Вы находитесь на странице: 1из 65

DAFTAR UPAH

NO. SATUAN
1 3
1 Pekerja OH 62,100.00
2 Tukang Gali OH 74,750.00
3 Tukang Kayu OH 75,900.00
4 Tukang Batu OH 74,750.00
5 Tukang Las OH 74,750.00
6 Tukang Besi OH 74,750.00
7 Tukang Pipa OH 75,900.00
8 Tukang Cat OH 74,750.00
9 Kepala Tukang OH 75,900.00
10 Mandor OH 80,500.00
11 Operator OH 86,250.00
12 Pembantu Operator OH 64,400.00
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
I BAHAN PASANGAN
1 Pasir Urug (PU) M3 78,800.00 20,000.00 22,750.00 7,880.00 129,430.00
2 Pasir Pasang (PP) M3 125,000.00 20,000.00 22,750.00 12,500.00 180,250.00
3 Pasir Beton (PB) M3 122,000.00 20,000.00 22,750.00 12,200.00 176,950.00
4 Pasir Kuarsa M3 190,000.00 20,000.00 32,500.00 19,000.00 261,500.00
5 Kerikil (KR) M3 113,750.00 25,000.00 22,750.00 11,375.00 172,875.00
6 Sirtu M3 72,000.00 20,000.00 22,750.00 7,200.00 121,950.00
7 Batu Belah (gunung) 15cm/20 cm M3 325,000.00 25,000.00 22,750.00 32,500.00 405,250.00
8 Batu sungai (mangga) M3 300,000.00 25,000.00 22,750.00 30,000.00 377,750.00
9 Portland Cement (PC) Kg 1,160.00 10.00 6.50 116.00 1,292.50
10 Semen putih Kg 1,500.00 10.00 6.50 150.00 1,666.50
11 Cornite Compound Jayaboard Zak 70,000.00 2,500.00 325.00 7,000.00 79,825.00
12 Bata Merah (kulim) Buah 285.00 10.00 13.00 28.50 336.50
13 Kerawang (Roster semen)20x20 cm Buah 22,000.00 20.00 52.00 2,200.00 24,272.00
14 Kerawang (Roster semen)40x40 cm Buah 45,000.00 20.00 52.00 4,500.00 49,572.00
15 Rumput Gajah Mini M2 11,500.00 500.00 650.00 1,150.00 13,800.00
16 Rumput Biasa M2 11,000.00 500.00 650.00 1,100.00 13,250.00
17 Tanah Hitam M3 43,000.00 20,000.00 22,750.00 4,300.00 90,050.00
18 Tanah Urug M3 20,000.00 2,000.00 22,750.00 2,000.00 46,750.00
19 Conblock K.175 T= 6 cm Bh 1,600.00 20.00 52.00 160.00 1,832.00
DAERAH BAIK
ESTIMATE ENGINEERS (EE)
HARGA UPAH DAN BAHAN BANGUNAN TAHUN ANGGARAN 2013
JENIS UPAH HARGA UPAH KETERANGAN
2 4 5
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
20 Conblock K.225 T= 6 cm Bh 1,800.00 20.00 52.00 180.00 2,052.00
21 Conblock K.300 T= 8 cm Bh 2,000.00 20.00 52.00 200.00 2,272.00
22 Grass Block T= 6 cm Bh 19,000.00 20.00 52.00 1,900.00 20,972.00
23 Buis Beton Dia 20cm P= 50 Cm Bh 40,000.00 5,000.00 3,250.00 4,000.00 52,250.00
24 Buis Beton Dia 40cm P = 60 Cm Bh 108,000.00 10,000.00 9,750.00 10,800.00 138,550.00
25 Buis Beton Dia 60cm P= 80 Cm Bh 190,000.00 15,000.00 9,750.00 19,000.00 233,750.00
26 Buis Beton Dia 80cm P= 100 Cm Bh 325,000.00 20,000.00 13,000.00 32,500.00 390,500.00
27 Buis Beton Dia 100cm P = 100 Cm Bh 400,000.00 20,000.00 13,000.00 40,000.00 473,000.00
-
II BAHAN KAYU -
1 Kayu Kelas I M3 3,500,000.00 20,000.00 22,750.00 350,000.00 3,892,750.00
2 Kayu Kelas II M3 2,200,000.00 20,000.00 22,750.00 220,000.00 2,462,750.00
3 Kayu Kelas III M3 1,800,000.00 20,000.00 22,750.00 180,000.00 2,022,750.00
4 Kayu List Profil siku2" M' 2,500.00 5.00 6.50 250.00 2,761.50
5 Kayu List Profil 0.8x3" M' 3,000.00 5.00 6.50 300.00 3,311.50
6 Papan 2 x 20 M3 1,800,000.00 20,000.00 22,750.00 180,000.00 2,022,750.00
7 Kayu Cerocok dia. 10 - 15 cm Btg 41,500.00 500.00 1,950.00 4,150.00 48,100.00
8 Dolken Kayu Galam, (8-10)Cm,Panjang 4 M Batang 9,500.00 500.00 325.00 950.00 11,275.00
9 Kayu Bakar M3 650,000.00 20,000.00 22,750.00 65,000.00 757,750.00
10 Papan Piri - piri (Siap Ketam 3 sisi) M3 2,200,000.00 20,000.00 22,750.00 220,000.00 2,462,750.00
11 Papan Lebah Bergayut M' 40,000.00 500.00 650.00 4,000.00 45,150.00
12 Singap Ukir kayu M2 670,000.00 3,000.00 6,500.00 67,000.00 746,500.00
13 Singap Ukir GRC M2 400,000.00 3,000.00 6,500.00 40,000.00 449,500.00
14 Selembayung GRC Lembar 30 cm Pasang 400,000.00 1,000.00 3,250.00 40,000.00 444,250.00
15 Selembayung kayu lebar 30 cm Pasang 250,000.00 1,000.00 3,250.00 25,000.00 279,250.00
16 Sayap layang-layang lebar 30 cm Pasang 250,000.00 1,000.00 3,250.00 25,000.00 279,250.00
17 Lisplank papan + anak ( + 30 cm) M' 50,000.00 1,000.00 3,250.00 5,000.00 59,250.00
-
III BAHAN BESI DAN BAJA -
1 Besi Beton Polos Kg 13,500.00 50.00 65.00 1,350.00 14,965.00
2 Besi Beton Ulir Kg 16,200.00 50.00 65.00 1,620.00 17,935.00
3 Kawat Beton Kg 16,300.00 20.00 32.50 1,630.00 17,982.50
4 Kawat 4 mm Kg 14,500.00 20.00 32.50 1,450.00 16,002.50
5 Kawat Las Listrik Kg 28,500.00 20.00 32.50 2,850.00 31,402.50
6 Kawat Ayam M2 13,833.00 20.00 130.00 1,383.30 15,366.30
7 Besi Strip Tebal 5 mm Kg 10,000.00 20.00 97.50 1,000.00 11,117.50
8 Baja Ringan C75 100 int kg 29,000.00 20.00 97.50 2,900.00 32,017.50
9 Baja Ringan C75 75 int Kg 27,000.00 20.00 97.50 2,700.00 29,817.50
10 Baja IWF Kg 11,850.00 20.00 97.50 1,185.00 13,152.50
11 Terali besi (Non Motif) M2 344,000.00 1,000.00 650.00 34,400.00 380,050.00
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
12 Baja Siku Kg 14,800.00 20.00 130.00 1,480.00 16,430.00
13 Pagar Hollowstarbuss 1,2 mm x 20 mm x mm (standard minimalis) M2 270,000.00 20.00 130.00 27,000.00 297,150.00
14 HollowMent Hijau 0.25mm x 40 mm x 20 mm Btg 16,000.00 300.00 65.00 1,600.00 17,965.00
15 HollowMent Hijau 0.25mm x 40 mm x 40 mm Btg 19,000.00 300.00 65.00 1,900.00 21,265.00
16 HollowGalvanis 0.30 mm x 40 mm x 20 mm Btg 18,500.00 300.00 65.00 1,850.00 20,715.00
17 HollowGalvanis 0.30 mm x 40 mm x 40 mm Btg 22,500.00 300.00 65.00 2,250.00 25,115.00
18 Rangka Furing Btg 10,000.00 300.00 65.00 1,000.00 11,365.00
-
IV BAHAN PAKU -
1 Paku 1 Cm - 2,5 Cm Kg 16,000.00 80.00 65.00 1,600.00 17,745.00
2 Paku 5 Cm - 12 Cm Kg 15,000.00 80.00 65.00 1,500.00 16,645.00
3 Paku Skrup Kg 10,000.00 80.00 65.00 1,000.00 11,145.00
4 Paku Skrup 5 Cm Kg 14,500.00 80.00 65.00 1,450.00 16,095.00
5 Paku Skrup 10 Cm Kg 15,000.00 80.00 65.00 1,500.00 16,645.00
6 Paku Asbes Kg 26,900.00 80.00 65.00 2,690.00 29,735.00
7 Paku Atap Genteng Metal Kg 22,000.00 80.00 65.00 2,200.00 24,345.00
8 Paku Atap Seng Gelombang Kg 22,500.00 80.00 65.00 2,250.00 24,895.00
-
V BAHAN ALLUMUNIUM -
1 Profil Allumunium "T" M' 22,850.00 275.00 715.00 2,285.00 26,125.00
-
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
VI BAHAN LANTAI -
1 Homogenius (60x60) Cm Buah 72,000.00 100.00 65.00 7,200.00 79,365.00
2 Keramik (40x40) Cm Buah 8,000.00 100.00 65.00 800.00 8,965.00
3 Keramik (30x30) Cm Buah 4,000.00 100.00 65.00 400.00 4,565.00
4 Keramik (20x20) Cm Buah 1,800.00 100.00 65.00 180.00 2,145.00
5 Keramik (20x25) Cm Buah 1,800.00 100.00 65.00 180.00 2,145.00
6 Homogenius Warna (60x60) Cm Buah 80,000.00 100.00 65.00 8,000.00 88,165.00
7 Keramik Warna (40x40) Cm Buah 8,300.00 100.00 65.00 830.00 9,295.00
8 Keramik Warna (30x30) Cm Buah 4,200.00 100.00 65.00 420.00 4,785.00
9 Keramik Warna (20x20) Cm Buah 2,000.00 100.00 65.00 200.00 2,365.00
10 Plint Keramik (10x20) Cm Buah 1,250.00 50.00 32.50 125.00 1,457.50
11 Plint Keramik (10x30) Cm Buah 2,200.00 30.00 19.50 220.00 2,469.50
12 Plint Keramik (10x40) Cm Buah 2,900.00 25.00 16.25 290.00 3,231.25
13 Plint Homogenius (10x60) Cm Buah 12,000.00 20.00 13.00 1,200.00 13,233.00
14 Plint Keramik Warna (10x20) Cm Buah 1,000.00 50.00 32.50 100.00 1,182.50
15 Plint Keramik Warna (10x30) Cm Buah 1,400.00 30.00 19.50 140.00 1,589.50
16 Plint Keramik Warna (10x40) Cm Buah 2,075.00 25.00 16.25 207.50 2,323.75
17 Plint Homogenius Warna (10x60) Cm Buah 13,333.33 20.00 13.00 1,333.33 14,699.67
18 Bon-bon Keramik M' 7,750.00 20.00 13.00 775.00 8,558.00
19 Floor hardener M2 34,800.00 100.00 65.00 3,480.00 38,445.00
20 Parquette M2 225,500.00 100.00 65.00 22,550.00 248,215.00
21 Karpet M2 12,959.00 323.98 2,198.30 1,295.90 16,777.18
-
VII BAHAN ATAP -
1 Asbes Gelombang Lbr 31,000.00 100.00 130.00 3,100.00 34,330.00
2 Atap canopy (poly carbonat + rangka hollowstarbus) M2 250,000.00 100.00 130.00 25,000.00 275,230.00
3 Genteng Metal gelombang Lbr 77,000.00 100.00 130.00 7,700.00 84,930.00
4 Genteng Metal alur lurus Lbr 39,000.00 100.00 130.00 3,900.00 43,130.00
5 Perabung genteng metal Lbr 25,000.00 100.00 130.00 2,500.00 27,730.00
6 Seng Gelombang BJLS 020 K Lbr 37,800.00 100.00 130.00 3,780.00 41,810.00
7 Seng Gelombang Alumunium 0,25 Lbr 65,000.00 100.00 130.00 6,500.00 71,730.00
8 Seng Plat BJLS 20 Lbr 59,720.00 100.00 130.00 5,972.00 65,922.00
9 Atap Multi Sirap Lbr 5,100.00 100.00 130.00 510.00 5,840.00
10 EDF M2 250,000.00 100.00 130.00 25,000.00 275,230.00
11 Genteng Beton warna BH 21,520.00 100.00 130.00 2,152.00 23,902.00
12 Bubungan beton warna BH 28,000.00 100.00 130.00 2,800.00 31,030.00
13 Allumunium Foil / Sisalation M2 10,000.00 100.00 130.00 1,000.00 11,230.00
14 Formika M2 40,000.00 500.00 650.00 4,000.00 45,150.00
-
VIII BAJA RINGAN -
1 Supertruss C75. 100INT Kg 29,000.00 100.00 130.00 25,000.00 35,700.00
2 Supertruss C75. 75INT Kg 27,000.00 100.00 130.00 25,000.00 33,000.00
3 Topspan 40,055 INT Kg 24,770.00 100.00 130.00 25,000.00 31,500.00
4 Wteks 12-14x20 HWFS Kls II Pc 160.00 100.00 130.00 510.00 900.00
5 CSP 10-16X16 HWFS Kls II Pc 160.00 100.00 130.00 510.00 900.00
6 SG10 Multiplate Pc 7,660.00 100.00 130.00 510.00 8,400.00
-
IX BAHAN LANGIT-LANGIT -
1 Teakwood (lapis jati) Tebal 3,6 mm Lembar 150,000.00 500.00 650.00 15,000.00 166,150.00
2 Plywood (Multiplek) 9 mm Lembar 111,000.00 500.00 650.00 11,100.00 123,250.00
3 Plywood (triplek) 3,6 mm Lembar 76,000.00 500.00 650.00 7,600.00 84,750.00
4 Gypsum Board 9 mm Lembar 85,000.00 500.00 650.00 8,500.00 94,650.00
5 List Gypsum lbr 15-20cm M' 17,600.00 500.00 650.00 1,760.00 20,510.00
6 Papan Gypsum 9 mm setara jayaboard Lembar 48,000.00 1,700.00 325.00 4,800.00 54,825.00
7 Papan Gypsum 8 mm setara jayaboard Lembar 34,500.00 1,550.00 325.00 3,450.00 39,825.00
8 Asbes Semen M2 31,200.00 500.00 650.00 3,120.00 35,470.00
9 Triplek melamin Lembar 75,000.00 500.00 650.00 7,500.00 83,650.00
-
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
X BAHAN PIPA DAN SANITAIR -
1 Pipa PVC Type AW 1/2" M' 3,500.00 50.00 130.00 350.00 4,030.00
2 Pipa PVC Type AW 3/4" M' 5,200.00 50.00 130.00 520.00 5,900.00
3 Pipa PVC Type AW 1" M' 5,200.00 50.00 130.00 520.00 5,900.00
4 Pipa PVC Type AW 2" M' 14,700.00 50.00 130.00 1,470.00 16,350.00
5 Pipa PVC Type AW 3" M' 29,000.00 50.00 130.00 2,900.00 32,080.00
6 Pipa PVC Type AW 4" M' 44,500.00 50.00 130.00 4,450.00 49,130.00
7 Pipa PVC Type AW 6" M' 40,000.00 50.00 130.00 4,000.00 44,180.00
8 Pipa Abu-abu 4" M' 15,000.00 50.00 130.00 1,500.00 16,680.00
9 Pipa GIP dia 1" M' 55,000.00 50.00 130.00 5,500.00 60,680.00
10 Pipa GIP dia 1,5" M' 82,000.00 50.00 130.00 8,200.00 90,380.00
11 Pipa GIP dia 2" M' 112,000.00 50.00 130.00 11,200.00 123,380.00
12 Pipa Besi dia 1" M' 35,000.00 50.00 130.00 3,500.00 38,680.00
13 Pipa Besi dia 1,5" M' 21,000.00 50.00 130.00 2,100.00 23,280.00
14 Pipa Besi dia 3/4" M' 28,000.00 50.00 130.00 2,800.00 30,980.00
15 Stop kran 3/4" Bh 47,000.00 50.00 130.00 4,700.00 51,880.00
16 Kran Air 1/2" atau 3/4" plastik Bh 12,500.00 50.00 130.00 1,250.00 13,930.00
17 Kran Air 1/2" atau 3/4" stainless Bh 125,000.00 50.00 130.00 12,500.00 137,680.00
18 Bak Fiberglass Kap. Kecil Bh 160,000.00 5,000.00 13,000.00 16,000.00 194,000.00
19 Bak Fiberglass Kap. Besar Bh 250,000.00 5,000.00 13,000.00 25,000.00 293,000.00
20 Kloset Duduk Monoblok Bh 1,600,000.00 5,000.00 13,000.00 160,000.00 1,778,000.00
21 Kloset Jongkok Porselen Bh 150,000.00 5,000.00 13,000.00 15,000.00 183,000.00
22 Urinoir Bh 1,300,000.00 5,000.00 13,000.00 130,000.00 1,448,000.00
23 Wastafel kecil standard dinding Bh 450,000.00 5,000.00 13,000.00 45,000.00 513,000.00
24 Seal Tape Bh 5,100.00 50.00 48.75 510.00 5,708.75
25 Floor Drain stainless Bh 160,000.00 50.00 130.00 16,000.00 176,180.00
26 Floor Drain plastik Bh 15,000.00 50.00 130.00 1,500.00 16,680.00
27 Tangki Plastik 250 L Unit 400,000.00 5,000.00 13,000.00 40,000.00 458,000.00
28 Tangki Plastik 500 L Unit 600,000.00 5,000.00 13,000.00 60,000.00 678,000.00
29 Tangki Plastik 1000 L setara Tedmond Unit 1,000,000.00 5,000.00 13,000.00 100,000.00 1,118,000.00
30 Tangki Stainless 500 Liter setara Tedmond Unit 1,600,000.00 5,000.00 13,000.00 160,000.00 1,778,000.00
31 Tangki Stainless 1100 Liter + Kaki setara Tedmond Unit 3,250,000.00 5,000.00 13,000.00 325,000.00 3,593,000.00
-
XI BAHAN PINTU -
1 Pintu Besi M2 660,500.00 5,000.00 13,000.00 66,050.00 744,550.00
2 Pintu Fiber Warna Lbr 754,500.00 5,000.00 13,000.00 21,000.00 793,500.00
3 Pintu Fiber KM/WC (lengkap) Lbr 210,000.00 5,000.00 13,000.00 21,000.00 249,000.00
4 Pintu Panel Tembusu Lbr 760,500.00 5,000.00 13,000.00 76,050.00 854,550.00
5 Pintu Panel Meranti Lbr 470,000.00 5,000.00 13,000.00 47,000.00 535,000.00
6 Pintu Plywood (triplek depan blkg) Lbr 190,000.00 5,000.00 13,000.00 19,000.00 227,000.00
7 Pintu Teakwood (lapis jati) depan belakang Lbr 620,000.00 5,000.00 13,000.00 62,000.00 700,000.00
8 Vertical Blind M2 90,000.00 5,000.00 1,722.50 9,000.00 105,722.50
9 Rolling Door M2 300,000.00 5,000.00 6,500.00 30,000.00 341,500.00
10 Folding Gate M2 500,000.00 5,000.00 6,500.00 50,000.00 561,500.00
11 Pintu Aluminium Kaca Lbr 2,100,000.00 5,000.00 6,500.00 210,000.00 2,321,500.00
-
XII BAHAN PENGGANTUNG / KUNCI -
1 Kunci Tanam Antik kuningan (standard) Bh 200,000.00 100.00 195.00 20,000.00 220,295.00
2 Kunci Tanam Biasa stainless (minimalis) Bh 100,000.00 100.00 195.00 10,000.00 110,295.00
3 Kunci Tanam Kamar Mandi Bh 38,000.00 100.00 195.00 3,800.00 42,095.00
4 Kunci Silinder Bh 23,500.00 100.00 195.00 2,350.00 26,145.00
5 Engsel Pintu 4" Bh 15,000.00 100.00 195.00 1,500.00 16,795.00
6 Engsel Jendela 3" Bh 10,000.00 100.00 195.00 1,000.00 11,295.00
7 Grendel pintu 6" (krom) Bh 20,000.00 100.00 195.00 2,000.00 22,295.00
8 Grendel Pintu 4"(krom) Bh 11,000.00 100.00 195.00 1,100.00 12,395.00
9 Grendel Jendela 2" (krom) Bh 8,500.00 100.00 195.00 850.00 9,645.00
10 Kait Angin / Hak Angin Bh 7,500.00 100.00 195.00 750.00 8,545.00
11 Tarikan Tangan Bh 7,500.00 100.00 195.00 750.00 8,545.00
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
12 Door Closer Bh 395,000.00 100.00 195.00 39,500.00 434,795.00
13 Door Stoper Plastik Bh 20,500.00 100.00 195.00 2,050.00 22,845.00
-
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
XIII BAHAN KACA -
1 Kaca 3 mm M2 76,500.00 800.00 3,250.00 7,650.00 88,200.00
2 Kaca 5 mm M2 87,000.00 800.00 3,250.00 8,700.00 99,750.00
3 Kaca es/buram 3 mm M2 60,000.00 800.00 3,250.00 6,000.00 70,050.00
4 Kaca es/buram 5 mm M2 67,500.00 800.00 3,250.00 6,750.00 78,300.00
5 Kaca patry M2 180,000.00 800.00 3,250.00 18,000.00 202,050.00
6 Kaca Rayben 3 mm M2 92,000.00 800.00 3,250.00 9,200.00 105,250.00
7 Kaca Rayben 5 mm M2 95,000.00 800.00 3,250.00 9,500.00 108,550.00
8 Jendela Nako (rangka + Kaca 5 mm) M2 85,000.00 800.00 3,250.00 8,500.00 97,550.00
9 Glass Block Ukuran standard BH 15,000.00 800.00 3,250.00 1,500.00 20,550.00
-
XIV BAHAN LISTRIK -
1 Pemasangan Titik Lampu (termasuk kabel,teedus, fitting) Ttk
180,000.00 - 180,000.00
2 Lampu Pijar 25 Watt Bh 6,500.00 5.00 5.00 650.00 7,160.00
3 Lampu Pijar 40 Watt Bh 8,200.00 5.00 5.00 820.00 9,030.00
4 Lampu Neon Jantung Bh 75,000.00 5.00 5.00 7,500.00 82,510.00
5 Lampu Save Energy (Lilin) Setara Philips Bh 50,000.00 5.00 5.00 5,000.00 55,010.00
6 Lampu TL Komplit 1 x 20 watt Bh 74,500.00 50.00 50.00 7,450.00 82,050.00
7 Lampu TL Komplit 2 x 20 Watt Bh 310,500.00 50.00 50.00 31,050.00 341,650.00
8 Lampu TL Komplit 1 x 40 Watt Bh 100,000.00 50.00 50.00 10,000.00 110,100.00
9 Lampu Down Light 4" komplit Bh 94,000.00 50.00 50.00 9,400.00 103,500.00
10 Lampu Baret Bh 188,000.00 50.00 65.00 18,800.00 206,915.00
11 Stop Kontak (setara broco) Bh 14,500.00 50.00 65.00 1,450.00 16,065.00
12 Saklar Tunggal (setara broco) Bh 14,500.00 50.00 65.00 1,450.00 16,065.00
13 Saklar Ganda (setara broco) Bh 21,600.00 50.00 65.00 2,160.00 23,875.00
14 Saklar Triple (setara broco) Bh 27,000.00 50.00 65.00 2,700.00 29,815.00
15 Zakering Khas (setara merlin gerlin) Bh 50,000.00 50.00 65.00 5,000.00 55,115.00
-
XV BAHAN CAT -
1 Cat Tembok setara maxilite Kg 19,300.00 100.00 130.00 1,930.00 21,460.00
2 Cat Tembok setara Catylac kg 38,270.00 100.00 130.00 900.00 39,400.00
3 Cat Kayu Kg 43,500.00 100.00 130.00 4,350.00 48,080.00
4 Cat Dasar / Kapur Kg 6,000.00 100.00 130.00 600.00 6,830.00
5 Cat Dasar / Menie Kayu Kg 27,000.00 100.00 130.00 2,700.00 29,930.00
6 Cat Vernish Kg 56,150.00 100.00 130.00 5,615.00 61,995.00
7 Cat Impra Kg 41,500.00 100.00 130.00 4,150.00 45,880.00
8 Cat Residu Kg 9,800.00 100.00 130.00 980.00 11,010.00
9 Soda Api Kg 11,600.00 100.00 130.00 1,160.00 12,990.00
10 Plamir setara RJ Kg 27,250.00 100.00 130.00 2,725.00 30,205.00
11 Dempul Kayu Kg 38,400.00 100.00 130.00 3,840.00 42,470.00
12 Kertas Amplas Lbr 6,150.00 25.00 32.50 615.00 6,822.50
13 Kuas 3" Bh 17,300.00 25.00 32.50 1,730.00 19,087.50
14 Kuas Golong/rol Bh 26,350.00 25.00 32.50 2,635.00 29,042.50
15 Thinner Ltr 19,000.00 100.00 130.00 1,900.00 21,130.00
16 Flincote / Menie Besi Kg 16,500.00 100.00 130.00 1,650.00 18,380.00
-
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
XVI BAHAN LAIN-LAIN -
1 Air Liter 20.00 1.00 3.25 2.00 26.25
2 Lem Kg 2,500.00 125.00 146.25 250.00 3,021.25
3 Lem Kayu Kg 25,300.00 125.00 146.25 2,530.00 28,101.25
4 Sealant Tube 12,000.00 125.00 146.25 1,200.00 13,471.25
5 Profil Kaca M' 1,700.00 42.50 110.50 170.00 2,023.00
6 Solar Liter 4,500.00 100.00 130.00 450.00 5,180.00
7 Minyak Pelumas Liter 23,000.00 308.13 801.13 2,300.00 26,409.26
8 Minyak Bekisting Liter 6,950.00 182.50 451.75 695.00 8,279.25
9 Aspal Kg 7,800.00 195.00 507.00 780.00 9,282.00
10 Tempat Masak Aspal BH 43,950.00 1,098.75 2,856.75 4,395.00 52,300.50
11 Ijuk Kg 10,400.00 100.00 130.00 1,040.00 11,670.00
12 Water proofing Coating Kg 22,500.00 100.00 130.00 2,250.00 24,980.00
13 Water proofing Membran M2 80,000.00 500.00 650.00 8,000.00 89,150.00
14 Batu Coral sikat ZAK 50,000.00 500.00 650.00 5,000.00 56,150.00
-
XVII Alat -
1 Mesin las Jam 98,100.00 - 98,100.00
2 Meja kayu 1 biro Unit 675,000.00 2,000.00 3,250.00 67,500.00 747,750.00
3 Meja kayu ramin + triplek motif teakwood 1 biro Unit 400,000.00 2,000.00 3,250.00 40,000.00 445,250.00
4 Meja kayu 1/2 biro Unit 425,000.00 2,000.00 3,250.00 42,500.00 472,750.00
5 Meja kayu ramin + triplek motif teakwood 1/2 biro Unit 225,000.00 2,000.00 3,250.00 22,500.00 252,750.00
6 Kursi direktur sedang (kaki 5 beroda) Unit 675,000.00 2,000.00 3,250.00 67,500.00 747,750.00
7 Kursi hadap (polaris) kaki besi, alas busa lapis kain Unit 200,000.00 2,000.00 1,300.00 20,000.00 223,300.00
8 Kursi Plastik Unit 40,000.00 1,000.00 3,250.00 4,000.00 48,250.00
9 Lemari Arsip 2 pintu (papan serbuk+kaca) Unit 725,000.00 2,000.00 3,250.00 72,500.00 802,750.00
10 Lemari Arsip 2 pintu sliding (besi+kaca) Unit 1,750,000.00 2,000.00 3,250.00 175,000.00 1,930,250.00
11 Filling Cabinet 4 laci Unit 1,257,354.00 2,000.00 3,250.00 125,735.40 1,388,339.40
12 Kursi Tamu standard (kayu, alas busa lapis kain Unit 1,800,000.00 2,000.00 3,250.00 180,000.00 1,985,250.00
13 Kursi tunggu (besi) 4 susun Unit 1,400,000.00 2,000.00 3,250.00 140,000.00 1,545,250.00
Bangkinang, Januari 2013
NO. JENIS BAHAN SATUAN
HARGA
TOKO/QUARRY
MUAT BONGKAR TRANSPORT OVERHEAD (10%)
JUMLAH HARGA
BAHAN
KETERANGAN
1 2 3 4 5 6 7 8 9
-
25.38
28.87 12,250.00 35,000.00
OK 12,250.00 35,000.00
OK 12,250.00 35,000.00
17,500.00 50,000.00
OK 12,250.00 35,000.00
12,250.00 35,000.00
17,500.00 50,000.00
12,250.00 35,000.00
64,625.00 OK 3.50 10.00
3.50 10.00
175.00 500.00
7.00 20.00
28.00 80.00
28.00 80.00
350.00 1,000.00
350.00 1,000.00
12,250.00 35,000.00
12,250.00 35,000.00
28.00 80.00
28.00 80.00
28.00 80.00
28.00 80.00
1,750.00 5,000.00
5,250.00 15,000.00
5,250.00 15,000.00
7,000.00 20,000.00
7,000.00 20,000.00
-
-
12,250.00 35,000.00
12,250.00 35,000.00
12,250.00 35,000.00
3.50 10.00
3.50 10.00
12,250.00 35,000.00
1,050.00 3,000.00
175.00 500.00
12,250.00 35,000.00
12,250.00 35,000.00
350.00 1,000.00
3,500.00 10,000.00
3,500.00 10,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
-
-
OK 35.00 100.00
OK 35.00 100.00
OK 17.50 50.00
17.50 50.00
17.50 50.00
70.00 200.00
52.50 150.00
52.50 150.00
52.50 150.00
52.50 150.00
350.00 1,000.00
70.00 200.00
70.00 200.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
-
-
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
-
-
385.00 1,100.00
-
-
35.00 100.00
8.50 35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
17.50 50.00
10.50 30.00
8.75 25.00
7.00 20.00
17.50 50.00
10.50 30.00
8.75 25.00
7.00 20.00
7.00 20.00
35.00 100.00
35.00 100.00
1,183.70 3,382.00
-
-
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
OK 70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
350.00 1,000.00
-
-
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
-
-
350.00 1,000.00
350.00 1,000.00
OK 350.00 1,000.00
350.00 1,000.00
350.00 1,000.00
175.00 500.00
175.00 500.00
350.00 1,000.00
350.00 1,000.00
-
-
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
26.25 75.00
70.00 200.00
70.00 200.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
-
-
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
7,000.00 20,000.00
927.50 2,650.00
3,500.00 10,000.00
3,500.00 10,000.00
3,500.00 10,000.00
-
-
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
105.00 300.00
-
-
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
-
-
-
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
70.00 200.00
70.00 200.00
70.00 200.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
35.00 100.00
-
-
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
70.00 200.00
17.50 50.00
17.50 50.00
17.50 50.00
70.00 200.00
70.00 200.00
-
-
1.75 5.00
78.75 225.00
78.75 225.00
78.75 225.00
59.50 170.00
70.00 200.00
431.38 1,232.50
243.25 695.00
273.00 780.00
1,538.25 4,395.00
70.00 200.00
70.00 200.00
350.00 1,000.00
350.00 1,000.00
-
-
-
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
700.00 2,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
1,750.00 5,000.00
49,500.00
60,500.00
60,500.00
60,500.00
82,500.00
60,500.00
82,500.00
66,000.00
60,500.00
60,500.00
60,500.00
60,500.00
DAFTAR UPAH
NO. JENIS UPAH SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
1 Pekerja OH 62,100.00
2 Tukang Gali OH 74,750.00
3 Tukang Kayu OH 75,900.00
4 Tukang Batu OH 74,750.00
5 Tukang Las OH 74,750.00
6 Tukang Besi OH 74,750.00
7 Tukang Pipa OH 75,900.00
8 Tukang Cat OH 74,750.00
9 Kepala Tukang OH 75,900.00
10 Mandor OH 80,500.00
11 Operator OH 86,250.00
12 Pembantu Operator OH 64,400.00
DAFTAR BAHAN BANGUNAN
NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
I BAHAN PASANGAN
1 Pasir Urug (PU) M3 129,430.00
2 Pasir Pasang (PP) M3 180,250.00
3 Pasir Beton (PB) M3 176,950.00
4 Pasir Kuarsa M3 261,500.00
5 Kerikil (KR) M3 172,875.00
6 Sirtu M3 121,950.00
7 Batu Belah (gunung) 15cm/20 cm M3 405,250.00
8 Batu sungai (mangga) M3 377,750.00
9 Portland Cement (PC) Kg 1,292.50
10 Semen putih Kg 1,666.50
11 Cornite Compound Jayaboard Zak 79,825.00
12 Bata Merah (kulim) Buah 336.50
13 Kerawang (Roster semen)20x20 cm Buah 24,272.00
14 Kerawang (Roster semen)40x40 cm Buah 49,572.00
15 Rumput Gajah Mini M2 13,800.00
16 Rumput Biasa M2 13,250.00
17 Tanah Hitam M3 90,050.00
18 Tanah Urug M3 46,750.00
19 Conblock K.175 T= 6 cm Bh 1,832.00
20 Conblock K.225 T= 6 cm Bh 2,052.00
21 Conblock K.300 T= 8 cm Bh 2,272.00
22 Grass Block T= 6 cm Bh 20,972.00
23 Buis Beton Dia 20cm P= 50 Cm Bh 52,250.00
24 Buis Beton Dia 40cm P = 60 Cm Bh 138,550.00
25 Buis Beton Dia 60cm P= 80 Cm Bh 233,750.00
26 Buis Beton Dia 80cm P= 100 Cm Bh 390,500.00
27 Buis Beton Dia 100cm P = 100 Cm Bh 473,000.00
DAFTAR HARGA SATUAN UPAH
DAN BAHAN BANGUNAN
II BAHAN KAYU
1 Kayu Kelas I M3 3,892,750.00
2 Kayu Kelas II M3 2,462,750.00
3 Kayu Kelas III M3 2,022,750.00
4 Kayu List Profil siku2" M' 2,761.50
5 Kayu List Profil 0.8x3" M' 3,311.50
6 Papan 2 x 20 M3 2,022,750.00
7 Kayu Cerocok dia. 10 - 15 cm Btg 48,100.00
8 Dolken Kayu Galam, (8-10)Cm,Panjang 4 M Batang 11,275.00
9 Kayu Bakar M3 757,750.00
10 Papan Piri - piri (Siap Ketam 3 sisi) M3 2,462,750.00
11 Papan Lebah Bergayut M' 45,150.00
12 Singap Ukir kayu M2 746,500.00
13 Singap Ukir GRC M2 449,500.00
14 Selembayung GRC Lembar 30 cm Pasang 444,250.00
15 Selembayung kayu lebar 30 cm Pasang 279,250.00
16 Sayap layang-layang lebar 30 cm Pasang 279,250.00
17 Lisplank papan + anak ( + 30 cm) M' 59,250.00
III BAHAN BESI DAN BAJA
1 Besi Beton Polos Kg 14,965.00
2 Besi Beton Ulir Kg 17,935.00
3 Kawat Beton Kg 17,982.50
4 Kawat 4 mm Kg 16,002.50
5 Kawat Las Listrik Kg 31,402.50
6 Kawat Ayam M2 15,366.30
7 Besi Strip Tebal 5 mm Kg 11,117.50
8 Baja Ringan C75 100 int kg 32,017.50
9 Baja Ringan C75 75 int Kg 29,817.50
10 Baja IWF Kg 13,152.50
11 Terali besi (Non Motif) M2 380,050.00
12 Baja Siku Kg 16,430.00
13 Pagar Hollow starbuss 1,2 mm x 20 mm x mm (standard minimalis) M2 297,150.00
14 Hollow Ment Hijau 0.25mm x 40 mm x 20 mm Btg 17,965.00
15 Hollow Ment Hijau 0.25mm x 40 mm x 40 mm Btg 21,265.00
16 Hollow Galvanis 0.30 mm x 40 mm x 20 mm Btg 20,715.00
17 Hollow Galvanis 0.30 mm x 40 mm x 40 mm Btg 25,115.00
18 Rangka Furing Btg 11,365.00
IV BAHAN PAKU
1 Paku 1 Cm - 2,5 Cm Kg 17,745.00
2 Paku 5 Cm - 12 Cm Kg 16,645.00
3 Paku Skrup Kg 11,145.00
4 Paku Skrup 5 Cm Kg 16,095.00
5 Paku Skrup 10 Cm Kg 16,645.00
6 Paku Asbes Kg 29,735.00
7 Paku Atap Genteng Metal Kg 24,345.00
8 Paku Atap Seng Gelombang Kg 24,895.00
V BAHAN ALLUMUNIUM
1 Profil Allumunium "T" M' 26,125.00
VI BAHAN LANTAI
1 Homogenius (60x60) Cm Buah 79,365.00
2 Keramik (40x40) Cm Buah 8,965.00
3 Keramik (30x30) Cm Buah 4,565.00
4 Keramik (20x20) Cm Buah 2,145.00
5 Keramik (20x25) Cm Buah 2,145.00
6 Homogenius Warna (60x60) Cm Buah 88,165.00
7 Keramik Warna (40x40) Cm Buah 9,295.00
8 Keramik Warna (30x30) Cm Buah 4,785.00
9 Keramik Warna (20x20) Cm Buah 2,365.00
10 Plint Keramik (10x20) Cm Buah 1,457.50
11 Plint Keramik (10x30) Cm Buah 2,469.50
12 Plint Keramik (10x40) Cm Buah 3,231.25
13 Plint Homogenius (10x60) Cm Buah 13,233.00
14 Plint Keramik Warna (10x20) Cm Buah 1,182.50
15 Plint Keramik Warna (10x30) Cm Buah 1,589.50
16 Plint Keramik Warna (10x40) Cm Buah 2,323.75
17 Plint Homogenius Warna (10x60) Cm Buah 14,699.67
18 Bon-bon Keramik M' 8,558.00
19 Floor hardener M2 38,445.00
20 Parquette M2 248,215.00
21 Karpet M2 16,777.18
VII BAHAN ATAP
1 Asbes Gelombang Lbr 34,330.00
2 Atap canopy (poly carbonat + rangka hollow starbus) M2 275,230.00
3 Genteng Metal gelombang Lbr 84,930.00
4 Genteng Metal alur lurus Lbr 43,130.00
5 Perabung genteng metal Lbr 27,730.00
6 Seng Gelombang BJLS 020 K Lbr 41,810.00
7 Seng Gelombang Alumunium 0,25 Lbr 71,730.00
8 Seng Plat BJLS 20 Lbr 65,922.00
9 Atap Multi Sirap Lbr 5,840.00
10 EDF M2 275,230.00
11 Genteng Beton warna BH 23,902.00
12 Bubungan beton warna BH 31,030.00
13 Allumunium Foil / Sisalation M2 11,230.00
14 Formika M2 45,150.00
VIII BAJA RINGAN
1 Supertruss C75. 100INT Kg 35,700.00
2 Supertruss C75. 75INT Kg 33,000.00
3 Topspan 40,055 INT Kg 31,500.00
4 Wteks 12-14x20 HWFS Kls II Pc 900.00
5 CSP 10-16X16 HWFS Kls II Pc 900.00
6 SG10 Multiplate Pc 8,400.00
IX BAHAN LANGIT-LANGIT
1 Teakwood (lapis jati) Tebal 3,6 mm Lembar 166,150.00
2 Plywood (Multiplek) 9 mm Lembar 123,250.00
3 Plywood (triplek) 3,6 mm Lembar 84,750.00
4 Gypsum Board 9 mm Lembar 94,650.00
5 List Gypsum lbr 15-20cm M' 20,510.00
6 Papan Gypsum 9 mm setara jayaboard Lembar 54,825.00
7 Papan Gypsum 8 mm setara jayaboard Lembar 39,825.00
8 Asbes Semen M2 35,470.00
9 Triplek melamin Lembar 83,650.00
X BAHAN PIPA DAN SANITAIR
1 Pipa PVC Type AW 1/2" M' 4,030.00
2 Pipa PVC Type AW 3/4" M' 5,900.00
3 Pipa PVC Type AW 1" M' 5,900.00
4 Pipa PVC Type AW 2" M' 16,350.00
5 Pipa PVC Type AW 3" M' 32,080.00
6 Pipa PVC Type AW 4" M' 49,130.00
7 Pipa PVC Type AW 6" M' 44,180.00
8 Pipa Abu-abu 4" M' 16,680.00
9 Pipa GIP dia 1" M' 60,680.00
10 Pipa GIP dia 1,5" M' 90,380.00
11 Pipa GIP dia 2" M' 123,380.00
12 Pipa Besi dia 1" M' 38,680.00
13 Pipa Besi dia 1,5" M' 23,280.00
14 Pipa Besi dia 3/4" M' 30,980.00
15 Stop kran 3/4" Bh 51,880.00
16 Kran Air 1/2" atau 3/4" plastik Bh 13,930.00
17 Kran Air 1/2" atau 3/4" stainless Bh 137,680.00
18 Bak Fiberglass Kap. Kecil Bh 194,000.00
19 Bak Fiberglass Kap. Besar Bh 293,000.00
20 Kloset Duduk Monoblok Bh 1,778,000.00
21 Kloset Jongkok Porselen Bh 183,000.00
22 Urinoir Bh 1,448,000.00
23 Wastafel kecil standard dinding Bh 513,000.00
24 Seal Tape Bh 5,708.75
25 Floor Drain stainless Bh 176,180.00
26 Floor Drain plastik Bh 16,680.00
27 Tangki Plastik 250 L Unit 458,000.00
28 Tangki Plastik 500 L Unit 678,000.00
29 Tangki Plastik 1000 L setara Tedmond Unit 1,118,000.00
30 Tangki Stainless 500 Liter setara Tedmond Unit 1,778,000.00
31 Tangki Stainless 1100 Liter + Kaki setara Tedmond Unit 3,593,000.00
XI BAHAN PINTU
1 Pintu Besi M2 744,550.00
3 Pintu Fiber KM/WC (lengkap) Lbr 249,000.00
4 Pintu Panel Tembusu Lbr 854,550.00
5 Pintu Panel Meranti Lbr 535,000.00
6 Pintu Plywood (triplek depan blkg) Lbr 227,000.00
7 Pintu Teakwood (lapis jati) depan belakang Lbr 700,000.00
8 Vertical Blind M2 105,722.50
9 Rolling Door M2 341,500.00
10 Folding Gate M2 561,500.00
11 Pintu Aluminium Kaca Lbr 2,321,500.00
XII BAHAN PENGGANTUNG / KUNCI
1 Kunci Tanam Antik kuningan (standard) Bh 220,295.00
2 Kunci Tanam Biasa stainless (minimalis) Bh 110,295.00
3 Kunci Tanam Kamar Mandi Bh 42,095.00
4 Kunci Silinder Bh 26,145.00
5 Engsel Pintu 4" Bh 16,795.00
6 Engsel Jendela 3" Bh 11,295.00
7 Grendel pintu 6" (krom) Bh 22,295.00
8 Grendel Pintu 4"(krom) Bh 12,395.00
9 Grendel Jendela 2" (krom) Bh 9,645.00
10 Kait Angin / Hak Angin Bh 8,545.00
11 Tarikan Tangan Bh 8,545.00
12 Door Closer Bh 434,795.00
13 Door Stoper Plastik Bh 22,845.00
XIII BAHAN KACA
1 Kaca 3 mm M2 88,200.00
2 Kaca 5 mm M2 99,750.00
3 Kaca es/buram 3 mm M2 70,050.00
4 Kaca es/buram 5 mm M2 78,300.00
5 Kaca patry M2 202,050.00
6 Kaca Rayben 3 mm M2 105,250.00
7 Kaca Rayben 5 mm M2 108,550.00
8 Jendela Nako (rangka + Kaca 5 mm) M2 97,550.00
9 Glass Block Ukuran standard BH 20,550.00
XIV BAHAN LISTRIK
1 Pemasangan Titik Lampu (termasuk kabel,teedus, fitting) Ttk 180,000.00
2 Lampu Pijar 25 Watt Bh 7,160.00
3 Lampu Pijar 40 Watt Bh 9,030.00
4 Lampu Neon Jantung Bh 82,510.00
5 Lampu Save Energy (Lilin) Setara Philips Bh 55,010.00
6 Lampu TL Komplit 1 x 20 watt Bh 82,050.00
7 Lampu TL Komplit 2 x 20 Watt Bh 341,650.00
8 Lampu TL Komplit 1 x 40 Watt Bh 110,100.00
9 Lampu Down Light 4" komplit Bh 103,500.00
10 Lampu Baret Bh 206,915.00
11 Stop Kontak (setara broco) Bh 16,065.00
12 Saklar Tunggal (setara broco) Bh 16,065.00
13 Saklar Ganda (setara broco) Bh 23,875.00
14 Saklar Triple (setara broco) Bh 29,815.00
15 Zakering Khas (setara merlin gerlin) Bh 55,115.00
XV BAHAN CAT
1 Cat Tembok setara maxilite Kg 21,460.00
3 Cat Kayu Kg 48,080.00
4 Cat Dasar / Kapur Kg 6,830.00
5 Cat Dasar / Menie Kayu Kg 29,930.00
6 Cat Vernish Kg 61,995.00
7 Cat Impra Kg 45,880.00
8 Cat Residu Kg 11,010.00
9 Soda Api Kg 12,990.00
10 Plamir setara RJ Kg 30,205.00
11 Dempul Kayu Kg 42,470.00
12 Kertas Amplas Lbr 6,822.50
13 Kuas 3" Bh 19,087.50
14 Kuas Golong/rol Bh 29,042.50
15 Thinner Ltr 21,130.00
16 Flincote / Menie Besi Kg 18,380.00
XVI BAHAN LAIN-LAIN
1 Air Liter 26.25
2 Lem Kg 3,021.25
3 Lem Kayu Kg 28,101.25
4 Sealant Tube 13,471.25
5 Profil Kaca M' 2,023.00
6 Solar Liter 5,180.00
7 Minyak Pelumas Liter 26,409.26
8 Minyak Bekisting Liter 8,279.25
9 Aspal Kg 9,282.00
10 Tempat Masak Aspal BH 52,300.50
11 Ijuk Kg 11,670.00
12 Water proofing Coating Kg 24,980.00
13 Water proofing Membran M2 89,150.00
14 Batu Coral sikat ZAK 56,150.00
XVII Alat
1 Mesin las Jam 98,100.00
2 Meja kayu 1 biro Unit 747,750.00
3 Meja kayu ramin + triplek motif teakwood 1 biro Unit 445,250.00
4 Meja kayu 1/2 biro Unit 472,750.00
5 Meja kayu ramin + triplek motif teakwood 1/2 biro Unit 252,750.00
6 Kursi direktur sedang (kaki 5 beroda) Unit 747,750.00
7 Kursi hadap (polaris) kaki besi, alas busa lapis kain Unit 223,300.00
8 Kursi Plastik Unit 48,250.00
9 Lemari Arsip 2 pintu (papan serbuk+kaca) Unit 802,750.00
10 Lemari Arsip 2 pintu sliding (besi+kaca) Unit 1,930,250.00
11 Filling Cabinet 4 laci Unit 1,388,339.40
12 Kursi Tamu standard (kayu, alas busa lapis kain Unit 1,985,250.00
13 Kursi tunggu (besi) 4 susun Unit 1,545,250.00
Bangkinang, Januari 2013
0
I. PEKERJAAN PERSIAPAN
1. MEMASANG 1M' PAGAR SEMENTARA DARI KAYU TINGGI 2 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Dolken Kayu Galam, (8-
10)Cm,Panjang 4 M
Btg 1.250 11,275.00 Rp 14,093.75 Rp
PC Kg 2.500 1,292.50 Rp 3,231.25 Rp
PB M3 0.005 176,950.00 Rp 884.75 Rp
KR M3 0.009 172,875.00 Rp 1,555.88 Rp
Kayu Kelas II (Balok) M3 0.072 2,462,750.00 Rp 177,318.00 Rp
Paku 5 cm - 12 cm Kg 0.060 16,645.00 Rp 998.70 Rp
Residu Kg 0.400 11,010.00 Rp 4,404.00 Rp
Pekerja OH 0.400 62,100.00 Rp 24,840.00 Rp
Tukang Kayu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.020 80,500.00 Rp 1,610.00 Rp
Sub Jumlah 245,634.33 Rp
2. MEMASANG 1M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Dolken Kayu Galam, (8-
10)Cm,Panjang 4 M
Btg 1.250 11,275.00 Rp 14,093.75 Rp
PC Kg 2.500 1,292.50 Rp 3,231.25 Rp
Seng Gelombang Lbr 1.200 27,730.00 Rp 33,276.00 Rp
PB M3 0.005 176,950.00 Rp 884.75 Rp
KR M3 0.009 172,875.00 Rp 1,555.88 Rp
Kayu Kelas II (Balok) M3 0.072 2,462,750.00 Rp 177,318.00 Rp
Paku 5 cm - 12 cm Kg 0.060 16,645.00 Rp 998.70 Rp
Meni Besi Kg 0.400 90,050.00 Rp 36,020.00 Rp
Pekerja OH 0.400 62,100.00 Rp 24,840.00 Rp
Tukang Kayu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.020 80,500.00 Rp 1,610.00 Rp
Sub Jumlah 310,526.33 Rp
3. MEMASANG 1M' PAGAR SEMENTARA DARI KAWAT BERDURI TINGGI 1,8 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Dolken Kayu Galam, (8-
10)Cm,Panjang 4 M
Btg 1.000 11,275.00 Rp 11,275.00 Rp
PC Kg 2.000 1,292.50 Rp 2,585.00 Rp
Kawat Duri Kg 25.000 15,366.30 Rp 384,157.50 Rp
PB M3 0.005 176,950.00 Rp 884.75 Rp
KR M3 0.009 172,875.00 Rp 1,555.88 Rp
Pekerja OH 0.400 62,100.00 Rp 24,840.00 Rp
Tukang Kayu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.020 80,500.00 Rp 1,610.00 Rp
Sub Jumlah 443,606.13 Rp
4. PEMBUATAN 1M2 RUMAH JAGA KONSTRUKSI KAYU
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Dolken Kayu Galam, (8-
10)Cm,Panjang 4 M
Btg 1.500 1,292.50 Rp 1,938.75 Rp
Kayu Kelas II M3 1.000 2,462,750.00 Rp 2,462,750.00 Rp
Paku Biasa Kg 0.150 16,645.00 Rp 2,496.75 Rp
Seng Gelombang Lbr 0.050 27,730.00 Rp 1,386.50 Rp
Pekerja OH 3.000 62,100.00 Rp 186,300.00 Rp
Tukang Kayu OH 0.276 75,900.00 Rp 20,948.40 Rp
Kepala Tukang OH 0.700 75,900.00 Rp 53,130.00 Rp
Mandor OH 1.500 80,500.00 Rp 120,750.00 Rp
Sub Jumlah 2,849,700.40 Rp
Tenaga Kerja
Bahan
Bahan
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Tenaga Kerja
Tenaga Kerja
DAFTAR ANALISA PEKERJAAN
Kebutuhan
Kebutuhan
Bahan
5. 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 10,235.00 Rp
6. 1 M2 PENGUKURAN DAN PEMASANGAN BAWPLANK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.008 2,022,750.00 Rp 16,182.00 Rp
Paku Biasa KG 0.020 16,645.00 Rp 332.90 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Kayu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 31,476.40 Rp
7. MEMBONGKAR 1 M3 BETON BERTULANG
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 6.667 62,100.00 Rp 414,020.70 Rp
Mandor OH 0.333 80,500.00 Rp 26,806.50 Rp
Sub Jumlah 440,827.20 Rp
8. MEMBONGKAR 1 M3 TEMBOK BATA MERAH
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 6.667 62,100.00 Rp 414,020.70 Rp
Mandor OH 0.033 80,500.00 Rp 2,656.50 Rp
Sub Jumlah 416,677.20 Rp
II. PEKERJAAN TANAH
9. MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.700 62,100.00 Rp 43,470.00 Rp
Mandor OH 0.025 80,500.00 Rp 2,012.50 Rp
Sub Jumlah 45,482.50 Rp
10. MENGGALI 1 M3 TANAH BIASA SEDALAM 2 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.900 62,100.00 Rp 55,890.00 Rp
Mandor OH 0.045 80,500.00 Rp 3,622.50 Rp
Sub Jumlah 59,512.50 Rp
11. MENGGALI 1 M3 TANAH BIASA SEDALAM 3 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 1.050 62,100.00 Rp 65,205.00 Rp
Mandor OH 0.067 80,500.00 Rp 5,393.50 Rp
Sub Jumlah 70,598.50 Rp
12. MENGGALI 1 M3 TANAH KERAS SEDALAM 1 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Mandor OH 0.032 80,500.00 Rp 2,576.00 Rp
Sub Jumlah 64,676.00 Rp
13. MENGGALI 1 M3 TANAH CADAS SEDALAM 1 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Mandor OH 0.060 80,500.00 Rp 4,830.00 Rp
Sub Jumlah 97,980.00 Rp
14. MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 1.200 62,100.00 Rp 74,520.00 Rp
Mandor OH 0.045 80,500.00 Rp 3,622.50 Rp
Sub Jumlah 78,142.50 Rp
Tenaga Kerja
Kebutuhan
Kebutuhan
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
15. MENGERJAKAN 1 M2 STRIPPING TEBING SETINGGI 1 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.050 62,100.00 Rp 3,105.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 3,507.50 Rp
16. MEMBUANG 1 M3 TANAH SEJAUH 30 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.330 62,100.00 Rp 20,493.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 21,298.00 Rp
17. MENGURUG KEMBALI 1 M3 GALIAN
Mengurug kembali 1 M3 galian dihitung 1/3 kali dari indeks pekerjaan galian
18. MEMADATKAN 1 M3 TANAH (PER 20 CM)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pekerja OH 0.500 62,100.00 Rp 31,050.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 35,075.00 Rp
19. MENGURUG 1 M3 PASIR URUG
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Pasir Urug M3 1.200 129,430.00 Rp 155,316.00 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 174,751.00 Rp
20. MEMASANG 1 M2 LAPISAN LAPISAN IJUK TEBAL 10 CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Ijuk Kg 6.000 11,670.00 Rp 70,020.00 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 80,542.50 Rp
21. MENGURUG 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Sirtu M3 1.200 121,950.00 Rp 146,340.00 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Mandor OH 0.025 80,500.00 Rp 2,012.50 Rp
Sub Jumlah 163,877.50 Rp
22. MENGURUG 1 M3 TANAH URUG
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Tanah Urug M3 1.200 46,750.00 Rp 56,100.00 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 75,535.00 Rp
23. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 3 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PC Kg 202.000 1,292.50 Rp 261,085.00 Rp
PP M3 0.485 180,250.00 Rp 87,421.25 Rp
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Tukang Batu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 984,087.75 Rp
III. PEKERJAAN PONDASI
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Kebutuhan
Tenaga Kerja
Kebutuhan
24. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PC Kg 163.000 1,292.50 Rp 210,677.50 Rp
PP M3 0.520 180,250.00 Rp 93,730.00 Rp
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Tukang Batu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 939,989.00 Rp
25. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 5 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PC Kg 136.000 1,292.50 Rp 175,780.00 Rp
PP M3 0.544 180,250.00 Rp 98,056.00 Rp
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Tukang Batu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 909,417.50 Rp
26. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 6 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PC Kg 117.000 1,292.50 Rp 151,222.50 Rp
PP M3 0.561 180,250.00 Rp 101,120.25 Rp
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Tukang Batu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 887,924.25 Rp
27. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 8 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PC Kg 91.000 1,292.50 Rp 117,617.50 Rp
PP M3 0.584 180,250.00 Rp 105,266.00 Rp
Pekerja OH 1.500 62,100.00 Rp 93,150.00 Rp
Tukang Batu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 858,465.00 Rp
28. MEMASANG 1 M3 BATU KOSONG (AANSTAMPING)
Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 1.200 405,250.00 Rp 486,300.00 Rp
PU M3 0.432 129,430.00 Rp 55,913.76 Rp
Pekerja OH 0.780 62,100.00 Rp 48,438.00 Rp
Tukang Batu OH 0.390 75,900.00 Rp 29,601.00 Rp
Kepala Tukang OH 0.039 75,900.00 Rp 2,960.10 Rp
Mandor OH 0.039 80,500.00 Rp 3,139.50 Rp
Sub Jumlah 626,352.36 Rp
29. MEMASANG 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR DAN 40% BATU BELAH
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 0.480 405,250.00 Rp 194,520.00 Rp
PC Kg 194.000 1,292.50 Rp 250,745.00 Rp
PB M3 0.312 176,950.00 Rp 55,208.40 Rp
KR M3 0.468 172,875.00 Rp 80,905.50 Rp
Besi Beton polos Kg 126.000 14,965.00 Rp 1,885,590.00 Rp
Kawat Beton Kg 1.800 17,982.50 Rp 32,368.50 Rp
Pekerja OH 3.000 62,100.00 Rp 186,300.00 Rp
Tukang Batu OH 0.850 75,900.00 Rp 64,515.00 Rp
Kepala Tukang OH 0.085 75,900.00 Rp 6,451.50 Rp
Mandor OH 0.150 80,500.00 Rp 12,075.00 Rp
Sub Jumlah 2,768,678.90 Rp
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
30. MEMASANG 1 M3 PONDASI SUMURAN, DIAMETER 100 CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Batu belah 15 cm/20 cm M3 0.450 405,250.00 Rp 182,362.50 Rp
PC Kg 194.000 1,292.50 Rp 250,745.00 Rp
PB M3 0.312 176,950.00 Rp 55,208.40 Rp
KR M3 0.468 172,875.00 Rp 80,905.50 Rp
Pekerja OH 2.380 62,100.00 Rp 147,798.00 Rp
Tukang Batu OH 0.300 75,900.00 Rp 22,770.00 Rp
Kepala Tukang OH 0.030 75,900.00 Rp 2,277.00 Rp
Mandor OH 0.080 80,500.00 Rp 6,440.00 Rp
Sub Jumlah 748,506.40 Rp
31. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA
CAMPURAN SPESI 1 PC : 2 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 140.000 336.50 Rp 47,110.00 Rp
PC Kg 43.500 1,292.50 Rp 56,223.75 Rp
PP M3 0.080 180,250.00 Rp 14,420.00 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Batu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 174,126.75 Rp
32. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA
CAMPURAN SPESI 1 PC : 3 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 140.000 336.50 Rp 47,110.00 Rp
PC Kg 32.950 1,292.50 Rp 42,587.88 Rp
PP M3 0.091 180,250.00 Rp 16,402.75 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Batu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 162,473.63 Rp
33. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA
CAMPURAN SPESI 1 PC : 4 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 140.000 336.50 Rp 47,110.00 Rp
PC Kg 26.550 1,292.50 Rp 34,315.88 Rp
PP M3 0.093 180,250.00 Rp 16,763.25 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Batu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 154,562.13 Rp
34. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA
CAMPURAN SPESI 1 PC : 5 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 140.000 336.50 Rp 47,110.00 Rp
PC Kg 22.200 1,292.50 Rp 28,693.50 Rp
PP M3 0.102 180,250.00 Rp 18,385.50 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Batu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 150,562.00 Rp
IV. PEKERJAAN DINDING
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
35. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA
CAMPURAN SPESI 1 PC : 6 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 140.000 336.50 Rp 47,110.00 Rp
PC Kg 18.500 1,292.50 Rp 23,911.25 Rp
PP M3 0.122 180,250.00 Rp 21,990.50 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Batu OH 0.200 75,900.00 Rp 15,180.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 149,384.75 Rp
36. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 2 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 18.950 1,292.50 Rp 24,492.88 Rp
PP M3 0.038 180,250.00 Rp 6,849.50 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 93,178.88 Rp
37. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 3 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 14.370 1,292.50 Rp 18,573.23 Rp
PP M3 0.040 180,250.00 Rp 7,210.00 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 87,619.73 Rp
38. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 4 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 11.500 1,292.50 Rp 14,863.75 Rp
PP M3 0.043 180,250.00 Rp 7,750.75 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 84,451.00 Rp
39. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 5 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 9.680 1,292.50 Rp 12,511.40 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 82,459.15 Rp
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
40. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 6 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 8.320 1,292.50 Rp 10,753.60 Rp
PP M3 0.049 180,250.00 Rp 8,832.25 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 81,422.35 Rp
41. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA
CAMPURAN SPESI 1 PC : 8 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Buah 100.000 336.50 Rp 33,650.00 Rp
PC Kg 6.500 1,292.50 Rp 8,401.25 Rp
PP M3 0.050 180,250.00 Rp 9,012.50 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 79,250.25 Rp
V. PEKERJAAN BETON
42. PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Besi Beton (Polos/Ulir) Kg 10.500 14,965.00 Rp 157,132.50 Rp
Kawat Beton Kg 0.150 17,982.50 Rp 2,697.38 Rp
Pekerja OH 0.070 62,100.00 Rp 4,347.00 Rp
Tukang Besi OH 0.070 74,750.00 Rp 5,232.50 Rp
Kepala Tukang OH 0.007 75,900.00 Rp 531.30 Rp
Mandor OH 0.004 80,500.00 Rp 322.00 Rp
Sub Jumlah 170,262.68 Rp
43. MEMASANG 10 KG KABEL PRESSTRESSED POLOS/STRANDS
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Besi Beton (Polos/Ulir) Kg 10.500 14,965.00 Rp 157,132.50 Rp
Kawat Beton Kg 0.100 17,982.50 Rp 1,798.25 Rp
Pekerja OH 0.050 62,100.00 Rp 3,105.00 Rp
Tukang Besi OH 0.050 74,750.00 Rp 3,737.50 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.003 80,500.00 Rp 241.50 Rp
Sub Jumlah 166,394.25 Rp
44. MEMASANG 1 M2 BEKISTING UNTUK PONDASI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.040 2,022,750.00 Rp 80,910.00 Rp
Paku 5 Cm - 10 Cm Kg 0.300 16,645.00 Rp 4,993.50 Rp
Minyak Bekisting Liter 0.100 8,279.25 Rp 827.93 Rp
Pekerja OH 0.520 62,100.00 Rp 32,292.00 Rp
Tukang Kayu OH 0.260 74,750.00 Rp 19,435.00 Rp
Kepala Tukang OH 0.026 75,900.00 Rp 1,973.40 Rp
Mandor OH 0.026 80,500.00 Rp 2,093.00 Rp
Sub Jumlah 142,524.83 Rp
45. MEMASANG 1 M2 BEKISTING UNTUK SLOOF
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.045 2,022,750.00 Rp 91,023.75 Rp
Paku 5 Cm - 10 Cm Kg 0.300 16,645.00 Rp 4,993.50 Rp
Minyak Bekisting Liter 0.100 8,279.25 Rp 827.93 Rp
Pekerja OH 0.520 62,100.00 Rp 32,292.00 Rp
Tukang Kayu OH 0.260 74,750.00 Rp 19,435.00 Rp
Kepala Tukang OH 0.026 75,900.00 Rp 1,973.40 Rp
Mandor OH 0.026 80,500.00 Rp 2,093.00 Rp
Sub Jumlah 152,638.58 Rp
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Kebutuhan
Tenaga Kerja
Bahan
Tenaga Kerja
Bahan
Kebutuhan
46. MEMASANG 1 M2 BEKISTING UNTUK KOLOM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.040 2,022,750.00 Rp 80,910.00 Rp
Paku 5 Cm - 12 Cm Kg 0.400 16,645.00 Rp 6,658.00 Rp
Minyak Bekisting Liter 0.200 8,279.25 Rp 1,655.85 Rp
Balok Kayu Kelas II M3 0.015 2,462,750.00 Rp 36,941.25 Rp
Plywood Tebal 6 mm Lbr 0.350 123,250.00 Rp 43,137.50 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 2.000 11,275.00 Rp 22,550.00 Rp
Pekerja OH 0.660 62,100.00 Rp 40,986.00 Rp
Tukang Kayu OH 0.330 74,750.00 Rp 24,667.50 Rp
Kepala Tukang OH 0.033 75,900.00 Rp 2,504.70 Rp
Mandor OH 0.033 80,500.00 Rp 2,656.50 Rp
Sub Jumlah 262,667.30 Rp
47. MEMASANG 1 M2 BEKISTING UNTUK BALOK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.040 2,022,750.00 Rp 80,910.00 Rp
Paku 5 Cm - 12 Cm Kg 0.400 16,645.00 Rp 6,658.00 Rp
Minyak Bekisting Liter 0.200 8,279.25 Rp 1,655.85 Rp
Balok Kayu Kelas II M3 0.018 2,462,750.00 Rp 44,329.50 Rp
Plywood Tebal 9 mm Lbr 0.350 123,250.00 Rp 43,137.50 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 2.000 11,275.00 Rp 22,550.00 Rp
Pekerja OH 0.660 62,100.00 Rp 40,986.00 Rp
Tukang Kayu OH 0.330 74,750.00 Rp 24,667.50 Rp
Kepala Tukang OH 0.033 75,900.00 Rp 2,504.70 Rp
Mandor OH 0.033 80,500.00 Rp 2,656.50 Rp
Sub Jumlah 270,055.55 Rp
48. MEMASANG 1 M2 BEKISTING UNTUK LANTAI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.040 2,022,750.00 Rp 80,910.00 Rp
Paku 5 Cm - 12 Cm Kg 0.400 16,645.00 Rp 6,658.00 Rp
Minyak Bekisting Liter 0.200 8,279.25 Rp 1,655.85 Rp
Balok Kayu Kelas II M3 0.015 2,462,750.00 Rp 36,941.25 Rp
Plywood Tebal 9 mm Lbr 0.350 123,250.00 Rp 43,137.50 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 6.000 11,275.00 Rp 67,650.00 Rp
Pekerja OH 0.660 62,100.00 Rp 40,986.00 Rp
Tukang Kayu OH 0.330 74,750.00 Rp 24,667.50 Rp
Kepala Tukang OH 0.033 75,900.00 Rp 2,504.70 Rp
Mandor OH 0.033 80,500.00 Rp 2,656.50 Rp
Sub Jumlah 307,767.30 Rp
48. MEMASANG 1 M2 BEKISTING UNTUK TANGGA
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.030 2,022,750.00 Rp 60,682.50 Rp
Paku 5 Cm - 12 Cm Kg 0.400 16,645.00 Rp 6,658.00 Rp
Minyak Bekisting Liter 0.150 8,279.25 Rp 1,241.89 Rp
Balok Kayu Kelas II M3 0.015 2,462,750.00 Rp 36,941.25 Rp
Plywood Tebal 9 mm Lbr 0.350 123,250.00 Rp 43,137.50 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 2.000 11,275.00 Rp 22,550.00 Rp
Pekerja OH 0.660 62,100.00 Rp 40,986.00 Rp
Tukang Kayu OH 0.330 74,750.00 Rp 24,667.50 Rp
Kepala Tukang OH 0.033 75,900.00 Rp 2,504.70 Rp
Mandor OH 0.033 80,500.00 Rp 2,656.50 Rp
Sub Jumlah 242,025.84 Rp
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Kebutuhan
49. MEMASANG 1 M2 JEMBATAN UNTUK MENGECORAN BETON
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III (Papan) M3 0.0264 2,022,750.00 Rp 53,400.60 Rp
Paku 5 Cm - 12 Cm Kg 0.600 16,645.00 Rp 9,987.00 Rp
Dolken Kayu Galam (Kaso), (8-10)
Cm, Panjang 4 M
Batang 0.500 11,275.00 Rp 5,637.50 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Kayu OH 0.050 74,750.00 Rp 3,737.50 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 83,101.10 Rp
50. MEMBUAT 1 M3 PONDASI BETON BERTULANG (BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.200 2,022,750.00 Rp 404,550.00 Rp
Paku 5 Cm - 12 Cm Kg 1.500 16,645.00 Rp 24,967.50 Rp
Minyak Bekisting Liter 0.400 8,279.25 Rp 3,311.70 Rp
Besi Beton Polos Kg 157.500 14,965.00 Rp 2,356,987.50 Rp
Kawat Beton Kg 2.250 17,982.50 Rp 40,460.63 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Pekerja OH 5.300 62,100.00 Rp 329,130.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.300 75,900.00 Rp 98,670.00 Rp
Tukang Besi OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.262 75,900.00 Rp 19,885.80 Rp
Mandor OH 0.265 80,500.00 Rp 21,332.50 Rp
Sub Jumlah 4,068,201.13 Rp
51. MEMBUAT 1 M3 SLOOF BETON BERTULANG ( BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.270 2,022,750.00 Rp 546,142.50 Rp
Paku 5 Cm - 12 Cm Kg 2.000 16,645.00 Rp 33,290.00 Rp
Minyak Bekisting Liter 0.600 8,279.25 Rp 4,967.55 Rp
Besi Beton Polos Kg 157.500 14,965.00 Rp 2,356,987.50 Rp
Kawat Beton Kg 2.250 17,982.50 Rp 40,460.63 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Pekerja OH 5.650 62,100.00 Rp 350,865.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.560 75,900.00 Rp 118,404.00 Rp
Tukang Besi OH 1.400 74,750.00 Rp 104,650.00 Rp
Kepala Tukang OH 0.323 75,900.00 Rp 24,515.70 Rp
Mandor OH 0.283 80,500.00 Rp 22,781.50 Rp
Sub Jumlah 4,293,482.38 Rp
52. MEMBUAT 1 M3 KOLOM BETON BERTULANG ( BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.400 2,022,750.00 Rp 809,100.00 Rp
Paku 5 Cm - 12 Cm Kg 4.000 16,645.00 Rp 66,580.00 Rp
Minyak Bekisting Liter 2.000 8,279.25 Rp 16,558.50 Rp
Besi Beton Polos Kg 315.000 14,965.00 Rp 4,713,975.00 Rp
Kawat Beton Kg 4.500 17,982.50 Rp 80,921.25 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.150 2,462,750.00 Rp 369,412.50 Rp
Plywood 6 mm Lbr 3.500 123,250.00 Rp 431,375.00 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 20.000 11,275.00 Rp 225,500.00 Rp
Pekerja OH 7.050 62,100.00 Rp 437,805.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.650 75,900.00 Rp 125,235.00 Rp
Tukang Besi OH 2.100 74,750.00 Rp 156,975.00 Rp
Kepala Tukang OH 0.403 75,900.00 Rp 30,587.70 Rp
Mandor OH 0.353 80,500.00 Rp 28,416.50 Rp
Sub Jumlah 8,182,859.45 Rp
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
53. MEMBUAT 1 M3 BALOK BETON BERTULANG (BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.320 2,022,750.00 Rp 647,280.00 Rp
Paku 5 Cm - 12 Cm Kg 3.200 16,645.00 Rp 53,264.00 Rp
Minyak Bekisting Liter 1.600 8,279.25 Rp 13,246.80 Rp
Besi Beton Polos Kg 157.500 14,965.00 Rp 2,356,987.50 Rp
Kawat Beton Kg 2.250 17,982.50 Rp 40,460.63 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.140 2,462,750.00 Rp 344,785.00 Rp
Plywood 9 mm Lbr 2.800 123,250.00 Rp 345,100.00 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 16.000 11,275.00 Rp 180,400.00 Rp
Pekerja OH 6.350 62,100.00 Rp 394,335.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.650 75,900.00 Rp 125,235.00 Rp
Tukang Besi OH 1.400 74,750.00 Rp 104,650.00 Rp
Kepala Tukang OH 0.333 75,900.00 Rp 25,274.70 Rp
Mandor OH 0.318 80,500.00 Rp 25,599.00 Rp
Sub Jumlah 5,347,035.63 Rp
54. MEMBUAT 1 M3 KOLOM BETON BERTULANG (BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.320 2,022,750.00 Rp 647,280.00 Rp
Paku 5 Cm - 12 Cm Kg 3.200 16,645.00 Rp 53,264.00 Rp
Minyak Bekisting Liter 1.600 8,279.25 Rp 13,246.80 Rp
Besi Beton Polos Kg 157.500 14,965.00 Rp 2,356,987.50 Rp
Kawat Beton Kg 2.250 17,982.50 Rp 40,460.63 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.120 2,462,750.00 Rp 295,530.00 Rp
Plywood 9 mm Lbr 2.800 123,250.00 Rp 345,100.00 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 32.000 11,275.00 Rp 360,800.00 Rp
Pekerja OH 5.300 62,100.00 Rp 329,130.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.300 75,900.00 Rp 98,670.00 Rp
Tukang Besi OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.265 75,900.00 Rp 20,113.50 Rp
Mandor OH 0.265 80,500.00 Rp 21,332.50 Rp
Sub Jumlah 5,350,820.43 Rp
55. MEMBUAT 1 M3 DINDING BETON BERTULANG (BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.240 2,022,750.00 Rp 485,460.00 Rp
Paku 5 Cm - 12 Cm Kg 3.200 16,645.00 Rp 53,264.00 Rp
Minyak Bekisting Liter 1.600 8,279.25 Rp 13,246.80 Rp
Besi Beton Polos Kg 157.500 14,965.00 Rp 2,356,987.50 Rp
Kawat Beton Kg 2.250 17,982.50 Rp 40,460.63 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.160 2,462,750.00 Rp 394,040.00 Rp
Plywood 9 mm Lbr 2.800 123,250.00 Rp 345,100.00 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 24.000 11,275.00 Rp 270,600.00 Rp
Pekerja OH 5.300 62,100.00 Rp 329,130.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.300 75,900.00 Rp 98,670.00 Rp
Tukang Besi OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.265 75,900.00 Rp 20,113.50 Rp
Mandor OH 0.265 80,500.00 Rp 21,332.50 Rp
Sub Jumlah 5,197,310.43 Rp
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
56. MEMBUAT 1 M3 DINDING BETON BERTULANG (BESI + BEKISTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.250 2,022,750.00 Rp 505,687.50 Rp
Paku 5 Cm - 12 Cm Kg 3.000 16,645.00 Rp 49,935.00 Rp
Minyak Bekisting Liter 1.200 8,279.25 Rp 9,935.10 Rp
Besi Beton Polos Kg 210.000 14,965.00 Rp 3,142,650.00 Rp
Kawat Beton Kg 3.000 17,982.50 Rp 53,947.50 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.105 2,462,750.00 Rp 258,588.75 Rp
Plywood 9 mm Lbr 2.500 123,250.00 Rp 308,125.00 Rp
Dolken Kayu Galam, (8-10) Cm,
Panjang 4 M
Batang 14.000 11,275.00 Rp 157,850.00 Rp
Pekerja OH 5.650 62,100.00 Rp 350,865.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.560 75,900.00 Rp 118,404.00 Rp
Tukang Besi OH 1.400 74,750.00 Rp 104,650.00 Rp
Kepala Tukang OH 0.323 75,900.00 Rp 24,515.70 Rp
Mandor OH 0.283 80,500.00 Rp 22,781.50 Rp
Sub Jumlah 5,798,353.05 Rp
57. MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (11 x 11) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.002 2,022,750.00 Rp 4,045.50 Rp
Paku 5 Cm - 12 Cm Kg 0.010 16,645.00 Rp 166.45 Rp
Minyak Bekisting Liter 1.200 8,279.25 Rp 9,935.10 Rp
Besi Beton Polos Kg 3.000 14,965.00 Rp 44,895.00 Rp
Kawat Beton Kg 0.450 17,982.50 Rp 8,092.13 Rp
PC Kg 4.000 1,292.50 Rp 5,170.00 Rp
PB M3 0.006 176,950.00 Rp 1,061.70 Rp
KR M3 0.009 172,875.00 Rp 1,555.88 Rp
Pekerja OH 0.180 62,100.00 Rp 11,178.00 Rp
Tukang Batu OH 0.020 74,750.00 Rp 1,495.00 Rp
Tukang Kayu OH 0.020 75,900.00 Rp 1,518.00 Rp
Tukang Besi OH 0.020 74,750.00 Rp 1,495.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.009 80,500.00 Rp 724.50 Rp
Sub Jumlah 91,787.65 Rp
58. MEMBUAT 1 M' RING BALOK BETON BERTULANG ( 10 x 15) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.003 2,022,750.00 Rp 6,068.25 Rp
Paku 5 Cm - 12 Cm Kg 0.020 16,645.00 Rp 332.90 Rp
Minyak Bekisting Liter 1.200 8,279.25 Rp 9,935.10 Rp
Besi Beton Polos Kg 3.600 14,965.00 Rp 53,874.00 Rp
Kawat Beton Kg 0.050 17,982.50 Rp 899.13 Rp
PC Kg 5.500 1,292.50 Rp 7,108.75 Rp
PB M3 0.009 176,950.00 Rp 1,592.55 Rp
KR M3 0.015 172,875.00 Rp 2,593.13 Rp
Pekerja OH 0.297 62,100.00 Rp 18,443.70 Rp
Tukang Batu OH 0.033 74,750.00 Rp 2,466.75 Rp
Tukang Kayu OH 0.033 75,900.00 Rp 2,504.70 Rp
Tukang Besi OH 0.033 74,750.00 Rp 2,466.75 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 110,252.20 Rp
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
59. MEMBUAT 1 M3 BETON 1 : 3 : 5
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 218.000 1,292.50 Rp 281,765.00 Rp
PB M3 0.520 176,950.00 Rp 92,014.00 Rp
KR M3 0.870 172,875.00 Rp 150,401.25 Rp
Pekerja OH 1.650 62,100.00 Rp 102,465.00 Rp
Tukang Batu OH 0.250 74,750.00 Rp 18,687.50 Rp
Kepala Tukang OH 0.025 75,900.00 Rp 1,897.50 Rp
Mandor OH 0.080 80,500.00 Rp 6,440.00 Rp
Sub Jumlah 653,670.25 Rp
60. MEMBUAT 1 M3 BETON 1 : 2 : 3
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Pekerja OH 2.000 62,100.00 Rp 124,200.00 Rp
Tukang Batu OH 0.350 74,750.00 Rp 26,162.50 Rp
Kepala Tukang OH 0.035 75,900.00 Rp 2,656.50 Rp
Mandor OH 1.000 80,500.00 Rp 80,500.00 Rp
Sub Jumlah 903,380.75 Rp
61. MEMBUAT 1 M3 BETON 1 : 2 : 3 + BEKISTING
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II M3 0.130 2,462,750.00 Rp 320,157.50 Rp
Paku kayu Kg 1.000 17,745.00 Rp 17,745.00 Rp
Pekerja OH 2.000 62,100.00 Rp 124,200.00 Rp
Tukang Batu OH 0.100 74,750.00 Rp 7,475.00 Rp
Tukang Kayu OH 0.350 74,750.00 Rp 26,162.50 Rp
Kepala Tukang OH 0.035 75,900.00 Rp 2,656.50 Rp
Mandor OH 1.000 80,500.00 Rp 80,500.00 Rp
Sub Jumlah 1,248,758.25 Rp
62. MEMBUAT 1 M3 BETON 1 : 3 : 5 + BEKISTING (PONDASI LAJUR)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 218.000 1,292.50 Rp 281,765.00 Rp
PB M3 0.520 176,950.00 Rp 92,014.00 Rp
KR M3 0.870 172,875.00 Rp 150,401.25 Rp
Kayu Kelas II M3 0.130 2,462,750.00 Rp 320,157.50 Rp
Paku kayu Kg 1.000 17,745.00 Rp 17,745.00 Rp
Pekerja OH 1.650 62,100.00 Rp 102,465.00 Rp
Tukang Batu OH 0.250 74,750.00 Rp 18,687.50 Rp
Tukang Kayu OH 0.350 74,750.00 Rp 26,162.50 Rp
Kepala Tukang OH 0.025 75,900.00 Rp 1,897.50 Rp
Mandor OH 0.080 80,500.00 Rp 6,440.00 Rp
Sub Jumlah 1,017,735.25 Rp
63. MEMBUAT 1 M3 BETON K 225
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 388.000 1,292.50 Rp 501,490.00 Rp
PB M3 0.650 176,950.00 Rp 115,017.50 Rp
KR M3 0.650 172,875.00 Rp 112,368.75 Rp
Pekerja OH 6.000 62,100.00 Rp 372,600.00 Rp
Tukang Batu OH 1.000 74,750.00 Rp 74,750.00 Rp
Kepala Tukang OH 0.100 75,900.00 Rp 7,590.00 Rp
Mandor OH 0.300 80,500.00 Rp 24,150.00 Rp
Sub Jumlah 1,207,966.25 Rp
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Tenaga Kerja
Bahan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
64. MEMBUAT 1 M3 BETON K 275
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 400.000 1,292.50 Rp 517,000.00 Rp
PB M3 0.400 176,950.00 Rp 70,780.00 Rp
KR M3 0.820 172,875.00 Rp 141,757.50 Rp
Pekerja OH 6.000 62,100.00 Rp 372,600.00 Rp
Tukang Batu OH 1.000 74,750.00 Rp 74,750.00 Rp
Kepala Tukang OH 0.100 75,900.00 Rp 7,590.00 Rp
Mandor OH 0.300 80,500.00 Rp 24,150.00 Rp
Sub Jumlah 1,208,627.50 Rp
65. MEMBUAT 1 M3 DINDING BETON BERTULANG ( BESI + BEKISTING) DRAINASE
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.133 2,022,750.00 Rp 269,025.75 Rp
Paku 5 Cm - 12 Cm Kg 1.333 17,745.00 Rp 23,654.09 Rp
Minyak Bekisting Liter 1.200 8,279.25 Rp 9,935.10 Rp
Besi Beton Polos Kg 60.000 14,965.00 Rp 897,900.00 Rp
Kawat Beton Kg 1.000 17,982.50 Rp 17,982.50 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Plywood 9 mm Lbr 0.800 123,250.00 Rp 98,600.00 Rp
Pekerja OH 5.300 62,100.00 Rp 329,130.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.560 74,750.00 Rp 116,610.00 Rp
Tukang Besi OH 1.400 74,750.00 Rp 104,650.00 Rp
Tukang Bongkar OH 1.200 74,750.00 Rp 89,700.00 Rp
Kepala Tukang OH 0.323 75,900.00 Rp 24,515.70 Rp
Mandor OH 0.283 80,500.00 Rp 22,781.50 Rp
Sub Jumlah 2,694,902.64 Rp
66. MEMBUAT 1 M3 PELAT LANTAI BETON BERTULANG (BESI + BEKESTING)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III M3 0.240 2,022,750.00 Rp 485,460.00 Rp
Paku 5 Cm - 12 Cm Kg 3.200 17,745.00 Rp 56,784.00 Rp
Minyak Bekisting Liter 1.600 8,279.25 Rp 13,246.80 Rp
Besi Beton Polos Kg 120.000 14,965.00 Rp 1,795,800.00 Rp
Kawat Beton Kg 2.000 17,982.50 Rp 35,965.00 Rp
PC Kg 336.000 1,292.50 Rp 434,280.00 Rp
PB M3 0.540 176,950.00 Rp 95,553.00 Rp
KR M3 0.810 172,875.00 Rp 140,028.75 Rp
Kayu Kelas II (Balok) M3 0.160 2,022,750.00 Rp 323,640.00 Rp
Plywood 9 mm LBR 2.800 123,250.00 Rp 345,100.00 Rp
Dolken Kayu galam BTG 24.000 11,275.00 Rp 270,600.00 Rp
Pekerja OH 5.300 62,100.00 Rp 329,130.00 Rp
Tukang Batu OH 0.275 74,750.00 Rp 20,556.25 Rp
Tukang Kayu OH 1.300 74,750.00 Rp 97,175.00 Rp
Tukang Besi OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.265 75,900.00 Rp 20,113.50 Rp
Mandor OH 0.265 80,500.00 Rp 21,332.50 Rp
Sub Jumlah 4,563,252.30 Rp
67. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS I
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I (Balok) M3 1.100 3,892,750.00 Rp 4,282,025.00 Rp
Paku 10 Cm Kg 1.250 16,645.00 Rp 20,806.25 Rp
Lem Kayu Kg 1.000 28,101.25 Rp 28,101.25 Rp
Pekerja OH 6.000 62,100.00 Rp 372,600.00 Rp
Tukang Kayu OH 20.000 74,750.00 Rp 1,495,000.00 Rp
Kepala Tukang OH 2.000 75,900.00 Rp 151,800.00 Rp
Mandor OH 0.300 80,500.00 Rp 24,150.00 Rp
Sub Jumlah 6,374,482.50 Rp
VI. PEKERJAAN KAYU
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
68. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II M3 1.200 2,462,750.00 Rp 2,955,300.00 Rp
Paku 10 Cm Kg 1.250 16,645.00 Rp 20,806.25 Rp
Lem Kayu Kg 1.000 28,101.25 Rp 28,101.25 Rp
Pekerja OH 6.000 62,100.00 Rp 372,600.00 Rp
Tukang Kayu OH 18.000 74,750.00 Rp 1,345,500.00 Rp
Kepala Tukang OH 2.000 75,900.00 Rp 151,800.00 Rp
Mandor OH 0.300 80,500.00 Rp 24,150.00 Rp
Sub Jumlah 4,898,257.50 Rp
69. MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Papan) M3 0.040 2,462,750.00 Rp 98,510.00 Rp
Paku 5 Cm - 7 Cm Kg 0.050 16,645.00 Rp 832.25 Rp
Pekerja OH 0.350 62,100.00 Rp 21,735.00 Rp
Tukang Kayu OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.105 75,900.00 Rp 7,969.50 Rp
Mandor OH 0.018 80,500.00 Rp 1,449.00 Rp
Sub Jumlah 208,983.25 Rp
70. MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA, KAYU KELAS III
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas III (Papan) M3 0.040 2,022,750.00 Rp 80,910.00 Rp
Paku 5 Cm - 7 Cm Kg 0.050 16,645.00 Rp 832.25 Rp
Pekerja OH 0.350 62,100.00 Rp 21,735.00 Rp
Tukang Kayu OH 1.050 74,750.00 Rp 78,487.50 Rp
Kepala Tukang OH 0.105 75,900.00 Rp 7,969.50 Rp
Mandor OH 0.018 80,500.00 Rp 1,449.00 Rp
Sub Jumlah 191,383.25 Rp
71. MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau kelas II (Papan) M3 0.040 2,462,750.00 Rp 98,510.00 Rp
Lem Kayu Kg 0.500 28,101.25 Rp 14,050.63 Rp
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Tukang Kayu OH 2.500 74,750.00 Rp 186,875.00 Rp
Kepala Tukang OH 0.250 75,900.00 Rp 18,975.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 384,535.63 Rp
72. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau kelas II (Papan) M3 0.024 2,462,750.00 Rp 59,106.00 Rp
Lem Kayu Kg 0.300 28,101.25 Rp 8,430.38 Rp
Pekerja OH 0.800 62,100.00 Rp 49,680.00 Rp
Tukang Kayu OH 2.000 74,750.00 Rp 149,500.00 Rp
Kepala Tukang OH 0.200 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.040 80,500.00 Rp 3,220.00 Rp
Sub Jumlah 285,116.38 Rp
73. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau kelas II (Papan) M3 0.064 2,462,750.00 Rp 157,616.00 Rp
Lem Kayu Kg 0.500 28,101.25 Rp 14,050.63 Rp
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Tukang Kayu OH 3.000 74,750.00 Rp 224,250.00 Rp
Kepala Tukang OH 0.300 75,900.00 Rp 22,770.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 484,811.63 Rp
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Bahan
Tenaga Kerja
74. MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP, RANGKA TERTUTUP
KAYU KELAS II (LEBAR SAMPAI 90 CM)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Papan) M3 0.025 2,462,750.00 Rp 61,568.75 Rp
Paku 1 Cm - 2,5 Cm Kg 0.030 16,645.00 Rp 499.35 Rp
Lem Kayu Kg 0.500 28,101.25 Rp 14,050.63 Rp
Plywood Tebal 3,6 mm Ukuran (90 x
220) Cm
Lembar 1.000 84,750.00 Rp 84,750.00 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Kayu OH 2.000 74,750.00 Rp 149,500.00 Rp
Kepala Tukang OH 0.200 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 365,223.73 Rp
75. MEMBUAT 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau Kelas II (Papan) M3 0.0256 2,462,750.00 Rp 63,046.40 Rp
Paku 1 Cm - 2,5 Cm Kg 0.030 16,645.00 Rp 499.35 Rp
Lem Kayu Kg 0.500 28,101.25 Rp 14,050.63 Rp
Plywood Tebal 3,6 mm Ukuran (90 x
220) Cm
Lembar 1.000 84,750.00 Rp 84,750.00 Rp
Pekerja OH 0.800 62,100.00 Rp 49,680.00 Rp
Tukang Kayu OH 2.000 74,750.00 Rp 149,500.00 Rp
Kepala Tukang OH 0.200 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.040 80,500.00 Rp 3,220.00 Rp
Sub Jumlah 379,926.38 Rp
76. MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau Kelas II (Papan) M3 0.060 2,462,750.00 Rp 147,765.00 Rp
Paku 1 Cm - 2,5 Cm Kg 0.150 17,745.00 Rp 2,661.75 Rp
Pekerja OH 0.500 62,100.00 Rp 31,050.00 Rp
Tukang Kayu OH 2.000 74,750.00 Rp 149,500.00 Rp
Kepala Tukang OH 0.200 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.025 80,500.00 Rp 2,012.50 Rp
Sub Jumlah 348,169.25 Rp
77. MEMASANG 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau Kelas II (Papan) M3 0.025 2,462,750.00 Rp 61,568.75 Rp
Paku 1 Cm - 2,5 Cm Kg 0.030 17,745.00 Rp 532.35 Rp
Lem Kayu Kg 0.300 28,101.25 Rp 8,430.38 Rp
Teakwood Tebal 3,6 mm Ukuran (90 x
220) Cm
Lembar 1.000 166,150.00 Rp 166,150.00 Rp
Pekerja OH 0.800 62,100.00 Rp 49,680.00 Rp
Tukang Kayu OH 2.000 74,750.00 Rp 149,500.00 Rp
Kepala Tukang OH 0.200 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.040 80,500.00 Rp 3,220.00 Rp
Sub Jumlah 454,261.48 Rp
78. MEMASANG 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Papan) M3 0.025 2,462,750.00 Rp 61,568.75 Rp
Paku 1 Cm - 2,5 Cm Kg 0.030 17,745.00 Rp 532.35 Rp
Lem Kayu Kg 0.800 28,101.25 Rp 22,481.00 Rp
Teakwood Tebal 3,6 mm Ukuran (90 x
220) Cm
Lembar 1.000 166,150.00 Rp 166,150.00 Rp
Formika Lembar 0.500 45,150.00 Rp 22,575.00 Rp
Pekerja OH 0.800 62,100.00 Rp 49,680.00 Rp
Tukang Kayu OH 2.500 74,750.00 Rp 186,875.00 Rp
Kepala Tukang OH 0.250 75,900.00 Rp 18,975.00 Rp
Mandor OH 0.040 80,500.00 Rp 3,220.00 Rp
Sub Jumlah 532,057.10 Rp
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
Kebutuhan
Bahan
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Bahan
79. MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I, KELAS II DAN KELAS III
BENTANG 6 METER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I, Kelas II, Kelas III (Balok) M3 1.100 2,022,750.00 Rp 2,225,025.00 Rp
Besi Strip Tebal 5 mm Kg 15.000 11,117.50 Rp 166,762.50 Rp
Paku 5 cm - 12 Cm Kg 5.600 16,645.00 Rp 93,212.00 Rp
Pekerja OH 4.000 62,100.00 Rp 248,400.00 Rp
Tukang Kayu OH 12.000 74,750.00 Rp 897,000.00 Rp
Kepala Tukang OH 1.200 75,900.00 Rp 91,080.00 Rp
Mandor OH 0.200 80,500.00 Rp 16,100.00 Rp
Sub Jumlah 3,737,579.50 Rp
80. MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I (Balok) M3 1.200 3,892,750.00 Rp 4,671,300.00 Rp
Besi Strip Tebal 5 mm Kg 15.000 11,117.50 Rp 166,762.50 Rp
Paku 12 Cm Kg 5.600 16,645.00 Rp 93,212.00 Rp
Pekerja OH 6.000 62,100.00 Rp 372,600.00 Rp
Tukang Kayu OH 20.000 74,750.00 Rp 1,495,000.00 Rp
Kepala Tukang OH 2.000 75,900.00 Rp 151,800.00 Rp
Mandor OH 0.300 80,500.00 Rp 24,150.00 Rp
Sub Jumlah 6,974,824.50 Rp
81. MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Balok) M3 1.100 2,462,750.00 Rp 2,709,025.00 Rp
Besi Strip Tebal 5 mm Kg 15.000 11,117.50 Rp 166,762.50 Rp
Paku 5 cm - 12 Cm Kg 3.000 16,645.00 Rp 49,935.00 Rp
Pekerja OH 2.400 62,100.00 Rp 149,040.00 Rp
Tukang Kayu OH 7.200 74,750.00 Rp 538,200.00 Rp
Kepala Tukang OH 0.720 75,900.00 Rp 54,648.00 Rp
Mandor OH 0.120 80,500.00 Rp 9,660.00 Rp
Sub Jumlah 3,677,270.50 Rp
82. MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaso-Kaso (5 x 7 ) Cm M3 0.014 2,462,750.00 Rp 34,478.50 Rp
Reng (2 x 3 ) Cm M3 0.036 2,462,750.00 Rp 88,659.00 Rp
Paku 5 Cm dan 10 Cm Kg 0.250 16,645.00 Rp 4,161.25 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Kayu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 142,145.25 Rp
83. MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaso-Kaso (5 x 7 ) Cm M3 0.014 2,462,750.00 Rp 34,478.50 Rp
Reng (3 x 4 ) Cm M3 0.057 2,462,750.00 Rp 140,376.75 Rp
Paku 5 Cm dan 10 Cm Kg 0.250 16,645.00 Rp 4,161.25 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Kayu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 193,863.00 Rp
84. MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II M3 0.165 2,462,750.00 Rp 406,353.75 Rp
Paku 5 Cm dan 10 Cm Kg 0.200 16,645.00 Rp 3,329.00 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang Kayu OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.012 75,900.00 Rp 910.80 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 427,498.55 Rp
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
85. MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 x 100) CM, KAYU KELAS II ATAU KELAS III
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaso-Kaso (5 x 7) Cm M3 0.0154 2,462,750.00 Rp 37,926.35 Rp
Paku 7 Cm - 10 Cm Kg 0.200 16,645.00 Rp 3,329.00 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Kayu OH 0.250 74,750.00 Rp 18,687.50 Rp
Kepala Tukang OH 0.025 75,900.00 Rp 1,897.50 Rp
Mandor OH 0.075 80,500.00 Rp 6,037.50 Rp
Sub Jumlah 77,192.85 Rp
86. MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 x 60) CM, KAYU KELAS II ATAU KELAS III
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaso-Kaso (5 x 7) Cm M3 0.0163 2,462,750.00 Rp 40,142.83 Rp
Paku 7 Cm - 10 Cm Kg 0.250 16,645.00 Rp 4,161.25 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Kayu OH 0.300 74,750.00 Rp 22,425.00 Rp
Kepala Tukang OH 0.030 75,900.00 Rp 2,277.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 82,231.08 Rp
87. MEMASANG 1 M' LISTPLANK UKURAN (2 x 20) CM, KAYU KELAS I ATAU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I atau Kelas II (Papan) M3 0.0108 2,462,750.00 Rp 26,597.70 Rp
Paku 5 Cm dan 7 Cm Kg 0.100 16,645.00 Rp 1,664.50 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Kayu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.025 75,900.00 Rp 1,897.50 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 51,722.20 Rp
89. MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 x 120) CM KAYU KELAS II ATAU KELAS III
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II atau Kelas III (Balok) M3 0.028 2,462,750.00 Rp 68,957.00 Rp
Paku 5 Cm dan 7 Cm Kg 0.150 16,645.00 Rp 2,496.75 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Kayu OH 0.450 74,750.00 Rp 33,637.50 Rp
Kepala Tukang OH 0.045 75,900.00 Rp 3,415.50 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 118,465.75 Rp
90. MEMASANG 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Balok) Ukuran (6 x 12) Cm M3 0.028 2,462,750.00 Rp 68,957.00 Rp
Paku 5 Cm dan 10 Cm Kg 0.150 16,645.00 Rp 2,496.75 Rp
Teakwood Tebal 3,6 mm, Ukuran 120 x
240 Cm
Lembar 0.860 166,150.00 Rp 142,889.00 Rp
Lem Kayu Kg 0.560 28,101.25 Rp 15,736.70 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Kayu OH 0.450 74,750.00 Rp 33,637.50 Rp
Kepala Tukang OH 0.045 75,900.00 Rp 3,415.50 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 277,091.45 Rp
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
91. MEMASANG 1 M2 DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Balok) Ukuran (6 x 12) Cm M3 0.028 2,462,750.00 Rp 68,957.00 Rp
Paku 5 Cm dan 10 Cm Kg 0.150 16,645.00 Rp 2,496.75 Rp
Plywood Tebal 3,6 mm, Ukuran 120 x
240 Cm
Lembar 0.860 84,750.00 Rp 72,885.00 Rp
Lem Kayu Kg 0.560 28,101.25 Rp 15,736.70 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Kayu OH 0.600 74,750.00 Rp 44,850.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 222,704.45 Rp
92. MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PAPAN KAYU KELAS I
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas I (Papan) M3 0.007 3,892,750.00 Rp 27,249.25 Rp
Paku 5 Cm dan 10 Cm Kg 0.100 16,645.00 Rp 1,664.50 Rp
Paku Skrup 10 Cm Kg 0.150 11,145.00 Rp 1,671.75 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Kayu OH 1.800 74,750.00 Rp 134,550.00 Rp
Kepala Tukang OH 0.180 75,900.00 Rp 13,662.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 218,472.50 Rp
93. MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PLYWOOD UKURAN (120 x 240) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plywood Tebal 3,6 mm Lembar 0.400 84,750.00 Rp 33,900.00 Rp
Paku 1 Cm dan 2,5 Cm Kg 0.050 16,645.00 Rp 832.25 Rp
Pekerja OH 0.025 62,100.00 Rp 1,552.50 Rp
Tukang Kayu OH 0.075 74,750.00 Rp 5,606.25 Rp
Kepala Tukang OH 0.0075 75,900.00 Rp 569.25 Rp
Mandor OH 0.0013 80,500.00 Rp 104.65 Rp
Sub Jumlah 42,564.90 Rp
94. MEMASANG 1 M2 PINTU / JENDELA KACA BINGKAI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II M3 0.020 2,462,750.00 Rp 49,255.00 Rp
Kaca Polos 5 MM M2 1.000 99,750.00 Rp 99,750.00 Rp
Pekerja OH 0.800 62,100.00 Rp 49,680.00 Rp
Tukang Kayu OH 1.000 74,750.00 Rp 74,750.00 Rp
Kepala Tukang OH 0.2000 75,900.00 Rp 15,180.00 Rp
Mandor OH 0.0800 80,500.00 Rp 6,440.00 Rp
Sub Jumlah 295,055.00 Rp
95. MEMASANG 1 M2 KASO + RENG ATAP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II M3 0.014 2,462,750.00 Rp 34,478.50 Rp
Paku Biasa Kg 0.150 16,645.00 Rp 2,496.75 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang Kayu OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.0120 75,900.00 Rp 910.80 Rp
Mandor OH 0.0060 80,500.00 Rp 483.00 Rp
Sub Jumlah 54,791.05 Rp
96. MEMASANG 1 M2 PLESTERAN 1 PC : 1 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 15.504 1,292.50 Rp 20,038.92 Rp
PP M3 0.016 180,250.00 Rp 2,884.00 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 48,498.92 Rp
Tenaga Kerja
VII. PEKERJAAN PLESTERAN
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
97. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 10.224 1,292.50 Rp 13,214.52 Rp
PP M3 0.023 180,250.00 Rp 4,145.75 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 42,936.27 Rp
98. MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 7.776 1,292.50 Rp 10,050.48 Rp
PP M3 0.023 180,250.00 Rp 4,145.75 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 39,772.23 Rp
99. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 6.240 1,292.50 Rp 8,065.20 Rp
PP M3 0.024 180,250.00 Rp 4,326.00 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 37,967.20 Rp
98. MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 5.184 1,292.50 Rp 6,700.32 Rp
PP M3 0.026 180,250.00 Rp 4,686.50 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 36,962.82 Rp
99. MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 4.416 1,292.50 Rp 5,707.68 Rp
PP M3 0.027 180,250.00 Rp 4,866.75 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 36,150.43 Rp
100. MEMASANG 1 M2 PLESTERAN 1 PC : 7 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 3.936 1,292.50 Rp 5,087.28 Rp
PP M3 0.028 180,250.00 Rp 5,047.00 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 35,710.28 Rp
Kebutuhan
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
101. MEMASANG 1 M2 PLESTERAN 1 PC : 8 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 3.456 1,292.50 Rp 4,466.88 Rp
PP M3 0.029 180,250.00 Rp 5,227.25 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Batu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 35,270.13 Rp
102. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 20 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 13.632 1,292.50 Rp 17,619.36 Rp
PP M3 0.027 180,250.00 Rp 4,866.75 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 56,146.61 Rp
103. MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 20 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 10.368 1,292.50 Rp 13,400.64 Rp
PP M3 0.031 180,250.00 Rp 5,587.75 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 52,648.89 Rp
104. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 20 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 8.320 1,292.50 Rp 10,753.60 Rp
PP M3 0.032 180,250.00 Rp 5,768.00 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 50,182.10 Rp
105. MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 20 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 6.912 1,292.50 Rp 8,933.76 Rp
PP M3 0.035 180,250.00 Rp 6,308.75 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 48,903.01 Rp
106. MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 20 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 5.888 1,292.50 Rp 7,610.24 Rp
PP M3 0.036 180,250.00 Rp 6,489.00 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 47,759.74 Rp
Tenaga Kerja
Kebutuhan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
Bahan
Tenaga Kerja
107. MEMASANG 1 M2 BARAPEN 1 PC : 5 PP, TEBAL 15 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 5.184 1,292.50 Rp 6,700.32 Rp
PP M3 0.026 180,250.00 Rp 4,686.50 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Batu OH 0.070 74,750.00 Rp 5,232.50 Rp
Kepala Tukang OH 0.007 75,900.00 Rp 531.30 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 27,109.62 Rp
108. MEMASANG 1 M2 PLESTERAN SKONING 1 PC : 2 PP, LEBAR 10 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 0.500 1,292.50 Rp 646.25 Rp
PP M3 0.013 180,250.00 Rp 2,343.25 Rp
Pekerja OH 0.057 62,100.00 Rp 3,539.70 Rp
Tukang Batu OH 0.380 74,750.00 Rp 28,405.00 Rp
Kepala Tukang OH 0.038 75,900.00 Rp 2,884.20 Rp
Mandor OH 0.003 80,500.00 Rp 241.50 Rp
Sub Jumlah 38,059.90 Rp
109. MEMASANG 1 M2 PLESTERAN CIPRAT 1 PC : 2 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 4.320 1,292.50 Rp 5,583.60 Rp
PP M3 0.006 180,250.00 Rp 1,081.50 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Tukang Batu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 31,470.60 Rp
110. MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan PC Kg 3.108 1,292.50 Rp 4,017.09 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Batu OH 0.070 74,750.00 Rp 5,232.50 Rp
Kepala Tukang OH 0.007 75,900.00 Rp 531.30 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 19,739.89 Rp
111. MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EXPOSE (=8 M')
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan PC Kg 1.600 1,292.50 Rp 2,068.00 Rp
Pekerja OH 0.075 62,100.00 Rp 4,657.50 Rp
Tukang Batu OH 0.035 74,750.00 Rp 2,616.25 Rp
Kepala Tukang OH 0.004 75,900.00 Rp 303.60 Rp
Mandor OH 0.004 80,500.00 Rp 322.00 Rp
Sub Jumlah 9,967.35 Rp
112. MEMASANG 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1 PC : 2 PP
Satuan Indeks Harga Satuan Jumlah Harga Satuan
PC Kg 6.340 1,292.50 Rp 8,194.45 Rp
PP M3 0.012 180,250.00 Rp 2,163.00 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.140 74,750.00 Rp 10,465.00 Rp
Kepala Tukang OH 0.014 75,900.00 Rp 1,062.60 Rp
Mandor OH 0.015 80,500.00 Rp 1,207.50 Rp
Sub Jumlah 41,722.55 Rp
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Tenaga Kerja
Kebutuhan
113. MEMASANG 1 M2 ACIAN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan PC Kg 3.250 1,292.50 Rp 4,200.63 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Batu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 22,393.63 Rp
114. MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Asbes Semen M2 1.100 83,650.00 Rp 92,015.00 Rp
Paku 1 Cm - 2,5 Cm Kg 0.010 29,735.00 Rp 297.35 Rp
Pekerja OH 0.030 62,100.00 Rp 1,863.00 Rp
Tukang Kayu OH 0.070 74,750.00 Rp 5,232.50 Rp
Kepala Tukang OH 0.007 75,900.00 Rp 531.30 Rp
Mandor OH 0.002 80,500.00 Rp 161.00 Rp
Sub Jumlah 100,100.15 Rp
115. MEMASANG 1 M2 LANGIT-LANGIT TRIPLEK UKURAN (120 x 240) CM, TEBAL 3 MM s/d 6 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plywood 3,6 mm Lembar 0.375 84,750.00 Rp 31,781.25 Rp
Paku 1 Cm - 2,5 Cm Kg 0.030 16,645.00 Rp 499.35 Rp
Pekerja OH 0.070 62,100.00 Rp 4,347.00 Rp
Tukang Kayu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.004 80,500.00 Rp 322.00 Rp
Sub Jumlah 45,183.60 Rp
116. MEMASANG 1 M2 LANGIT-LANGIT LAMBRIZING KAYU TEBAL 9 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Papan M3 0.015 2,022,750.00 Rp 30,341.25 Rp
Paku 1 Cm - 2,5 Cm Kg 0.010 16,645.00 Rp 166.45 Rp
Pekerja OH 0.600 62,100.00 Rp 37,260.00 Rp
Tukang Kayu OH 0.800 74,750.00 Rp 59,800.00 Rp
Kepala Tukang OH 0.080 75,900.00 Rp 6,072.00 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 136,054.70 Rp
117. MEMASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (120 x 240 x 9) MM, TEBAL 9 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Rangka Furing M' 3.600 11,365.00 Rp 40,914.00 Rp
Kawat dia 4 mm KG 0.150 16,002.50 Rp 2,400.38 Rp
Gybsum Board Lembar 0.364 94,650.00 Rp 34,452.60 Rp
Paku Skrup Kg 0.110 16,095.00 Rp 1,770.45 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Kayu OH 0.050 74,750.00 Rp 3,737.50 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 90,266.93 Rp
118. MEMASANG 1 M' LIST LANGIT-LANGIT KAYU PROFIL
Satuan Indeks Harga Satuan Jumlah Harga Satuan
List Kayu Profil M' 1.050 3,311.50 Rp 3,477.08 Rp
Paku 1 Cm - 2,5 Cm Kg 0.010 16,645.00 Rp 166.45 Rp
Pekerja OH 0.050 62,100.00 Rp 3,105.00 Rp
Tukang Kayu OH 0.050 74,750.00 Rp 3,737.50 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.003 80,500.00 Rp 241.50 Rp
Sub Jumlah 11,107.03 Rp
119. MEMASANG 1 M2 PIRI - PIRI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Papan piri - piri M3 0.020 2,462,750.00 Rp 49,255.00 Rp
Paku 1 Cm - 2,5 Cm Kg 0.200 16,645.00 Rp 3,329.00 Rp
Pekerja OH 0.230 62,100.00 Rp 14,283.00 Rp
Tukang Kayu OH 0.670 74,750.00 Rp 50,082.50 Rp
Kepala Tukang OH 0.067 75,900.00 Rp 5,085.30 Rp
Mandor OH 0.012 80,500.00 Rp 966.00 Rp
Sub Jumlah 123,000.80 Rp
120. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (40 x 40) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Abu-Abu (40 x 40) Cm Buah 6.630 8,965.00 Rp 59,437.95 Rp
PC Kg 9.800 1,292.50 Rp 12,666.50 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Tukang Batu OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.012 75,900.00 Rp 910.80 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 106,668.00 Rp
IX. PEKERJAAN PENUTUP LANTAI DAN DINDING
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
VIII. PEKERJAAN LANGIT-LANGIT
Kebutuhan
Bahan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Tenaga Kerja
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Tenaga Kerja
Kebutuhan
121. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (30 x 30) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Abu-Abu (30 x 30) Cm Buah 11.870 4,565.00 Rp 54,186.55 Rp
PC Kg 10.000 1,292.50 Rp 12,925.00 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.125 74,750.00 Rp 9,343.75 Rp
Kepala Tukang OH 0.013 75,900.00 Rp 986.70 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 102,745.75 Rp
122. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (20 x 20) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Abu-Abu (20 x 20) Cm Buah 26.500 2,145.00 Rp 56,842.50 Rp
PC Kg 10.400 1,292.50 Rp 13,442.00 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Pekerja OH 0.270 62,100.00 Rp 16,767.00 Rp
Tukang Batu OH 0.130 74,750.00 Rp 9,717.50 Rp
Kepala Tukang OH 0.013 75,900.00 Rp 986.70 Rp
Mandor OH 0.014 80,500.00 Rp 1,127.00 Rp
Sub Jumlah 106,993.95 Rp
123. MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (40 x 40) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Warna (40 x 40) Cm Buah 6.630 9,295.00 Rp 61,625.85 Rp
PC Kg 9.800 1,292.50 Rp 12,666.50 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Semen Warna Kg 1.300 1,666.50 Rp 2,166.45 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Tukang Batu OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.012 75,900.00 Rp 910.80 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 111,022.35 Rp
124. MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (30 x 30) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Warna (30 x 30) Cm Buah 11.870 4,785.00 Rp 56,797.95 Rp
PC Kg 10.000 1,292.50 Rp 12,925.00 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Semen Warna Kg 1.500 1,666.50 Rp 2,499.75 Rp
Pekerja OH 0.260 62,100.00 Rp 16,146.00 Rp
Tukang Batu OH 0.125 74,750.00 Rp 9,343.75 Rp
Kepala Tukang OH 0.013 75,900.00 Rp 986.70 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 107,856.90 Rp
125. MEMASANG 1 M2 LANTAI KERAMIK UKURAN (20 x 25) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Ubin Warna (20 x 25) Cm Buah 21.500 2,145.00 Rp 46,117.50 Rp
PC Kg 10.400 1,292.50 Rp 13,442.00 Rp
PP M3 0.045 180,250.00 Rp 8,111.25 Rp
Pekerja OH 0.270 62,100.00 Rp 16,767.00 Rp
Tukang Batu OH 0.130 74,750.00 Rp 9,717.50 Rp
Kepala Tukang OH 0.013 75,900.00 Rp 986.70 Rp
Mandor OH 0.014 80,500.00 Rp 1,127.00 Rp
Sub Jumlah 96,268.95 Rp
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Bahan
Kebutuhan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
126. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (15 x 20) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Abu-Abu (15 x 20) Cm Buah 5.300 1,457.50 Rp 7,724.75 Rp
PC Kg 1.650 1,292.50 Rp 2,132.63 Rp
PP M3 0.004 180,250.00 Rp 721.00 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 23,980.48 Rp
127. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (10 x 30) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Abu-Abu (10 x 30) Cm Buah 3.530 1,589.50 Rp 5,610.94 Rp
PC Kg 1.240 1,292.50 Rp 1,602.70 Rp
PP M3 0.003 180,250.00 Rp 540.75 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 21,156.49 Rp
128. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (10 x 40) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Abu-Abu (10 x 40) Cm Buah 2.650 2,323.75 Rp 6,157.94 Rp
PC Kg 1.240 1,292.50 Rp 1,602.70 Rp
PP M3 0.003 180,250.00 Rp 540.75 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 21,703.49 Rp
129. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 20) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Warna (10 x 20) Cm Buah 5.300 1,457.50 Rp 7,724.75 Rp
PC Kg 1.140 1,292.50 Rp 1,473.45 Rp
PP M3 0.003 180,250.00 Rp 540.75 Rp
Semen Warna Kg 0.100 1,666.50 Rp 166.65 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 23,307.70 Rp
130. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 30) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Warna (10 x 30) Cm Buah 3.530 1,589.50 Rp 5,610.94 Rp
PC Kg 1.140 1,292.50 Rp 1,473.45 Rp
PP M3 0.003 180,250.00 Rp 540.75 Rp
Semen Warna Kg 0.100 1,666.50 Rp 166.65 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 21,193.89 Rp
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
131. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 40) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plint Ubin PC Warna (10 x 40) Cm Buah 2.650 3,231.25 Rp 8,562.81 Rp
PC Kg 1.140 1,292.50 Rp 1,473.45 Rp
PP M3 0.003 180,250.00 Rp 540.75 Rp
Semen Warna Kg 0.100 1,666.50 Rp 166.65 Rp
Pekerja OH 0.090 62,100.00 Rp 5,589.00 Rp
Tukang Batu OH 0.090 74,750.00 Rp 6,727.50 Rp
Kepala Tukang OH 0.009 75,900.00 Rp 683.10 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 24,145.76 Rp
132. MEMASANG 1 M2 LANTAI KARPET
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Karpet M2 1.050 16,777.18 Rp 17,616.03 Rp
Lem Kg 0.350 3,021.25 Rp 1,057.44 Rp
Pekerja OH 0.170 62,100.00 Rp 10,557.00 Rp
Tukang Batu OH 0.170 74,750.00 Rp 12,707.50 Rp
Kepala Tukang OH 0.017 75,900.00 Rp 1,290.30 Rp
Mandor OH 0.009 80,500.00 Rp 724.50 Rp
Sub Jumlah 43,952.77 Rp
133. MEMASANG 1 M2 FLOOR HARDENER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Floor Hardener Kg 5.000 38,445.00 Rp 192,225.00 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.012 75,900.00 Rp 910.80 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 210,040.80 Rp
134. MEMASANG 1 M' PLINT KAYU KELAS II UKURAN (2 x 10) CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kayu Kelas II (Papan 2 x 10 Cm) M3 0.003 2,462,750.00 Rp 7,388.25 Rp
Paku Skrup 5 Cm Kg 0.050 16,095.00 Rp 804.75 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang Kayu OH 0.120 74,750.00 Rp 8,970.00 Rp
Kepala Tukang OH 0.012 75,900.00 Rp 910.80 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 26,008.80 Rp
135. MENGERJAKAN 100 KG PEKERJAAN PERAKITAN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Solar Liter 1.000 5,180.00 Rp 5,180.00 Rp
Minyak Pelumas Liter 0.100 26,409.26 Rp 2,640.93 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Tukang Besi OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.001 75,900.00 Rp 75.90 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Alat Sewa Alat Jam 0.008 98,100.00 Rp 784.80 Rp
Sub Jumlah 22,769.13 Rp
136. MENGERJAKAN 1 CM PENGELASAN DENGAN LAS LISTRIK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kawat Las Listrik Kg 0.040 31,402.50 Rp 1,256.10 Rp
Solar Liter 0.030 5,180.00 Rp 155.40 Rp
Minyak Pelumas Liter 0.004 26,409.26 Rp 105.64 Rp
Pekerja OH 0.004 62,100.00 Rp 248.40 Rp
Tukang besi OH 0.002 74,750.00 Rp 149.50 Rp
Kepala Tukang OH 0.0002 75,900.00 Rp 15.18 Rp
Mandor OH 0.0002 80,500.00 Rp 16.10 Rp
Alat Sewa Alat Jam 0.017 98,100.00 Rp 1,667.70 Rp
Sub Jumlah 3,614.02 Rp
Kebutuhan
Bahan
Tenaga Kerja
X. PEKERJAAN BESI DAN ALLUMUNIUM
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
137. MEMASANG 1 M2 PINTU ROLLING DOOR BESI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Pintu Gulung Besi M2 1.000 744,550.00 Rp 744,550.00 Rp
Pekerja OH 1.200 62,100.00 Rp 74,520.00 Rp
Tukang besi OH 1.200 74,750.00 Rp 89,700.00 Rp
Kepala Tukang OH 0.120 75,900.00 Rp 9,108.00 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 918,361.00 Rp
138. MEMASANG 1 M2 ROLLING DOOR ALLUMUNIUM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Rolling Door Allumunium M2 1.000 341,500.00 Rp 341,500.00 Rp
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Tukang besi OH 1.000 74,750.00 Rp 74,750.00 Rp
Kepala Tukang OH 0.100 75,900.00 Rp 7,590.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 489,965.00 Rp
139. MEMASANG 1 M2 JENDELA NAKO DAN TERALIS
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Jendela Nako (Rangka + Kaca 5 mm) M2 1.100 97,550.00 Rp 107,305.00 Rp
Paku Skrup 1 Cm - 2,5 Cm Kg 0.200 16,645.00 Rp 3,329.00 Rp
Besi Strip tebal 5 mm M' 7.000 11,117.50 Rp 77,822.50 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang besi OH 0.200 74,750.00 Rp 14,950.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.001 80,500.00 Rp 80.50 Rp
Sub Jumlah 217,425.00 Rp
140. MEMASANG 1 M2 ATAP ASBES GELOMBANG (1,80 x 0,92) x 5 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Asbes Gelombang Lbr 0.750 34,330.00 Rp 25,747.50 Rp
Paku Asbes Kg 0.120 29,735.00 Rp 3,568.20 Rp
Pekerja OH 0.140 62,100.00 Rp 8,694.00 Rp
Tukang Kayu OH 0.070 74,750.00 Rp 5,232.50 Rp
Kepala Tukang OH 0.007 75,900.00 Rp 531.30 Rp
Mandor OH 0.007 80,500.00 Rp 563.50 Rp
Sub Jumlah 44,337.00 Rp
141. MEMASANG 1 M2 ATAP SUPER STEEL
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Genteng Metal gelombang Lbr 1.020 84,930.00 Rp 86,628.60 Rp
Paku Atap Genteng Metal Kg 0.200 24,345.00 Rp 4,869.00 Rp
Pekerja OH 0.200 62,100.00 Rp 12,420.00 Rp
Tukang Kayu OH 0.100 74,750.00 Rp 7,475.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 112,956.60 Rp
142. MEMASANG 1 M' PERABUNG / NOK SUPER STEEL
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Perabung Genteng Metal Lbr 1.100 27,730.00 Rp 30,503.00 Rp
Paku 5 Cm - 10 Cm Kg 0.050 24,345.00 Rp 1,217.25 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Tukang Kayu OH 0.150 74,750.00 Rp 11,212.50 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.013 80,500.00 Rp 1,046.50 Rp
Sub Jumlah 60,642.75 Rp
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
XI. PEKERJAAN PENUTUP ATAP
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Bahan
Kebutuhan
143. MEMASANG 1 M2 ATAP SENG GELOMBANG BJLS
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Atap Seng Gelombang BJLS 020 K Lbr 0.840 41,810.00 Rp 35,120.40 Rp
Paku Atap Seng Gelombang Kg 0.020 24,895.00 Rp 497.90 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang Kayu OH 0.060 74,750.00 Rp 4,485.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 48,493.70 Rp
144. MEMASANG 1 M' PERABUNG / NOK SENG GELOMBANG
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Seng Plat BJLS Lbr 0.300 65,922.00 Rp 19,776.60 Rp
Paku 1 Cm - 2,5 Cm Kg 0.040 17,745.00 Rp 709.80 Rp
Pekerja OH 0.120 62,100.00 Rp 7,452.00 Rp
Tukang Kayu OH 0.060 74,750.00 Rp 4,485.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.006 80,500.00 Rp 483.00 Rp
Sub Jumlah 33,361.80 Rp
145. MEMASANG 1 M2 ALLUMUNIUM FOIL / SISALATION
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Allumunium Foil/Sisalation M2 1.050 11,230.00 Rp 11,791.50 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Kayu OH 0.050 74,750.00 Rp 3,737.50 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.008 80,500.00 Rp 644.00 Rp
Sub Jumlah 25,867.50 Rp
146. MEMASANG 1 BUAH KLOSED DUDUK MONOBLOK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kloset Duduk Monoblok Bh 1.000 1,778,000.00 Rp 1,778,000.00 Rp
Perlengkapan (6% dari harga) Ls 1.000 106,680.00 Rp 106,680.00 Rp
Pekerja OH 3.300 62,100.00 Rp 204,930.00 Rp
Tukang Batu OH 1.100 74,750.00 Rp 82,225.00 Rp
Kepala Tukang OH 0.001 75,900.00 Rp 75.90 Rp
Mandor OH 0.160 80,500.00 Rp 12,880.00 Rp
Sub Jumlah 2,184,790.90 Rp
147. MEMASANG 1 BUAH KLOSED JONGKOK PORSELEN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kloset Jongkok Porselen Bh 1.000 183,000.00 Rp 183,000.00 Rp
PC Kg 6.000 1,292.50 Rp 7,755.00 Rp
PP M3 0.010 180,250.00 Rp 1,802.50 Rp
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Tukang Batu OH 1.500 74,750.00 Rp 112,125.00 Rp
Kepala Tukang OH 0.150 75,900.00 Rp 11,385.00 Rp
Mandor OH 0.016 80,500.00 Rp 1,288.00 Rp
Sub Jumlah 379,455.50 Rp
148. MEMASANG 1 BUAH URINOIR
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Urinoir Bh 1.000 1,448,000.00 Rp 1,448,000.00 Rp
Perlengkapan (30% dari harga) Ls 1.000 434,400.00 Rp 434,400.00 Rp
PC Kg 6.000 1,292.50 Rp 7,755.00 Rp
PP M3 0.010 180,250.00 Rp 1,802.50 Rp
Pekerja OH 1.000 62,100.00 Rp 62,100.00 Rp
Tukang Batu OH 1.000 74,750.00 Rp 74,750.00 Rp
Kepala Tukang OH 0.100 75,900.00 Rp 7,590.00 Rp
Mandor OH 0.100 80,500.00 Rp 8,050.00 Rp
Sub Jumlah 2,044,447.50 Rp
XII. PEKERJAAN SANITASI
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
149. MEMASANG 1 BUAH WESTAFEL
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Westafel Bh 1.000 513,000.00 Rp 513,000.00 Rp
Perlengkapan (12% dari harga) Ls 1.000 61,560.00 Rp 61,560.00 Rp
PC Kg 6.000 1,292.50 Rp 7,755.00 Rp
PP M3 0.010 180,250.00 Rp 1,802.50 Rp
Pekerja OH 1.200 62,100.00 Rp 74,520.00 Rp
Tukang Batu OH 1.450 74,750.00 Rp 108,387.50 Rp
Kepala Tukang OH 0.150 75,900.00 Rp 11,385.00 Rp
Mandor OH 0.100 80,500.00 Rp 8,050.00 Rp
Sub Jumlah 786,460.00 Rp
150. MEMASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0,3 M3
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bak Fiberglass Kap. 0,3 M3 Kecil Bh 1.000 194,000.00 Rp 194,000.00 Rp
Perlengkapan (18% dari harga) Ls 1.000 34,920.00 Rp 34,920.00 Rp
Pekerja OH 1.800 62,100.00 Rp 111,780.00 Rp
Tukang Batu OH 2.700 74,750.00 Rp 201,825.00 Rp
Kepala Tukang OH 0.540 75,900.00 Rp 40,986.00 Rp
Mandor OH 0.110 80,500.00 Rp 8,855.00 Rp
Sub Jumlah 592,366.00 Rp
151. MEMASANG 1 BUAH BAK FIBERGLASS KAPASITAS 1 M3
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bak Fiberglass Kap. 1 M3 Besar Bh 1.000 293,000.00 Rp 293,000.00 Rp
Perlengkapan (12% dari harga) Ls 1.000 35,160.00 Rp 35,160.00 Rp
Pekerja OH 0.300 62,100.00 Rp 18,630.00 Rp
Tukang Batu OH 0.450 74,750.00 Rp 33,637.50 Rp
Kepala Tukang OH 0.045 75,900.00 Rp 3,415.50 Rp
Mandor OH 0.090 80,500.00 Rp 7,245.00 Rp
Sub Jumlah 391,088.00 Rp
152. MEMASANG 1 BUAH BAK KONTROL (30 X 30) CM, TINGGI 35 CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Bh 145.000 336.50 Rp 48,792.50 Rp
PC Kg 44.000 1,292.50 Rp 56,870.00 Rp
PP M3 0.070 180,250.00 Rp 12,617.50 Rp
KR M3 0.007 172,875.00 Rp 1,210.13 Rp
PB M3 0.060 176,950.00 Rp 10,617.00 Rp
Besi Beton Polos Kg 1.600 14,965.00 Rp 23,944.00 Rp
Pekerja OH 3.200 62,100.00 Rp 198,720.00 Rp
Tukang Batu OH 1.015 74,750.00 Rp 75,871.25 Rp
Kepala Tukang OH 0.0015 75,900.00 Rp 113.85 Rp
Mandor OH 0.002 80,500.00 Rp 128.80 Rp
Sub Jumlah 428,885.03 Rp
153. MEMASANG 1 BUAH BAK KONTROL (45 X 45) CM, TINGGI 50 CM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bata Merah Bh 250.000 336.50 Rp 84,125.00 Rp
PC Kg 77.000 1,292.50 Rp 99,522.50 Rp
PP M3 0.130 180,250.00 Rp 23,432.50 Rp
KR M3 0.020 172,875.00 Rp 3,457.50 Rp
PB M3 0.090 176,950.00 Rp 15,925.50 Rp
Besi Beton Polos Kg 2.600 14,965.00 Rp 38,909.00 Rp
Pekerja OH 0.900 62,100.00 Rp 55,890.00 Rp
Tukang Batu OH 0.473 74,750.00 Rp 35,356.75 Rp
Kepala Tukang OH 0.047 75,900.00 Rp 3,567.30 Rp
Mandor OH 0.071 80,500.00 Rp 5,715.50 Rp
Sub Jumlah 365,901.55 Rp
154. MEMASANG 1 M' PIPA PVC TYPE AW 1/2"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pipa PVC 1/2" M' 1.200 4,030.00 Rp 4,836.00 Rp
Perlengkapan (35% dari harga) Ls 1.000 1,410.50 Rp 1,410.50 Rp
Pekerja OH 0.036 62,100.00 Rp 2,235.60 Rp
Tukang Pipa OH 0.060 75,900.00 Rp 4,554.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.0018 80,500.00 Rp 144.90 Rp
Sub Jumlah 13,636.40 Rp
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
155. MEMASANG 1 M' PIPA PVC TYPE AW 3/4"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pipa PVC 3/4" M' 1.200 5,900.00 Rp 7,080.00 Rp
Perlengkapan (35% dari harga) Ls 1.000 2,065.00 Rp 2,065.00 Rp
Pekerja OH 0.036 62,100.00 Rp 2,235.60 Rp
Tukang Pipa OH 0.060 75,900.00 Rp 4,554.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.0018 80,500.00 Rp 144.90 Rp
Sub Jumlah 16,534.90 Rp
156. MEMASANG 1 M' PIPA PVC TYPE AW 1"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pipa PVC 1" M' 1.200 5,900.00 Rp 7,080.00 Rp
Perlengkapan (35% dari harga) Ls 1.000 2,065.00 Rp 2,065.00 Rp
Pekerja OH 0.036 62,100.00 Rp 2,235.60 Rp
Tukang Pipa OH 0.060 75,900.00 Rp 4,554.00 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.0018 80,500.00 Rp 144.90 Rp
Sub Jumlah 16,534.90 Rp
157. MEMASANG 1 M' PIPA PVC TYPE AW 3"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pipa PVC 3" M' 1.200 32,080.00 Rp 38,496.00 Rp
Perlengkapan (35% dari harga) Ls 1.000 11,228.00 Rp 11,228.00 Rp
Pekerja OH 0.081 62,100.00 Rp 5,030.10 Rp
Tukang Pipa OH 0.135 75,900.00 Rp 10,246.50 Rp
Kepala Tukang OH 0.0135 75,900.00 Rp 1,024.65 Rp
Mandor OH 0.0041 80,500.00 Rp 330.05 Rp
Sub Jumlah 66,355.30 Rp
158. MEMASANG 1 M' PIPA PVC TYPE AW 4"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Pipa PVC 4" M' 1.200 49,130.00 Rp 58,956.00 Rp
Perlengkapan (35% dari harga) Ls 1.000 17,195.50 Rp 17,195.50 Rp
Pekerja OH 0.081 62,100.00 Rp 5,030.10 Rp
Tukang Pipa OH 0.135 75,900.00 Rp 10,246.50 Rp
Kepala Tukang OH 0.0135 75,900.00 Rp 1,024.65 Rp
Mandor OH 0.0041 80,500.00 Rp 330.05 Rp
Sub Jumlah 92,782.80 Rp
159. MEMASANG 1 BUAH KRAN 1/2" ATAU 3/4"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kran Air 1/2" atau 3/4" stainless Bh 1.000 137,680.00 Rp 137,680.00 Rp
Seal Tape Bh 0.025 5,708.75 Rp 142.72 Rp
Pekerja OH 0.010 62,100.00 Rp 621.00 Rp
Tukang Pipa OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 147,195.22 Rp
160. MEMASANG 1 BUAH FLOOR DRAIN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Floor Drain stainless Bh 1.000 176,180.00 Rp 176,180.00 Rp
Pekerja OH 0.010 62,100.00 Rp 621.00 Rp
Tukang Pipa OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 185,552.50 Rp
161. MEMASANG 1 BUAH KUNCI TANAM ANTIK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kunci Tanam Antik Bh 1.000 220,295.00 Rp 220,295.00 Rp
Pekerja OH 0.060 62,100.00 Rp 3,726.00 Rp
Tukang Kayu OH 0.600 75,900.00 Rp 45,540.00 Rp
Kepala Tukang OH 0.060 75,900.00 Rp 4,554.00 Rp
Mandor OH 0.003 80,500.00 Rp 241.50 Rp
Sub Jumlah 274,356.50 Rp
162. MEMASANG 1 BUAH KUNCI TANAM BIASA
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kunci Tanam Biasa stainless Bh 1.000 110,295.00 Rp 110,295.00 Rp
Pekerja OH 0.010 62,100.00 Rp 621.00 Rp
Tukang Kayu OH 0.500 75,900.00 Rp 37,950.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.005 80,500.00 Rp 402.50 Rp
Sub Jumlah 150,027.50 Rp
Kebutuhan
Tenaga Kerja
XIII. PEKERJAAN KUNCI DAN KACA
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
163. MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kunci Tanam Kamar Mandi Bh 1.000 42,095.00 Rp 42,095.00 Rp
Pekerja OH 0.005 62,100.00 Rp 310.50 Rp
Tukang Kayu OH 0.500 75,900.00 Rp 37,950.00 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.0003 80,500.00 Rp 24.15 Rp
Sub Jumlah 80,759.15 Rp
164. MEMASANG 1 BUAH KUNCI SILINDER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kunci Silinder Bh 1.000 26,145.00 Rp 26,145.00 Rp
Pekerja OH 0.005 62,100.00 Rp 310.50 Rp
Tukang Kayu OH 0.500 75,900.00 Rp 37,950.00 Rp
Kepala Tukang OH 0.005 75,900.00 Rp 379.50 Rp
Mandor OH 0.0003 80,500.00 Rp 24.15 Rp
Sub Jumlah 64,809.15 Rp
165. MEMASANG 1 BUAH ENGSEL PINTU
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Engsel Pintu 4" Bh 1.000 16,795.00 Rp 16,795.00 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 30,314.40 Rp
166. MEMASANG 1 BUAH ENGSEL JENDELA
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Engsel Jendela 3" Bh 1.000 11,295.00 Rp 11,295.00 Rp
Pekerja OH 0.010 62,100.00 Rp 621.00 Rp
Tukang Kayu OH 0.100 75,900.00 Rp 7,590.00 Rp
Kepala Tukang OH 0.010 75,900.00 Rp 759.00 Rp
Mandor OH 0.0005 80,500.00 Rp 40.25 Rp
Sub Jumlah 20,305.25 Rp
167. MEMASANG 1 BUAH KAIT ANGIN / HAK ANGIN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kait Angin / Hak Angin Bh 1.000 8,545.00 Rp 8,545.00 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 22,064.40 Rp
168. MEMASANG 1 BUAH TARIKAN TANGAN
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Tarikan Tangan Bh 1.000 8,545.00 Rp 8,545.00 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 22,064.40 Rp
169. MEMASANG 1 BUAH DOOR CLOSER
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Door Closer Bh 1.000 434,795.00 Rp 434,795.00 Rp
Pekerja OH 0.050 62,100.00 Rp 3,105.00 Rp
Tukang Kayu OH 0.500 75,900.00 Rp 37,950.00 Rp
Kepala Tukang OH 0.050 75,900.00 Rp 3,795.00 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 479,846.25 Rp
170. MEMASANG 1 M2 KACA 3 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaca 3 mm M2 1.100 88,200.00 Rp 97,020.00 Rp
Kayu List Profil M' 1.200 3,311.50 Rp 3,973.80 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 114,513.20 Rp
Kebutuhan
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
171. MEMASANG 1 M2 KACA 5 MM
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaca 5 mm M2 1.100 99,750.00 Rp 109,725.00 Rp
Kayu List Profil M' 1.200 3,311.50 Rp 3,973.80 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 127,218.20 Rp
172. MEMASANG 1 M2 KACA PATRY
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Kaca Patry M2 1.100 202,050.00 Rp 222,255.00 Rp
Kayu List Profil M' 1.200 3,311.50 Rp 3,973.80 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 239,748.20 Rp
173. MEMASANG 1 BUAH ENGSEL PINTU KUNINGAN 6"
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Engsel Pintu Kuningan 6" Bh 1.000 22,295.00 Rp 22,295.00 Rp
Pekerja OH 0.015 62,100.00 Rp 931.50 Rp
Tukang Kayu OH 0.150 75,900.00 Rp 11,385.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Mandor OH 0.0008 80,500.00 Rp 64.40 Rp
Sub Jumlah 35,814.40 Rp
174. MENGIKIS 1 M2 PERMUKAAN CAT TEMBOK LAMA
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Soda Api Kg 0.500 12,990.00 Rp 6,495.00 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 16,011.25 Rp
175. PENGECATAN 1 M2 BIDANG TEMBOK BARU (1 PLAMIR, 1 CAT DASAR, 2 CAT PENUTUP)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plamir Kg 0.100 30,205.00 Rp 3,020.50 Rp
Cat Dasar / Kapur Kg 0.100 6,830.00 Rp 683.00 Rp
Cat Tembok Kg 0.260 21,460.00 Rp 5,579.60 Rp
Pekerja OH 0.020 62,100.00 Rp 1,242.00 Rp
Tukang Cat OH 0.063 74,750.00 Rp 4,709.25 Rp
Kepala Tukang OH 0.0063 75,900.00 Rp 478.17 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 15,913.77 Rp
176. PENGECATAN 1 M2 BIDANG TEMBOK LAMA (1 CAT DASAR, 2 CAT PENUTUP)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Cat Dasar / Kapur Kg 0.100 6,830.00 Rp 683.00 Rp
Cat Tembok Kg 0.260 21,460.00 Rp 5,579.60 Rp
Pekerja OH 0.020 62,100.00 Rp 1,242.00 Rp
Tukang Cat OH 0.063 74,750.00 Rp 4,709.25 Rp
Kepala Tukang OH 0.0063 75,900.00 Rp 478.17 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 12,893.27 Rp
177. PENGECATAN 1 M2 BIDANG KAYU BARU (1 PLAMIR, 1 MENIE, 1 CAT DASAR, 2 CAT PENUTUP)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plamir Kg 0.150 30,205.00 Rp 4,530.75 Rp
Cat Menie Kayu Kg 0.200 29,930.00 Rp 5,986.00 Rp
Cat Dasar / Menie Kayu Kg 0.170 29,930.00 Rp 5,088.10 Rp
Cat Kayu Kg 0.260 48,080.00 Rp 12,500.80 Rp
Pekerja OH 0.070 62,100.00 Rp 4,347.00 Rp
Tukang Cat OH 0.009 74,750.00 Rp 672.75 Rp
Kepala Tukang OH 0.006 75,900.00 Rp 455.40 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 33,782.05 Rp
178. PENGECATAN 1 M2 BIDANG KAYU LAMA (1 PLAMIR, 1 CAT DASAR, 1 CAT PENUTUP)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Plamir Kg 0.150 30,205.00 Rp 4,530.75 Rp
Cat Dasar / Menie Kayu Kg 0.170 29,930.00 Rp 5,088.10 Rp
Cat Kayu Kg 0.170 48,080.00 Rp 8,173.60 Rp
Pekerja OH 0.070 62,100.00 Rp 4,347.00 Rp
Tukang Cat OH 0.075 74,750.00 Rp 5,606.25 Rp
Kepala Tukang OH 0.0075 75,900.00 Rp 569.25 Rp
Mandor OH 0.0025 80,500.00 Rp 201.25 Rp
Sub Jumlah 28,516.20 Rp
Bahan
Tenaga Kerja
IV. PEKERJAAN CAT
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Tenaga Kerja
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
179. PENGECATAN 1 M2 VERNISH
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Cat Vernish Kg 0.150 61,995.00 Rp 9,299.25 Rp
Dempul Kayu Kg 0.050 42,470.00 Rp 2,123.50 Rp
Kertas Amplas Lbr 0.100 6,822.50 Rp 682.25 Rp
Kuas Biasa Bh 0.010 19,087.50 Rp 190.88 Rp
Pekerja OH 0.160 62,100.00 Rp 9,936.00 Rp
Tukang Cat OH 0.160 74,750.00 Rp 11,960.00 Rp
Kepala Tukang OH 0.016 75,900.00 Rp 1,214.40 Rp
Mandor OH 0.0250 80,500.00 Rp 2,012.50 Rp
Sub Jumlah 37,418.78 Rp
180. PENGECATAN 1 M2 IMPRA (4 X SAPU)
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Cat Impra Kg 0.100 45,880.00 Rp 4,588.00 Rp
Kuas Golong Bh 0.100 29,042.50 Rp 2,904.25 Rp
Kertas Amplas Lbr 0.010 6,822.50 Rp 68.23 Rp
Thinner Ltr 0.100 21,130.00 Rp 2,113.00 Rp
Kayu Perancah M3 0.026 2,022,750.00 Rp 52,591.50 Rp
Kayu Kelas II (Papan) M3 0.002 2,462,750.00 Rp 4,925.50 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Tukang Cat OH 0.300 74,750.00 Rp 22,425.00 Rp
Kepala Tukang OH 0.025 75,900.00 Rp 1,897.50 Rp
Mandor OH 0.007 80,500.00 Rp 563.50 Rp
Sub Jumlah 101,391.48 Rp
181. PENGECATAN 1 M2 RESIDU
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Cat Residu Kg 0.350 11,010.00 Rp 3,853.50 Rp
Pekerja OH 0.100 62,100.00 Rp 6,210.00 Rp
Mandor OH 0.050 80,500.00 Rp 4,025.00 Rp
Sub Jumlah 14,088.50 Rp
182. PENGECATAN 1 M2 MENIE KAYU
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Cat Menie Kayu Kg 0.120 29,930.00 Rp 3,591.60 Rp
Pekerja OH 0.150 62,100.00 Rp 9,315.00 Rp
Kepala Tukang OH 0.015 75,900.00 Rp 1,138.50 Rp
Sub Jumlah 14,045.10 Rp
183. MEMASANG 1 M2 LAPANGAN RUMPUT
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Rumput M2 1.050 13,250.00 Rp 13,912.50 Rp
Tanah Hitam M3 0.050 90,050.00 Rp 4,502.50 Rp
Pekerja OH 0.030 62,100.00 Rp 1,863.00 Rp
Tukang Batu OH 0.100 74,750.00 Rp 7,475.00 Rp
Mandor OH 0.010 80,500.00 Rp 805.00 Rp
Sub Jumlah 28,558.00 Rp
184. MEMASANG 1 BTG KAYU CEROCOK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan Kayu Cerocok Btg 1.000 48,100.00 Rp 48,100.00 Rp
Pekerja OH 0.250 62,100.00 Rp 15,525.00 Rp
Tukang Kayu OH 0.030 74,750.00 Rp 2,242.50 Rp
Kepala Tukang OH 0.004 75,900.00 Rp 303.60 Rp
Mandor OH 0.030 80,500.00 Rp 2,415.00 Rp
Sub Jumlah 68,586.10 Rp
185. MEMASANG 1 M2 PAVING BLOK
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Paving Blok Bh 38.000 1,832.00 Rp 69,616.00 Rp
PP M3 0.007 180,250.00 Rp 1,261.75 Rp
Pekerja OH 0.500 62,100.00 Rp 31,050.00 Rp
Tukang Batu OH 0.020 74,750.00 Rp 1,495.00 Rp
Kepala Tukang OH 0.020 75,900.00 Rp 1,518.00 Rp
Mandor OH 0.002 80,500.00 Rp 161.00 Rp
Sub Jumlah 105,101.75 Rp
186. MEMASANG 1 M2 SOSOTAN ASPAL
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Aspal Kg 1.500 9,282.00 Rp 13,923.00 Rp
Tempat Masak Aspal Bh 0.003 52,300.50 Rp 156.90 Rp
Kayu Bakar M3 0.020 757,750.00 Rp 15,155.00 Rp
Pekerja OH 0.020 62,100.00 Rp 1,242.00 Rp
Tukang Batu OH 0.002 74,750.00 Rp 149.50 Rp
Mandor OH 0.001 80,500.00 Rp 80.50 Rp
Sub Jumlah 30,706.90 Rp
187. MEMASANG 1 M2 TABURAN PASIR COR
Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan PB M3 0.010 176,950.00 Rp 1,769.50 Rp
Pekerja OH 0.020 62,100.00 Rp 1,242.00 Rp
Mandor OH 0.001 80,500.00 Rp 80.50 Rp
Sub Jumlah 3,092.00 Rp
Kebutuhan
Bahan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Bahan
Kebutuhan
Bahan
XV. PEKERJAAN LAIN-LAIN
Kebutuhan
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bahan
Kebutuhan
Kebutuhan
Bahan
Tenaga Kerja
Tenaga Kerja
Kebutuhan
Tenaga Kerja
Bangkinang, Januari 2013