0 оценок0% нашли этот документ полезным (0 голосов)
37 просмотров5 страниц
This document establishes a procedure for controlling documents at Stanzen Links. It defines document control and assigns responsibilities. The procedure involves identifying master and controlled copies, revising documents when changes occur, and recording revisions. Annexures describe the document identification system and control of external documents like standards, customer formats, and drawings. References include lists and records for managing documents and revisions.
This document establishes a procedure for controlling documents at Stanzen Links. It defines document control and assigns responsibilities. The procedure involves identifying master and controlled copies, revising documents when changes occur, and recording revisions. Annexures describe the document identification system and control of external documents like standards, customer formats, and drawings. References include lists and records for managing documents and revisions.
This document establishes a procedure for controlling documents at Stanzen Links. It defines document control and assigns responsibilities. The procedure involves identifying master and controlled copies, revising documents when changes occur, and recording revisions. Annexures describe the document identification system and control of external documents like standards, customer formats, and drawings. References include lists and records for managing documents and revisions.
DOCUMENTS Page 1 of 4 1. PURPOSE: To establish a documented procedure to define the control of documents 2. SCOPE: All the documents pertaining to the requirements of the Quality Management systems are covered under this procedure. 3. DEFINITION OF CONTROL OF DOCUMENTS: Controls established on documents to ensure the adequacy changes relevant versions legibility and identification. Also to prevent the unintended use of obsolete documents. 4. RESPONSIBILITY: Management representative is responsible for the implementation of this procedure in coordination !ith dept. heads Production "ngineering is responsible to implementation of "C# 5. PROCEDURE: 1. The document control of various documents generated $%nternal & e'ternal( is e'plained in the Anne'ure 1 ) Anne'ure * + respectively. +. All original documents are identified as MASTER $,tamped on reverse side of document in -./"(. 0. All copies issued are identified as CONTROLLED COPY $,tamped on front side of the document in 12""# ( 4. 3henever there is a revision to the documents M.2 & concerned 456 !ill ensure that the latest version of the document is made available at the place of use & reference and e'isting copies are collected and disposed. 7. Concerned 4568s are responsible for control of documents pertaining to their respective processes. 9. 5n effecting the document changes the master copy !ill be stamped as OBSOLETE $,tamped on front side of the document in 2"6( across the document and retained for future reference. :. Changes to documents are identified by concerned dept heads and communicated to the M.2. through 6ocument Change 2equest. 5n approval of document change request by M2 concerned 4568s ensures to effect changes. ;. 3henever documents are changed the revision number is gradually increased by one number and revision date is updated. <. %nitially for all the documents the revision number is == and issue number is 1. 5nce the document undergoes 1= revisions the issue number is updated. 1=. As and !hen engineering specification changes are received from the customer the same is revie!ed by the C>T !ithin t!o !or?ing !ee?s and implemented. 3here necessary process documents such are revised and implemented. "ngineering change details including the date of implementation are recorded in "ngineering change #ote $"C#(. "C#8s are maintained by Production "ngineering.
65C. 2"> 2"@. #5 & 6AT" %,,/" #5 & 6AT" P2"PA2"6 -A APP25@"6 -A STN/QSP/MR/01 STANZEN PROCEDURE FOR CONTROL OF DOCUMENTS ANNEXURE I Page + of 4 ,l.#o 6ocument %dentification ,ystem Prepared -y Approved -y %ssued -y Method 5f %ssue 2evision Control 2ecording 5f 2evisions 1 Quality ,ystem Manual "g. ,T#&Q,M&BB 3here ,T# C ,tanDen .in?s. Q,M C Quality ,ystem Manual BB C ,ection #umber M.2. M6 M.2. %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for particular page only 6etails are recorded in the 2evision ,tatus $,T#& Q,M&6( and amendment sheet $,T#& Q,M&"( of Quality ,ystem Manual. + Quality ,ystem Procedures "g. ,T#&BBB&Q,P&AA 3here ,T# C ,tanDen .in?s. BBB C 6ept code Q,P C Quality ,ystem Procedure AA C 2unning serial number 456 M2 M.2 %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for particular page only 6etails of change are recorded in the Master list of documents. 0 3or? instructions "g. ,T#&BBB&3%&AA 3here ,T# C ,tanDen .in?s. BBB C 6ept code 3% C 3or? instructions AA C 2unning serial number Core Team Member 456 M.2 %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for particular page only 6etails of change are recorded in the Master list of documents. 4 Control plans "g. CP&BB 3here CP C Control Plan BB C 2unning serial number C>T 456 P" P" %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for all pages 6etails of change are recorded in the Master list of documents. 7 >M"A "g. >M"A& BB 3here >M"A C >ailure Modes and "ffects Analysis BB C 2unning serial number C>T 456 P" P" %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for all pages 6etails of change are recorded in the Master list of documents. 65C. 2"> 2"@. #5 & 6AT" %,,/" #5 & 6AT" P2"PA2"6 -A APP25@"6 -A STN/QSP/MR/01 STANZEN LINKS PROCEDURE FOR CONTROL OF DOCUMENTS Page 0 of 4 ,l. #o 6ocument %dentification system Prepared by Approved by %ssued by Method of issue 2evision control 2ecording of revisions 9 1uidelines "g. ,T#&1.&&BB 3here ,T# C ,tanDen .in?s. 1. C 1uidelines BBC 2unning serial number Core Team Members 456 M.2. %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for particular page only 6etails of change are recorded in the Master list of documents. : >orms & >ormats "g. ,T#& BBB&> &AA 3here ,T# C ,tanDen .in?s. BBB C 6ept Code > C >orms & >ormat AA C >ormat #umber Core Team Member 456 M.2. %ssued through 6ocument %ssue 2egister. Copy identified as CONTROLLED COPY 2evisions are made as and !hen needed. 2evision no. is changed for particular page only 6etails of change are recorded in the Master list of documents. A##"B/2" * + C5#T25. 5> "BT"2#A. 65C/M"#T, ,r. #o. 6ocument 2esp /pdating Method 2evision Control %ssue Control 1. #ational & %nternational ,tandards & sanctioned interpretations of standard * %,5 &T, 19<4< & A%A1 manuals M.2. Monitoring through !ebsites of publishing agencies /pdating the list of e'ternally originated documents Copies !ill not be issued. 5riginals !ill be maintained by M2 and made accessible to process 4eads on request. +. Quality agreements & customer given formats M.2. To receive the latest from customer. /pdating the list of e'ternally originated documents Copies !ill not be issued. 5riginals !ill be maintained by M2 and made accessible to process 4eads on request. Copies of formats !ill be issued to concerned process. 0 Customer 6ra!ings P." To receive the latest from customer. /pdating the list of Customer 6ra!ings Copies !ill be issued through 6ra!ings %ssue 2egister. 5riginals !ill be maintained by P" and made accessible to process 4eads on request. 65C. 2"> 2"@. #5 & 6AT" %,,/" #5 & 6AT" P2"PA2"6 -A APP25@"6 -A STN/QSP/MR/01 STANZEN LINKS PROCEDURE FOR CONTROL OF DOCUMENTS Page 4 of 4 REFERENCE: %. Master .ist of documents %%. .ist of formats $ master inde'( %%%. 6ocument issue record %@. 6ocument revision register @. 6ocument Change 2equest @%. .ist of e'ternally originated documents @%%. .ist of Customer 6ra!ings @%%%. "ngineering Change #ote $ "C#(
65C. 2"> 2"@. #5 & 6AT" %,,/" #5 & 6AT" P2"PA2"6 -A APP25@"6 -A STN/QSP/MR/01