DATE
9/24/2014
JOB NO :
TK-291812
DESIGNED
ACTIVITY:
CHECKED
Zhuan
SHEET
E
L
L
h
f
s
=
=
=
=
15920
2500
2133
8241
mm
mm
mm
mm
Loading Calculation:
Dead Load :
1.
Roofing sheet:
0.30BMT
0.35TCT
Information from catalogue
Mass per unit area
Mass per unit length
Self weight of roofing
2.
2a
0.110
kN/m
Ceiling sheet :
40mm PU Panel
3.6m span
Information from catalogue
Mass per unit area
=
Mass per unit length =
Self weight of roofing
=
0.299 kN/m
Glass wool + steel
For 3.6 m span
3.
=
=
=
=
=
=
Purlin :
Try : LCC10016-50
Ix =
572000 mm4
Iy =
128000 mm4
Zx =
11440 mm3
Zy =
3951 mm3
UDL contributed by purlins =
0
0.000
0.00
0.000
rx
ry
D
B
=
=
=
=
8
kg/m2
kN/m2
kN
kN/m
0.096
8.48 kg/m2
8.05 kg/m
40.16 mm
19 mm
100
50 mm
pcs =
3.11 kg/m2
2.36 kg/m
Weight
A
L
t
kN/m
=
=
=
=
=
=
=
=
2.8
355
3600
1.6
0
0.000
0.00
0.000
kg/m
mm2
mm
mm
kg/m2
kN/m2
kN
kN/m
PROJECT:
DATE
9/24/2014
JOB NO :
TK-291812
DESIGNED
ACTIVITY:
CHECKED
Zhuan
SHEET
0.9 kN/m
Ve = Vs x Sb
32
m/s
where
Vb =
32 m/s
Sa = Altitude factor Cl:2.2.2.2
Sd = Direction factor Cl:2.2.2.3
Ss = Seasonla factor Cl:2.2.2.4
Sp = Probability factor Cl:2.2.2.5
=
=
=
=
Sb
1
1
1
1
2.5 m
10 km
1.38
1.38 x
32
44.16 m/s
1195.415 Pa
1.195 kN/m2
-0.6 (for two opposite walls equally permeable and wind normal to impermeable face)
= qs Cpe Ca
= -0.559 kN/m2
-0.187 kN/m2
PROJECT:
DATE
9/24/2014
JOB NO :
TK-291812
DESIGNED
ACTIVITY:
CHECKED
Zhuan
SHEET
Coefficient calculation :
k = ( I1 / I2 ) x ( h / s )
= f/h
m = 1+
B = 2 ( k+1 ) + m
C = 1 + 2m
N = B + mC
=
=
=
0.187
1.683
0.673
x 4 x
kN
kN/m
2.5
0.303
0.853
1.853
4.46
4.706
13.180
C
D
MB
MC
MD
HA
HE
VA
VE
=
=
=
=
=
=
-37.839 kN m
=
=
=
=
=
=
11.209
-37.839
15.1355
15.1355
20.4333
20.4333
kN m
kN m
kN
kN
kN
kN
C
D
PROJECT:
DATE
9/24/2014
JOB NO :
TK-291812
DESIGNED
ACTIVITY:
CHECKED
Zhuan
SHEET
1.633
MC
wh / 4 + mMD
-0.391 kN m
MD
HA
HE
=
=
=
-wL2 /8 X [ 2 (B+C) + k] / N
-(wh - HE)
-MD / h
=
=
=
-0.892 kN m
-1.6626 kN
0.357 kN
VA
VE
=
=
-wh2 / 2L
- VA
=
=
-0.159 kN
0.159 kN
-30.155 kN m
MC
MD
HA
HE
VA
VE
=
=
=
=
=
=
8.933
-30.155
12.0621
12.0621
16.2841
16.2841
=
=
=
=
=
=
( wL / 8) + mMB
MB
-MB / h
HA
2
wL / 2
VA
kN m
kN m
kN m
kN
kN
kN
kN
Max
MB
MC
MD
HA
HE
VA
VE
=
=
=
=
=
=
=
-37.839
11.209
-37.839
15.1355
15.1355
20.4333
20.4333
kN m
kN m
kN m
kN
kN
kN
kN
kN m
kN m
kN m
kN
kN
kN
kN
PROJECT:
DATE
JOB NO :
TK-291812
DESIGNED
ACTIVITY:
CHECKED
SHEET
9/24/2014
Zhuan