1.10
1.11
Allow for clearing the site from any debris,
trees,roots etc, filling hollows and levelling.
LS 0.00
1,12
Excavation of found trench 0.4m x
0.5m depth. M
3
0.00
1.13
Mass concrete in 50 mm thick blinding
layer (1:4:8 mix ) under the foundation
wall. M
3
0.00
1.14
Rubble stone foundation wall in
cement & sand mortar 1:4 ( 0.8 m x
0.4m wide) min. 15cm above ground
level.
M
3
0.00
1.15
R.C (1:2:4 mix) in ground beam
(0.4m x0.15m ), with 4N0. Y12 re-bars
& R6 links @ 300 mm c/c. M
3
0.00
1.16
200 mm thick stone hardcore filling
well compacted and leveled. M
3
0.00
1.17
75mm thick murram or other approved
backfill material, well compacted and
leveled. M
3
0.00
0.00
1.20
1.21 Ordinary portland Cement Bags 0.00 0.00
1.22 River sand or other approved sand tonne 0.00 0.00
1.23 Stone ballast (20mm size) tonne 0.00 0.00
1.24 Foundation stone tonne 0.00 0.00
1.25 Hardcore stone tonne 0.00 0.00
1.26 Murram or approved backfill material tonne 0.00 0.00
1.27 Re-bar Y12 Pcs 0.00 0.00
1.28 Re-bar R 6 Pcs 0.00 0.00
1.29 White timber 12x1 Pcs 0.00 0.00
1.30 White timber 2x1 Pcs 0.00 0.00
1.31 Wire nails 3 Kg 0.00 0.00
1.32 Binding wire Kg 0.00 0.00
1.33 Water Truck 0.00 0.00
Total materials 0.00
1.34 Transport cost % 0.00 0.00
1.35 Labour Costs % 0.00 0.00
Total transport & labour 0.00
0.00
2.10
2.11
Mass concrete (1:3:6 mix ) in conc. floor
slab 50 mm thick. M
3
0.00
2.12
40cm thick rubble stone walling in cement
& sand mortar 1;4 mix M
3
0.00
Superstructure works including conc. floor slab
Substructure work
Total for Item 1.10
Bill of materials for Item 1.10 (Substructure works)
Total for I tem 1.20
Community Market Place _Standard BoQ TEMPLATE
Item
N0.
Description of works Unit Spec. QTY
Unit
Cost
Total
Cost
Contribution
2.13
20cm thick cement block walling laid in
cement & sand mortar 1:4 mix ( rate to
include making of blocks) M
2
0.00
2.14
R.C (1:2:4 mix) in two level conc. ring
beams (40 cm x15 cm ), each with
4N0. Y12 re-bars & R6 links @ 250
mm c/c. M
3
0.00
2.15
R.C (1:2:4 mix) in 20 cm x 20 cm
column shaft, each with 4N0. Y12 re-
bars & R6 links @ 200 mm c/c. M
3
0.00
2.16
R.C (1:2:4 mix) in display tables (1m x
0.7m x 0.05m x 12 N0. ). M
3
0.00
0.00
2.20
2.21 Ordinary portland Cement bags 0.00 0.00
2.22 River sand or other approved sand tonne 0.00 0.00
2.23 Stone ballast (20mm size) tonne 0.00 0.00
2.24
Re-bar Y12
Pcs 0.00 0.00
2.25
Re-bar R 6
Pcs 0.00 0.00
2.26
Well cured Sand /cement hollow blocks
(size 40x20x20 cm)
Pcs 0.00 0.00
2.27
Walling stones
tonne 0.00 0.00
2.28
Water
Truck 0.00 0.00
2.29
White timber 12x1
Pcs 0.00 0.00
2.3
White timber 2x3
Pcs 0.00 0.00
2.31
White timber 2x1
Pcs 0.00 0.00
2.32
Wire nails 3
Kg 0.00 0.00
2.33
Binding wire
Kg 0.00 0.00
Total materials 0.00
2.34 Transport cost % 0.00 0.00
2.35 Labour Costs % 0.00 0.00
Total transport & labour 0.00
0.00
3.10 Roof work
3.11
Roof with timber rafters covered with N0.
28 GCI sheets with two coats anti- rust
paint M
2
0.00
3.12
Supply and fix 200mm x 20mm fascia
board, including two coats enamel paint
LM 0.00
3.13
Supply and erect 75 mm diam black steel
pipes (or class A pipes), to include two
coats gloss paint, for verandah roof
support.
Pcs 0.00
0.00
3.20
3.21 White timber 3 x 2 Pcs 0.00 0.00
3.22 White timber 2 x 2 Pcs 0.00 0.00
3.23 White timber 6 x1 Pcs 0.00 0.00
3.24 White timber 12x1 Pcs 0.00 0.00
3.25 GCI Sheets ( N0.28 ) Pcs 0.00 0.00
Bill of materials for Item 3.10 ( Roof work )
Total for Item 2.10
Bill of materials for Item 2.10 ( Superstructure works )
Total for Item 2.20
Total for Item 3.10
3.26 Roofing nails Kg 0.00 0.00
3.27 Wire nails (assorted) Kg 0.00 0.00
3.28 75 mm diam. Class A steel pipes Pcs 0.00 0.00
Total materials 0.00
3.29 Transport cost % 0.00 0.00
3.30 Labour Costs % 0.00 0.00
Total transport & labour 0.00 0.00
0.00
4.10 Plastering and other finishing
4.11
External & internal plastering ,12 mm
thick, cement / sand mix 1:5, with
wood float finish. M
2
0.00
4.12
Apply two coats white wash and
distemper paint to the plastered wall
surface. M
2
0.00
4.13
40 mm thick 1;3 cement/sand floor
screed. M
2
0.00
0.00
4.20
4.21 Ordinary portland Cement bags 0.00 0.00
4.22 River sand or other approved sand tonne 0.00 0.00
4.24 Water Trucks 0.00 0.00
4.25 Lime bags 0.00 0.00
4.26 Emulsion paint Litres 0.00 0.00
4.27 Gloss paint Litres 0.00 0.00
Total materials 0.00
4.29 Transport cost % 0.00 0.00
4.30 Labour Costs % 0.00 0.00
Total transport & Labour 0.00 0.00
0.00
5.10
Supply and fix wooden panel doors (2.0m
x 0.9m) single leaf, complete with hinges &
locks and to include two coats of gloss
paint.
Pcs Metal 0.00 0.00
5.12
Supply and fix metal gate ( 3m x 2.5m)
complete with hinges and locks and to
include 2 coats of gloss paint.
Pcs 0.00 0.00
5.13
Supply and fix wooden panel windows
(1.0m x 1.2m ) complete with wooden
frame, hinges & locks and to include two
coats of gloss paint.
Pcs 0.00 0.00
0.00
6.10
6.11
Water tank / Plumbing works
LS 1 0.00 0.00
6.12
Standard latrine units as per BoQ
LS 0.00 0.00
6.13
Electrical installation works
LS 1 0.00 0.00
Provisional Items (includes materials & labour )
Bill of materials for Item 4.10 ( Plastering & other finishes )
Total for Item 4.20
Gates, Doors & Windows
Total for Item 5.10
Total for Item 3.20
Total for Item 4.10
0.00
7.10 Other inputs
7.11 Land 1 0.00 0.00
7.12 Miscellaneus 1 0.00 0.00
Total for Item 7.10 0.00
0.00 0.00 0.00
0.00
Total for Item 6.10
Grand Total (Bill of materials, provisional items & other inputs
Grand Total (BoQ, provisional items & other inputs)