This document provides specifications for a glazed aluminum curtain wall system for the Worli Mixed Used Development project. It outlines requirements for quality control testing during construction, including testing water leakage and operable windows. It also provides specifications for delivery, storage, handling, environmental requirements during installation, field measurements, and coordination with other contractors. Testing is required to verify proper water drainage and ensure no water leakage occurs.
This document provides specifications for a glazed aluminum curtain wall system for the Worli Mixed Used Development project. It outlines requirements for quality control testing during construction, including testing water leakage and operable windows. It also provides specifications for delivery, storage, handling, environmental requirements during installation, field measurements, and coordination with other contractors. Testing is required to verify proper water drainage and ensure no water leakage occurs.
This document provides specifications for a glazed aluminum curtain wall system for the Worli Mixed Used Development project. It outlines requirements for quality control testing during construction, including testing water leakage and operable windows. It also provides specifications for delivery, storage, handling, environmental requirements during installation, field measurements, and coordination with other contractors. Testing is required to verify proper water drainage and ensure no water leakage occurs.
Worli Mixed Used Development Meinhardt Faade Technology
Kohn Pedersen Fox Associates PC Architects March 19, 2012
Project No 1848-01 GLAZED ALUMINUM CURTAIN WALL 084413 - 40 incurred by the Owner Representative, Owner and Consultant. Remedial measures shall maintain all specified standards of quality and durability. All remedial proposals shall first be properly documented and submitted for approval. Remedial work shall only proceed upon Consultants/Owners and Owner Representative's written approval of proposal. E. Verify during construction that water leakage and condensation are effectively collected and drained to the exterior. Test internal gutters for every floor by temporarily plugging weep holes and filling with water. After a minimum of fifteen (15) minutes. Inspect for water leakage. Correct deficiencies and retest until successful tests are achieved. Remove weep hole plugs after testing. All gutters are to be clean and free of debris prior to installing additional material that would prevent access at a later time. F. Operable windows shall be tested to 100% requirement. The test to be used for this shall conform to AAMA501.2. 1. Verify during construction that water leakage and condensation are effectively collected and drained to the exterior. Test internal gutters 100% for every floor by temporarily plugging weep holes and filling with water. After a minimum of fifteen (15) minutes. Inspect for water leakage. Correct deficiencies and retest until successful tests are achieved. Remove weep hole plugs after testing. All gutters shall be clean and free of debris prior to installing additional material that would prevent access at a later time. 1.15 DELIVERY STORAGE AND HANDLING A. All components of the wall shall be identified after fabrication by marks clearly indicating their location on the building as shown on the drawings. B. Storage on site shall be in a location and manner directed by the Main Contractor. Materials shall be stored so that they do not suffer any damage including damages arising from weather, soiling wetting, or any other deleterious effect. C. Packaging shall be the minimum necessary to protect the parts from damage during shipping, hoisting, and storage. D. Glass shall be protected from any possibility of water/condensation damage during shipping. 1.16 ENVIRONMENTAL REQUIREMENTS A. Do not install sealants when ambient temperature is less than 5'C, or when any other environmental conditions that do not conform to manufacturer's specification. B. Maintain this minimum temperature during and after installation of sealants. 1.17 FIELD MEASUREMENTS A. Verify that field measurements are as indicated on shop drawings. External Facade Contractor is responsible for verifying all dimensions in field and for providing timely notification of any field conditions that are the work of others that may inhibit the installation of the work of this contract. 1.18 COORDINATION A. The work under this section shall be coordinated with related work of other trades, utility companies, etc., in a mannerto ensure the steady progress of work under this contract. B. Scheduling. 1. External Facade Contractor shall prepare and maintain a detailed schedule of activities from the time of contract award until contract completion. Schedule of coordinated submittals and