)
0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

75%
S/. 26,886.88
S/. 4,329.50
S/. 0.00
S/. 1,500.00
S/. 0.00
S/. 80.00
S/. 342.50
S/. 91.00
S/. 1,775.00
S/. 408.00
S/. 133.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 22,557.38
S/. 2,158.50
S/. 3,487.50
S/. 271.00
S/. 341.00
S/. 0.00
S/. 0.00
S/. 1,178.00
S/. 7,411.00
S/. 183.00
S/. 153.00
S/. 0.00
S/. 0.00
S/. 2,218.00
S/. 284.00
S/. 0.00
S/. 0.00
S/. 100.00
S/. 404.00
S/. 573.00
S/. 0.00
S/. 590.00
S/. 1,783.13
S/. 1,166.25
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00

100%
S/. 36,773.50
S/. 4,329.50
S/. 0.00
S/. 1,500.00
S/. 0.00
S/. 80.00
S/. 342.50
S/. 91.00
S/. 1,775.00
S/. 408.00
S/. 133.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 24,967.00
S/. 2,158.50
S/. 3,487.50
S/. 271.00
S/. 341.00
S/. 0.00
S/. 0.00
S/. 1,178.00
S/. 7,411.00
S/. 183.00
S/. 153.00
S/. 0.00
S/. 0.00
S/. 2,218.00
S/. 284.00
S/. 0.00
S/. 0.00
S/. 100.00
S/. 404.00
S/. 573.00
S/. 0.00
S/. 590.00
S/. 3,804.00
S/. 1,555.00
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 7,477.00
S/. 357.50
S/. 710.00
S/. 1,141.00
S/. 546.00
S/. 0.00
S/. 0.00
S/. 889.00
S/. 947.00
S/. 1,900.00
S/. 0.00
S/. 0.00
S/. 694.00
S/. 105.00
S/. 187.50
S/. 0.00

VALORIZADO ACUMULADO MENSUAL DEL PROYECTO


NOMBRE DE TAREA
PREVISTO
ENERO
FEBRERO
MARZO
PROYECTO DE VIVIENDA UNIFAMILIAR
S/. 36,773.501PISO
S/. 7,598.21
- (160 m2) S/. 17,395.07 S/. 28,821.00
1ra. Etapa
S/. 4,329.50 S/. 4,329.50
S/. 4,329.50
S/. 4,329.50
Inicio del proyecto
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Estudio y diseo de ingenieria
S/. 1,500.00 S/. 1,500.00
S/. 1,500.00
S/. 1,500.00
Tramites
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Limpieza de terreno
S/. 80.00
S/. 80.00
S/. 80.00
S/. 80.00
Trazo, nivelacion y replanteo
S/. 342.50
S/. 342.50
S/. 342.50
S/. 342.50
Excavacin pozo a tierra S/. 91.00
S/. 91.00
S/. 91.00
S/. 91.00
Excavacion cimentacion S/. 1,775.00 S/. 1,775.00
S/. 1,775.00
S/. 1,775.00
Excavacion desague
S/. 408.00
S/. 408.00
S/. 408.00
S/. 408.00
Colocacion tubo de desague
S/. 133.00
S/. 133.00
S/. 133.00
S/. 133.00
d1
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d2
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fin de la 1ra. Etapa
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
2da. Etapa
S/. 24,967.00 S/. 3,268.71 S/. 13,065.57 S/. 24,491.50
Construccion de cimientos
S/. 2,158.50 S/. 2,158.50
S/. 2,158.50
S/. 2,158.50
Construccion de columnas
S/. 3,487.50
S/. 498.21
S/. 3,487.50
S/. 3,487.50
Colocacion tuberia agua enS/.piso
271.00
S/. 271.00
S/. 271.00
S/. 271.00
Colocacion tuberia para electricidad
S/. 341.00 en piso
S/. 341.00
y pozo a tierra
S/. 341.00
S/. 341.00
d3
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d4
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Construccion falso piso S/. 1,178.00
S/. 0.00
S/. 1,178.00
S/. 1,178.00
Construccion de muros S/. 7,411.00
S/. 0.00
S/. 5,293.57
S/. 7,411.00
Colocacion tuberia agua enS/.muro
183.00
S/. 0.00
S/. 183.00
S/. 183.00
Colocacion tuberia para electricidad
S/. 153.00 en muro
S/. 0.00
S/. 153.00
S/. 153.00
d5
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d6
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Construccion de Losa Aligerada
S/. 2,218.00
S/. 0.00
S/. 0.00
S/. 2,218.00
Colocacion tuberia y cajas S/.
para
284.00
electricidadS/.
en0.00
losa aligerada
S/. 0.00
S/. 284.00
d7
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fraguado de Losa aligerada S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Desencofrado Losa aligerada
S/. 100.00
S/. 0.00
S/. 0.00
S/. 100.00
Impermeabilizar Loza aligerada
S/. 404.00
S/. 0.00
S/. 0.00
S/. 404.00
Colocacion de marcos, ventanas
S/. 573.00
y puertas S/. 0.00
S/. 0.00
S/. 573.00
d8
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Cableado electrico
S/. 590.00
S/. 0.00
S/. 0.00
S/. 590.00
Tarrajeo interiores
S/. 3,804.00
S/. 0.00
S/. 0.00
S/. 3,328.50
Tarrajeo exteriores
S/. 1,555.00
S/. 0.00
S/. 0.00
S/. 1,555.00
Derrame en puertas y ventanas
S/. 256.00
S/. 0.00
S/. 0.00
S/. 256.00
d9
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d10
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d11
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fin de la 2da Etapa
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
3ra Etapa
S/. 7,477.00
S/. 0.00
S/. 0.00
S/. 0.00
Colocacin de accesorios sanitarios
S/. 357.50
S/. 0.00
S/. 0.00
S/. 0.00

Colocacion de mayolica S/. 710.00


S/. 0.00
Acabado de piso interiorS/. 1,141.00
S/. 0.00
Acabado de piso exterior S/. 546.00
S/. 0.00
d12
S/. 0.00
S/. 0.00
d13
S/. 0.00
S/. 0.00
Pintado exterior
S/. 889.00
S/. 0.00
Pintado interior
S/. 947.00
S/. 0.00
Colocacin de puertas y S/.
ventanas
1,900.00
S/. 0.00
d14
S/. 0.00
S/. 0.00
d15
S/. 0.00
S/. 0.00
Colocacin accesorios electricos
S/. 694.00
y luminarias
S/. 0.00
Jardineria
S/. 105.00
S/. 0.00
Limpieza general
S/. 187.50
S/. 0.00
Fin de la 3ra. Etapa (Fin del Proyecto)
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

CTO
ABRIL
S/. 36,773.50
S/. 4,329.50
S/. 0.00
S/. 1,500.00
S/. 0.00
S/. 80.00
S/. 342.50
S/. 91.00
S/. 1,775.00
S/. 408.00
S/. 133.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 24,967.00
S/. 2,158.50
S/. 3,487.50
S/. 271.00
S/. 341.00
S/. 0.00
S/. 0.00
S/. 1,178.00
S/. 7,411.00
S/. 183.00
S/. 153.00
S/. 0.00
S/. 0.00
S/. 2,218.00
S/. 284.00
S/. 0.00
S/. 0.00
S/. 100.00
S/. 404.00
S/. 573.00
S/. 0.00
S/. 590.00
S/. 3,804.00
S/. 1,555.00
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 7,477.00
S/. 357.50

S/. 710.00
S/. 1,141.00
S/. 546.00
S/. 0.00
S/. 0.00
S/. 889.00
S/. 947.00
S/. 1,900.00
S/. 0.00
S/. 0.00
S/. 694.00
S/. 105.00
S/. 187.50
S/. 0.00

INICIO
ENERO
FEBRERO
MARZO
ABRIL

0
7598.21
17395.07
28821
36773.5

40000
35000
30000
25000
20000
15000
10000
7598.21
5000
0

0
INICIO

ENERO

Chart Title
36773.5
28821

17395.07

7598.21

ENERO

FEBRERO

MARZO

ABRIL

ENERO

FEBRERO

NOMBRE DE TAREA
PREVISTO
ACUMULADO MENSUAL ACUMULADO
PROYECTO DE VIVIENDA UNIFAMILIAR
S/. 36,773.501PISOS/.- (160
7,598.21
m2) S/. 7,598.21 S/. 17,395.07
1ra. Etapa
S/. 4,329.50
S/. 4,329.50 S/. 4,329.50
S/. 4,329.50
Inicio del proyecto
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Estudio y diseo de ingenieria
S/. 1,500.00
S/. 1,500.00 S/. 1,500.00
S/. 1,500.00
Tramites
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Limpieza de terreno
S/. 80.00
S/. 80.00
S/. 80.00
S/. 80.00
Trazo, nivelacion y replanteo
S/. 342.50
S/. 342.50
S/. 342.50
S/. 342.50
Excavacin pozo a tierra S/. 91.00
S/. 91.00
S/. 91.00
S/. 91.00
Excavacion cimentacion S/. 1,775.00
S/. 1,775.00 S/. 1,775.00
S/. 1,775.00
Excavacion desague
S/. 408.00
S/. 408.00
S/. 408.00
S/. 408.00
Colocacion tubo de desague
S/. 133.00
S/. 133.00
S/. 133.00
S/. 133.00
d1
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d2
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fin de la 1ra. Etapa
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
2da. Etapa
S/. 24,967.00
S/. 3,268.71 S/. 3,268.71 S/. 13,065.57
Construccion de cimientos
S/. 2,158.50
S/. 2,158.50 S/. 2,158.50
S/. 2,158.50
Construccion de columnas
S/. 3,487.50
S/. 498.21
S/. 498.21
S/. 3,487.50
Colocacion tuberia agua enS/.piso
271.00
S/. 271.00
S/. 271.00
S/. 271.00
Colocacion tuberia para electricidad
S/. 341.00 en piso
S/.y 341.00
pozo a tierra
S/. 341.00
S/. 341.00
d3
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d4
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Construccion falso piso S/. 1,178.00
S/. 0.00
S/. 0.00
S/. 1,178.00
Construccion de muros S/. 7,411.00
S/. 0.00
S/. 0.00
S/. 5,293.57
Colocacion tuberia agua enS/.muro
183.00
S/. 0.00
S/. 0.00
S/. 183.00
Colocacion tuberia para electricidad
S/. 153.00 en muroS/. 0.00
S/. 0.00
S/. 153.00
d5
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d6
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Construccion de Losa Aligerada
S/. 2,218.00
S/. 0.00
S/. 0.00
S/. 0.00
Colocacion tuberia y cajas S/.
para
284.00
electricidad en
S/.losa
0.00aligerada
S/. 0.00
S/. 0.00
d7
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fraguado de Losa aligerada S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Desencofrado Losa aligerada
S/. 100.00
S/. 0.00
S/. 0.00
S/. 0.00
Impermeabilizar Loza aligerada
S/. 404.00
S/. 0.00
S/. 0.00
S/. 0.00
Colocacion de marcos, ventanas
S/. 573.00
y puertas S/. 0.00
S/. 0.00
S/. 0.00
d8
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Cableado electrico
S/. 590.00
S/. 0.00
S/. 0.00
S/. 0.00
Tarrajeo interiores
S/. 3,804.00
S/. 0.00
S/. 0.00
S/. 0.00
Tarrajeo exteriores
S/. 1,555.00
S/. 0.00
S/. 0.00
S/. 0.00
Derrame en puertas y ventanas
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00
d9
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d10
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
d11
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Fin de la 2da Etapa
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

3ra Etapa
S/. 7,477.00
S/. 0.00
Colocacin de accesorios sanitarios
S/. 357.50
S/. 0.00
Colocacion de mayolica S/. 710.00
S/. 0.00
Acabado de piso interiorS/. 1,141.00
S/. 0.00
Acabado de piso exterior S/. 546.00
S/. 0.00
d12
S/. 0.00
S/. 0.00
d13
S/. 0.00
S/. 0.00
Pintado exterior
S/. 889.00
S/. 0.00
Pintado interior
S/. 947.00
S/. 0.00
Colocacin de puertas y S/.
ventanas
1,900.00
S/. 0.00
d14
S/. 0.00
S/. 0.00
d15
S/. 0.00
S/. 0.00
Colocacin accesorios electricos
S/. 694.00
y luminarias S/. 0.00
Jardineria
S/. 105.00
S/. 0.00
Limpieza general
S/. 187.50
S/. 0.00
Fin de la 3ra. Etapa (Fin del Proyecto)
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

FEBRERO

MARZO

MENSUAL
ACUMULADO
S/. 9,796.86 S/. 28,821.00
S/. 0.00
S/. 4,329.50
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,500.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 80.00
S/. 0.00
S/. 342.50
S/. 0.00
S/. 91.00
S/. 0.00
S/. 1,775.00
S/. 0.00
S/. 408.00
S/. 0.00
S/. 133.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 9,796.86 S/. 24,491.50
S/. 0.00
S/. 2,158.50
S/. 2,989.29
S/. 3,487.50
S/. 0.00
S/. 271.00
S/. 0.00
S/. 341.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,178.00
S/. 1,178.00
S/. 5,293.57
S/. 7,411.00
S/. 183.00
S/. 183.00
S/. 153.00
S/. 153.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 2,218.00
S/. 0.00
S/. 284.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 100.00
S/. 0.00
S/. 404.00
S/. 0.00
S/. 573.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 590.00
S/. 0.00
S/. 3,328.50
S/. 0.00
S/. 1,555.00
S/. 0.00
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

ABRIL

MENSUAL
ACUMULADO
S/. 11,425.93 S/. 36,773.50
S/. 0.00
S/. 4,329.50
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,500.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 80.00
S/. 0.00
S/. 342.50
S/. 0.00
S/. 91.00
S/. 0.00
S/. 1,775.00
S/. 0.00
S/. 408.00
S/. 0.00
S/. 133.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 11,425.93 S/. 24,967.00
S/. 0.00
S/. 2,158.50
S/. 0.00
S/. 3,487.50
S/. 0.00
S/. 271.00
S/. 0.00
S/. 341.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,178.00
S/. 2,117.43
S/. 7,411.00
S/. 0.00
S/. 183.00
S/. 0.00
S/. 153.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 2,218.00
S/. 2,218.00
S/. 284.00
S/. 284.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 100.00
S/. 100.00
S/. 404.00
S/. 404.00
S/. 573.00
S/. 573.00
S/. 0.00
S/. 0.00
S/. 590.00
S/. 590.00
S/. 3,328.50
S/. 3,804.00
S/. 1,555.00
S/. 1,555.00
S/. 256.00
S/. 256.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

MENSUAL
S/. 7,952.50
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 475.50
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 475.50
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 36,773.50

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

S/. 7,477.00
S/. 357.50
S/. 710.00
S/. 1,141.00
S/. 546.00
S/. 0.00
S/. 0.00
S/. 889.00
S/. 947.00
S/. 1,900.00
S/. 0.00
S/. 0.00
S/. 694.00
S/. 105.00
S/. 187.50
S/. 0.00

S/. 7,477.00
S/. 357.50
S/. 710.00
S/. 1,141.00
S/. 546.00
S/. 0.00
S/. 0.00
S/. 889.00
S/. 947.00
S/. 1,900.00
S/. 0.00
S/. 0.00
S/. 694.00
S/. 105.00
S/. 187.50
S/. 0.00