Вы находитесь на странице: 1из 17

NEW SHIPBUILDING

PROJECT MANAGEMENT
Navgathi Marine Design & Constructions Pvt. Ltd.
ABOUT US

Three years young and growing fast

Client interest as a primar y driving force

Handling prestigious projects like VLOO

Blend of youth and experience

Focus on developing innovative solutions
WHAT WE OFFER

Concept Design of Ships

Shipyard Assessment

Contract Specification Analysis

Plan Approval

New Shipbuilding Super vision
CONCEPT DESIGN OF SHIPS

Our Design team can conceptualize Clients ideas to a design
for initial discussions
SHIPYARD ASSESSMENT
Analysis of

Shipyard facilities,

Quality standards,

Track record
CONTRACT SPECIFICATION ANALYSIS

Our Technical team, with New Shipbuilding and Operations experience,
can provide a detailed review on the contact specification
PLAN APPROVAL

Key stage in Shipbuilding where it is
possible to incorporate Client standards
in to the project

Our Technical team can execute approval
process
NEW SHIPBUILDING SUPERVISION

Site team -Site manager, Hull,
Coating, Machiner y, Electrical

Naval Architects, Welding Engineers,
M a r i n e E n g i n e e r s , C h e m i c a l
Engineers, Electrical Engineers

Nationality - Indian, Korean, or other nationality
CURRENT PROJECTS
Nine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea
Par ticulars
Length 340 m
Breadth 60 m
Depth 31 m
Draft 22.28 m
Deadweight 320,000 T
Speed 15.5 Kn
Holds Five center hold (Ore/Oil) + Ten wing tanks (Oil) + Ten wing tanks (Ballas
t)
Main Engine Hyundai War tsila 7RT-FLEX 82 T 31,640 KW @ 80 rpm
Classification LR +100A1 ORE & OIL CARRIER, ESP, SHIPRIGHT (SDA,FDA, CM), LMC, U
MS, IGS, COW, LI
CURRENT PROJECTS
Nine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea
CURRENT PROJECTS
Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea
Par ticulars
Length 186 m
Breadth 27.8 m
Depth 15.6 m
Draft 10.9 m
Deadweight 37,000 T
Speed 14.8 Kn
Holds Five center hold (Bulk) + Ten wing tanks (Ballast)
Main Engine Hyundai-B&W 6S46MC-C8 7,860 KW @ 129 rpm
Classification DNV +1A1, Bulk Carrier ESP, BC-A, Grab [20], CSR, E0, BIS, TMON,
BWM-E(S), DG-B
CURRENT PROJECTS
Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea
CURRENT PROJECTS
Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea
Par ticulars
Length 330 m
Breadth 57 m
Depth 26.5 m
Draft 18.8 m
Deadweight 2,63,000 T
Speed 14.9 Kn
Holds Five center hold (Bulk) + Ten wing tanks (Ballast)
Main Engine Hyundai-War tsila 6RT FLEX 82T 27,120 KW @ 80 rpm
Classification LR +100A1, ORE CARRIER, ESP, SHIP RIGHT (SDA, FDA, CM), ACS(B), L
1, IWS, LMC, UMS
CURRENT PROJECTS
Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea
PROJECTS STARTING NEXT YEAR
Two 80,000 TDW Bulk Carrier at Sungdong Shipyard, S.Korea
CONTACT
Navgathi Marine Design & Constructions Pvt.
E: nav@navgathi.com
W: www.navgathi.com
III/131, Kalamasser y,
Kochi - 683104
India
T: +91-484-6492607, F: +91-484-2543609
P.K. Mohammad
E: mohammad@navgathi.com
M: +91-9497793296
TMT Site Office, Hyundai Heavy Industries,
Ulsan - 682792
S.Korea
T: +82-52-250-6730
Sandith Thandasherr y
E: sandith@navgathi.com
M: +82-1091450692

Вам также может понравиться