Вы находитесь на странице: 1из 5

Circle UPW(SRINAGAR)

Strategic Partner BHARTI


Date of Installation
14-Mar-14
Date of Integration
19-Mar-14
Date of Commissioning
19-Mar-14
Site Name KIRTINAGAR
Airtel 2G Site ID KRTI01
Airtel 3G Site ID UKRTI01
Tower company Site ID
SACFA ID
Site Lat/Long 30.21456/78.76992
UMTS Band for Node B 2100 MHZ
Type (GBT/RTT/RTP/IBS) RTT
Type of Node B (HSPA / MIMO ) HSPA
Name of Infra Provider (Tower Company) Indus
Anchor Operator
Sharing Opco 1
Sharing Opco 2
Sharing Opco 3
Sharing Opco 4
Infra Shared(Tower / DG / Shelter / AC / AC Mains /
DC Btys etc)
YES
Sites Layout Attached YES
Acceptance KPI Attached YES
Standared Node AT Documents attached YES
Site Photographs for RF & EMF Attached YES
EMF Compliance Format Attached YES
Site Address
City KIRTINAGAR
Site Owner Details
Name
Address
Mobile Numbers :
Landline Number (R) :
Landline Number (O) :
Mob Number Mob Number
Name Name
Date : Date :
MAIN BZR,KIRTI NGR,DEOPRAYAG,TEHRI
GARWAWL,UP(W
Site Data & Test Report-Node B New Site
Sign Sign
Signoff :
Project Manager ( Airtel ) Project Manager (SP)
241982862.xls.ms_office
1
2
3
6
Sector 1 OFC
Sector 2 OFC
Sector 3 OFC
Sector 1
Sector 2
Sector 3
Sector 1
Sector 2
Sector 3
11
12
Up Link (UL)
Down Link (DL)
14
SIM Number
Video Call
AMR Speech
Service test
PS Service test
SMS Service test
Sector 4
Planned Actual Planned Actual Planned Actual Planned
DB DB DB DB DB DB
NA NA NA NA NA NA
1 1 1 1 1 1
31 31 22 22 31 31
330 330 120 120 250 250
0 0 1 1 0 0
1 1 3 3 1 1
NA NA NA NA NA NA
43 43 43 43 43 43
Sector/ Cell Feeder Type Feeder Length (m)
Measured
VSWR
Test Pass /
Fail
Sector 1
Sector 2
Sector 3
Sector 4
For Node B Cabinet
For all Cables &
Accessories
For UMTS Antenns
For TMA's
For Indoor Unit
For Outdoor Unit
20 Earthing check for 3G equipment
To be checked on IGB
and OGB
Method Adopted
Compliance (Yes/No)
22 Wiring Diagram Enclosed Yes/No
Yes/No Yes/No Yes/No
DNP
DNP
DNP
DNP
DNP
DNP
DNP
24 Attach Prediction Plots (Annexure 1) Yes/No
25
Attach Drive Test Plots and Stats -
RSCP, Ec/Io, Active Set Count, UE Tx
Yes/No
26 Attach Walk Test Report for IBS Yes/No
27
Coverage Certified to be in line with
Prediction
Yes/No
Date :
Mobile Number:
Node B Product Type (Configuration) -
Node B Hardware Details
RRU
Longitude :
Feeder Cable Type
Feeder Cable Length
Base Unit (Model No)
Tower Unit (Model No)
Site Address:
Region and Circle:
Power Output
Antenna Height (AGL)
Site ID:
Site Name:
KRTI01
KIRTINAGAR
UMTS Cable Return loss, Cable Loss &
VSWR Measurements :
No of HSPA Codes
TMA
UMTS Antenna Type
Azimuth
Model
Pass
Antenna Type ( Part Code )
Service Test
19
21
4
5
7
8
18
17
NO
NO
NO
NO
KIRTINAGAR
NO
NO
NO
23
TMA Alarm
Alternator fault
YES
Node B Alarm Verification
EMF Testing
S.No
KRTI01
MAIN BZR,KIRTI NGR,DEOPRAYAG,TEHRI GARWAWL,UP(W
Node B
Activity Planned Actual Remarks
NO
YES
NO
OK/Not OK- (Visual check)
Project Manager (SP)
Signoff :
Labelling done for All Node B and TX
equipments Installed
YES
LLOP
DG Fails to Stop
Mention Yes / No
Node B Material Check List Attached
Pass
Number of Channel Elements (CE's)
9
10
13
16
15
43
Serial Number
NO
NO
NO
NA
43
43
43
NA
NA
43
Item List Sector 3
8171014349
NO
Phone Number
Project Manager ( Airtel )
Antenna System Details
Test Handset Details
Antenna Quantity
Pass
Sector 1 Sector 2
NA
W995
To be Given within one 7 days of Site RFS
To be Given within one 7 days of Site RFS
To be Given within one 7 days of Site RFS
DG Common Fault (due to)
Soft copy along with candidate to be given by D&P
78.74992
NO
NO
NA
Mobile Number:
Electrical Downtilt
LWL
PIU Battery Low
V-Belt Failure
HCT/HWT
NO
OFC
OFC
NA
Latitude :
TX Power ( On Top of BTS Cabinet )
Mechanical Downtilt
Telecom Material Check List verified against planned Material
(Please attach the List )
UPW,DEHRADUN
RRU
30.21456 30.21456
OFC
78.74992
43
NA
241982862.xls.ms_office
Cell ID:
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
27

72 75
28
ok
Date:
Remarks (Comments):
6 OK
OK OK OK
OK
Jitter 4 29
25
3G to 3G
OK 63
SP Signature Bharti Signature:
5
Maximum Latency
OK
62
Handover 24
26
Handover Function
OK
2G to 3G and 3G to 2G
OK
Average Latency 60
YES YES
70

OK
HSUPA Setup Success/Failure
yes
yes
OK
HSUPA Throughput
PS
17
23 R99 Throughput (UL)
HSDPA Throughput
19 HSDPA Setup Success/Failure
20
22
18
1.8MBPS OK 1.5MBPS
134KBPS OK
1.3MBPS
134KBPS 134KBPS
YES
134KBPS
yes
OK
3.5mbps 3.7mbps
yes
OK 21 R99 Throughput (DL) 134KBPS
3.3mbps OK
yes
134KBPS
OK YES
yes
OK
OK yes
yes
YES
yes
16 Video Call Setup Success/Failure (MT)
R99 PS Setup Success/Failure
YES
15 Voice Call Setup Success/Failure (MT) YES YES
yes 14 Video Call Setup Success /Failure(MO)
OK
OK
OK
OK
OK
OK yes
yes
YES
yes
yes
43
-2
yes
-2
-63
35
Connection
13 Voice Call Setup Success/Failure (MO)
-59
14
13 RSCP(nearby site)
MCC
10757
12
Ec/Io(nearby site)
PSC
10
97
9 LAC
RAC
11 ARFCN
404
97 97
10757 10757
3210
404 404
10 10
10757 10757
97
10757
Idle
8
7 MNC 404 404
3210 3210 3210
-60
-2.5
27
10
OK
OK
OK
Check
404
3210 3210 OK
97 97 OK
plan plan Check Check plan
cell 1
KIRTINAGAR
UWRDN01
24556, 24557, 24558
Last Drive Performed:
Remarks result cell 2 cell 3 No. Activity/Process
New Site:
Site Name: Site ID: KRTI01
Single Cell Function Test (SCFT)
Site Connected to RNC:
Others:

Вам также может понравиться