Вы находитесь на странице: 1из 14

Summary Bill Group

AMOUNT I N USD
Bill 1 General 0.00
Bill 2 Site Clearance 0.00
Bill 3 Drainage 0.00
Bill 4 Earthworks 0.00
Bill 5 Gravel Wearing Course 0.00
Bill 8 Structures 0.00
Bill 9 Ancillary 0.00
0.00
PS Provisional sum (Insurance ) 18,000.00
Bill 10 Dayworks 0.00
18,000.00
0.00
18,000.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Grand Total
Subtotal
Grand total for bill items
Contingency - 2.5% [to beexpended in wholeor in
part
at thediscretion of theEngineer]
Summary of Estimated Construction Cost
Rate Amount
USD USD
1000 GENERAL
12
1200 GENERAL REQUIREMENTS AND PROVISIONS
12.01
Provision, erection, maintenance and removal of project sign
board as indicated in the drawing or instructed by the
Engineer.
No
2 0.00
1300 CONTRACTOR'S ESTABLISHMENT ON SITE
13.01
The contractor's general obligations for all charges in respect
of the establishment of the contractor's organization, camps,
equipment ,personnel, contractors laboratory, accommodation
and construction plant on the site, and their removal on
completion of the contract, and also the financing costs,
risks, legal,security arrangemnts and contractual obligations
and general items of cost not covered elsewhere
L.S
1 0.00
16
1600 ENVIRONMENTAL PROTECTION AND
MITIGATION MEASURES
16.01
Environmental Protection and Mitigation Measures
LS
1 0.00
TOTAL FOR BILL 1, 1000 GENERAL PROVISIONS 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 1,General Provisions
Bill 1,General Provisions
Qty.
Rate Amount
USD USD
2000 SITE CLEARANCE
21
2100: CLEARING AND GRUBBING
21.01
Clearing and grubbing ha 8 0.00
21.02
Removal and grubbing of large trees and tree stumps
(a) Girth exceeding 1.0 m up to and including 2 m No. 385 0.00
(b) Girth exceeding 2 m up to and including 3m No. 150 0.00
(c) Girth exceeding 3 m and more No. 30 0.00
TOTAL FOR BILL 2, 2000 Site Clearance (carried to
summary)
0.00
Description
Bill 2, Site Clearance
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Unit
Yambio-Nabiapai
Qty.
Bill 2, Site Clearance
Pay Item
No.
Rate Amount
USD USD
3000: DRAINAGE
31
3100: DRAINS
31.01 Excavation for open drains
(a) Common/normal and intermediate excavation or shaping of open drains (intercepting
ditches, turn-outs, culvert in-/outlet drains, etc.) in all typeof soil material of all class within
any depth rates below the surface level, loading and hauling, and re-use in embankments incl.
spreading, shaping and compaction to 95% of modified AASHTO density including all lead
and lift within the project.
M
3
8,500 0
32
3200: CULVERTS AND APPURTENANT STRUCTURES
32.01
Common/normal and intermediate excavation of trench within any depth rates below the
surface level for foundation at new pipe culvert location or for replacement of existing culvert
and for inlet and outlet structures incl. trimming/compaction of bottom of excavation, backfill
with suitable material from the excavation and compaction, disposal of surplus and unsuitable
material.
M
3
230 0.00
32.02
Provide approved material for backfill at culvert location and compact incl.
trimming/compaction of bottom of excavation.
(a) Using the excavated material
M
216 0.00
(b) Using imported selected material M 505 0.00
32.03
supply, Installation, and placement of precast reinforced concrete pipe culvert 900mm
diameter, with details shown on the drawings
M
84 0.00
32.05 Provide and construct apron/slab with cut-off wall (toe wall), and head and wing walls at box
culverts and slab culvert including all ancillary works:
(a) Concrete Class 30/20 for apron/slab and cut-off wall (toe wall);
M3
10 0.00
(b) High yield reinforcement steel for apron/slab and cut-off wall (toe wall) (Grade 60)
t
1 0.00
(c) Cement-mortared (1:3) mediumpointed Class A stone masonry for head and wing walls of
slab culvert and/or drifts
M3
20 0.00
34
3400: Pitching, Stonework, And Erosion Protection
34.01
Provide and construct cement-mortared 1:4 fine pointed Class A stone masonry for cascades,
inlet and outlet structures for concrete pipe culverts, and where instructed including
foundation and all ancillary works
M
108 0.00
TOTAL FOR BILL 3, 3000 DRAINAGE (carried to summary) 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 3, Drainage
Bill 3, Drainage
Qty.
Rate Amount
USD USD
4000 EARTHWORKS
41.04
Removal of unsuitable (unstable) material in roadbed to any depth as
instructed by the Engineer incl. loading, hauling, deposit, spreading,
etc., and provision, placing and compaction of approved material for
backfill.
M
7,000 0.00
43 4300: Borrow Materials
43.01
Embankment Fill of approved Borrow material with all lift and free
haul within the project, all complete.
M
10,500 0.00
TOTAL FOR BILL 4, 4000 EARTHWORKS
0.00
Bill 4, Earthworks
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 4, Earthworks
Pay Item
No.
Description Unit
Yambio-Nabiapai
Qty.
Rate Amount
USD USD
54
5400: GRAVEL WEARING COURSE
54.01
Gravel Wearing Course of approved material all complete, compacted
to 98% of AASTHO modified density as specified in Job Specific
Technical Specification. M 10,500 0.00
TOTAL FOR BILL 5 (carried to summary)
0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 5, Gravel Wearing Course
Bill 5, Road Base/Base course and Sub base
Qty.
Item Description Unit
Rate
USD
Quantity
Amount
USD
Division 8100
Structure Excavation
81.02 (a)
Excavation of all type of soil material required for the
foundation of structure, and for the portion of existing
structure to be demolished, extended or modified
including backfilling with approved local materials all
complete in layers of 150 mm or as instructed by the
Engineer. cu. m. 150.00 0.00
Division 8300
83.01
Supply, installation and placement of reinforcing steel
bars, Grade 60 for concrete structures as shown in
drawings which shall confirms to the requirements of
AASHTO M31 (ASTM A615) ton 0.50 0.00
Division 8400
84.01 (a)
Class 30/20 cast in situ reinforced concrete works for
slab bridges/culverts as per dimensions shown in
drawings and in accordance with the provisions of series
8000 of the specification and special provisions to
specification. cu. m. 10.00 0.00
89.01
Provide and construct cement-mortared (1:4) fine pointed
Class A stone masonry for abutment and wing walls of
major structures cu. m. 10.00 0.00
Provide and place hand laid rock to 0.30m behind
abutment and wing walls cu. m. 10.00 0.00
Total Bill No :8 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill 8: Structures
For UNOPS
Project Engineer:
Project Manager

Page No.(9)
Quantity Surveyor:
Project Manager:
Rate Amount
USD USD
9000 ANCILLARY WORKS
91 GABIONS
91.01
Delivery, assembly, installation and rock filling of Standard sized Gabion Boxes, including the preparation of
the foundation and surface for bedding, as per standard specifications or instruction from the Engineer. M 10 0
9400: ROAD SIGNS
94.01
Provide and erect where shown on Drawings and/or where instructed new galvanized steel plate road signs of
high intensity grade reflective sheeting on standard single reinforced concrete sign posts (alternatively hot dip
galvanized steel pipe with internal diameter of 75mm can be used for the sign post)
(a) triangular type, 900mm equilateral No 5 0
(b) circular type, 600mm diameter. No 3 0
TOTAL FOR BILL 9, 9000 ANCILLARY WORKS
0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 9, Ancillary Works
Bill 9, Ancillary Works
Qty.
SCHEDULE OF DAYWORK RATES.10.1 LABOUR
10.1.A Headman (Forman/Engineer) hr
10.1.B Headman (Skilled labour) hr
10.1.C
Labourer
hr
10.1.D Driver (light duty) hr
10.1.E Driver (Heavy duty) hr
10.1.F Mason hr
10.1.G
Carpenter
hr
10.1.H
Steel Fixer
hr
10.1.I Welder hr
10.1.J Electrician hr
10.1.K Mechanic hr
10.1.L Watchman hr
10.1.M Surveyor hr
10.1.N Surveying Assistant hr
10.1.M Equipment Operator (Skilled) hr
10.1.N Equipment Operator (Semi-Skilled) hr
SCHEDULE OF DAYWORK RATES.10.2 MATERIALS
10.2.A Cement,Ordinary Portland (or equivalent in bags) t
10.2.B
Coarse aggregate for concrete m
3
10.2.D Plywood 6mm No.
10.2.E
Sand m
3
10.2.F
Stone m
3
SCHEDULE OF DAYWORK RATES.10.3 CONSTRUCTION
PLANT
10.3.A
Crawler Loader 1.5m
3
hr
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.2 DAYWORK MATERIALS (Carried to Daywork Summary)
Dayworks
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.1 DAYWORK LABOUR (Carried to Daywork Summary)
10.2.C Mild Steel reinforcement bars Grade 60 (various sizes) t
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Dayworks
Pay Item
No.
Description Unit
10.3.B
Dumper Truck 5m
3
hr
10.3.C
Dumper Truck 8m
3
hr
10.3.D Site Dumper hr
10.3.E Crawler Dozer with ripper 120 kw hr
10.3.F Crawler Dozer with ripper 200 kw hr
10.3.G Motor Grader any capacity hr
10.3.H Water Tanker 5000 literes hr
10.3.I Wheeled Loader/Backhoe hr
10.3.J Concrete Mixer 10/17t hr
10.3.K Power Generator 40 KVA hr
10.3.L Welding Set (500 amp) hr
10.3.M Water Pump (50 to 100mm) hr
10.3.N Crane Mounted Truck (11/2 t) hr
10.3.O Manually Operated Compactor hr
10.3.P Concrete Vibrator (Pocker) hr
10.3.Q 4-WD Pick-up hr
10.3.R Vibrating Roller hr
10.3.S Tractor hr
10.3.T Hydraulic Excavator (Tracked) 10-20 t hr
10.3.U Hydraulic Excavator (Tracked) 20-30 t hr
TOTAL For Daywork (Provisional Sum)
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.2 DAYWORK Plants
Rate Amount
USD USD
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
Sub-Total 0.00
15.00%
0.00
1 0.00
8 0.00
5 0.00
15 0.00
15 0.00
Sub-Total
0.00
15.00%
0.00
8 0.00
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.2 DAYWORK MATERIALS (Carried to Daywork Summary)
Dayworks
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.1 DAYWORK LABOUR (Carried to Daywork Summary)
1 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Dayworks
Works Contract
Qty.
8 0.00
8 0.00
4 0.00
4 0.00
4 0.00
8 0.00
8 0.00
8 0.00
4 0.00
8 0.00
4 0.00
8 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
Sub-Total
0.00
15.00%
0.00
0.00
TOTAL For Daywork (Provisional Sum)
Allow Percentage of sub-total for Contractor's Overheads,Profit,etc (15%).
TOTAL 10.2 DAYWORK Plants
Item Unit Rate
No (USD)
Provisional Sum Items
PS 1 Insurances Provisional Sum 1
Provisional Sum Items - PS1
Rehabilitation of Yambio-Nabiapai
Bill of Quantity
Description Unit Qty
Amount
(USD)
18,000.00
18,000.00
Rehabilitation of Yambio-Nabiapai
Bill of Quantity

Вам также может понравиться