Project Number: 3313C Project: Yakin SPS-"D" Project

Doc. Number: CAL-YKSPSD-P-0001 Sheet:


Prepared Checked Approved
LINE NO. : 155-D-8"-PF Design Case: base case
ROUTING : SPS-"D" Well #P1/P2/P3/P4 TO 100-D-8" (Existing Yakin WB)
SERVICE : Gross Oil
DESIGN CRITERIA
1. Fluid velocity less than errosional velocity v < Ve
2. Allowable Pressure Drop DP / 100 ft psi/100 ft
Calculation input data
Gas Rate Q
G
MMSCFD 0.30 (*)
HC Liquid Rate Q
O
BPD 3000.00 (*)
Aqueous Rate Q
W
BPD 9000.00 (*)
Pressure P psig 130 (*)
Temperature T F 130 (*)
Gas Molecular Weight MW 18.14 (*)
Gas Compressibility Z 0.9788 (*)
Gas density r
G
lb/ft
3
0.4744 (*)
HC Liquid Density r
O
lb/ft
3
53.4054 (*)
Aqueous Density r
W
lb/ft
3
63.6174 (*)
Average density r
M
lb/ft
3
15.954 (*)
Gas Weight Rate W
G
lb/hr 600 (*)
Liquid Weight Rate W
L
lb/hr 171384 (*)
Gas Viscosity m
G
cp 0.0125 (*)
Liquid Viscosity m
Lhc
cp 4.0400 (*)
Aqueous Viscosity m
Laq.
cp 0.4600 (*)
Liquid Surface Tension s
L
dyne/cm 10.7100 (*)
CALCULATION
Liquid Specific gravity sg
L 0.979
Erosional Velocity Ve fps 25.036
Baker Map Factor -1 L
m
2.488
Baker Map Factor -2 f
i
5.450
Nominal Pipe Size NPS Sch Iinside Diamneter
Option 1 6 80 5.761 (*)
Option 2 8 80 7.625 (*)
Option 3 10 80 9.564 (*)
Fluid Velocity v fps
Option 1 16.54
Option 2 9.44
Option 3 6.00
Liquid weight flow rate per cross section area W
m
lb/hr.ft
2
Option 1
Option 2
Option 3
Gas weight flow rate per cross section area G lb/hr.ft
2
Option 1
Option 2
Option 3
Baker Map Y Axis
Option 1
Option 2
Option 3
Baker Map X Axis
Option 1
Option 2
Option 3
Baker Flow Regime
Option 1
Option 2
Option 3
Pressure Drop DP / 100 ft psi/100 ft
Option 1 0.05
Option 2 0.01
Option 3 0.00
SELECTED NPS inch 8 (*)
Notes:
(*) Item to be specified
Description
Gas/liquid two-phase Line Sizing Calculation
Rev Date
1893
BUBBLE
BUBBLE
1203
1333
947258
3316
540735
343704
3872.8353
3872.8353
BUBBLE
761
484
3872.8353
Hysim No.02