Вы находитесь на странице: 1из 9

<<Project Name>>

Pilot Review
Customer Name
Directions for using template:
Read the Guidance (Arial blue font in brackets) to understand the information that
should be placed in each section of this template. Then delete the Guidance and
replace the placeholder within <<Begin tet here!! with "our response. There ma" be
additional Guidance in the Appendi of some documents# which should also be
deleted once it has been used.
$ome templates ha%e four le%els of headings. The" are not indented# but can be
differentiated b" font t"pe and si&e:
'eading ( ) Arial Bold (* font
'eading + ) Arial Bold ,talic (- font
'eading . ) Arial Bold (. font
'eading . ) Arial Bold ,talic (+ font
/ou ma" elect to indent sections for readabilit".
Author
Author 0osition
1ate
2ersion: (.3
3453+5+3(-

2002 Microsoft Corporation. All rights reserved.
The information contained in this document represents the current view of Microsoft Corporation on the issues
discussed as of the date of publication. Because Microsoft must respond to changing market conditions, it should not
be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accurac of an
information presented after the date of publication.
This document is for informational purposes onl. MICROSOFT MAKES NO WARRANTIES E!PRESS OR
IMP"IE# IN T$IS #OC%MENT&
Microsoft and !isual Basic are either registered trademarks or trademarks of Microsoft in the "nited #tates and$or
other countries.
3453+5+3(-

Revision & Sign-off Sheet
6hange Record
1ate Author 2ersion 6hange Reference
Re%iewers
7ame 2ersion Appro%ed 0osition 1ate
1istribution
7ame 0osition
1ocument 0roperties
,tem 1etails
1ocument Title 0ilot Re%iew
Author
6reation 1ate
8ast 9pdated
3453+5+3(-

Table of Contents
$ummar"..........................................................................................................................
:b;ecti%es........................................................................................................................
$uccess <actors and =etrics............................................................................................
0ilot <eedback $ummaries..............................................................................................
$essions with the 9ser 6ommunit".............................................................................
0roblem Reports.........................................................................................................-
>nd?user $ur%e"s........................................................................................................-
:bser%ations of the 0ro;ect Team...............................................................................-
$tatistical :perations Reports....................................................................................-
0ro;ect Team <eedback...................................................................................................-
Training <eedback......................................................................................................@
1eplo"ment <eedback................................................................................................@
$upport <eedback.......................................................................................................@
6ommunications <eedback........................................................................................@
0roblems >ncountered................................................................................................@
$uggestions for ,mpro%ements...................................................................................*
0ilot Results and Recommendations..............................................................................*
3453+5+3(- 3

%I'tro(uctio' to t)e Tem*late
#escri*tio'+ The &ilot 'eview document records the results of the process that
validates that what is delivered during the pilot meets specifications and business
re(uirements.
,usti-icatio'+ The pilot)s success or failure is tpicall indicative of the progress of
the overall pro*ect. Capturing the results of the pilot provides valuable insight into the
solution)s value. +f the development and testing activities rigorousl followed the
specifications and design, the pilot should go smoothl. +f the pilot results are less
than favorable, changes to the pro*ect, small or large, can be made as appropriate.
,Team Role Primar.+ Pro/ram Ma'a/eme't will facilitate the creation of the pilot
review document, using the pilot plan -developed during the planning phase. as
conte/t. &rogram management should collect input from representatives of all pilot
participants -team members and end0users. regarding their feedback on the pilot.
Team Role Seco'(ar.+ Pro(uct Ma'a/eme't will emplo the pilot review content
that describes end0user satisfaction and make an necessar changes to
communication or other customer centric activities. #evelo*me't will need to act on
an solution anomalies reported in this review. Test ma need to modif testing
procedures to either shrink or enlarge the testing criteria. %ser E0*erie'ce
addresses an issues that are negativel affecting users. Release Ma'a/eme't will
review the pilot results to understand if an part of the deploment process or
operational environment needs modification to ensure a successful implementation of
the entire solution.12
3453+5+3(-

Summar.
%#escri*tio'+ The #ummar section summari3es the results of the &ilot 'eview
document, identifing whether the pilot was approved or received conditional
approval and including ke recommendations and re(uired action items.
,usti-icatio'+ #ome pro*ect participants ma need to know onl the highlights of the
review, and summari3ing these creates that user view. +t also enables the full reader
to know the essence of the document before the e/amine the details.2
<<Begin tet here!!
O1jectives
%#escri*tio'+ The 4b*ectives section lists and describes the ke ob*ectives to be met
b the pilot review process. This information is a re0statement of the pilot ob*ectives
found in the &ilot &lan, which was created during the planning phase.
,usti-icatio'+ 'estating pilot ob*ectives provides the reader with sufficient conte/t to
make the remainder of the document meaningful.2
<<Begin tet here!!
Success Factors a'( Metrics
%#escri*tio'+ The #uccess 5actors and Metrics section restates the success factors
and metrics contained within the &ilot &lan. This includes a list of the factors that will
be used to *udge the pilot as a success, partial success, or failure and the metrics to
be used to make these *udgments. This section also records the results of the
*udgments.
,usti-icatio'+ 'estating pilot success factors and metrics provides the reader with
sufficient conte/t to make the remainder of the document meaningful.2
<<Begin tet here!!
Pilot Fee(1ac2 Summaries
%#escri*tio'+ The &ilot 5eedback #ummaries section contains summaries of the
feedback obtained from all the pilot participants. An efficient wa of collecting the
original feedback data is via web site forms.
,usti-icatio'+ 6ach participating team is assessing pilot results from a different
perspective. B including feedback from all teams, the pro*ect ensures that the pilot
was performed and assessed from a broad range of viewpoints.2
Sessions with the User Community
%#escri*tio'+ The pro*ect team holds man sessions with the user communit during
the planning, development, deploment, and operation of a pilot. The #essions with
3453+5+3(- +

the "ser Communit section lists and describes each session7 defining its ob*ectives,
listing user feedback and recommendations, and defining responses and actions
taken b the pilot team.2
<<Begin tet here!!
Problem Reports
%#escri*tio'+ &ilots help to identif and define man tpes of problems that might
occur during the development and deploment of a full solution at a far smaller cost
than the development of a full solution. &roblems can be documented using pro*ect
problem report templates to ensure that all participants are recording standard
information. The &roblem 'eports section contains a summar of all problem
reports.2
<<Begin tet here!!
End-user Surveys
%#escri*tio'+ A primar ob*ective of pilots is to gain information from users about the
usabilit of the proposed solution. The 6nd0user #urves section should include the
ob*ectives and a description of each surve, the information gathered and recorded in
the surve, and conclusions reached from anal3ing surve results.2
<<Begin tet here!!
Observations of the Proe!t Team
%#escri*tio'+ The pro*ect team observes the deploment and operation of the pilot to
gather and record specific sets of re(uired information as well as ad hoc
observations. The 4bservations of the &ro*ect Team section includes the information
gathered and recorded b the pro*ect team and their conclusions and
recommendations.2
<<Begin tet here!!
Statisti!al Operations Reports
%#escri*tio'+ The #tatistical 4perations 'eports section defines the statistics that
were both planned and gathered during pilot operations, summaries of the statistics,
and conclusions based on the statistics.2
<<Begin tet here!!
Project Team Fee(1ac2
%#escri*tio'+ The &ro*ect Team 5eedback section contains feedback from pro*ect
teams. This feedback is collected during and at the end of the pilot in order to
evaluate its success.
3453+5+3(- .

,usti-icatio'+ 6ach participating team is assessing pilot results from a different
perspective. B including feedback from all teams, the pro*ect ensures that the pilot
was performed and assessed from a broad range of viewpoints.2
Training "eedba!#
%#escri*tio'+ The Training section describes the training provided to end0users,
operations personnel, and other groups that participated in the pilot program. +t
describes the effectiveness of the training, identifies and describes training problems,
lists lessons learned, and makes recommendations that will make the training on the
actual solution effective.2
<<Begin tet here!!
$eployment "eedba!#
%#escri*tio'+ The 8eploment section summari3es the pilot deploment plan and
compares the actual deploment with the plan, listing and defining problems
encountered and solved, lessons learned, and recommendations for deploment of
the full solution.2
<<Begin tet here!!
Support "eedba!#
%#escri*tio'+ The #upport section describes the support planned and provided for
the pilot solution. +t includes the actual support needed to conduct the pilot, support
problems encountered and solved, and lessons learned that can be e/trapolated into
support for the actual solution.2
<<Begin tet here!!
Communi!ations "eedba!#
%#escri*tio'+ The Communications section summari3es the pilot communication
plan and describes actual communication e/periences with pilot stakeholders. +t
includes the actual communications that occurred during the pilot, communication
problems encountered and solved, and lessons learned that can be e/trapolated into
communication for the actual solution.2
<<Begin tet here!!
Problems En!ountered
%#escri*tio'+ The &roblems 6ncountered section lists and describes the problems
encountered in ever aspect of the pilot -planning, development, deploment,
training, operations, management, user involvement, support, etc... +t also describes
the impact of the problems, solutions applied to the problems, and lists all unsolved
problems and the challenges to their solutions.2
<<Begin tet here!!
3453+5+3(- -

Suggestions for %mprovements
%#escri*tio'+ The #uggestions for +mprovements section lists and describes all
recommended improvements to the pilot, including e/tensions to the current pilot and
an additional pilots. +dentif and define their ob*ectives for each e/tension and
additional pilot.2
<<Begin tet here!!
Pilot Results a'( Recomme'(atio's
%#escri*tio'+ The &ilot 'esults and 'ecommendations section contains a complete
evaluation of the pilot9s success and makes all necessar recommendations. +t
describes how well the pilot was received b the users and an usabilit issues or
problems that need to be corrected prior to developing the full solution. This section
should identif the specific changes or improvements that need to be made from both
a technical and pro*ect management perspective.
,usti-icatio': The (ualit goals of the pro*ect and the business ob*ectives of the
solution are furthered b a complete and ob*ective assessment of the pilot.2
<<Begin tet here!!
3453+5+3(- @

Вам также может понравиться