Вы находитесь на странице: 1из 15

Project : 150 kV T/L ASAHIMAS MENES

PAD-CHIMNEY & PILE FOUNDATION UPLIFT TEST


UPLIFT TEST LOADING STEP CALCULATION

MAIN BEAM WEIGHT


IWF 700X300X13X24, L=7.6 m. = 185 x 7.6 = 1,406.00 kg
Stiff. PL 143X652x16mm., 14 Nos = 7850 x 0.143 x 0.652 x 0.016 x 14 = 163.95 kg
Stiff. PL 143X652x12mm., 18 Nos = 7850 x 0.143 x 0.652 x 0.012 x 4 =
35.13
kg
Main beam weight = 1,605.08 kg
Additional force to cover self weight of main beam = 1605.07 x 0.5 =
Effective area of Hydraulic Jack =
Pressuremeter reading =

802.54
11.81
149.84

kg
in2
psi

LOADING STEP FOR PAD-CHIMNEY FOUNDATION UPLIFT TEST


Design Load =

25.92

tons

3750

(refer to BK/AM 2010/100)

3650

B
Pile Test

% of Design Load
Eff. Area
Load (ton)
(in2)
%
6.48
11.81
25%
50%
12.96
11.81
70%
18.14
11.81
80%
20.74
11.81
100%
25.92
11.81
110%
28.51
12.81

Detail calculation for 25% design load :


Jacking load = (Pile load x A) / (A+B)
= ( 25% x 25.92 x 3750 ) / (3750+3650)
=
3.28
tons
Jack
= 7,240.74 pounds
Pressuremeter reading = 7240.74/11.81
= 613.10 psi

Pressure

Pressure. Plus Weight Beam

Pressure. Plus Weight Beam

(psi)

(psi)

(psi) (dibulatkan

613.10
1,226.21
1,716.69
1,961.93
2,452.41
2,487.06

762.94
1,376.04
1,866.53
2,111.77
2,602.25
2,636.90

800.00
1,400.00
1,900.00
2,100.00
2,600.00
2,700.00

LOADING STEP FOR PILE FOUNDATION UPLIFT TEST


Design Load =

14.47

tons

2550

(refer to BK/AM 2010/200)

2400

B
Pile Test

% of Design Load
Eff. Area
Load (ton)
(in2)
%
3.62
11.81
25%
50%
7.24
11.81
75%
10.85
11.81
100%
14.47
11.81
125%
18.09
11.81
150%
21.71
11.81
175%
25.32
11.81
200%
28.94
11.81

Detail calculation for 25% design load :


Jacking load = (Pile load x A) / (A+B)
= ( 25% x 14.47 x 2550 ) / (2550+2400)
=
1.86
tons
Jack
= 4,109.15 pounds
Pressuremeter reading = 4109.15/11.81
= 347.94 psi

Pressure

Pressure. Plus Weight Beam

Pressure. Plus Weight Beam

(psi)

(psi)

(psi) (dibulatkan

347.94
695.88
1,043.81
1,391.75
1,739.69
2,087.63
2,435.57
2,783.51

497.78
845.72
1,193.65
1,541.59
1,889.53
2,237.47
2,585.41
2,933.35

500.00
900.00
1,200.00
1,600.00
1,900.00
2,200.00
2,600.00
3,000.00

RECORD OF PILE TEST


UPLIFT LOADING
Page : 1/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

I
Note : Pressuremeter reading already added by main bem self weight

Time

% Of
Design
Load

Load
Duration
(Minute)

Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

Butt Movement Reading

Average Butt
Movement (MM)

0.00

0.00

0.00

0.00

11.25

3.62

500

0.04

0.07

0.07

0.06

11.27

3.62

500

0.05

0.08

0.08

0.07

11.29

3.62

500

0.06

0.09

0.09

0.08

3.62

500

0.07

0.10

0.10

0.09

11.40

15

3.62

500

0.07

0.10

0.10

0.09

12.10

45

3.62

500

0.10

0.10

0.11

0.10

12.25

60

3.62

500

0.10

0.10

0.11

0.10

12.25

7.24

900

0.24

0.27

0.29

0.27

0.28

0.29

0.27

11.25

11.33

25

60

12.27

7.24

900

0.25

12.29

7.24

900

0.25

0.29

0.30

0.28

7.24

900

0.26

0.29

0.30

0.28

12.40

15

7.24

900

0.27

0.30

0.31

0.29

13.10

45

7.24

900

0.29

0.33

0.35

0.32

0.33

0.35

0.32

12.33

50

60

13.25

60

7.24

900

0.29

13.25

3.62

500

0.21

0.23

0.25

0.23

13.27

3.62

500

0.20

0.23

0.24

0.22

13.29

3.62

500

0.20

0.23

0.24

0.22

13.33

3.62

500

0.20

0.23

0.24

0.22

13.40

15

3.62

500

0.20

0.23

0.24

0.22

13.45

20

3.62

500

0.20

0.23

0.24

0.22

13.45

0.00

0.05

0.07

0.07

0.06

13.47

0.00

0.05

0.06

0.07

0.06

13.49

0.00

0.05

0.06

0.07

0.06

25

0.00

0.05

0.06

0.07

0.06

14.00

15

0.00

0.05

0.06

0.07

0.06

14.30

45

0.00

0.06

0.10

0.09

0.08

14.45

60

0.00

0.06

0.09

0.08

0.08

13.53

20

60

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 2/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

II
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

14.45

7.24

900

0.30

0.37

0.38

0.35

14.47

7.24

900

0.31

0.38

0.38

0.36

14.49

7.24

900

0.31

0.38

0.38

0.36

14.53

7.24

900

0.31

0.38

0.38

0.36

15.00

15

7.24

900

0.31

0.38

0.39

0.36

15.05

20

7.24

900

0.31

0.38

0.39

0.36

15.05

10.85

1,200

0.49

0.58

0.58

0.55

15.07

10.85

1,200

0.51

0.60

0.60

0.57

15.09

10.85

1,200

0.52

0.60

0.60

0.57

0.61

0.61

0.58

Time

% Of
Design
Load

50

Butt Movement Reading

Average Butt
Movement (MM)

20

10.85

1,200

0.52

15.20

15

10.85

1,200

0.52

0.61

0.61

0.58

15.50

45

10.85

1,200

0.52

0.61

0.61

0.58

16.05

60

10.85

1,200

0.52

0.60

0.61

0.58

16.05

14.47

1,600

0.90

1.05

1.01

0.99

1.09

1.04

1.03

15.13

75

Load
Duration
(Minute)

60

16.07

14.47

1,600

0.95

16.09

14.47

1,600

0.96

1.10

1.05

1.04

14.47

1,600

0.97

1.12

1.07

1.05

16.20

15

14.47

1,600

0.98

1.12

1.08

1.06

16.50

45

14.47

1,600

1.00

1.12

1.08

1.07

17.05

60

14.47

1,600

1.01

1.12

1.08

1.07

16.13

100

60

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 3/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

II
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

17.05

10.85

1,200

0.99

1.07

1.03

1.03

17.07

10.85

1,200

0.99

1.06

1.03

1.03

17.09

10.85

1,200

0.98

1.06

1.02

1.02

17.13

10.85

1,200

0.98

1.06

1.02

1.02

17.20

15

10.85

1,200

0.98

1.06

1.02

1.02

17.25

20

10.85

1,200

0.98

1.06

1.02

1.02

17.25

7.24

900

0.66

0.75

0.73

0.71

17.27

7.24

900

0.66

0.75

0.73

0.71

17.29

7.24

900

0.66

0.75

0.73

0.71

0.76

0.74

0.72

Time

% Of
Design
Load

75

50

Load
Duration
(Minute)

Butt Movement Reading

Average Butt
Movement (MM)

20

20

17.33

7.24

900

0.67

17.40

15

7.24

900

0.67

0.76

0.74

0.72

17.45

20

7.24

900

0.67

0.75

0.74

0.72

17.45

0.00

0.21

0.21

0.20

0.21

17.47

0.00

0.18

0.18

0.16

0.17

0.16

0.15

0.16

0.00

0.16

0.00

0.15

0.15

0.14

0.15

18.00

15

0.00

0.15

0.15

0.14

0.15

18.30

45

0.00

0.14

0.13

0.12

0.13

18.45

60

0.00

0.14

0.13

0.12

0.13

17.49
17.53

60

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 4/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

III
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

18.45

7.24

900

0.50

0.57

0.56

0.54

18.47

7.24

900

0.51

0.57

0.56

0.55

18.49

7.24

900

0.52

0.57

0.58

0.56

18.53

7.24

900

0.52

0.58

0.58

0.56

19.00

15

7.24

900

0.52

0.59

0.58

0.56

Time

% Of
Design
Load

50

Load
Duration
(Minute)

Butt Movement Reading

Average Butt
Movement (MM)

20

19.05

20

7.24

900

0.52

0.59

0.58

0.56

19.05

14.47

1,600

1.15

1.28

1.29

1.24

19.07

14.47

1,600

1.18

1.31

1.27

1.25

19.09

14.47

1,600

1.20

1.33

1.28

1.27

1.34

1.30

1.28

100

20

19.13

14.47

1,600

1.21

19.20

15

14.47

1,600

1.24

1.38

1.33

1.32

19.25

20

14.47

1,600

1.25

1.40

1.34

1.33

19.25

18.09

1,900

1.66

1.80

1.76

1.74

19.27

18.09

1,900

1.74

1.88

1.83

1.82

1.91

1.86

1.84

18.09

1,900

1.76

18.09

1,900

1.78

1.93

1.88

1.86

19.40

15

18.09

1,900

1.97

2.12

2.06

2.05

20.10

45

18.09

1,900

2.05

2.24

2.15

2.15

20.25

60

18.09

1,900

2.05

2.24

2.15

2.15

20.25

21.71

2,200

2.71

2.85

2.79

2.78

20.27

21.71

2,200

2.83

2.99

2.93

2.92

20.29

21.71

2,200

3.16

3.35

3.26

3.26

21.71

2,200

3.23

3.42

3.35

3.33

20.40

15

21.71

2,200

3.44

3.63

3.55

3.54

21.10

45

21.71

2,200

3.57

3.77

3.69

3.68

21.25

60

21.71

2,200

3.57

3.77

3.70

3.68

19.29
19.33

20.33

125

150

60

60

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 5/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

III
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

21.25

18.09

1,900

3.57

3.77

3.70

3.68

21.27

18.09

1,900

3.57

3.77

3.70

3.68

21.29

18.09

1,900

3.57

3.77

3.70

3.68

21.33

18.09

1,900

3.57

3.77

3.70

3.68

21.40

15

18.09

1,900

3.57

3.77

3.70

3.68

21.45

20

18.09

1,900

3.57

3.77

3.70

3.68

21.45

14.47

1,600

3.50

3.67

3.59

3.59

21.47

14.47

1,600

3.49

3.67

3.59

3.58

21.49

14.47

1,600

3.49

3.67

3.59

3.58

3.67

3.59

3.58

Time

% Of
Design
Load

125

100

Load
Duration
(Minute)

Butt Movement Reading

Average Butt
Movement (MM)

20

20

21.53

14.47

1,600

3.49

22.00

15

14.47

1,600

3.49

3.67

3.59

3.58

22.05

20

14.47

1,600

3.49

3.66

3.59

3.58

22.05

7.24

900

2.95

3.09

3.00

3.01

22.07

7.24

900

2.92

3.07

2.98

2.99

3.06

2.97

2.98

7.24

900

2.91

22.13

7.24

900

2.91

3.06

2.97

2.98

22.20

15

7.24

900

2.90

3.05

2.97

2.97

22.25

20

7.24

900

2.90

3.05

2.97

2.97

22.25

0.00

2.20

2.30

2.15

2.22

22.27

0.00

2.02

2.11

1.98

2.04

22.29

0.00

1.99

2.07

1.95

2.00

0.00

1.99

2.05

1.93

1.99

22.40

15

0.00

1.98

2.04

1.92

1.98

23.10

45

0.00

1.96

2.02

1.91

1.96

23.25

60

0.00

1.96

2.00

1.91

1.96

22.09
50

22.33

20

60

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 6/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

IV
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

23.25

7.24

900

2.64

2.74

2.67

2.68

23.27

7.24

900

2.66

2.77

2.71

2.71

23.29

7.24

900

2.66

2.77

2.72

2.72

23.33

7.24

900

2.69

2.80

2.73

2.74

23.40

15

7.24

900

2.69

2.80

2.73

2.74

23.45

20

7.24

900

2.69

2.80

2.74

2.74

23.45

14.47

1,600

3.87

4.00

3.95

3.94

23.47

14.47

1,600

3.92

4.07

4.01

4.00

23.49

14.47

1,600

3.93

4.09

4.02

4.01

23.53

14.47

1,600

3.95

4.10

4.04

4.03

00.00

15

14.47

1,600

3.95

4.11

4.04

4.03

00.05

20

14.47

1,600

3.95

4.11

4.04

4.03

00.05

21.71

2,200

4.90

5.04

4.98

4.97

00.07

21.71

2,200

4.97

5.12

5.05

5.05

00.09

21.71

2,200

5.00

5.17

5.10

5.09

00.13

21.71

2,200

5.03

5.19

5.12

5.11

00.20

15

21.71

2,200

5.29

5.45

5.39

5.38

00.25

20

21.71

2,200

5.30

5.47

5.40

5.39

00.25

25.32

2,600

6.05

6.15

6.12

6.11

00.27

25.32

2,600

6.17

6.25

6.22

6.21

00.29

25.32

2,600

6.23

6.31

6.27

6.27

25.32

2,600

6.45

6.52

6.49

6.49

00.40

15

25.32

2,600

6.87

6.93

6.91

6.90

01.10

45

25.32

2,600

7.80

7.81

7.81

7.81

01.25

60

25.32

2,600

7.80

7.81

7.82

7.81

Time

00.33

% Of
Design
Load

50

100

150

175

Load
Duration
(Minute)

20

20

20

60

Butt Movement Reading

Average Butt
Movement (MM)

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 7/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

IV
Note : Pressuremeter reading already added by main bem self weight
% Of
Design
Load

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

01.25

28.94

3,000

12.35

12.27

12.43

12.35

01.27

28.94

3,000

12.44

12.33

12.49

12.42

01.29

28.94

3,000

12.47

12.36

12.51

12.45

01.33

28.94

3,000

12.87

12.71

12.89

12.82

01.40

15

28.94

3,000

13.27

13.13

13.30

13.23

02.10

45

28.94

3,000

14.02

13.88

14.08

13.99

60

28.94

3,000

14.31

14.19

14.39

14.30

80

28.94

3,000

14.93

14.78

15.00

14.90

100

28.94

3,000

15.25

15.10

15.32

15.22

120

28.94

3,000

15.70

15.55

15.78

15.68

180

28.94

3,000

16.19

16.05

16.29

16.18

240

28.94

3,000

16.55

16.43

16.68

16.55

300

28.94

3,000

16.45

16.35

16.57

16.46

360

28.94

3,000

16.58

16.47

16.72

16.59

420

28.94

3,000

17.08

16.90

17.17

17.05

09.25

480

28.94

3,000

17.12

16.99

17.24

17.12

10.25

540

28.94

3,000

17.22

17.08

17.36

17.22

11.25

600

28.94

3,000

17.26

17.11

17.39

17.25

12.25

660

28.94

3,000

17.29

17.16

17.44

17.30

13.25

720

28.94

3,000

17.33

17.25

17.51

17.36

02.25
02.45
03.05
03.25
04.25
05.25
06.25
07.25
08.25

200

Load
Duration
(Minute)

720 (if Butt Movement 0.25 mm/hour)

Time
Reading
(Minute)

Time

Butt Movement Reading

Average Butt
Movement (MM)

Remarks

RECORD OF PILE TEST


UPLIFT LOADING
Page : 8/8
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type

: Bore Pile

Dated Installed

: March 19, 2008

Length of Pile

: 8.5 m.

Date of Testing

: April 21-23, 2008

Diameter of Pile

: 400 mm.

Cut of Level ( -0.4 m. )

Description of Test

: Uplift Load Test

Ground Level ( 0.0 m. )

Loading System

: Hydraulic Jack

Founding Level ( -9.0 m. )

Working Load

: 14.47 tons

Location

: G.I. Menes

Test Load

: 28.94 tons

Test Pile No.

:1

Step No.

IV
Note : Pressuremeter reading already added by main bem self weight
Time
Reading
(Minute)

Test
Load
(Tons)

Press.
meter
(psi)

Dial No. 1

Dial 2

Dial 3

13.25

25.32

2,600

17.23

17.12

17.39

17.25

13.27

25.32

2,600

17.22

17.11

17.37

17.23

13.29

25.32

2,600

17.21

17.09

17.35

17.22

25.32

2,600

17.20

17.06

17.34

17.20

13.40

15

25.32

2,600

17.20

17.06

17.34

17.20

14.10

45

25.32

2,600

17.25

17.14

17.40

17.26

14.25

60

25.32

2,600

17.23

17.11

17.35

17.23

14.25

21.71

2,200

16.98

16.85

17.08

16.97

14.27

21.71

2,200

16.97

16.84

17.07

16.96

14.29

21.71

2,200

16.97

16.84

17.07

16.96

21.71

2,200

16.95

16.83

17.06

16.95

14.40

15

21.71

2,200

16.93

16.82

17.05

16.93

15.10

45

21.71

2,200

16.89

16.77

17.00

16.89

15.25

60

21.71

2,200

16.86

16.76

16.99

16.87

15.25

14.47

1,600

16.06

16.00

16.17

16.08

15.27

14.47

1,600

16.04

15.98

16.15

16.06

15.29

14.47

1,600

16.02

15.97

16.15

16.05

14.47

1,600

16.02

15.96

16.14

16.04

15.40

15

14.47

1,600

16.01

15.96

16.13

16.03

16.10

45

14.47

1,600

15.98

15.92

16.10

16.00

16.25

60

14.47

1,600

15.93

15.85

16.05

15.94

16.25

7.24

900

15.45

15.45

15.56

15.49

16.27

7.24

900

15.35

15.35

15.46

15.39

16.29

7.24

900

15.33

15.33

15.45

15.37

7.24

900

15.33

15.33

15.44

15.37

16.40

15

7.24

900

15.33

15.36

15.44

15.38

17.10

45

7.24

900

15.28

15.37

15.44

15.36

17.25

60

7.24

900

15.24

15.32

15.37

15.31

17.25

0.00

14.01

14.20

14.60

14.27

18.25

60

0.00

6.90

6.02

6.82

6.58

19.25

120

0.00

6.82

5.95

6.75

6.51

20.25

180

0.00

6.81

5.91

6.72

6.48

21.25

240

0.00

6.78

5.87

6.68

6.44

22.25

300

0.00

6.76

5.85

6.67

6.43

360

0.00

6.75

5.83

6.65

6.41

00.25

420

0.00

6.74

5.82

6.65

6.40

01.25

480

0.00

6.73

5.81

6.64

6.39

02.25

540

0.00

6.73

5.80

6.62

6.38

03.25

600

0.00

6.70

5.78

6.61

6.36

04.25

660

0.00

6.68

5.77

6.59

6.35

05.25

720

0.00

6.66

5.76

6.57

6.33

Time

13.33

14.33

15.33

16.33

23.25

% Of
Design
Load

175

150

100

50

Load
Duration
(Minute)

60

60

60

60

720

Butt Movement Reading

Average Butt
Movement (MM)

Remarks

GRAPH OF PILE UPLIFT AXIAL TENSILE LOAD TEST STEP


30

25

Test Load (TON)

20

15

10

0
0

60

120

180

240

300

360

420

480

540

600

660

720

780

840

900

960

1020 1080 1140 1200 1260 1320 1380 1440 1500 1560 1620 1680 1740 1800 1860 1920 1980 2040 2100 2160 2220 2280 2340 2400 2460 2520

Time of Duration (Minute)

Load (Ton)

INDIVIDUAL PILE UNDER STATIC AXIAL TENSILE LOAD(ASTM D-3689)


30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
0

500

1000

1500

2000

2500

3000

Project
Location
Test No.
Elevation
Date of test

:
:
:
:
:

150 kV T/L Asahimas Menes


Gardu induk (G.I.) Menes
1 (Uplift Pile Load Test)

Type of pile
Date of Installation
Type of Hydraulick Jack
Area of piston (AP)
Hydraulic Pump
Manometer
Dial Gauge
Accuracy/Resolution

:
:
:
:
:
:
:
:

Bore Pile
March 19, 2008
Enerpac CLSG 508
11.81
:
in
Enerpac P-80
Enerpac G4039 L capacity 0-10.000 Psi
Mitutoyo Analog Capacity 0 - 100 mm
0.01 mm

April 21-23, 2008

Elapsed time (min)

Elapsed time (min)


500

1000

1500

2000

2500

3000

0.0

0.0

3.0

3.0

6.0

9.0
12.0

Settlement (mm)

Settlement (mm)

Load (Ton)

6.0

9.0
12.0

15.0

15.0

18.0

18.0

8 10 12 14 16 18 20 22 24 26 28 30
Ultimate Load= 24 Ton

Enerpac G4039 L capacity 0-10.000 Psi

Elapsed time (minute)


0
0
2
4
8
15
45
60
62
64
68
75
105
120
122
124
128
135
140
142
144
148
155
185
200
202
204
208
215
220
222
224
228
235
265
280
282
284
288
295
325
340
342
344
348
355
360
362
364
368
375
380
382
384
388
395
425
440
442
444
448
455
460
462
464
468
475
480
482
484
488
495
525
540
542
544
548
555
585
600
602
604
608
615
620
622
624
628
635
640
642
644
648
655
660
662
664
668
675
705
720
722
724
728
735
740
742
744
748
755
760
762
764
768
775
780
782
784
788
795
825
840
842
844
848
855
885
900
920
940
960
1020
1080
1140
1200
1260
1320
1380
1440
1500
1560
1562
1564
1568
1575
1605
1620
1622
1624
1628
1635
1665
1680
1682
1684
1688
1695
1725
1740
1742
1744
1748
1755
1785
1800
1800
1860
1920
1980
2040
2100
2160
2220
2280
2340
2400
2460
2520

Load (Ton) LoadPr (Ton) Settlement (mm)


0.0
0.00
0.00
3.6
3.62
0.06
3.6
3.62
0.07
3.6
3.62
0.08
3.6
3.62
0.09
3.6
3.62
0.09
3.6
3.62
0.10
3.6
3.62
0.10
7.7
7.24
0.27
7.7
7.24
0.28
7.7
7.24
0.28
7.7
7.24
0.29
7.7
7.24
0.32
7.7
7.24
0.32
3.6
3.62
0.22
3.6
3.62
0.22
3.6
3.62
0.22
3.6
3.62
0.22
3.6
3.62
0.22
0.0
0.00
0.06
0.0
0.00
0.06
0.0
0.00
0.06
0.0
0.00
0.06
0.0
0.00
0.08
0.0
0.00
0.08
7.7
7.24
0.36
7.7
7.24
0.36
7.7
7.24
0.36
7.7
7.24
0.36
7.7
7.24
0.36
10.9
10.85
0.57
10.9
10.85
0.57
10.9
10.85
0.58
10.9
10.85
0.58
10.9
10.85
0.58
10.9
10.85
0.58
15.0
14.47
1.03
15.0
14.47
1.04
15.0
14.47
1.05
15.0
14.47
1.06
15.0
14.47
1.07
15.0
14.47
1.07
10.9
10.85
1.03
10.9
10.85
1.02
10.9
10.85
1.02
10.9
10.85
1.02
10.9
10.85
1.02
7.7
7.24
0.71
7.7
7.24
0.71
7.7
7.24
0.72
7.7
7.24
0.72
7.7
7.24
0.72
0.0
0.00
0.17
0.0
0.00
0.16
0.0
0.00
0.15
0.0
0.00
0.15
0.0
0.00
0.13
0.0
0.00
0.13
3.6
3.62
0.55
3.6
3.62
0.56
3.6
3.62
0.56
3.6
3.62
0.56
3.6
3.62
0.56
15.0
14.47
1.25
15.0
14.47
1.27
15.0
14.47
1.28
15.0
14.47
1.32
15.0
14.47
1.33
18.2
18.09
1.82
18.2
18.09
1.84
18.2
18.09
1.86
18.2
18.09
2.05
18.2
18.09
2.15
18.2
18.09
2.15
21.3
21.71
2.92
21.3
21.71
3.26
21.3
21.71
3.33
21.3
21.71
3.54
21.3
21.71
3.68
21.3
21.71
3.68
18.2
18.09
3.68
18.2
18.09
3.68
18.2
18.09
3.68
18.2
18.09
3.68
18.2
18.09
3.68
15.0
14.47
3.58
15.0
14.47
3.58
15.0
14.47
3.58
15.0
14.47
3.58
15.0
14.47
3.58
7.7
7.24
2.99
7.7
7.24
2.98
7.7
7.24
2.98
7.7
7.24
2.97
7.7
7.24
2.97
0.0
0.00
2.04
0.0
0.00
2.00
0.0
0.00
1.99
0.0
0.00
1.98
0.0
0.00
1.96
0.0
0.00
1.96
7.7
7.24
2.71
7.7
7.24
2.72
7.7
7.24
2.74
7.7
7.24
2.74
7.7
7.24
2.74
15.0
14.47
4.00
15.0
14.47
4.01
15.0
14.47
4.03
15.0
14.47
4.03
15.0
14.47
4.03
21.3
21.71
5.05
21.3
21.71
5.09
21.3
21.71
5.11
21.3
21.71
5.38
21.3
21.71
5.39
25.5
25.32
6.21
25.5
25.32
6.27
25.5
25.32
6.49
25.5
25.32
6.90
25.5
25.32
7.81
25.5
25.32
7.81
29.6
28.94
12.42
29.6
28.94
12.45
29.6
28.94
12.81
29.6
28.94
13.23
29.6
28.94
13.99
29.6
28.94
14.30
29.6
28.94
14.90
29.6
28.94
15.22
29.6
28.94
15.68
29.6
28.94
16.18
29.6
28.94
16.55
29.6
28.94
16.45
29.6
28.94
16.59
29.6
28.94
17.05
29.6
28.94
17.12
29.6
28.94
17.25
29.6
28.94
17.25
29.6
28.94
17.30
29.6
28.94
17.36
25.5
25.32
17.23
25.5
25.32
17.22
25.5
25.32
17.20
25.5
25.32
17.20
25.5
25.32
17.26
25.5
25.32
17.23
21.3
21.71
16.96
21.3
21.71
16.96
21.3
21.71
16.95
21.3
21.71
16.93
21.3
21.71
16.89
21.3
21.71
16.87
15.0
14.47
16.06
15.0
14.47
16.05
15.0
14.47
16.04
15.0
14.47
16.03
15.0
14.47
16.00
15.0
14.47
15.94
3.6
3.62
15.39
3.6
3.62
15.37
3.6
3.62
15.37
3.6
3.62
15.38
3.6
3.62
15.36
3.6
3.62
15.31
0.0
0.00
14.27
0.0
0.00
6.63
0.0
0.00
6.51
0.0
0.00
6.48
0.0
0.00
6.44
0.0
0.00
6.43
0.0
0.00
6.41
0.0
0.00
6.40
0.0
0.00
6.39
0.0
0.00
6.38
0.0
0.00
6.36
0.0
0.00
6.33
0.0
0.00
6.33

Load_1 (Ton) Settlement_1 (mm)


0.00
0.00
3.60
0.10
7.70
0.32
3.60
0.22
0.00
0.08
7.70
0.36
10.90
0.58
15.00
1.07
10.90
1.02
7.70
0.72
0.00
0.13
3.60
0.56
15.00
1.33
18.20
2.15
21.30
3.68
18.20
3.68
15.00
3.58
7.70
2.97
0.00
1.96
7.70
2.74
15.00
4.03
21.30
5.39
25.50
7.81
28.70
17.36
25.50
17.23
21.30
16.87
15.00
15.94
3.60
15.31
0.00
6.33

STEP 1
0.00
3.62
3.62
3.62
3.62
3.62
3.62
3.62
7.24
7.24
7.24
7.24
7.24
7.24
7.24
3.62
3.62
3.62
3.62
3.62
3.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.06
0.07
0.08
0.09
0.09
0.10
0.10
0.27
0.27
0.28
0.28
0.29
0.32
0.32
0.23
0.22
0.22
0.22
0.22
0.22
0.06
0.06
0.06
0.06
0.06
0.08
0.08

STEP 2
0.00
7.24
7.24
7.24
7.24
7.24
7.24
10.85
10.85
10.85
10.85
10.85
10.85
10.85
14.47
14.47
14.47
14.47
14.47
14.47
14.47
10.85
10.85
10.85
10.85
10.85
10.85
7.24
7.24
7.24
7.24
7.24
7.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.08
0.35
0.36
0.36
0.36
0.36
0.36
0.55
0.57
0.57
0.58
0.58
0.58
0.58
0.99
1.03
1.04
1.05
1.06
1.07
1.07
1.03
1.03
1.02
1.02
1.02
1.02
0.71
0.71
0.71
0.72
0.72
0.72
0.21
0.17
0.16
0.15
0.15
0.13
0.13

STEP 3
0.00
7.24
7.24
7.24
7.24
7.24
7.24
14.47
14.47
14.47
14.47
14.47
14.47
18.09
18.09
18.09
18.09
18.09
18.09
18.09
21.71
21.71
21.71
21.71
21.71
21.71
21.71
18.09
18.09
18.09
18.09
18.09
18.09
14.47
14.47
14.47
14.47
14.47
14.47
7.24
7.24
7.24
7.24
7.24
7.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.13
0.54
0.55
0.56
0.56
0.56
0.56
1.24
1.25
1.27
1.28
1.32
1.33
1.74
1.82
1.84
1.86
2.05
2.15
2.15
2.78
2.92
3.26
3.33
3.54
3.68
3.68
3.68
3.68
3.68
3.68
3.68
3.68
3.59
3.58
3.58
3.58
3.58
3.58
3.01
2.99
2.98
2.98
2.97
2.97
2.22
2.04
2.00
1.99
1.98
1.96
1.96

STEP 4
0.00
7.24
7.24
7.24
7.24
7.24
7.24
14.47
14.47
14.47
14.47
14.47
14.47
21.71
21.71
21.71
21.71
21.71
21.71
25.32
25.32
25.32
25.32
25.32
25.32
25.32
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
28.94
25.32
25.32
25.32
25.32
25.32
25.32
25.32
21.71
21.71
21.71
21.71
21.71
21.71
21.71
14.47
14.47
14.47
14.47
14.47
14.47
14.47
7.24
7.24
7.24
7.24
7.24
7.24
7.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.96
2.68
2.71
2.72
2.74
2.74
2.74
3.94
4.00
4.01
4.03
4.03
4.03
4.97
5.05
5.09
5.11
5.38
5.39
6.11
6.21
6.27
6.49
6.90
7.81
7.81
12.35
12.42
12.45
12.82
13.23
13.99
14.30
14.90
15.22
15.68
16.18
16.55
16.46
16.59
17.05
17.12
17.22
17.25
17.30
17.36
17.25
17.23
17.22
17.20
17.20
17.26
17.23
16.97
16.96
16.96
16.95
16.93
16.89
16.87
16.08
16.06
16.05
16.04
16.03
16.00
15.94
15.49
15.39
15.37
15.37
15.38
15.36
15.31
14.27
6.58
6.51
6.48
6.44
6.43
6.41
6.40
6.39
6.38
6.36
6.35
6.33

Elapsed time (minute)


0
0
60
120
180
240
300
360
420
480
540
1980
2040
3480
32
34
40
40
42
44
50
60
70
70
72
73
73
75
77
81
83

Load (Ton) LoadPr (Ton) Settlement (mm)


0.0
0.00
0.00
6.8
0.00
0.00
6.8
1.70
0.04
6.8
1.70
0.04
6.8
3.40
0.04
13.2
3.40
0.04
13.2
5.10
0.11
13.2
5.10
0.14
13.2
6.80
0.14
18.5
6.80
0.15
18.5
8.50
0.24
18.5
8.50
0.27
18.5
0.00
0.27
20.6
0.00
0.28
20.6
0.29
20.6
0.31
20.6
0.31
25.9
0.31
25.9
0.36
25.9
0.38
25.9
0.38
25.9
0.38
25.9
0.38
29.2
0.38
29.2
0.38
29.2
0.38
0.0
0.38
0.0
0.04
0.0
0.01
0.0
0.01
0.0
0.01

Load_1 (Ton) Settlement_1 (mm)


0.0
0.00
6.8
0.04
13.2
0.14
18.5
0.27
20.6
0.31
25.9
0.38
29.2
0.38
0.0
0.01

TRENDLINE
0.00
7.24
10.85
14.47
18.09
21.71
25.32
28.94

0.00
0.32
0.58
1.07
2.15
3.68
7.81
17.36

Load (Ton)

PAD & CHIMNEY AXIAL TENSILE LOAD (IEC)


Project
Location
Test No.
Elevation
Date of test

30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0

1000

2000

3000

:
:
:
:
:

Type of Foundation
:
Date of Installation
:
Type of Hydraulick Jack:
Area of piston (AP)
:
Hydraulic Pump
:
Manometer
:
Dial Gauge
:
Accuracy/Resolution
:

4000

150 kV T/L Asahimas Menes


Gardu induk (G.I.) Menes
1 (Pad & Chimney Uplift Load Test)
April 25, 2008

Pad and Chimney


March 18, 2008
Enerpac CLSG 508
11.81
: in
Enerpac P-80
Enerpac G4039 L kapasitas 0-10.000 Psi
Mitutoyo Analog Capacity 0 - 100 mm
0.01 mm

Elapsed time (min)

Load (ton)

Elapsed time (min)


0

1000

2000

3000

4000

0.15

0.20
0.25

0.30
0.35
0.40
0.45

0.50

Settlement (mm)

Settlement (mm)

0.05
0.10

10

20

30

0.00

0.00

1.00
1.50
2.00
2.50
3.00

Ultimate Load > 30 Ton

40

GRAPH OF LOAD TEST CONCRETE BEAM STEP


10

Stage 5 (850 kg/m2)


8

Pumping Stage/ Fill Water for Step 5


7

Stage 4 (680 kg/m2)

Test Load (kPa)

Removing all Water


Pumping Stage/ Fill Water for Step 4

Stage 3 (510 kg/m2)

Pumping Stage/ Fill Water for Step 3

Stage 2 (340 kg/m2)


3

Pumping Stage/ Fill Water for Step 2


2

Stage 1(170 kg/m2)

Pumping Stage/ Fill Water for Step 1

Rebound Record

300

600

900

1200

1500

1800

2100

2400

Time of Duration (Minute)

2700

3000

3300

3600

Вам также может понравиться