The bidder should have implemented The criteria should be relxed, the As per RFP
videoconferencing /MPLS VPN solution details of video conferencing projects
in at least 3 organizations (preferable with implementation across 10 and
3.14/Pg 13/pt no one govt. organization) with the above locations should be considered
2 implementation being udnertaken for qualifying criteria
5
across 20 locations or more in india
during the last five years as on march
31, 2009
The SI will size the amount of As per understanding bandwidth has Please refer the corrigendum dated
bandwidth and network required for to be quoted along with FMS charges 09.02.2009
videoconferencing and will please confirm. Please mention the
coordinate,procure and establish the MPLS port size at each of the
5.3/pg no 28/pt required link and bandwidht with locations of KVIC. Also please
3
no 2 internet service provider. The SLAs mention the MPLS port size required
defined for the bandwidht will be at the central location.
applicable to the SI
Technical Specification - Indicative Is the KVIC looking for serial network As per RFP
4 7.4/pg no 43/ module *V.35) and module T1/PRI
module for VC End points?
Technical Specification - Indicative IS the KVIC looking for 3+1 MCU Yes.
5 7.4/pg no 43/ license for all VC end point sites?
Technical Specification - Indicative Whether Plasma display to be Wall Mounted
6 7.4/pg no 43/ mounted on wall or to be kept on
table?
Technical Specification - Indicative Is the KVIC looking for external No. " It should be possible to register
7 7.4/pg no 43/ gatekeeper for register H.323 H.323 endpoints (VC/VoIP) with
endpoints (VC/VoIP) with names and names and alias numbers. " This point
alias numbers? stands.
Technical Specification - Indicative IS the KVIC looking fr external The requirement is of Recording and
8 7.4/pg no 43/ recording & streaming services for recorded streaming. No live streaming
Video session? is envisaged in the scope of this
project
Technical Specification - Indicative Below points ned to be addd in the Depends on site conditions
Technical specifications of Video
Conferencing equipments
1). Distance between plasma and
codec must be less than 1 mts.
2). Distance between codec and
laptop will not be more than 1.5 mtrs
for content sharing.
3). KVIC will provide all necessary
Rack space for mountng the MCU.
4). KVIC will provide all necessary
9 7.4/pg no 43/ power supply for video conferencing
equipments.
5). KVIC will provide all necessary Air
Condition for video conferencing
equipments.
6). KVIC will provide required IP
addresses for video conferencing
equipments.
Multi Party Control Unit (MCU) Please clarify on below end points Please read 7.4.2 pt 2 / pg 45 as "
systems would use 384/512kpbs for Capacity: The MCU shall support at
MCU connectivity from different mode least 40 participants on IP & SIP @
of connectivity. (IP/ISDN) 2Mbps on a single chassis. The
10 7.4.2/pg no 45
system shall support both H.323 &
H.320 directly without any protocol
conversions "
Technical Specification - Indicative Please clarify on below points Depends on site conditions
1. Audio Cable is of 1.5 meter
2. Video Cable is of 1.5 meter
3. P+C cable is of 3 meter.
11 7.4.2/pg no 45 4. LAN Cable is of 6 meter
5. Power Cable is of 1.5 meter
6. Mic Cable of 2.5 meter
Access switch- minimum of 24 port Why CWDM required on the The requirement is of Layer 2 switch
10/100 Mbps Fast Ethernet switches? supporting all layer 2 datalink layer
autosensing ports with two uplink slots protocols
7.4.4/pg no 52/pt supporting gigabit ports such as
12
no 3 1000Base-Sz, 1000Base-Lx, and
1000Base-T,CWDM
Acess Cable- Switch should be Since there will be only a Video Yes,
stackable in nature with dedicated fail- Conferencing equipment connected to
7.4.4/pg no 52/pt safe bi-directional stacking ports for the switch, Is stacking required?
13
no 3 each switch
Criteria Table - 4.2 Marks gicen is 10. Should be 15 as Maximum Marks is As per RFP
14 3.18.2/pg no 17 shown as 15
One month for implementation Should be 12 weekes taking into As per RFP
account time to procure
15 5.3.1/pg no 28 communication links.
Bandwidth (b/w) to be given by SI Later sections have given b/w. which Badnwidth to be given by SI
16 5.3.2/pg no 28 is to take precedence
Videoconference Room Please provide details of facilities Please refer the corrigendum dated
17 5.3.2/ pg no 28 available in room 09.02.2009
Bandwidth should be available for Please explain "other routine uses" Please refer the corrigendum dated
18 5.3.2/ pg no 28 other routine usses 09.02.2009
Spares Pelase list out spares required Bidder should calculate and provide
19 5.3.2/ pg no 29 the spares list to achieve the
mentioned SLA's
Spares Will spares from a part of commercial No
20 5.3.2/ pg no 29 evaluation
The contract is for 3 years, why does Should be 3 years Please refer the corrigendum dated
22 5.3.2/ pg no 29 FMS mention 2.5 years 09.02.2009
Training Please elaborate on trining required Training for the user's at the field and
23 5.3.2/ pg no 29 central Office of KVIC.
OSAT mentions 4 hrs run for 2 days Please clarify Onsite Acceptence testing will be done
for 8 hours ( 4 hours per day
24 continous). There should not be any
gap between Network billing and
OSAT.
Network will be commissioned prior to Network billing to start as soon as Network billing will be taken into the
25 5.4.2.1/pg no 32 OSAT network is installed account when the OSAT is complete.
Delivery and installations is 2.5 months This is in variance with earlier mention As per RFP
26 5.5/pg no 33 timeframe of 1 month. Please
reationalise to 12 weeks
Payment terms does not have section Payment terms should have separate Please refer the corrigendum dated
27 5.5/pg no 34 for bandwidth mention for bandwidth 09.02.2009
VC Schedule mentions both 1 hour and Please Clarify Please refer the corrigendum dated
28 5.6.2.10/pg no 39 3 hours notice 09.02.2009
SI Staff to be available on demand 48 hrs notice to be given Please refer the corrigendum dated
29 6.1/pg no 40 basis 09.02.2009
Sites to be connected on b/w of 384 Please clarify whether ISDN links will Proposed solution should be IP based
30 7.1/pg no 41 kbps (ISDN/IP) suffice at central site. and the proposed equipments should
support ISDN.
Sites to be connected on b/w of 384 Please clarify whether ISDN links will Proposed solution should be IP based
31 7.1/pg no 41 kbps (ISDN/IP) suffice at remote location. and the proposed equipments should
support ISDN.
Sites to be connected on b/w of 384 If ISDN is used, on average, for each Proposed solution should be IP based
kbps (ISDN/IP) location for how many hours per week and the proposed equipments should
32 7.1/pg no 41
will it be used support ISDN.
Sites to be connected on b/w of 384 If ISDN is used, will KVIC bear costs Proposed solution should be IP based
33 7.1/pg no 41 kbps (ISDN/IP) and the proposed equipments should
support ISDN.
Network supposrt mentions Please clarify whether this refers to Please read 7.4.1 / pg 43 as "
H.323/SIP/V.35, etc as 2 Mbps the equipment only or for the network H.323 2 Mbps
as well SIP 2 Mbps
ISDN
35 7.4.1/pg no 43 BRI 512 Kbps
PRI 2Mbps
V.35 2Mbps
Start Stop recording at will Predecide which calls to record The Start Stop recording should be at
40 7.4.2/pg no 46
the will of KVIC officials.
41 7.4.3/pg no 46 Dynamic allocation Predefine b/w As per RFP
43 8.8.4/pg no 62 CV date of birth Change to number of years of exp. Please refer the RFP
Entry Taxes, Octroi should be Quoted The prices shall be As per RFP
as extra inclusive of CST/ LST,
Freight, Insurance but
exclusive of octroi/entry
tax. Some of the sites are
in areas which require
way bills, road permits for
despatch of the
equipments. These
53 documents are to be
provided by the end user,
for the SI to despatch the
equipments. the same
should be provided to the
SI by the KVIC. The
Entry Tax/ Octroi as
applicable at certain sites
should be reimberused
by KVIC to the SI against
Original receipts.
Presence of Video Controller and Please Clarify Please refer the corrigendum dated
6.1 &6.2/ pg no
54 Assistant - 3 months and on call basis 09.02.2009
39
Way Bills/ Road Permits/ Entry As some of the sites are SI is responsible.
Permits/ Forms for Despatch of the in states which requre
equipment way bills, road permits for
despatch of the
equipments. These
documents are to be
55 5.1.3/pg no 27 provided by the END
user fo the SI to despatch
the equipments. The
Same should be provided
to the SI by the KVIC.
Delievery of Six sites within 6 weeks We request KVIC to Please refer the RFP
and installation within 2 weeks extedn this delivery time
thereafter. Total 8 weeks period to within six weeks
and installation,
precommissioning and
site acceptance test and
implementation within 2
weeks from the date of
receipt of the equipment
at site, readness of the
site etc. the delay in the
above, not attributable to
the above will not
constitute as a late
deliver/installation.
56 5.3.1/pg no 28 i.e. Total 8 weeks for
entire implemenation at
each site. This schedule
does not exceed your
total time lines planned
for the project.
Balance 34 sites will also
be implement in total 8
weeks from the day of
the recipet of
confirmation from KVIC.
Bandwidth by SI, SLA with SI for Procurement of Please refer the corrigendum dated
bandwidth. bandwidth, establishing 09.02.2009
the required link and
57 5.3.2/pg np 28
bandwidth is with ISP?
SLA should be with the
ISP not with SI?
Payment terms - payment of 100% of Please refer the RFP
installation and commissioning
58 5.5/pg no 34 payment on completion and pre
commissioning against BG to be kept
vaid for period of 2 months for 40% of
the installation
Acessories - Please clarify number of 3 mic at locations mentioned in priority
mics required to be supplied with the 1 and 1 one mic at remaining 34
59 7.4.1/pg no 43 system? locations.
Please Clarify if the MCU is to be " The MCU should have an option for a
equipped with the redundant power redundant power supply " This point
62 pg no 46
supply? stand deleted
Please clarify the number of PRIs The MCU should have support for
65 required to be used? handling 4 PRI for future use.
Considering the
importance and scale of
a 40 location MPLS
connectivity, provision of
a full time Network
Provision of Network Administrator
80 Administrator @ 8 X 5 for
not mentioned in the tender invitation.
3 Years deputed at
Central Location is very
important suggession
which may kindly be
considered,
Delivery Period
mentioned (1 Month) is
very very less
considering the Industry
standard delivery times
for MCU, CODECs,UPS
83 5.5/pg no 33 Milestones and Payment Terms and other items. Kindly
make it as 45 to 60 days.
Further Timilines
mentioned in the table of
this clause is difficult to
understnad and hence
see more clarity.
It will be responsibility of SI
We would suggest to
evaluate on the basis of
one reference with the
Reference has been asked for the 3 80% of the estimated
organizations with the implementation project cost as per the
87 3.14.5/pg no 13
being undertaken across 20 locations 12-02-1-CTE-6 of CVC
or more. guidelines. This will
increase the number of
qualified bidders and is in
the intereset of KVIC.
As per RFP
We request KVIC to
ISDN data rates up to 2Mbps of page please confirm the
96
43 requirement for support
of ISDN PRI 2Mbps
As per RFP
The bidder should have implemented The point is to be clear ther the Request you to correct as Accepted. Preference will be given to
videoconferencing /MPLS VPN solution intranet, routing and wireless "The bidder should have Wireline
in at least 3 organizations (preferable connectivity are the similar type of implemented
one govt. organization) with the solution in the market. videoconferencing/WAN
implementation being udnertaken either in wireline or in
across 20 locations or more in india wireless solution in at leat
106
during the last five years as on march 3 organizations
31
Network supported H.323 2 Mbps, SIP IS the ISDN PRI support required Please read 7.4.1 / pg 43 as "
2 Mbps, ISDN, BRI 512 kbps, PRI 2 from the day one? H.323 2 Mbps
Mbps, v.35 2 Mbps SIP 2 Mbps
ISDN
107 7.4.1/pg no 43 BRI 512 Kbps
PRI 2Mbps
V.35 2Mbps
Accessories: Since external MCU is already asked Embedded MCU ( 1+ 3 ) is required
Omni directional Microphone with mute in the next category, embedded MCU for six location. Rest location should
button in the endpoint required from day one have the option of MCU license
108 Remote Control or optional?
Multiple embedded 4 site MCU (1+3)
3.14 point 2 The firm should be in the business of The firm should be in the business of Accepted
providing IT related services for at least providing IT/TELECOM related
5 years as of 31-3-2009. services for at least 5 years as of 31-
109 3-2009.
3.14 point 3 The firm has to be profitable and The firm has to be profitable and As oer RFP
should not have incurred loss in the should not have incurred loss in the
110 last 3 Financial Years (FY 08-09, FY last 2 Financial Years (FY 08-
07-08, FY 06-07) 09, FY 07-08)
3.14 point 5 The bidder should have implemented The bidder or its Group As per RfP
videoconferencing/ MPLS VPN solution company/subsidary should
in at least 3 organizations (preferably have implemented videoconferencing/
one Govt. organization) with the MPLS VPN solution in at least 3
implementation being undertaken organizations (preferably one Govt.
across 20 locations or more in India organization) with the implementation
during the last five years as on March being undertaken across 20 locations
111 31, 2009 or more in India during the last five
years as on March 31, 2009
PQ # 4: Average Annual Turn Over for It should be INR 10 Crore (INR Ten It should be INR 10 Crore As per RFP
116 last three years Crore) (INR Ten Crore)
PQ # 5: Please allow even those companies Please allow even those As per RFP
have implemented IT Solution companies have
Projects in at least 3 organizations implemented IT Solution
117 (preferable one Govt. Organization) Projects in at least 3
organizations (preferable
one Govt. Organization)
120
Bid submission date Extend the bid submission date by Extend the bid As per RFP
121 two weeks. submission date by two
weeks.
HCL INFOSYSTEMS
Page
S/N Clause No. Query
No.
7.4.4 Access
Point no. e) says switch should be stackable in
8 51 Switch
nature ?
specification
26 53 BOM Sr. No. 6.a 1KVA Rack Mountable with 30 min. backup
7.4.1 Video
Network Supported – H.323 -2Mbps , SIP -2Mbps ,
conferencing
27 ISDN BRI 512Kbps, ISDN PRI -2Mbps, V.35 2Mbps
endpoints
on page 41
(CODEC)
Suggestion Reply
Presence of Video
Controller and Assistant
6.1 &6.2/
4 - 3 months and on call
pg no 39
basis
5.3.1/pg
6
no 28
Suggestion Reply
Can we submit EMD of 3 lac in a form of Bank Guarantee
Please Clarify
As some of the sites are in states which requre way bills, road permits
for despatch of the equipments. These documents are to be provided
by the END user fo the SI to despatch the equipments. The Same
should be provided to the SI by the KVIC.
We request KVIC to extedn this delivery time period to within six weeks
and installation, precommissioning and site acceptance test and
implementation within 2 weeks from the date of receipt of the
equipment at site, readness of the site etc. the delay in the above, not
attributable to the above will not constitute as a late deliver/installation.
i.e. Total 8 weeks for entire implemenation at each site. This schedule
does not exceed your total time lines planned for the project.
Balance 34 sites will also be implement in total 8 weeks from the day
of the recipet of confirmation from KVIC.
The MCU has different modules/interfaces for the IP ports and ISDN
ports in the single Chasis.
RELIANCE COMMUNICATON
Sr. No.Page No.Clause No. Query
The firm has to be profitable and should not have incurred loss in
the last 2 Financial Years (FY 08-09, FY 07-08)
9 7.4/pg no 43/
11 7.4.2/pg no 45
This criteria should be relaxed as CMMi level The criteria should be relaxed as it
5 certification os required for software would not restrict Telecom
development and scope of work does not companies to participate in the bid
include any application development. who have capability to deliver on
scope of work.
The criteria should be relxed, the details of
video conferencing projects with
implementation across 10 and above
locations should be considered for qualifying
criteria
Network Supported
H.323 2 Mbps
SIP 2 Mbps
7.4 Technical specifications
1 ISDN
- Indicative
BRI 512 kbps
PRI 2 Mbps
v.35 2 Mbps
Accessories
Omni directional Microphone with Mute
2 button
Remote Control
Minimum embedded 4 site MCU(1+3)
Please clarify :
1. The minimum HD ports required from
day one and the scalibility for future
roadmap.
2. Please confirm on conference data
rates?
3. The capability of reservation and
scheduling tools?