Recommendations include as a table in the following format:
Recommendation Likely resource implications Priority Target date
Observation #1
a. The tools are to be removed from the workshop by the supervisor in charge.
b. Review and application of The Safe System of Work for Tool Storage and Use is called for.
A 1 week would be enough to serve this purpose. No cost
45 minutes to One hour of reassessment and application. No cost
High (1 week)
Low (2 Months)
Observation #2
Constant reminders from the supervisor to the workers about the dangers of an electrical generator.
Regular inspections preventing accidents involving the electric generator.
Prevent access to the electric generator by posting a guard or building a fence.
No cost, only the supervisors time.
No cost.
Guards salary 1 day
Ongoing
2 months
Observation #3
The Fire extinguisher should be sent to maintenance.
Replacement of fire extinguishers and adaptation of a better storage area is recommended.
Immediate
1 month
Observation #4
Ongoing
Observation #5 Proper Training and regular fire drills for all the employees on site.
Reminders about the allocated cooking area will be given to all employees.
Risk assessment for all activities, further action will be enforced afterwards. Observation #6 First Aid Kits will be supplied and all employees will be given familiarization as to where the kits are.
The first aid kits will be properly labelled as such.
2 weeks
1 month
Observation #7 All First Aid kits will be resupplied regularly.
2 weeks
1 month
Observation #8 Additional First Aid kits should be supplied to the site.
Positive finding. Continuously ensure the PPE remains in good condition.
1 week
1 month
Observation #9 Positive finding. Keep proper maintenance of the pump and filter so that it continues to produce clean water. Be noted that this water is to be used for showering only and not drinking.
2 months
Observation #10 Installation of a drip tray is recommended to avoid leaking into the ground.
N/A
Observation #11 Completion and writing up of the Material Safety Data Sheets, putting it up in the area for any handlers to read as well as in case of spillage and other emergencies.
N/A
Observation #12 Allocate a more proper place for the storage of these items and unused materials.
2 months
Observation #13 Inform the Area supervisor to move the hazard to a safer position.
2 months
Observation #14
The portable generator will be stored in an appropriate area and away from temperate areas. All work in the immediate area will be halted and cleared of personnel. Personnel would be briefed on how to perform maintenance of the said generator.
1 month
Observation #15 Best practices show that according to the international standards to best reduce it to about 20 km/hr. A new
1 week
sign could be implemented with the new number as well as the proper unit term.
Observation #16 Install dual language signs for the convenience of visitors and contractors.
Immediate
Observation #19 To be noted to the supervisor for possible remedial reminder and training.
Note the supervisor for constant reminders and training.
Include this as a part of the inspection and rounds to be done for the on-site supervisor.
1 week
Observation #20 There should be a good toolbox talk or a notice to r0065mind and tell the people involved to remember not to leave the keys in the ignition of any vehicles or machinery as best practically possible. .