Вы находитесь на странице: 1из 12

SADRAJ

CONTENTS:


1. Primjena
Application
2. Toplo oblikovanje
Hot forming
3. Zavarivanje
Welding
4. Izvoenje toplinskog procesa
Execution of thermal process
5. Ispitivanje
Examination


Dijagrami
Diagrams


















Izradio: Odobrio:
Potpis, Datum


Slavonski Brod - CROATIA
Dodatak za :
Naziv:
X20 & P91 Zavarivanje i toplinska obrada
X20 & P91 Welding and PWHT
Zabiljeeno prema EN ISO 16016
AE&E/DD TEP-Standard ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 1 von 12
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 2 von 12
1. Podruje primjene:
Application
Za X10CrMoVNb9 1 (1.4903) vrijedi smjernica VdTV 511/206.99.
Za X20CrMoV12 1 (1.4922) vrijedi smjernica DIN 17 175 (beavne cijevi),
DIN 17 234 (kovani komadi) i VdTV 110 12.95

For X10CrMoVNb9 1 (1.4903) is valid the guideline VdTVs 511/206.99.

For X20CrMoV12 1 (1.4922) is valid the guideline DIN 17 175 (seamless tubes), DIN 17
234 (forged pieces) and VdTV 110 12.95

2. Toplo oblikovanje:
Hot forming

2.1. Temperatura oblikovanja: 1100850 C.
Ohlaivanje na sobnu temperaturu (ca.+20 C) izvoditi na mirnom zraku.
Neodarene dijelove titi od vlanosti.
Prije arenja ne izvoditi ispitivanje magnetom.

Forming temperature: 1100850 C.
Then cool to the room temperature (ca +20 C) in still air.
Attention: It should be protected against moisture before thermal treatment!
Do not perform MT before heat treatment. . Achtung

2.2. Nakon oblikovanja na toplo struktura elika je bitno poboljana.
The structure is essentially upgraded after the hot forming treatment.

Kaljenje : 10401070C
Vrijeme dranja: s 25mm 30 Min.
s > 25mm 60 min.
Ohlaivanje na mirnom zraku.

Poputanje: 750780C
Vrijeme dranja: s 30mm 60 Min
s > 30mm 120 Min.
Ohlaivanje na mirnom zraku.

Toplinska obrada nesmije se odvijati samo na oblikovanom podruju nego mora
obuhvatiti cijeli proizvod.

Hardening: 10401070C
Holding time: t 25mm 30 minutes
t > 25mm 60 minutes
Cooling in still air .
Thermal stress relief: 750780C
Holding time: t 30mm 60 minutes
t > 30mm 120 minutes
Cooling in still air .
The heat treatment must not be executed only on the formed range, but it must include
the whole product.

2.3. Ispitivanje
Examination

Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 3 von 12
Za dokazivanje toplinskog procesa predvieno je odarivanje (normalizacija i
poputanje) i jedna paralelna proba na materijalu iste ere.
Opseg ispitivanja: 100% MT nakon poputanja
1x ispitivanje na vlak kod RT (ca.+20C)
1x ilavost (Charpy V proba kod RT)
1x mikrostruktura
1x ispitivanje tvrdoe

Stress relieving (normalizing and thermal stress relief) and one parallel test on the tube
of the same heat are foreseen for the thermal process testing .
Examination scope: 100% MT after thermal stress relief
1x Tensile test at room temperature (ca +20C)
1 x Impact test (Charpy V test at room temperature)
1 x Microstructure
1 x Hardness test


Zahtijevane vrijednosti:
X10CrMoVNb 91
Vlana vrstoa: Rm= 620 850 N/mm
ilavost: min. 41J
Struktura: poputeni martenzit
Tvrdoa: 200 260 HV10

Requaired values:
X10CrMoVNb 91
Tensile strength: Rm= 620 850 N/mm
Notch impact toughness: min. 41J
Structure: tempered martensite
Hardness: 200 260 HV10


P91
Vlana vrstoa: Rm= min.585 N/mm
ilavost: min. 41J
Struktura: poputeni martenzit
Tvrdoa: 184 250 HV10

P91
Tensile strength: Rm= min.585 N/mm
Notch impact toughness: min. 41J
Structure: tempered martensite
Hardness: 184 250HV10


X20CrMoV121
Vlana vrstoa: Rm=700 850 N/mm
ilavost: min. 27J
Struktura: poputeni martenzit
Tvrdoa: 215 265 HV10

X20CrMoV121
Tensile strength: Rm=700 850 N/mm
Notch impact toughness: min. 27J
Structure: tempered martensite
Hardness: 215 265 HV10
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 4 von 12

3. Zavarivanje
Welding

3.1 Openito
General

3.1.1
Prije poetka zavarivanja AE&E priloiti postupak ispitivanja prema EN 2883
odnosno ASME IX i specifikaciju postupka zavarivanja (WPS) prema EN288 2
odnosno ASME IX za provjeru.
Before beginning of the welding, AE&E should show the examination procedure for
checking according to EN 2883 respectively ASME IX and the welding procedure
specification (WPS) according to EN288 2 respectively ASME IX.

3.1.2
Zavariva mora biti kvalificiran prema EN2871, ASME IX ili istovjetno. Prije
poetka zavarivanja daju se radne probe na odgovarajuem probnom uzorku
(dimenzija i pozicija).
A welder must be qualified according to EN2871 or ASME IX, or according to both of
them. Work tests on an appropriate test sample (dimension and position) are to be
provided before the beginning of welding.

3.1.3
Pri zavarivanju korijena i prvog prolaza popune obavezna je upotreba zatitnog
korijenskog plina.
The backing gas should be used during the root and the first fill pass welding.

3.1.4
Mjesta zavarivanja moraju bit zatiena od vlage i nepovoljnih vremenskih
utjecaja.
Welding places must be protected against moisture and foul weather influences.

3.1.5
Unutranjost cijevi prilikom zavarivanja i toplinskih aktivnosti moraju biti
zatiene od propuha.
The inner sides of tubes must be protected against the draught during the welding and
thermal activities

3.2 Postupci zavarivanja
Welding procedure


Do debljine 8 mm moe se potpuno zavarivati samo WIG postupkom zavarivanja, a
iznad te debljine popuna i zavrni sloj zavaruju se runim elektrolunim
postupkom zavarivanja. U radionici je dozvoljeno EPP zavarivanje.
Only TIG welding procedure may be applied to 8 mm thickness, while above that
thickness the SMAW procedure is to be applied for the fill and the finish layer welding.
Saw welding procedure may be applied in workshop.

Zavarivanje se izvodi vieslojno sa poboljanim meuprolazima. Maximalno
dozvoljeno njihanje je 3x elektrode i ne smije se prekoraiti. Dozvoljena debljina
prolaza kod runog zavarivanja je max. 3 mm i ne smije se prekoraiti.

The welding is multi-layer welding with upgraded interpasses. Maximum allowed wave
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 5 von 12
bead is 3 times electrode and must not be exceeded. Allowed pass thickness at
manual welding is 3 mm maximum and must not be exceeded.

3.3 Dodatni materijal
Filler metal

Dodatni materijal za zavarivanje prema osnovnom materijalu mora biti
odgovarajui odnosno kvalificiran.
Smije se koristiti samo bazino-obloena elektroda kod runog zavarivanja
odnosno bazini praak kod EPP zavarivanja.
Elektrode se sue 2h na 300350 C, osim ako proizvoa elektrode nije odredio
drugaije. Do zavarivanja osuene elektrode skladite se na temp. 100 C bilo
stacionarno bilo u zagrijanim tobolcima.
Max. dozvoljeni promjer elektrode odnosnor odnosno ice za zavarivanje je 4 mm.

The filler metal relating to the parent metal must be appropriate respectively qualified.
Only basic coated electrode may be used at manual welding respectively the basic flux
at SAW.
The electrodes are being dried for 2h at 300350 C, if not defined otherwise by the
electrode manufacturer. Dried electrodes are being stored at min. 100 C either
stationary or in heated quivers till welding.
Maximum allowed diameter of electrodes or wires a wire is 4 mm.

4. Izvoenje toplinskog procesa
Execution of thermal process

4 1
Predgrijavanje / Meuprolazna temperatura
Temperatura predgrijavanja: X10CrMoVNb91 150200 C
X20CrMoV121 250300 C
Preheating / Interpass temperature
Preheating temperature: X10CrMoVNb91 150200 C
X20CrMoV121 250300 C


Predgrijavanje se mora provoditi kontrolirano. Od 70 mm i/ili s > 7,1 mm
predgrijavanje izvoditi induktivno ili elektrootporno. Temperatura se oitava preko
termoelemenata. Termoelement smije biti udaljen od zavara najvie 50 mm.
The preheating, including heating, must be controlled. An inductive heating or resistance
heating elements are to be used for the preheating of the tubes having the larger than
70 mm and/or s>7,1 mm. The temperature is being read through thermo
elements/thermocouples. The thermo element/thermocouple may be for maximum 50
mm far away from the weld.

Male cijevi dozvoljeno je predgrijavati i pomou plamena. Temperatura
predgrijavanja se kontrolira pomou termokrede. Mjerenje je potrebno vriti na
udaljenosti 50-100 mm od zavara.

Small diameter tubes may be preheated by means of the flame as well. The preheating
temperature is controlled by means of the thermo crayon. The temperature measuring
should be performed at the distance of 50-100 mm from the weld.


MEUPROLAZNA TEMPERATURA NE SMIJE PRELAZITI 350 C!
THE INTERPASS TEMPERATURE MUST NOT EXCEED 350 C!
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 6 von 12


Predgrijavanje se mora odravati do zavretka zavarivanja.
The preheating must be kept until the completion of welding

4.2 Meuohlaivanje
Intermediate cooling

Nakon zavarivanja moe se razliito postupati ovisno o debljinama stijenke cijevi
(vidi dijagram).
Cijevi sa debljinom stijenke s 7,1mm smiju se ohladiti na temperaturu okolia.
Uz uvaavanje da se pri tome moraju zatiti od atmosferskih utjecaja npr.
kondenzacije (vanjske i unutarnje).
After welding it can procede differently depending on the tube wall thickness (see
diagram).
The tubes having the wall thickness t 7,1mm may be cooled down to the ambient
temperature. Take care to provide the protection against moisture from air, e.g.
cvondensation (external and internal).


Cijevi veih debljina stijenke moraju se nakon zavarivanja ohladiti na 10080 C
(X10CrMoVNb91) odnosno 120100 C (X20CrMoV121) i zadrati na toj temperaturi
2 h.
The tubes having larger tube thickness must be cooled down after welding to 10080 C
(X10CrMoVNb91) respectively 120100 C (X20CrMoV121) and hold at that temperature
for 2 hours.

4.3
Toplinska obrada (vidi dijagram)
Heat treatment (see diagram)

4.3.1
Parametri
Parameters

Temperatura: 740770 C (X10CrMoVNb91)
720780 C (X20CrMoV121)
Vrijeme dranja: s 8mm 30 min
8 > s 30mm 60 min
s > 30 mm 2 min/mm mind. 120 min
s > 60 mm 180 min
mperature: 740770 C (X10CrMoVNb91)
720780 C (X20CrMoV121)
Holding time: t 8mm 30 min
8 > t 30mm 60 min
t > 30 mm 2 min/mm minimum 120 min
t > 60 mm 180 min
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 7 von 12

4.3.2 Provoenje
Execution

Uvijek gdje je mogue nastojati provesti toplinsku obradu u pei na cijelom
objektu. Paziti da se najmanja brzina ohlaivanja znatno ne prekorai, ali je
takoer vano da se ne uspori ohlaivanje zbog isijavanja kolica ili drugih
sudionika procesa.
The heat treatment is to be executed on the complete object always wherever it is
possible. Care should be taken not to exceed the minimum cooling rate considerably. But
it is also important not to slowdown the cooling because of irradiation of the heating car
or other factor included in the process.

Toplinska obrada treba se provoditi u gornjem temperaturnom podruju.
The heat trreatment should be executed in upper temperature range.


Mjerenje temperature provodi se pomou termoelemenata. Stezni elementi nisu
doputeni. Kod cijevi veih promjera postavlja se vie elemenata okolo.
The temperature measuring is performed by means of thermoelements/thermocouples.
Clamping elements are not allowed. More elements are to be put around the tubes
having larger diameter. More elements are to be put around the tubes having larger
diameter.

Ako se istovremeno odaruje vie paralelnih krunih zavara npr. cijevi ogrijevnih
povrin,) potrebno je predvidjeti za svaki zavar termoelement.

If more parallel circumferential welds are being heat treated simultaneously then the
thermoelements must be provided for each weld.

Svaka toplinska obrada mora se dokumentirati. Dokumentacija mora sadravati
dijagram i skicu sa poloajem teroelemenata. Na dijagramu treba biti registrirana
brzina zagrijavanja i hlaenja..

Each heat treatment must be documented. Documentation must include a diagram and a
sketch showing thermoelements position. Unique shift of rate is designated in a diagram.

4.3.3 Toplinsko ravnanje
Kad je potrebno moe nakon zavarivanja pri temperaturi 450750C uslijediti
toplinsko ravnanje. Nakon toplinskog ravnanja zahtijeva se naponsko
odarivanje.

Thermal flattening
When it is required the thermal flattening may proceed after welding at the
temperature 450750C. Thermal treatment is required after the thermal flattening.

4.3.4 Nakon zavarivanja, a prije toplinske obrade elici su krti pa je neophodno paljivo
rukovanje (transport, odlaganje, udarci ekia itd.).
The steels are brittle after welding and before heat treatment so that careful handling is
absolutely necessary (transport, putting in a suitable place, using a hammer, etc.)

4.4

igovi zavarivaa smiju se otiskivati tek nakon toplinske obrade. Prije odarivanja
koristiti flomastere ili tokaste markere.
Welders' stamps may be impressed only after the heat treatment. Use felt-tip pens or
dotted-face low stress die stamps.
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 8 von 12

5. Isptivanje
Examination
5.1 Openito
General
Ovdje se provode ispitivanja na specifinim materijalima i potrebna je dopuna
uobiajenih planova ispitivanja. Ispitivanje povrinskim metodama dozvoljeno je
provoditi samo nakon toplinske obrade. Mjesto ispitivanja mora biti oiena od
ogorina i ostalih neistoa.

Ako je nacrtom propisano ili isto zahtijeva metoda ispitivanja potrebno je
bruenje nadvienja zavara ravno s osnovnim materijalom.

Here stated examinations which are being executed for special materials and there are a
supplement requests for the Testing plans. Surfaces examination is allowed only after
the heat treatment. Test places must be free of scales and other impurities.

If it is designated by a drawing or requested by a control method then the reinforcement
of the weld should be ground to the level of the parent metal.

5.2 Opseg ispitivanja
Examination scope

5.2.1
Radiografsko ispitivanje
Radiographic examination

Opseg
Scope: 100 %
Kod s > 15 mm moe se RT zamijeniti UT postupkom ispitivanja.
At s > 15 mm it can replace RT procedure with UT procedure.

5.2.2
Ultrazvuno ispitivanje
Ultrasonic test

Prikljuci > 120 mm i s > 15 mm 100 %
Nozzle welds > 120 mm i s > 15 mm 100 %


Navareni dijelovi 50 %
Welded attachments
5.2.3
Ispitivanje povrina MT ili PT
Surface examination MT or PT

All 100%
5.2.4
Ispitivanje tvrdoe
Hardness testing

Sueljeni spojevi < 76,1 5 % (Nosive cijevi100 %) *)
Circumferential weld seams < 76,1 % (Supporting tubes 100 %) *)
Sve ostalo 50 % **)
All other 50 % **)

Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 9 von 12
*) Opseg ispitivanja od 5% mora zahvatiti 10 zavara od svakog zavarivaa kao i
minimalno 3 zavara nakon odarivanja.
**) Kod cijevi > 114,3 mm potrebna su 3 ispitivanja po opsegu.

*) The examination scope of 5% must include 10 welds from each welder as well as
minimum 3 welds after heat treatment.
**) The examination scope includes 3 examinations at the tubes > 114,3 mm.


Ako se ispitivanje na malim cijevima izvodi pomou mobilnog ureaja za
ispitivanje tvrdoe onda se paralelno mora probni uzorak iste cijevi podvrgnuti
zavarivanju i toplinskoj obradi. Tvrdoa ovog probnog uzorka e se utvrditi u
laboratoriju i kalibrirati e se mobilni ureaj.

If the examination on small tubes is executed with a mobile device for hardness testing
then the test specimen of the same tube must be parallel subjected to welding and heat
treatment. The hardness of this test specimen will be defined in the laboratory and the
mobile device will be calibrated.

5.2.5
Sva ispitivanja se dokumentiraju a mjesta ispitivanja i vrijednosti tvrdoe se moraju
zabiljeiti na skici.
All examinations are to be documented, test point and hardness values must be
recorded in the sketch.
























Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 10 von 12

Dijagrami toplinskog procesa X10CrMoVNb91
Diagrams of thermal process X10CrMoVNb91

a) Tube wall thickness < 7.1 mm

b) Tube wall thickness > 7,1 mm






Heating rate.= Cooling rate
from / to 400C
See diagram
Preheating
150-200C
Welding
Cooing in still air
Holding
because of
RT*
PWHT
Min.holding
time 30 min.
Cooling from 400 in
still air
Time
Heating rate= Cooling rate
from / to 300C
See diagram
Welding
Cooling in still
air
Holding at 10080C
/ 2h
t<8mm min.30min.
8<t<30mm min 60min
t>30mm 2min/mm; min 2h
Time
Cooling from 300C in still
air
Preheating
150-200C
PWHT
Predgrijavanje
150-200C
Zavarivanje
Brzina zagr.= brzina ohl.
od / do 300C
Vidi dijagram

Ohlaivanje na
mirnom zraku
Zaustavljanje
zbog RT*)
Naponsko
Odarivanje
Vrijeme dranja
Ohlaivanje od 400 na
mirnom zraku.
Zaustavljanje
na 10080/2h
Predgrijavanje
150-200C
Zavarivanje
Ohlaivanje na
mirnom zraku
Brzina zagr.= brzina ohl.
od / do 400C
Vidi dijagram

Naponsko
odarivanje
min. vrijeme
dranja 30min.
Ohlaivanje od 300
na mirnom zraku.
Vrijeme
Vrijeme
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 11 von 12

Execution of thermal process X20CrMoV121

Tube wall thickness 7,1mm



































Heating rate= cooling rate
from / to 400C
See diagram
Welding
Cooling in still air
Holding
because of
RT*
PWHT
Min. holding time 30 min.
Cooling from 400 in
still air
Time
Preheating
250-300C
Brzina zagr.= brzina ohl.
od / do 400C
Vidi dijagram

Predgrijavanje
250-300C
Zavarivanje
Ohlaivanje na
mirnom zraku
Zaustavljanje
zbog RT*)
Naponsko
odarivanje
Min. dranje 30min.
Ohlaivanje od 400 na
mirnom zraku.
Vrijeme
Naziv
X20 & P91 Zavarivanje i toplinska obrada
Welding and PWHT

Slavonski Brod - CROATIA
AE&E/DD TEP- Radna norma / Instruction ADS 06.000.101
ADS 06.000.101_HE.doc Seite : 12 von 12

Tube wall thickness > 7,1mm



Maximum heating rate respectively cooling rate



Heating rate= Cooling rate
from / to 300C
See diagram
Preheating
250-300C
Welding
Cooling in still air
Holding at
120100C / 2h
PWHT
Holding time:
8<t<30mm min.60min
30<t<60mm min. 120min
t>60mm min. 180min
Cooling from 300 in
still air
Vrijeme
Predgrijavanje
250-300C
Zavarivanje
Ohlaivanje na
mirnom zraku
Zaustavljanje
na 120100/2h
Brzina zagr.= brzina ohl.
od / do 300C
Vidi dijagram

Naponsko
odarivanje
Ohlaivanje od 300 na
mirnom zraku.