This document evaluates technical bids for storage tanks for the Yanbu Export Refinery Project. It lists 8 equipment items and their required internal and external accessories. It also outlines the scope of work, supply, and highlights that should be confirmed before selecting a vendor, including activities like shop drawing reviews, painting, and nitrogen filling. Vendors may note any deviations or clarifications in their bid responses. The evaluation provides specifications for the storage tanks and assesses vendors' compliance with project requirements.
This document evaluates technical bids for storage tanks for the Yanbu Export Refinery Project. It lists 8 equipment items and their required internal and external accessories. It also outlines the scope of work, supply, and highlights that should be confirmed before selecting a vendor, including activities like shop drawing reviews, painting, and nitrogen filling. Vendors may note any deviations or clarifications in their bid responses. The evaluation provides specifications for the storage tanks and assesses vendors' compliance with project requirements.
This document evaluates technical bids for storage tanks for the Yanbu Export Refinery Project. It lists 8 equipment items and their required internal and external accessories. It also outlines the scope of work, supply, and highlights that should be confirmed before selecting a vendor, including activities like shop drawing reviews, painting, and nitrogen filling. Vendors may note any deviations or clarifications in their bid responses. The evaluation provides specifications for the storage tanks and assesses vendors' compliance with project requirements.
INQUIRY NO. : R-2154-101H REVISION : 0 DISCIPLINE : MS INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CURRENCY : USD HEC DESCRIPTION UNIT WT(Total) WT(Total) REMARKS (Ton) UNIT PRICE USD (Ton) 1 TERMS & CONDITIONS 1.1 Proposal No./ Date 1.2 Delivery 1.3 Delivery Condition / Sea Port 2 COMMENT ON QUOTATION 2.1 EQUIPMENT NO. 117-D-0013 1 0.0 0.0 0.0 0.0 119-D-0008 1 0.0 0.0 0.0 0.0 119-D-0010 1 0.0 0.0 0.0 0.0 119-D-0500 1 0.0 0.0 0.0 0.0 140-D-0003 1 0.0 0.0 0.0 0.0 140-D-0004 1 0.0 0.0 0.0 0.0 142-D-0004 1 0.0 0.0 0.0 0.0 142-D-0025 1 0.0 0.0 0.0 0.0 Start-up Spare Parts(Gasket : 200%, Bolt/Nut : 10%, Min. 3sets) sets 0.0 0.0 Others 0.0 0.0 TOTAL 8 0.0 0.0 0.0 USD/Ton #DIV/0! 3 OPTION PRICES 3.1 Electric & hydro water at field Required 0.0 3.2 Foundation chipping and grouting work and material Required 0.0 3.3 Touch Up Paint BQ (m2) = [Total Surface Area for Painting (m2)] x 10% USD Required 0.0 3.4 Capital Spare Parts N/R N/A 3.5 Operation Spare Parts for two (2) years Set Required 0.0 (Gasket : 100%, Bolt/Nut : 10%, Min. 4sets) Vendor Rec. 4 SCOPE OF WORK Inclusion Exclusion Quotation Final Remarks 4.1 Mechanical Guarantee X Included 4.2 Equipment Complete Design X 4.3 Vent calculation in accordance with API 2000 X 4.4 Equipment and Material Procurement X 4.5 Material certification to be submitted X 4.6 Fabrication(shop and field), site erection and installation work X 4.7 Manufacturing and Assembly X 4.8 Internal painting/coating as per coating data sheet X 4.9 Painting up to Finish Coat in accordance with Project Specification (Vendor shall Get X 4.10 Rust Prevention for Storage X 4.11 Detail design & drawing for platform and ladder(circular stairway) X 4.12 All Sub-Vendor and Internal Vendor Coordination X 4.13 PWHT for stress relieve as per Data Sheet, Code and Standard, if required X 4.14 Impact test as per Code and Standard, if required X 4.15 Stress analysis for External force & moment X 4.16 Pre-Inspection Meeting X 4.17 Shop/field inspection and test as per standards, design code & specification X 4.18 PMI (Positive Material Identification) & Its Reports, if requested X 4.19 Hydrostatic test and calibration at site X 4.20 Chemical cleaning on the surface of stainless steel, if requested X 4.21 Cleaning tank inside after hydrotest and before final inspection X 4.22 Marking, Packing and Transportation X 4.23 Documentation as per the Requirements of this Requisition X 4.24 All documents and support for Government approval as required X 4.25 Compliance with statutory requirements, Code and Standard X 4.26 Consideration of equipment design and shipping arrangements for ease of delivery to the job site X 4.27 Local regulation approval work & all documents and certificates for government approval X 4.28 Provision of all necessary design certifications X 4.29 Preparation for Shipment X VENDOR NAME 1 of 4 TECHENICAL BID EVALUATION PROJECT NAME : YANBU EXPORT REFINERY PROJECT INQUIRY NO. : R-2154-101H REVISION : 0 DISCIPLINE : MS INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CURRENCY : USD HEC DESCRIPTION UNIT WT(Total) WT(Total) REMARKS (Ton) UNIT PRICE USD (Ton) VENDOR NAME 4.30 Others specified in this Requisition X 4.31 Other Accessories Required for Safe Operation (Not Referred in this Requisition) X 5 SCOPE OF SUPPLY Inclusion Exclusion Quotation Final Remarks 5.1 Equipment proper X Included 5.2 Equipment with nozzles, flanges and its supports X 5.3 All internals unless otherwise noted on equipment data sheet X 5.4 Attachments for internals X 5.5 Internal pipe such as dip pipe, feed pipe, etc. and its supports X 5.6 Other parts welded on tank (wear plate, deflector, vortex breaker, etc) X 5.7 Blind flanges, bolts, nuts & gaskets for manhole, vent and drain nozzles X 5.8 Grounding lugs per drawing PIP X 5.9 Sump as per data sheet X 5.10 Oil skimmer X 5.11 Bird screen for open vent, if required X 5.12 Lifting lugs for installation and maintenance, if required X 5.13 Earth lugs X 5.14 Settlement check piece X 5.15 Name plate (Stainless Steel) with bracket X 5.16 Hot dip galvanized anchor bolt/nuts/washers X 5.17 Landing Platform(50% Roof Area) and circular stairway (hot dip galvanized grating) X 5.18 Internal flange in including bolt/nut & Gasket (Non-Asbestos sheet) X 5.19 All parts shown on applicable data sheets, standards and drawings X 5.20 Hand grip and internal ladder, if required X 5.21 Support clip for ladder, platforms X 5.22 Support clip for Pipe support, if required X 5.23 Temporary support and skid for erection X 5.24 Special tools for erection & maintenance, if required X 5.25 Touch-up paint for field repair works X 5.26 Internal and external accessories for 117-D-0013 - Gauge hatch for nozzle "G" X - Emergency vent cover for nozzle "M2" X - Pressure/vacuum vent for nozzle "J" X - Air sparger for nozzle "F" X - Internal pipe for nozzle "A" X - Caustic distributor for nozzle "B" X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - Internal lining and external painting (including underside of bottom plate) X 5.27 Internal and external accessories for 119-D-0008 - Gauge hatch for nozzle "EM" (non-spark, self closing gauge hatch cover and slotted gauge well) X - Emergency vent cover for nozzle "CM" X - Pressure/vacuum vent with flame arrester for nozzle "BV" X - Draw-off sump (API 650 type) for nozzle "AW" X - Stilling well for nozzle "CL", "GL" X - Inlet distributor for nozzle "AI" X - Skimmer sump with flexible hose for nozzle "BW" X - Internal floating roof (metallic pontoon type) X - Mechanical seals X - Foam system X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - Internal lining and external painting (including underside of bottom plate) X - Insulation support ring X 5.28 Internal and external accessories for 119-D-0010 - Gauge hatch for nozzle "BM" (non-spark, self closing gauge hatch cover and slotted gauge well) X - Emergency vent cover for nozzle "AM" X - Pressure/vacuum vent with flame arrester for nozzle "BV" X - Draw-off sump (API 650 type) for nozzle "CW" X - Stilling well for nozzle "BL", "CL" X - Inlet distributor for nozzle "AI" X 2 of 4 TECHENICAL BID EVALUATION PROJECT NAME : YANBU EXPORT REFINERY PROJECT INQUIRY NO. : R-2154-101H REVISION : 0 DISCIPLINE : MS INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CURRENCY : USD HEC DESCRIPTION UNIT WT(Total) WT(Total) REMARKS (Ton) UNIT PRICE USD (Ton) VENDOR NAME - Skimmer sump with flexible hose for nozzle "AW" X - Internal floating roof (metallic pontoon type) X - Mechanical seals X - Foam system X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - Internal lining and external painting (including underside of bottom plate) X - Insulation support ring X 5.29 Internal and external accessories for 119-D-0500 - Gauge hatch for nozzle "EM" (non-spark, self closing gauge hatch cover and slotted gauge well) X - Emergency vent cover for nozzle "AM" X - Pressure/vacuum vent with flame arrester for nozzle "BV" X - Jet mixer for nozzle "BI" X - Stilling well for nozzle "BL" X - Inlet distributor for nozzle "AI" X - Skimmer sump with flexible hose for nozzle "AW" X - Internal floating roof (metallic pontoon type) X - Mechanical seals X - Foam system X - Landing platform and Circular stairway (grating type) X - Roof handrail X - Internal lining and external painting (including underside of bottom plate) X - Insulation support ring X 5.30 Internal and external accessories for 140-D-0003 - Gauge hatch for nozzle "M" (non-spark, self closing gauge hatch cover with lock) X - Emergency vent cover for nozzle "C2" X - Pressure/vacuum vent for nozzle "D" X - Inlet distributor for nozzle "AI" X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - Internal lining and external painting (including underside of bottom plate) X - Insulation support ring X 5.31 Internal and external accessories for 140-D-0004 - Gauge hatch for nozzle "H" (non-spark, self closing gauge hatch cover with lock) X - Emergency vent cover for nozzle "MH-2" X - Pressure/vacuum vent for nozzle "D" X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - External painting (including underside of bottom plate) X 5.32 Internal and external accessories for 142-D-0004 - Gauge hatch for nozzle "G" (non-spark, self closing gauge hatch cover with lock) X - Emergency vent cover for nozzle "M2" X - Pressure/vacuum vent for nozzle "R" X - Draw-off sump (API 650 type) for nozzle "D" X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - Internal lining and external painting (including underside of bottom plate) X 5.31 Internal and external accessories for 142-D-0025 - Gauge hatch for nozzle "G" (non-spark, self closing gauge hatch cover) X - Emergency vent cover for nozzle "M2" X - Pressure/vacuum vent for nozzle "V" X - Draw-off sump (API 650 type) for nozzle "D" X - Landing platform and Circular stairway (grating type) X - Roof handrail (All Around) X - External painting (including underside of bottom plate) X 6 HIGHLIGHT IN PROPOSAL 6.1 Activities to be confirmed before selecting the vendor - Shop drawing for Platform & Ladder Required - Painting including finish coat Required - Nitrogen Filling shall be applied to Tank packing (Shop Fabricated Item Only) Required 3 of 4 TECHENICAL BID EVALUATION PROJECT NAME : YANBU EXPORT REFINERY PROJECT INQUIRY NO. : R-2154-101H REVISION : 0 DISCIPLINE : MS INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CURRENCY : USD HEC DESCRIPTION UNIT WT(Total) WT(Total) REMARKS (Ton) UNIT PRICE USD (Ton) VENDOR NAME 6.2 Vendors Deviations/Clarifications - Deviation and/or Alternative Yes or No 6.3 Special Note (if any) 7 Result of Technical Evaluation (Techenically Acceptable) 4 of 4