This document provides a table of contents for a project report on the IDEO Wutthakat building. The report will discuss the building concept, design, structural system, materials used, precast production, erection, connections, mechanical/electrical/plumbing systems, safety plans, drafting documents, evaluations, problems encountered, and recommendations for improvement. The report is divided into 13 sections covering these topics in detail with input from various parties involved in the project.
This document provides a table of contents for a project report on the IDEO Wutthakat building. The report will discuss the building concept, design, structural system, materials used, precast production, erection, connections, mechanical/electrical/plumbing systems, safety plans, drafting documents, evaluations, problems encountered, and recommendations for improvement. The report is divided into 13 sections covering these topics in detail with input from various parties involved in the project.
This document provides a table of contents for a project report on the IDEO Wutthakat building. The report will discuss the building concept, design, structural system, materials used, precast production, erection, connections, mechanical/electrical/plumbing systems, safety plans, drafting documents, evaluations, problems encountered, and recommendations for improvement. The report is divided into 13 sections covering these topics in detail with input from various parties involved in the project.
1.1.3. Cost & Budget Construction cost, design fee, special consultant fee
1.1.4. Precast concrete No. of precast member 1.2. Project development Conventional to Precast concrete, why & how?
1.3. Site Environment Nearby location, canal, temple, infrastructure, Road
1.4. Construction schedule Start, finish, master plan 2. Structural Design BE1TECH Design report 2.1. Structural system 2.1.1. Gravity system Foundation, column, wall, slab 2.1.2. Lateral system Shear wall Lift core, stair core etc. 2.1.3. Structural response 1 st , 2 nd , 3 rd Mode 2.1.4. Loading criteria Seismic, Wind, Live load, Superimposed, Partition
3. Architectural Design PLAN/ANANDA Design report 3.1. Design consideration 3.2. Room type Type 1, 2, 3 3.3. Parking Layout 4. Material HELIX/GEL 4.1. Concrete Strength, age, slump, slab, wall, post- tension slab, transfer floor, foundation
4.2. Reinforcement Steel reinforcement, strength 4.3. Grouting 4.4. Mechanical splice 4.5. Cement padding 4.6. Post-install system 4.7. Sealant 4.8. Water proofing 5. Precast Production GEL 5.1. About GEL GEL company 5.2. Plant layout Stock yard, construction, curing etc. 5.3. Production line 5.4. Production capacity 5.5. Quality control 5.6. Product tolerance 5.7. Mock up 5.8. Transportation 6. Erection HELIX 6.1. Planning Erection planning, team set-up, floor sequence
6.2. Quality control Pre-erection/post-erection 6.3. Erection tolerance 6.4. Erection time Wall, slab, shear wall, faade 6.5. Machine & equipment Which machine, How 6.6. Labour Team member 6.7. Yarding & storage 6.8. Site traffic 7. Precast Connection HELIX 7.1. Type 7.2. Installation method 7.3. Installation time 8. MEP System MINERVA 8.1. Electrical 8.2. Sanitary 8.3. Mechanical 8.4. Ventilation & Aircondition 8.5. OTTV RTTV 9. Safety HELIX 9.1. Safety plan & protocol 9.2. Equipment Crane, Rigging 9.3. Fall protection 10. Drafting MINERVA/HELIX/ GEL
10.1. Shop drawing 10.2. Production drawing 10.3. Erection drawing 11. Project evaluation MINERVA/ANANDA 11.1. Conventional VS Precast Cost, time, quality 11.2. Structural point of view 11.3. Architectural point of view 12. Problem & solution Problem and solution in construction MINERVA 12.1. Structural 12.2. Architectural 12.3. MEP 13. Observation and Recommendation How can we improve the product? Design, Construction, Cost, Time THANIT