August 1, 2014

The Philippine Stock Exchange, Inc.


3
rd
Floor, The Philippine Stock Exchange Plaza
Ayala Triangle
Ayala Ave. cor. Paseo de Roxas
Makati City


Attention: Ms. J anet A. Encarnacion
Head, Disclosure Department


Gentlemen:

Attached please find a duly-accomplished SEC Form 17-C pertaining to the 97 MW Avion Open Cycle
Natural Gas-Fired Power Plant.

Thank you.






Very truly yours,

RACHEL R. HERNANDEZ
Corporate Secretary
















SECURITIES AND EXCHANGE COMMISSION

SEC FORM 17-C

CURRENT REPORT UNDER SECTION 17
OF THE SECURITIES REGULATION CODE
AND SRC RULE 17.2(c) THEREUNDER

1. August 1, 2014
Date of Report (Date of earliest event reported)

2. SEC Identification Number A1998-18260 3. BIR Tax Identification No. 202-464-633

4. FIRST GEN CORPORATIONExact name of issuer as specified in its charter

5. Metro Manila, Philippines................................ 6. (SEC Use Only)
Province, country or other jurisdiction of incorporation Industry Classification Code:

7. 3F Benpres Building, Exchange Road cor. Meralco Avenue, Pasig City 1600.
Address of principal office Postal Code

8. (632) 449-6400Issuer's telephone number, including area code

9. N/A Former name or former address, if changed since last report

10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA

Title of Each Class Number of Shares of Common Stock Outstanding
and Amount of Debt Outstanding
(as of June 30, 2014)
Common Stock 3,363,913,757 shares

11. Indicate the item numbers reported herein: Item No. 9

First Gen Corporation (First Gen), through its wholly owned subsidiary Prime Meridian Powergen
Corp. (PMPC), executed supply contracts with the Istroenergo Group (IEG) for PMPC's 97 MW Avion
Open Cycle Natural Gas-Fired Power Plant (Avion Plant). IEG is an engineering contractor from
Slovakia experienced in the construction of aeroderivative gas turbine power plants. The Avion
Plant will use General Electrics LM6000 PC Sprint aeroderivative gas turbines and have the
capability to burn natural gas or liquid fuel. It will be located adjacent to First Gens 1000 MW
Santa Rita and 500 MW San Lorenzo natural gas-fired power plants in Batangas City, and is expected
to be completed at a cost of approximately US$150 million.

The Avion Plant is targeted to be completed and operational by April 2015, and will help provide
additional power supply at that time.










SIGNATURE


Pursuant to the requirements of the Securities Regulation Code, the issuer has duly caused this
report to be signed on its behalf by the undersigned hereunto duly authorized.


FIRST GEN CORPORATION August 1, 2014
Issuer Date
By:
RACHEL R. HERNANDEZ
Corporate Secretary