Вы находитесь на странице: 1из 3

Xyz COMPANY

METHOD STATEMENT M & E NO.: M & E MST- 031/ REV 0 Page 1 of 3


TITLE:

G. I. DUCT A!RICATION.
G. I. DUCT A!RICATION.
1.0 PURPOSE
The purpose of this procedure is to describe the method for G.I duct fabrication.
2.0 SCOPE
This procedure shall be applicable for the duct system used to transmit air from
the air handling apparatus to the space to be conditioned.
3.0 REERENCE
3.1 QAP 0!0 "ocument # "ata $ontrol
3.2 QAP 100 Inspection # Testing
3.3 QAP 0%0 "esign $ontrol.
%.0 DEINITION
%.1 $ompany &'(.
%.2 Quality )ngineer *ominated Quality )ngineer at +ite.
%.3 "iscipline )ngineer $ompany designated ,-A$ )ngineer as
decided by the .anagement and assigned /ith the
responsibility of managing electrical part of the
Pro0ect.
%.% "1 1%2 "uct 1or2 +tandard
%.! A+,3A) American +ociety of ,eating4 3efrigeration and air5
conditioning )ngineering.
. # ) .+T5 0316 3)- 0 "ate7 8anuary 294 2001
Xyz COMPANY
METHOD STATEMENT M & E NO.: M & E MST- 031/ REV 0 Page " of 3
TITLE:

G. I. DUCT A!RICATION.
!.0 PROCEDURE
!.1 Responsibility
!.1.1 The responsibility for carrying out this .ethod +tatement shall be that of the
"iscipline )ngineer6 :oremen4 unless other/ise specifically mentioned in this
procedure. The Quality )ngineer6 "iscipline )ngineer6 :oremen shall be
responsible for inspection # testing.
!.2 Preparation
!.2.1 Particular pro0ect specification and "1 standard should be ;erified from the
appro;ed shop dra/ing and .echanical specification boo2.
!.2.2 Thic2ness of acoustic liner and minimum re<uired distance of acoustic liner rom
unit outlet should be ;erified and accordingly duct s2etches shall be made.
!.2.3 In e;ery s2etch4 thic2ness =gauge> of the sheet4 ;olume control damper and fire
dampers position in the duct shall be sho/n in order to fabricate the duct
accordingly.
!.3 Fabrication
!.3.1 All fabrication shall be done according to the "1 standard4 /hich is sho/n in
the appro;ed dra/ings or in the specification.
!.3.2 "uring fabrication fabricator should ma2e sure that the /astage should not
e?ceeds more than 10@ of the total fabricated duct area.
!.3.3 According to "1 6 A+,3A) standard4 all duct 0oining4 stiffener shall be
pro;ided in the duct /or2shop itself.
!.3.% All G.I. sheets shall be handled in a proper /ay so that it should not get
damaged during transportation and handling at duct /or2shop. +uper;isor
must ma2e sure that hand glo;es are supplied to all /or2ers and all /or2ers
must use during the time of /or2ing.
!.3.! "uring cutting of G.I. sheet4 super;isor must ma2e sure that cut edges are
sharp /ithout any burr4 if it is not satisfactory then blade must be sharpened.
!.3.9 Aoc2 former o;erlap shall be chec2ed and to be ;erified for the siBe of standard.
. # ) .+T5 0316 3)- 0 "ate7 8anuary 294 2001
Xyz COMPANY
METHOD STATEMENT M & E NO.: M & E MST- 031/ REV 0 Page 3 of 3
TITLE:

G. I. DUCT A!RICATION.
!.3.C "uct /or2 shop super;isor should chec2 and ;erify for any manufacturing
defects and dimensional discrepancy before dispatching all fabricated ducts
to site
!.3.D +heet consumption for each pro0ect and daily /ise shall be recorded in the
/or2shop material register.
!.3.E .onthly 6 Quarterly in;oice shall be raised to each pro0ect 6 party
!.3.10 All re<uired chec25 list shall be chec2ed and ;erified accordingly before
despatching any fabricated duct to respecti;e sites.
9.0 DOCUMENTATION/ RECORDS
9.1 G. I. "uct /or2s5 Inspection report . # ) Q$:orm5 0315016 3)-. 0.
. # ) .+T5 0316 3)- 0 "ate7 8anuary 294 2001