Project Profile:
Cascade Periodontics
Client: Kathleen Reuter
Project Address:
19797 Village Office Ct.
Bend, Oregon
Project Contractor:
Chris Harmening
Harmony Contracting

Phone: (503) 487-7476
Email:
Harmonycontracting@gmail.com

Project Architect:
Steel and Associates
Jeff Wellman
TO: Jeff Wellman, Tim Hansen, Chris Harmening, Kathleen Reuter

Hello All ~

This PDF is an update packet showing evolutions of the design as of
the date noted. If you have any questions please dont hesitate to call.

Thank you ~

Miriah ODair
Update 1- 8.13.14

Date of UPDATE: 8.9.14
Overview:
1
2
3
4
5
6
9
7
7
7
8
9
10
11
12
1. Revision of Entrance Area
2. Updated Reception Counter Design
3. Revision Lab Area
4. Elevation of Accent Feature at Waiting Area
5. ADA Bathroom
6. Meeting Room Drywall Questions?
7. Suspended Ceiling Elements with Lights & Fans
8. Add Electrical Op1/2 Cabs at Writing Area
9. Adjust and Align Closets
10. Mini Fridge in Closet for Tissue Samples
11. Reminder Reverse Osmosis Distillation System
12. Stairwall Renderings
13. Flooring Break/Material Updates
1. Rev. Entrance
1. Move Door OR Replace
Door With Window
2. Move Window To Door
Location OR Replace
Window With New Door
3. Shorten Existing Wall
4. Remove Existing Wall
5. Extend Cement Flooring
1
2
3
4
5
2. Reception Desk
1. Reception Layout
2. Copier Location (Desk Top)
3. Stereo Location
4. Remove Existing Wall & Stereo
Shelf

1
2
3
4
5
This Area Will Require Electrical For
Computers, Stereo, Scanner, Phone
Support, Fax Support, And Call
Intercom System Support

***We Will Also Need Outlets For
The Accent Salt Lamps At The Top Of
The Storage Cabinets

*Recessed Accent Can Li ght
Focused On Signage




!
! ! !
1&2 Entrance Reception 3D
1. Salt Lamps
2. Signage 3Form
3. Stereo Location
4. New View Entrance
5. Silhouette Faux Paint
Grass Image on Front of
Reception Counter
1
2
3
4
5
3. Rev. LAB
1. Remove Door
2. Extend Wall Add Door
1
2
3
4
5
This Area Will Require Electrical For
Grinders And Other Lab Equipment

We Will Also Need An Outlet For A
Water Cooler

Due To The Change In The Walls
We Will Also Be Relocating The
Main Bank Of Switches
Kathleen is planning a meeting
with the electricians to update and
review all switching placements.





!
1
2 3
4
!
4. Accent Wall Waiting Area
1. Fountain
2. Beverage Area
3. Recessed Shelves
4. Cement Accent Panel
3-8w x 8-0h
opening 1-6w x 2-6h
5. 3Form Accent Panel
5
* This Area Will Require
El ect ri cal For The Wat er
Fountain And Coffee Maker




4. Accent Wall 3D
1. Fountain With Mirror Background In Niche
2. 3Form Accent
3. Coffee Service with Recessed Shelves
4. Logo Etched Into Cement Option
5. Silhouette Faux Paint Grass Pattern
1
2
3
4
5
3
1
5. ADA Restroom
1. Scaled ADA Sink
2. Reuse Existing Toilet 27 Deep
3. In Wall Ada Trash And Paper Towel
Repurpose From Current Location: Location
3a Is The First Choice Placement 3b Is The
Second Choice Placement*
*There are 2 of these, one for this bathroom
and one for the upstairs bathroom
1
2
3a
4
5
Just a note that this space is very tight when
I scaled in an ADA Sink. Might be wise to
measure twice and frame once to be sure we
get the 5 ADA clearance circle into this
space. The trash can shown will just fit into
the area by the pump room door.





!
3b
6. Meeting Room
Jeff ~

This is a quick 3D Section
of the meeting room area
under and around the
stairs. I have some
questions about how the
drywall should finish out in
this space. Kathleen
would like to maximize
any and all options to use
the space for storage. If
you can spare me a free
moment we can meet
online and I can show you
the space vi a screen
share on my computer.
Then we can put in the
options that are available
to her as an elevation
reference for framing and
drywall.

Just gi ve me a cal l
anytime!

541.788.3841
1
2
3
4
5
!
7. Rev. Suspended Ceiling Lights
1. 6 Diameter Suspended Ceiling Element with 4
Diameter Magellan Light Fixture
2. 4 Diameter Magellan Light Fixture Ceiling Mount
3. Scaled Ceiling Fans Brewmaster 56 Diameter with
2 blades. Sorry the only Fans I have show 3 blades.
1
2
3
4
5





!
1
1
3
The ceiling fans need to mount on the beam to be level.
This gets a bit tricky when considering the supports
needed for the suspended lights. There is enough
room to do it, but it will require some careful
measurements.

I am showing the suspended ceilings at 2 thick with the
top of the ceiling level with the 8 finish height of the
walls.






7. Suspended Ceiling & Fans 3D
1
2
3
4
5
8. Rev. OP 1&2 Cabinets
1. OP 1&2 Cabinets

1
2
3
4
5

* This area is a desk area that will
need an electrical outlet either in the
floor or in the toekick of the cabinet
whichever is easiest.






!
!
!
9. Rev. Closet Walls
1. Hall Closets
1
2
3
4
5
The Closet Doors Are
Being Revised To Bifold
Style Doors
Since the swing of these
doors is no long A traffic
issue Kathleen would like
to bump the closets front
edge to the back edge of
the OP 3 exterior wall or
Exterior door frame.

!
!
!
1
10 & 11. Mini Fridge & Water Distillation
1. Mini Fridge in Closet
2. Under Sink Reverse Osmosis Water Distillation

1
2
3
4
5

* The Closet Will Need An Outlet For
The Mini Fridge That Will Store
Tissue Samples.

The Reverse Osmosis May Need
Electrical As Well? Some Systems
Do Some Dont And I Am Not Sure
About This One.





!#
!
!
12. Stair Wall Elevations
1. OP 3 Wall 8 Finish Height
2. Finish Height to Ceiling
3. 36 Balcony Finish Height
4. Bath and Laundry Room
Walls Ceiling Height
1
2
3
4
5
!
!
!
2
12. Stair Wall 3D
To help show the height transitions I used an accent paint color on the wall for the rendering. At this time paint colors have not
been selected.
1
2
3
4
5
13. Material Floor Breaks
1. 24x24 Carpet Squares
2. Cement Floor
3. 6x48 Vinyl Wood Look Strip Floor
4. Low Cost Stock Vinyl