Pre-Start Checklist - Hot Water Boiler

System:____________________/Tab:3.___
Project Name:
Project Number:
!tro"uctio!:
This form is to be completed by the contractor, his subcontractors and/ or vendors at earliest possible point
in the progress of the project. Deviations and defects should be noted at the end of each section.
#e!eral $ata:
Reference No./ Location:
Nameplate Data is complete and legible !record":
#oiler complies $ith approved shop dra$ings
#oiler location matches coordination dra$ing location.
#oiler is set in place, and installed per manufacturer%s directions
&'eneral (ommissioning (hec)list& has been completed in so far as is possible for this system.
!stallatio! %ea"i!ess:
'as piping is complete, including all vents piped to outside, all pressure testing complete
'as *ressure at gas train regulator inlet meets manufacturer re+uirements !record the follo$ing"
Re+uired pressure at gas train inlet ,ctual pressure at gas train inlet
*ressure at inlet to building regulator *ressure at outlet from building regulator
(old $ater piping is complete, pressure tested, flushed, from source to -.- /ystem.
.ater /oftener has been successfully started, is filled $ith salt, and has been regenerated.
-.- piping and all accessories is complete and ready!e0pansion tan), relief valves, air separator"
1nitial flush of -.- is complete
*ressure testing is complete
-.- *umps have been successfully started.
Temporary strainers has been installed on boiler inlet.
-.- system has been filled $ith !chec) one"
2inal fill $ater 3 all cleaning and flushing is complete.
.ater for cleaning 3 cleaning to be done after boiler has started.
40haust stac) is complete, including termination above roof, flashing at roof
4lectrical *o$er and (ontrol $iring is complete and ready
*o$er to #oiler control panel
*o$er to 2orced draft fan
1nterloc) $iring is complete to a+uastats and safeties
DD( (ontrols have been terminated and are ready to test.
Start-&' Coor"i!atio!:
(ommissioning 4ngineer, 5tilities Department, *roject 4ngineer, 'eneral (ontractor and all
re+uired sub3contractors have been contacted, and notified of planned start3up date.
2a0 /tart3up Notification to (ommissioner 67 -ours prior to planned start3up.
8anufacturer%s pre3start chec)list has been completed !attach"
/tart3up scheduled for:, to be conducted by:
Com'lete" by:_______________________ Com'a!y: ____________ $ate:_____________
5niversity of 8ichigan
2acilities *lanning and Design
2acilities 4valuation and (ommissioning