Company: ABC Manufacturing Limited, Anytown, Nova Scotia Project: Dust Collector Cell #5 Fan !grade Consultant: "o#n Smit#, $% &ng%, "% '% Smit# &ngineering (nc% )*+ Main St%, Anytown, NS $#one, -./*0 5551.... Fa2, -./*0 55513333 &mail, 4o#n546smit#enginc%ns%ca Date: "an ), */)+ 1. !pplication"Process Description ABC Manufacturing o!erates a #ardwood furniture manufacturing facility in Anytown, Nova Scotia% 7#e !lant #as a wood dust collection system consisting of )/ e2#aust fans and two dust collectors% 7#e fans #ave a total air flow ca!acity in e2cess of )//,/// l8s, wit# a motor load of a!!ro2imately 5// 69% 9ood dust is collected from t#e various manufacturing !rocesses wit#in t#e !lant and conveyed to t#e dust collectors w#ere it is transferred to t#e cyclone and eventually into silo storage for dis!osal% A system sc#ematic is s#own as Figure )% Fi#ure 1: $ood Dust Collection System 7#e system o!erates for roug#ly :,/// #rs !er year -* s#ift ;asis, seven days !er wee60% 7#e system re<uires a constant air flow rate and t#e fans o!erate under a steady load% 7#ey are started and sto!!ed on a fi2ed sc#edule ;y !rogramma;le1logic controllers% %. &lectricity Sa'in# Opportunity ABC !lans to u!grade t#is system to meet increased !roduction levels% 7#ey will add ca!acity w#en re!lacing t#e oldest of t#e e2#aust fans, w#ic# #as ;een in service for t#e !ast */ years% 7#is study will evaluate two re!lacement fan models, one of w#ic# is more efficient and also more e2!ensive% As a !reliminary estimate, t#e more efficient fan would save a;out 5/,/// 69# of electrical energy !er year in com!arison wit# t#e lower cost model% 7#e electrical demand savings would ;e a!!ro2imately 3 6=A% 7#e more efficient fan would #ave an installed cost of roug#ly 5/> more t#an t#e alternative% Based on !ast installations ;y ABC, t#e less1e2!ensive fan will cost a!!ro2imately ?+/,/// installed, so t#e more efficient o!tion can ;e e2!ected to cost a!!ro2imately ?@5,///% *@*A).//:%doc $age ) of * $rinted, +)1Aug1)@ Single line sc#ematic-s0 7#e content in t#is e2am!le is for illustrative !ur!oses only% Bevise eac# section as needed for your !ro4ect% 7#e Feasi;ility Study Cuide, !rovided ;y &NSC, descri;es t#e information t#at s#ould ;e su!!lied in eac# section of t#is !ro!osal% -Dou can remove t#is te2t;o20 FORM 3: Custom Feasibility Study Proposal Template 3. Ot(er Project )ene*its ABC e2!ects a moderate savings in maintenance costs% 7#e value of t#is ;enefit, if any, will ;e estimated during t#e detailed analysis% +. Scope o* $or, 7#e main study activities will include, Site visit to ABC Manufacturing, to verify suita;ility of t#e two o!tions under considerationE Analysis of o!tions for energy savingsE $re!aration and delivery of t#e Feasi;ility Study Be!ort% -. Sc(edule 7#e Feasi;ility Study re!ort will ;e com!leted wit#in four wee6s after a!!roval from &NSC to !roceed% ABC Manufacturing will install t#e new fan during a !lanned maintenance s#utdown in August, *//3% .. Study Team 7#e study and re!ort will ;e com!leted ;y Mr% "o#n Smit#, $%&ng% a Senior Mec#anical &ngineer wit# */ years of e2!erience in designing industrial ventilation and dust collection systems% /. Test &0uipment No test e<ui!ment will ;e needed for t#is study% 1. Study Cost 7#e total cost for t#e wor6 is estimated at ?*,5// !lus FS7% ABC Manufacturing is not see6ing any ot#er funding assistance for t#is study% &ND GF F&AS(B(L(7D S7DD $BG$GSAL *@*A).//:%doc $age * of * $rinted, +)1Aug1)@