To the extent the plinth area of an inter floor called mezzanine remains within and upto 40 per cent
of the plinth area for the main storey of the building immediately below the said inter floor such an
inter floor should be regarded as mezzanine and if plinth area of the inter floor exceeds this limiting
figure of 40 per cent than the inter floor should be regarded for purpose of item No. 11.29 of this
chapter, as a regular storey. A mezzanine floor is not to be regarded as a separate additional storey
in the structure for purpose of allowing extra rate for brick work under item No. 11.29. In the case of
a building storey having such a mezzanine, therefore the storey shall be considered for the full
height as if ignoring the existence of the mezzanine inter floor.
Deleted
The through rates, for the requisite mix of the mortar for item No. 11.73 and 11.74 can be arrived at
by adding Rs. 10.50 and Rs. 12.50 respectively for plains zone and Rs. 12.00 and Rs. 14.00
respectively for sub-montainous Zone to be the through rates of brick work in foundation and plinth,
of that mix.
These rates are meant for small engineering works where the total quantity of Brick work does not
exceed 15 cu.m. and for all building works and boundry walls. The labour rates for large engineering
works except building works and boundry walls involving more than 15 cu.m. of brick work shall be
reduced by ten per cent and the through rates shall be reduced correspondingly.
Through rate for brick work with 2nd class Bricks will be reduced by Rs. 30/- per cu.m, than the rates
with first class Bricks for that item of work.
The labour rates as well as through rates include the cost of water. In case water is supplied free by
the department, rates will be reduced accordingly.
CHAPTER NO. 11
BRICK WORK
Notes :-
The rates for brick work done upto 1.5 metres height above the top of foundation concrete in case of
compound walls and in other Engineering works, is the same as for brick work in foundation and
plinth. In case of foundations of bridges, for those with ordinary open foundations, masonry above
top of foundation concrete and in case of well foundations, above top of well cap, for a height of 1.5
metres shall be paid for at the rate, appearing in schedule for masonry, in foundation and plinth.
Deleted
The Labour rate given in this chapter include the cost of water, tools and plants, scaffolding (Labour
& Materials) and cost of good earth for mud mortar and mud plaster, where ever required.
The depth of foundation shall be deemed upto 1.5 metres below ground level. If the depth of
foundation where no basement is to be provided is more than 1.5 metres add Rs. 8/- and Rs.
8.80/- per cu.m. for plains and submountainous area, respectively, in the rates of items of
foundation, for every additional depth of 4 metres or part there of.
In case of basement, the masonry for basement floor, above the floor of basement, shall be
payable at the rates of the items of super-structure. For its foundation portion, allow Rs. 8.00
and Rs. 8.80 per cum. for plains and sub-mountainous area, respectively extra in the
foundation rates, for every additional depth of 4 metres or part there of.
Unless otherwise stated, the labour rates include the cost of rehandling of materials within 100
metres.
Page 65 CSR-1987 [Re-print]
Page 66 CSR-1987 [Re-print]
(xii)
(xiii)
(xiv)
(xv)
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
11.1
Cum. 49.50 352.00 54.00 357.00
11.2
Cum. 70.00 372.00 77.00 379.00
11.3
Cum. 49.50 362.00 54.00 367.00
11.4
Cum. 70.00 382.00 77.00 389.00
11.5
Cum. 49.50 374.00 54.00 379.00
11.6
Cum. 70.00 394.00 77.00 401.00
11.7
Cum. 49.50 388.00 54.00 393.00
11.8
Cum. 70.00 409.00 77.00 416.00
11.9
Cum. 49.50 420.00 54.00 425.00
11.10
Cum. 70.00 440.00 77.00 447.00
11.11
Cum. 70.00 491.00 77.00 498.00
Regarding the payment of extra rate, for subsequent storey above ground level, the structure above
plinth level, on natural ground level, will be considered as first storey.
The work of brick masonry, in stone-dust (from crusher) shall only be done, with prior approval of
the competent authority and the rate of brick work in cement sand mortar increased by Rs. 5/- cum
correspondingly.
Ground hydrated lime shall be used in all items of brick work in lime mortar.
Sr. No. Sub-Mountionus Description
For brick work under water, the pumping out of water shall be carried out departmentally.
Unit Plains
First class burnt brick work laid in cement sand
mortor 1:4 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:7 in foundation and plinth.
First class burnt brick work laid in cement sand
mortar 1:7 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:6 in foundation and plinth.
First class burnt brick work laid in cement sand
mortar 1:6 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:5 in foundation and plinth.
First class burnt brick work laid in cement sand
mortar 1:3 in foundation and plinth.
First class burnt brick work laid in cement sand
mortar 1:3 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:2 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:5 in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement sand
mortar 1:4 in foundation and plinth.
2
Page 67 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.12
Cum. 49.50 418.00 54.00 423.00
11.13
Cum. 70.00 439.00 77.00 446.00
11.14
Cum. 49.50 401.00 54.00 406.00
11.15
Cum. 70.00 421.00 77.00 428.00
11.16
Cum. 49.50 390.00 54.00 395.00
11.17
Cum. 70.00 411.00 77.00 418.00
11.18
Cum. 49.50 381.00 54.00 386.00
11.19
Cum. 70.00 401.00 77.00 408.00
11.20
Cum. 49.50 377.00 54.00 382.00
11.21
Cum. 70.00 397.00 77.00 404.00
11.22
Sqm. 12.00 51.00 13.00 52.00
11.23
Cum. 44.00 289.00 48.50 294.00
First class burnt brick work laid in cement, lime,
sand mortar 1:1:6 (One cement, One lime, six
sand) in foundation and plinth.
First class burnt brick work laid in lime surkhi,
mortar 1:2 ( One lime and two surkhi)in
foundation and plinth.
First class burnt brick work laid in lime surkhi,
sand mortar 1:1:1 (One lime, One surkhi one
sand) in first storey upto 4 metres above plinth
level.
First class burnt brick work laid in cement, lime,
sand, mortar 1:3:12 (One cement, three lime
and twelve sand) in foundation and plinth.
First class burnt brick work laid in cement, lime,
sand mortar 1:3:12 (One cement, three lime
and twelve sand) in first storey upto 4 metres
above plinth level
115mm thick brick wall laid in cement, lime,
sand mortar 1:1:6 ( One Cement, one lime, six
sand) in superstructure upto 4 metres above
plinth level.
First class burnt brick work laid in lime surkhi,
mortar 1:2 ( One lime and two surkhi) in first
storey upto 4 metres above plinth level.
First class burnt brick work laid in lime surkhi,
sand mortar 1:1:1 (One lime One surkhi, one
sand) in foundation and plinth.
First class burnt brick work laid in cement, lime,
sand mortar 1:1:6 (One cement, One lime, and
six sand) in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in cement lime,
sand mortar 1:2:9 (One cement, two lime and
nine sand) in foundation and plinth.
First class burnt brick work laid in cement lime,
sand, mortar 1:2:9 (One cement, two lime and
Nine sand) in first storey upto 4 metres above
plinth level.
First class burnt brick work laid in mud mortar
in foundation and plinth.
Page 68 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
Page 69 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.24
Cum. 57.00 302.00 63.00 308.00
11.25
Cum. 64.00 327.00 71.00 333.00
11.26
Cum. 49.00 132.00 54.00 142.00
11.27
Cum. 57.00 223.00 63.00 229.00
11.28
Cum. 65.00 244.00 71.00 251.00
11.29 (a) Extra for additional storey upto 4 metres
above the top of structural roof of lower
storey.
Cum. 8.00 8.00 8.80 8.80
(b) Extra for brick work done above 4
meters (where any single storey
exceeds 4 metres in height) for every
additional height of 2 metres or part
thereof. Cum. 8.00 8.00 8.80 8.80
(c) Extra for 115mm thick brick walls for
additional storey upto 4 meters above
the top of structural roof of lower storey.
Sqm. 1.00 1.00 1.10 1.10
(d) Extra for 115mm thick brick work of
walls done above 4 meters (where any
single storey exceeds 4 meters in
height) for every additional height of 2
meters or parts thereof.
Sqm. 1.00 1.00 1.10 1.10
11.30 (a) Extra for profile walls.
Cum. 4.95 4.95 - -
(b) Extra for flared out walls of syphons,
super-passages, falls etc. Cum. 8.00 8.00 - -
11.31
Cum. 13.00 13.00 14.50 14.50
Extra for burnt brick work in square or
rectangular pillars in building.
First class burnt brick work laid in mud mortar
with Jibi face (Outer 5 cm.) laid in cement, sand
mortar 1:5 including striking of joints in first
storey upto 4 metres above plinth level.
Sundried brick work laid in mud mortar in first
storey upto 4 metres above plinth level.
Gilafi work with burnt bricks in the face and
sundried bricks in the interior, laid in mud
mortar including supply of mud mortar in first
storey upto 4 metres above plinth level.
Gilafi work as per item No. 11.27 with Jibi face
(outer 5cm laid in cement, sand mortar 1:5)
including striking joints.
First class burnt brick work laid in mud mortar
in first storey upto 4 metres above plinth level.
Note : Deleted
Page 70 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.32
Cum. 65.00 137.00 72.00 144.00
Extra for burnt brick work in circular pillars
constructed with dressed bricks including cost
of dressing bricks
Page 71 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.33
(a) Upto 1.5 metres span
Cum. 29.50 48.00 32.50 51.00
(b) more than 1.5 metres but upto 3 metres
span.
Cum. 59.00 87.00 65.00 93.00
(c) more than 3 metres but upto 6 metres
span.
Cum. 69.00 105.00 76.00 112.00
11.34
Sqm. 13.00 57.00 14.50 58.00
11.35
Sqm. 9.30 48.50 10.00 49.00
11.36
Sqm. 12.00 51.00 13.00 52.00
11.37
Sqm. 13.00 45.00 14.00 46.50
11.38
Sqm. 12.00 39.00 14.00 41.00
11.39
Sqm. 20.50 77.00 24.00 80.00
11.40
Metre 5.20 11.00 5.70 11.50
11.41
Metre 7.80 17.00 8.60 17.50
11.42
Cum. 138.00 856.00 152.00 869.00
Providing 75mm first class burnt brick drip
course at junction of roof and walls laid in
cement sand mortar 1:4 including dressing of
bricks.
Extra for burnt brick work in arches including
cost of shuttering :-
115 mm thick brick wall with every fourth
course reinforced with hoop iron laid in 1 :4
cement sand mortar in super structure.
115 mm thick brick wall laid in cement mortar
1:4 without reinforcement in foundation and
plinth.
115 mm thick brick wall laid in cement sand
mortar 1:4 without reinforcement in super
structure.
75 mm thick brick wall laid in cement sand
mortar 1:4 with every alternate course
reinforced with hoop iron in superstructure.
First class 115mm thick honey-comb burnt
brick work laid in cement sand mortar 1:4
First class 225mm thick honey-comb burnt
brick work laid in cement sand mortar 1:4
Providing first class burnt brick on edge drip
course at the junction of roof and walls in
cement sand mortar 1:4 including dressing of
bricks.
Reinforced brick work in lintels 1:3 (50 kg.
cement 0.1 cum Course sand) including
shuttering and reinforcement upto 64kg per
cum.
Note :- Deleted
Page 72 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.43
Cum. 102.00 522.00 112.00 532.00
11.44
Cum. 112.00 788.00 123.00 800.00
11.45
Cum. 102.00 495.00 112.00 506.00
11.46
Cum. 112.00 742.00 123.00 754.00
11.47
Cum. 10.50 10.50 11.50 11.50
11.48
Cum. 18.50 18.50 20.00 20.00
11.49
Sqm. 19.00 51.00 20.50 53.00
11.50
Sqm. 19.00 53.00 20.50 55.00
11.51
Sqm. 17.00 49.50 19.00 51.00
11.52
Sqm. 20.50 59.00 22.50 61.00
11.53
Sqm. 19.50 62.00 21.50 64.00
Tile jali 15.24cm thick laid in cement sand
mortar 1:4 using 46 numbers tiles 30.48cm x
15.24cm x 5.08cm.
First class brick tile masonry with 22.86cm. x
11.43cm x 3.81cm tiles in cement sand mortar
1:4 in first storey upto 4 metres above plinth
level.
First class brick tile masonary with
30.48cmx15.24cmx5.08cm tiles in cement
sand mortar 1:6 in first storey upto 4 metres
above plinth level.
First class brick tile masonry with 22.86cm. x
11.43cmx 3.81cm tiles in cement sand mortar
1:6 in first storey upto 4 metres above plinth
level.
Extra for brick tile masonry in additional storey
upto 4 metres above the top of structural roof
of lower storey.
Brick and brick tile jali with 22.86cm x 11.43cm
thick alternate layers laid in cement sand
mortar 1:4 using 30 numbers bricks and 30
numbers brick tiles 22.86cm x 11.43cm x
3.81cm.
Extra for brick tile masonry in square or
rectangular pillars.
Tile facing with 22.86 cmx11.43cmx3.81cm tile
laid in cement sand mortar 1:4 in first story upto
4 metres above plinth level without steel
reinforcement.
Tile facing with 22.86 cmx11.43cmx3.81cm
tiles laid in cement sand mortar 1:4 in first story
upto 4 metres above plinth level with steel
reinforcement.
Brick and tile jali 11.43 cm x 15.24 cm thick
alternate layers laid in cement sand mortar 1:4
using 22 numbers bricks and 18 Nos. tile 30.48
cm x 15.24 cm x 5.08 cm.
First class brick tile masonary with 30.48
cm.x15.24cmx5.08cm tiles in cement sand
mortar 1:4 in first storey upto 4 metres above
plinth level.
Page 73 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.54
Sqm. 1.55 1.55 1.70 1.70
11.55
Sqm. 23.00 61.00 25.00 64.00
11.56
Sqm. 41.50 101.00 45.50 105.00
11.57
Sqm. 30.00 108.00 33.50 111.00
11.58
Sqm. 30.00 128.00 33.00 131.00
11.59
Sqm. 31.00 57.00 34.00 61.00
11.60
Metre 17.00 29.50 19.00 31.50
11.61
Metre 8.50 15.50 9.30 16.00
11.62
Metre 4.15 6.80 4.55 7.20
11.63
Metre 3.90 9.40 4.30 9.80
11.64
Each 9.30 14.50 10.50 15.50
Dressed or moulded two brick cornice laid in
cement sand mortar 1:4 including 12mm thick
cement plaster 1:4 or pointing as required.
Dressed or moulded one brick cornice laid in
cement sand mortar 1:4 including 12mm thick
cement plaster 1:4 or pointing as required.
Corbelling around almirah including 12mm
thick cement plaster 1:6
Maroo-corners making from first class burnt
bricks and fixing in position with cement sand
mortar 1:4
V-shaped brick jali in 22.86 cm thick walls laid
in cement sand mortar 1:6 finished with 12mm
thick cement sand plaster 1:6 including making
straight edges with plaster.
Brick and tile jali with 22.86cm x 30.48cm thick
alternate layers laid in cement sand mortar 1:4
using 31 numbers bricks and 48 number tiles
30.48cm x 15.24cm x 5.08cm.
Tile jali with 22.86cm x 30.48cm thick
alternate layers laid in cement sand mortar 1:4
using 90 number tiles 22.86cm x 11.43cm x
3.81cm and 37 numbers tiles 30.48cm x
15.24cm x 5.08cm.
Extra for tile facing in additional storey upto 4
metres above the top of structural roof of the
lower storey.
Brick jali with 22.86cm x 11.43cm thick
alternate layers laid in cement sand mortar 1:4
using 58 number bricks.
Tile on edge jali 5 cm thick laid in cement sand
mortar 1:4 reinforced with hoop iron 18 gauge
(1.25 mm) 25mm wide at every course using
19 numbers tiles 30.48cm x 15.24cm x 5.08cm.
Dressed or moulded three brick cornice laid in
cement sand mortar 1:4 including 12mm thick
cement plaster 1:4 or pointing as required.
Page 74 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
11.65
100
Nos
36.50 36.50 40.00 40.00
11.66
Each 0.90 1.60 0.95 1.70
11.67
Cum. 21.00 21.00 23.00 23.00
11.68
Cum. 27.00 27.00 29.50 29.50
11.69
Cum. 20.50 20.50 22.50 22.50
11.70
Sqm. 19.50 19.50 21.50 21.50
11.71
Cum. 123.00 5,509.00 135.00 5,522.00
11.72
Cum. 23.50 23.50 25.50 25.50
11.73
Cum. 60.00 --- 66.00 ---
11.74
Cum. 62.00 --- 68.00 ---
11.75
Metre 2.85 7.70 3.10 8.00
11.76
Sqm 12.10 41.50 13.30 42.70
11.77
Extra for specially moulded radiated work in
arches of egg-shaped sewers circular barrels
and similar drainage works excluding cost of
centring and moulds.
Extra for specially moulded brick work in
circular work such as well shafts circular
sumps, pump chambers etc. in which specially
moulded or cut bricks have to be used but for
which no centring or supports are required upto
4.5 metre internal diametre.
First class burnt brick masonry in well steining
of circular wells.
Providing 5.55cm brick daily facing with brick
size 22.86cm x 5.55cm x 6.83cm to be
obtained after cutting from full brick size of
22.86cm x 11.11cm x 6.83cm laid in cement
sand mortar 1:3 on RCC lintels, beams, facia
etc.
Chiselling sides of head regulator and others
brick works to increase gullet width.
Fire brick work in lining of fire-places, flues etc.
(excepting chimney -shafts)
Pise work (Mud walling) including the cost of
earth, water and laying the earth into shape,
pruning and scraping, complete in all respects.
First class burnt brick masonry in well steining
of square, rectangular or ploygonal wells.
76mm thick brick architrave to windows and
ventilators 115mm projected laid in cement
sand mortar 1:4 including 12mm thick cement
plaster 1:4
First Class burnt clay Fly Ash Brick work laid in
cement sand mortar in foundations and plinth
Dressing, chamfering of bricks to required
shape in masonry work.
Replacing kallar eaten bricks.
Labour for brick work laid dry in walls
Page 75 CSR-1987 [Re-print]
Labour
Rate
Through
Rate
Labour
Rate
Through
Rate
1 3 4 5 6 7
Sr. No. Sub-Mountionus Description Unit Plains
2
(i) Cement Sand Mortar 1:7 Cum 49.50 352.00 54.00 357.00
(ii) Cement Sand Mortar 1:6 Cum 49.50 362.00 54.00 367.00
(iii) Cement Sand Mortar 1:5 Cum 49.50 374.00 54.00 379.00
(iv) Cement Sand Mortar 1:4 Cum 49.50 388.00 54.00 393.00
(v) Cement Sand Mortar 1:3 Cum 49.50 420.00 54.00 425.00
11.78
(i) Cement Sand Mortar 1:7 Cum 70.00 372.00 77.00 379.00
(ii) Cement Sand Mortar 1:6 Cum 70.00 382.00 77.00 389.00
(iii) Cement Sand Mortar 1:5 Cum 70.00 394.00 77.00 401.00
(iv) Cement Sand Mortar 1:4 Cum 70.00 409.00 77.00 416.00
(v) Cement Sand Mortar 1:3 Cum 70.00 440.00 77.00 447.00
(vi) Cement Sand Mortar 1:2 Cum 70.00 491.00 77.00 498.00
11.79
Sqm 13.00 57.00 14.50 58.00
11.80
Sqm 9.30 48.50 10.00 49.00
11.81
Sqm 12.00 51.00 13.00 52.00
11.82
Sqm 12.00 39.00 14.00 41.00
11.83
Sqm 20.50 77.00 24.00 80.00
First Class 225mm thick honey-comb burnt
clay fly ash brick work laid in cement sand
mortar 1:4.
First Class brunt clay Fly Ash brick work laid in
cement sand mortar in first storey upto 4
metres) above plinth level.
115mm thick clay fly ash brick wall with every
fourth course reinforced with hoop iron laid in
cement sand mortar 1:4 in super structure.
115mm thick clay fly ash brick wall laid in
cement sand mortar 1:4 without reinforcement
in foundation and plinth.
115mm thick clay fly ash brick wall laid in
cement sand mortar 1:4 without rainforcement
in super structure.
First Class 115mm thick honey-comb burnt
clay fly ash brick work laid in cement sand
mortar 1:4.
Page 76 CSR-1987 [Re-print]