LTE Cluster Optimization Report
2/4/2013
LTE Cluster C08
Mohammed Shashieh
Cluster No Total Planned Sites Sites integrated
Cluster 08 8 5
eNodeB ID Site Name Cluster Cell ID TAC PCI DL EARFCN
10026 LMU0026 LTE cluster C08 0 5 75 1525
10026 LMU0026 LTE cluster C08 1 5 76 1525
10026 LMU0026 LTE cluster C08 2 5 77 1525
10027 LMU0027 LTE cluster C08 0 5 72 1525
10027 LMU0027 LTE cluster C08 1 5 73 1525
10027 LMU0027 LTE cluster C08 2 5 74 1525
10037 LMU0037 LTE cluster C08 0 5 66 1525
10037 LMU0037 LTE cluster C08 1 5 67 1525
10037 LMU0037 LTE cluster C08 2 5 68 1525
10394 LMU0394 LTE cluster C08 0 5 78 1525
10394 LMU0394 LTE cluster C08 1 5 79 1525
10394 LMU0394 LTE cluster C08 2 5 80 1525
10731 LMU0731 LTE cluster C08 0 5 219 1525
10731 LMU0731 LTE cluster C08 1 5 220 1525
10731 LMU0731 LTE cluster C08 2 5 221 1525
Cell Data and Cluster Map
Sites on-aired
5
Percentage w.r.t total planned sites
62.50
Bandwidth Azimuth Longitude Latitude Remark
15M 60 23.629 58.501 commissioned
15M 180 23.629 58.501 commissioned
15M 300 23.629 58.501 commissioned
15M 80 23.6236 58.4927 commissioned
15M 160 23.6236 58.4927 commissioned
15M 300 23.6236 58.4927 commissioned
15M 60 23.6198 58.5023 commissioned
15M 180 23.6198 58.5023 commissioned
15M 300 23.6198 58.5023 commissioned
15M 60 23.6279 58.4865 commissioned
15M 180 23.6279 58.4865 commissioned
15M 320 23.6279 58.4865 commissioned
15M 60 23.63094 58.4935 commissioned
15M 180 23.63094 58.4935 commissioned
15M 300 23.63094 58.4935 commissioned
Cell Data and Cluster Map
Percentage w.r.t total planned sites
62.50
Topic
Drive Test Results - Distribution Graphs
Cluster PCI
Distribution
Cluster DL RSRP
Distribution
Cluster DL SINR
Distribution
Cluster DL SINR
Distribution
Cluster Test Result
Drive Test Results - Distribution Graphs
SINR
%
30.3
75.93
92.47
Throughput(SINR>0dB)
Max (aveg)
96.773
Average (aveg)
36.963
Quality Test
Sample Count
SINR => 17
SINR= > 5
SINR => -3
Inter RAT Redirection
Suc 0 IRAT Statistics:-
Succea
No. Longitude Latitude
1 58.131355 23.67402
2 58.131534 23.67394
3 58.130428 23.67474
4 58.131164 23.67422
5 58.125143 23.67232
6 58.125183 23.67246
7 58.128168 23.67457
8 58.12835 23.67459
9 58.146048 23.65855
10 58.145595 23.65889
11 58.141783 23.63654
12 58.141706 23.63594
13 58.16785 23.65478
14 58.168189 23.65502
15 58.157332 23.66718
16 58.157044 23.66729
17 58.139785 23.67904
18 58.139785 23.67907
19 58.130015 23.67778
20 58.129817 23.67783
21 58.104229 23.68224
22 58.10428 23.68223
23 58.119151 23.64931
24 58.118983 23.64924
25 58.114625 23.63655
26 58.114572 23.6364
27 58.120279 23.63754
28 58.120622 23.63751
29 58.124323 23.64018
30 58.124645 23.64006
31 58.122315 23.64505
32 58.122391 23.64504
33 58.117056 23.64627
34 58.116893 23.64634
35 58.112164 23.6451
36 58.112318 23.64503
37 58.110781 23.64517
38 58.110742 23.64509
39 58.105445 23.65818
40 58.105254 23.65825
41 58.100486 23.65706
42 58.100488 23.65721
43 58.10228 23.65433
44 58.10207 23.65445
LTE Inter RAT Redirection
45 58.101878 23.64395
46 58.1019 23.64345
47 58.097281 23.66418
48 58.09699 23.66429
49 58.150081 23.66958
50 58.150394 23.66944
IRAT Attempt:-
IRAT Success:-
LTE Inter RAT Redirection
LTE Inter RAT Redirection
Over Shoot Analysis
1
2
3
Issue Description and
Analysis
Events distributions
1.Here the target area
encouters a weak SINR
and due to that it is jointion
of several cell edges. 2
cells overshoots here,
namely LMU0041A and
LMU0230A. Need to down
tilt down by 2 degrees and
4 degrees.
And by launch, there will
intergrate a new site
LMU0004, which will
improve the SINR.
2. Similar situation as
abrove. And there is no
domainate cell. LMU0394B
needs tilting up from 8
degrees to 5 degrees.
By launch, there is another
new site LMU0393 at the
marked place.
3.LMU0039A needs tilting
down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.
3
4
5
6
3.LMU0039A needs tilting
down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.
4.LMU0030A_PCI0 is
overshooting all over
cluster 08. suggested tilting
down by 4 degrees.
5.LMU0184A_PCI0 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
7
8
9
6
7.LMU0018A_PCI45 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
8.LMU0018B_PCI46 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
13
9
10
11
12
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
10.LMU0040A_PCI53 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
11.LMU0029A_PCI54 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
12.LMU0029B_PCI55 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
13
14
15
16
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
14.LMU0039C_PCI59 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
15.LMU0027C_PCI74 is
overshooting all over
nearby sites. suggested
tilting down by 2
degrees.
16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
19
20
16
17
18
19.LMU0394A_PCI78 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.
16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
17.LMU0026B_PCI76 is
overshooting all over
nearby sites. suggested
tilting down by 4
degrees.
18.LMU0026C_PCI77 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
20
20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.
Suggesti
ons
Over Shoot Analysis
as analysis
as analysis
Remark
Issue Description and
Analysis
as analysis 1.Here the target area
encouters a weak SINR
and due to that it is jointion
of several cell edges. 2
cells overshoots here,
namely LMU0041A and
LMU0230A. Need to down
tilt down by 2 degrees and
4 degrees.
And by launch, there will
intergrate a new site
LMU0004, which will
improve the SINR.
2. Similar situation as
abrove. And there is no
domainate cell. LMU0394B
needs tilting up from 8
degrees to 5 degrees.
By launch, there is another
new site LMU0393 at the
marked place.
3.LMU0039A needs tilting
down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.
as analysis
as analysis
as analysis
as analysis
3.LMU0039A needs tilting
down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.
4.LMU0030A_PCI0 is
overshooting all over
cluster 08. suggested tilting
down by 4 degrees.
5.LMU0184A_PCI0 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
as analysis
as analysis
as analysis
as analysis 7.LMU0018A_PCI45 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
8.LMU0018B_PCI46 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
as analysis
as analysis
as analysis
as analysis
as analysis
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
10.LMU0040A_PCI53 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
11.LMU0029A_PCI54 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
12.LMU0029B_PCI55 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
as analysis
as analysis
as analysis
as analysis
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
14.LMU0039C_PCI59 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
15.LMU0027C_PCI74 is
overshooting all over
nearby sites. suggested
tilting down by 2
degrees.
16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
as analysis
as analysis
as analysis
as analysis
as analysis
19.LMU0394A_PCI78 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.
16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
17.LMU0026B_PCI76 is
overshooting all over
nearby sites. suggested
tilting down by 4
degrees.
18.LMU0026C_PCI77 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
as analysis 20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.
242074968.xlsx.ms_office
No. Cata. Events distributions
Mobiltiy No Issue Found
Accessibilty No Issue Found
Retainability No Issue Found
Abnormal Events Analysis
8/24/2014 , 3135
242074968.xlsx.ms_office
Suggestions Remark
Abnormal Events Analysis
Issue Description and Analysis
8/24/2014 , 3235
242074968.xlsx.ms_office
Target Value Optimization Result
95.00% 100.00%
98.00% 100.00%
36.963mbps
IRAT handover success rate to
3G(If Availiable)
DL Single User average
S1/X2 Handover Failure Rate
S1/X2 Handover Interruption
Time, intra-eNBC-Plane
IRAT handover success rate to
3G
Intra Frequency Handover
Success Rate
C-Plane Latency Intra frequency
HO
C-Plane Latency Intra frequency
HO
Service Request Delay
ERAB Establishment Success
Rate
E-RAB PS Drop Rate
Access RACH Latency
RLC ARQ/HARQ
Retransmission Rate
DriveTest KPI
RRC Connection Establishment
Success Rate
Attach Failure Rate
Item
Service Request Failure Rate
8/24/2014 , 3335
242074968.xlsx.ms_office
Formula
RRC Connection Establishment Success Rate = Number of RRC Connection
Establishment Success / Number of RRC Connection Establishment Attempt * 100%
Attach failure Rate = 1- Number of LTE Attach Complete/ Number of LTE Attach
Request
Service Request Failure Rate = 1-RRC setup success rate*ERAB setup success
rate(%)
Service Request Delay = T(RRCRecfgComplete)-
T(RRCConnectionRequest);excluded the Service request failure delay
*Exclude the unreasonable latency due to service request not finished but reselect to
other cells
ERAB Establishment Success Rate = Number of ERAB Establishment Success /
Number of ERAB Establishment Attempt * 100%
Call drop rate = Number of E-RAB Abnormal Release / Number of E-RAB Setup
Success * 100%
DT Tool cannot measure this value as it is layer-2 measurement. But this procedure
included in idle to Active and Handover.
Result evaluation: Average rudimental BLER recorded in Probe and Assistant
Handover Successful Rate = Number of Intra Freq Handover Success / (Number of
Intra Freq Handover Success + Number of Intra Freq HO Failure) * 100%;
C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)
IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/
(LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail Counter)*100%
Handover Successful Rate = Number of Intra Freq Handover Success / (Number of
Intra Freq Handover Success + Number of Intra Freq HO Failure) * 100%;
C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)
C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)
IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/
(LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail Counter)*100%
DriveTest KPI
8/24/2014 , 3435
Equipment
Type Test Equipment
Test Setup
Test Type Long call
Genex Assitant V3.5
LTE Terminal
Data Collection Software
Data Analysis Software
Huawei E392u-12
Genex Probe V3.5

Вам также может понравиться