MINISTRYOFRAILWAYS
RAILWAYSBOARD
No.2013/WI/Genl./0/30ptII NewDelhidtd.1862013
TheGeneralManagers,
AllIndianRailways.
Sub: Elimination of Level Crossings from New Line, Gauge Conversion and
DoublingProjects.
Ref:RailwayBoardsletter2006/CEIV/LX/WP/1dated09/01/2012.
It has been observed that Railways are finalizing LSection of the project
with primary objective of eliminating the level crossings which has resulted in
astronomicalincreaseinthecostoftheprojectonaccountofincreaseinareasof
land to be acquired, quantity of earthwork, increase in barrel of the bridges etc.
Given the current financial crunch which Indian Railways is facing it has become
imperativetogiveprimacytoeconomyofcostofconstruction.
Inviewoftheabove,followingguidelinesshouldbefollowed:
ThisissueswiththeapprovalofBoard(ME)
AnjumPervez
ExecutiveDirector(Proj.Mon.)
Copyto/1)CAO/Construction,AllIndianRailways.
2)MD/RVNL