S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFC 3500 50 P/m 175000 2 PLB 3500 26 P/m 91000 3 WSC 2 2650 Each 5300 4 GI pipe 3 2 240 P/m 480 5 Coupler 35 45 Each 1575 6 SJC/ BJC 5 1000 Each 5000 7 Pig tail 24 450 Each 10800 Total 289155 B) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFCT excavation trench and refilling after laying PLB charges 0 27.26 P/m 0 2 HDPE laying of PLB 0 2.29 P/m 0 a) GIHB road / rail horizontal boring HDD 3500 140 P/m 490000 b) GIHB road / rail horizontal boring manual 0 80 P/m 0 6 GIBC laying GI on bridge and culvert 0 1900 Pcm 0 7 RCCT laying of split RCC in trench 50 5 P/m 250 8 OFCP polling of OFC 3500 5 p/m 17500 9 OFST splicing OFC at joint and end 5 2000 Each 10000 10 JCBR contraction of joints chamber 5 1400 P/c 7000 11 ORJF fixing of rout and joint indicator 20 146.3 p/u 2926 12 DOCT documentation of OFC rout 24 50 p/km 1200 2.4 SRCC supply of SRCC 0 50 P/m 0 Total 528876 7.1 Drum recovery of empty drum 2 200 Each -400 B) Grand Total 528476 C) 1 Forest Dept. 600000 2 PWD Dept. & Municipality and Railway 600000 Total 1200000 A) Cable Items for laying OFC : ` 289155 B) OFC laying charges : ` 528476 C) NOC charges : ` 1200000 D) : ` 20000 Grand total : ` 2037631 D E (TRANSMISSION) S D E (TRANSMISSION) MATHURA MATHURA List for cable items for laying OFC for Chhatikara-Akshay Patra 2 MB ILL commissioning : List for cable items for laying OFC for Chhatikara-Akshay Patra 2 MB ILL commissioning : 3 NOC charges of railway, forests PWD, NH-2, Municipality Departments : Transportation of stores at Different sites and miscellanies A) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFC 46000 50 P/m 2300000 2 PLB 45000 26 P/m 1170000 3 WSC 2 2650 Each 5300 4 GI pipe 3 500 240 P/m 120000 5 Coupler 450 45 Each 20250 6 SJC/ BJC 25 1000 Each 25000 7 Pig tail 100 450 Each 45000 Total 3685550 B) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFCT excavation trench and refilling after laying PLB charges 8000 27.26 P/m 218080 2 HDPE laying of PLB 44500 2.29 P/m 101905 a) GIHB road / rail horizontal boring HDD 17000 140 P/m 2380000 b) GIHB road / rail horizontal boring manual 20000 80 P/m 1600000 6 GIBC laying GI on bridge and culvert 45 1900 Pcm 85500 7 RCCT laying of split RCC in trench 2000 5 P/m 10000 8 OFCP polling of OFC 46000 5 p/m 230000 9 OFST splicing OFC at joint and end 30 2000 Each 60000 10 JCBR contraction of joints chamber 30 1400 P/c 42000 11 ORJF fixing of rout and joint indicator 225 146.3 p/u 32917.5 12 DOCT documentation of OFC rout 45 50 p/km 2250 2.4 SRCC supply of SRCC 2000 50 P/m 100000 Total 4862652.5 7.1 Drum recovery of empty drum 23 200 Each -4600 B) Grand Total 4858052.5 C) 1 Forest Dept. 800000 2 PWD Dept. & Municipality and Railway 500000 Total 1300000 A) Cable Items for laying OFC : ` 3685550 B) OFC laying charges : ` 4858052.5 C) NOC charges : ` 1300000 D) : ` 20000 Grand total : ` 9863603 D E (TRANSMISSION) MATHURA MATHURA List for cable items for laying OFC for shifting the OFC route along National Highway # 2 between Kosi to Mathura due to widening of NH#2 from four Lane to six Lane in Mathura SSA : List of OFC laying charges for shifting the OFC route along National Highway # 2 between Kosi to Mathura due to widening of NH#2 from four Lane to six Lane in Mathura SSA: 3 NOC charges of railway, forests PWD, NH-2, Municipality Departments : Transportation of stores at Different sites and miscellanies S D E (TRANSMISSION) A) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFC 3500 50 P/m 175000 2 PLB 3000 26 P/m 78000 3 WSC 2 2650 Each 5300 4 GI pipe 3 50 240 P/m 12000 5 Coupler 60 45 Each 2700 6 SJC/ BJC 5 1000 Each 5000 7 Pig tail 100 450 Each 45000 Total 323000 B) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFCT excavation trench and refilling after laying PLB charges 500 27.26 P/m 13630 2 HDPE laying of PLB 3000 2.29 P/m 6870 a) GIHB road / rail horizontal boring HDD 2000 140 P/m 280000 b) GIHB road / rail horizontal boring manual 500 80 P/m 40000 6 GIBC laying GI on bridge and culvert 4.5 1900 Pcm 8550 7 RCCT laying of split RCC in trench 0 5 P/m 0 8 OFCP polling of OFC 3500 5 p/m 17500 9 OFST splicing OFC at joint and end 3 2000 Each 6000 10 JCBR contraction of joints chamber 3 1400 P/c 4200 11 ORJF fixing of rout and joint indicator 20 146.3 p/u 2926 12 DOCT documentation of OFC rout 3 50 p/km 150 2.4 SRCC supply of SRCC 0 50 P/m 0 Total 379826 7.1 Drum recovery of empty drum 2 200 Each -800 B) Grand Total 379426 C) 1 Forest Dept. 150000 2 PWD Dept. & Municipality and Railway 50000 Total 200000 A) Cable Items for laying OFC : ` 323000 B) OFC laying charges : ` 379426 C) NOC charges : ` 200000 D) : ` 5000 Grand total : ` 907426 D E (TRANSMISSION) MATHURA MATHURA List for cable items for laying OFC for shifting the OFC route along National Highway # 59 at Sadabad due to widening of NH#59 in Mathura SSA : List of OFC laying charges for shifting the OFC route along National Highway # 59 at Sadabad due to widening of NH#59 in Mathura SSA: 3 NOC charges of railway, forests PWD, NH-2, Municipality Departments : Transportation of stores at Different sites and miscellanies S D E (TRANSMISSION) A) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFC 25000 50 P/m 1E+06 2 PLB 23600 26 P/m 613600 3 WSC 2 2650 Each 5300 4 GI pipe 3 400 240 P/m 96000 5 Coupler 250 45 Each 11250 6 SJC/ BJC 20 1000 Each 20000 7 Pig tail 100 450 Each 45000 Total 2E+06 B) S.No. Name of Item Quantity Rate (`) Unit Amount (`) 1 OFCT excavatio n trench and refilling after laying PLB charges 6000 27.26 P/m 163560 2 HDPE laying of PLB 24000 2.29 P/m 54960 a) GIHB road / rail horizonta l boring HDD 14000 140 P/m 1960000 List for cable items for laying OFC for shifting List of OFC laying charges for shifting the OFC route along National Highway # 2 between 3 b) GIHB road / rail horizonta l boring manual 4000 80 P/m 320000 6 GIBC laying GI on bridge and culvert 40 1900 Pcm 76000 7 RCCT laying of split RCC in trench 1000 5 P/m 5000 8 OFCP polling of OFC 25000 5 p/m 125000 9 OFST splicing OFC at joint and end 20 2000 Each 40000 10 JCBR contracti on of joints chamber 20 1400 P/c 28000 11 ORJF fixing of rout and joint indicator 145 146.3 p/u 21213.5 12 DOCT documen tation of OFC rout 24 50 p/km 1200 2.4 SRCC supply of SRCC 1000 50 P/m 50000 Total 2844934 3 7.1 Drum recovery of empty drum 12 200 Each -2400 B) Grand Total 2842534 C) 1 Forest Dept. 600000 2 PWD Dept. & Municipa lity and Railway 600000 Total 1200000 A) Cable Items for laying OFC : ` 2041150 B) OFC laying charges : ` 2842534 C) NOC charges : ` 1200000 D) : ` 20000 Grand total : ` 6103684 D E (TRANSMISSION) MATHURA MATHURA NOC charges of railway, forests PWD, NH-2, Municipality Departments : Transportation of S D E (TRANSMISSION)