Академический Документы
Профессиональный Документы
Культура Документы
Fecha: 12/04/12
Pgina 1 de 27
INDICE
3.0
3.1
3.2
3.2.1
3.3
METODOLOGIA EMPLEADA......................................................................................... 10
3.4
RESULTADOS ............................................................................................................... 12
3.5
3.5.1
3.5.2
3.5.3
3.6
CONCLUSIONES ........................................................................................................... 25
Fecha: 12/04/12
Pgina 2 de 27
ANALISIS DE LA DEMANDA
CONSIDERACIONES BASICAS
Parmetros de Diseo
K1
1.3
K2
1.8
Contribucin
80%
Ao
BASE
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
273
55.18
56.04
56.86
57.73
58.61
60.16
52.90
50.69
48.77
50.06
51.39
52.57
53.77
55.01
56.29
57.58
58.89
60.27
61.67
63.07
64.54
66.01
67.54
277
50.80
52.83
54.97
57.13
59.30
61.93
55.49
54.09
52.92
55.20
57.60
59.00
60.46
61.92
63.45
65.00
66.60
68.16
69.87
71.61
73.32
75.15
76.98
394
17.50
17.50
17.90
18.30
18.80
19.70
20.70
21.60
22.60
23.70
24.80
25.30
25.90
26.50
27.10
27.80
28.40
29.00
29.70
30.40
31.10
31.80
32.50
395
24.60
26.20
27.80
29.40
31.10
33.30
35.60
37.90
40.30
42.90
45.50
46.60
47.70
48.70
49.90
51.00
52.20
53.40
54.70
55.90
57.20
58.50
59.80
273
99.33
100.88
102.35
103.92
105.49
108.28
95.23
91.25
87.79
90.11
92.50
94.63
96.78
99.01
101.33
103.64
106.01
108.48
111.01
113.53
116.17
118.81
121.56
277
91.44
95.09
98.94
102.84
106.75
111.48
99.88
97.37
95.25
99.37
103.67
106.20
108.83
111.46
114.21
117.00
119.87
122.69
125.76
128.90
131.97
135.28
138.57
Fecha: 12/04/12
Pgina 3 de 27
394
31.50
31.50
32.22
32.94
33.84
35.46
37.26
38.88
40.68
42.66
44.64
45.54
46.62
47.70
48.78
50.04
51.12
52.20
53.46
54.72
55.98
57.24
58.50
SUB AREAS
N1
N2
AREA (m)
2619284.7178
244438.0499
395
44.28
47.16
50.04
52.92
55.98
59.94
64.08
68.22
72.54
77.22
81.90
83.88
85.86
87.66
89.82
91.80
93.96
96.12
98.46
100.62
102.96
105.30
107.64
SUB AREAS
N3
C1
C2
S1
S2
S3
S4
S5
S6
S7
S8
Fecha: 12/04/12
Pgina 4 de 27
AREA (m)
9241.5109
526662.1334
116249.4874
167864.5346
1970550.8240
619565.5173
559681.6637
3383557.3233
239322.9838
129532.2635
649464.6650
Para obtener los caudales mximos horarios relacionamos las reas de los sectores, las reas
de drenaje y los caudales mximos horarios de los sectores encontrados en el tem 1.2.1.1.
Donde:
Qmx. Horario ADNorte = Caudal mximo horario rea drenaje norte
AADNorte = rea del rea de drenaje Norte
AADCentro = rea del rea de drenaje Centro
(
Donde:
Qmx. Horario ADNorte = Caudal mximo horario rea drenaje centro
AADNorte = rea del rea de drenaje Centro
AADNorte = rea del rea de drenaje Norte
Fecha: 12/04/12
Pgina 5 de 27
En el caso del rea de drenaje Sur solo sumamos los caudales mximos horarios de los
sectores correspondientes, porque coinciden con sus reas, es decir:
Ao
Base 2011
11.09
477.05
-1
2012
51.42
11.50
499.06
2013
53.78
12.03
522.02
2014
56.13
12.56
546.27
2015
58.72
13.14
572.07
2016
62.37
13.95
603.13
2017
66.25
14.82
545.60
2018
70.02
15.66
537.55
2019
74.02
16.56
525.70
2020
78.37
17.54
548.18
2021
82.72
18.51
571.63
2022
84.6
18.94
584.96
10
2023
86.6
19.38
598.59
11
2024
88.49
19.80
612.45
12
2025
90.61
20.27
626.77
13
2026
92.72
20.75
641.19
14
2027
94.84
21.22
656.12
15
2028
96.96
21.70
671.41
16
2029
99.31
22.22
687.14
17
2030
101.54
22.73
703.08
18
2031
103.9
23.25
719.41
19
2032
106.26
23.78
736.15
20
2033
108.61
24.30
753.36
Fecha: 12/04/12
Pgina 6 de 27
Ao
BASE
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
AREA DE DRENAJE
Norte
Centro
Sur
49.54
11.09
381.64
51.42
11.50
399.24
53.78
12.03
417.62
56.13
12.56
437.02
58.72
13.14
457.65
62.37
13.95
482.5
66.25
14.82
436.48
70.02
15.66
430.04
74.02
16.56
420.56
78.37
17.54
438.55
82.72
18.51
457.3
84.60
18.94
467.96
86.60
19.38
478.87
88.49
19.80
489.96
90.61
20.27
501.41
92.72
20.75
512.95
94.84
21.22
524.9
96.96
21.70
537.12
99.31
22.22
549.71
101.54
22.73
562.46
103.90
23.25
575.53
106.26
23.78
588.92
108.61
24.30
602.69
Fecha: 12/04/12
Pgina 7 de 27
En el caso del rea de drenaje Norte, tenemos reas por sub reas de drenaje:
Sub rea
N1
N2
N3
TOTAL
rea (m)
2619284.7178
244438.0499
9241.5109
2872964.2786
Donde:
Qcontribucin ADNorte1 = Caudal de contribucin rea drenaje Norte 1
AADNorte1 = rea del rea de drenaje Norte1
De la misma manera se evala para el sub rea de drenaje norte 2 y sub rea de drenaje norte
3.
Cuadro de caudales de contribucin por sub reas de drenaje
Ao
Base
-1
0
1
2
3
4
5
6
7
8
9
10
11
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
rea
Q contribucin (L/s)
Norte
49.54
51.42
53.78
56.13
58.72
62.37
66.25
70.02
74.02
78.37
82.72
84.60
86.60
88.49
Ao
12
13
14
15
16
17
18
19
20
2025
2026
2027
2028
2029
2030
2031
2032
2033
rea
Q contribucin (L/s)
Norte
90.61
92.72
94.84
96.96
99.31
101.54
103.90
106.26
108.61
Fecha: 12/04/12
Pgina 8 de 27
En el caso del rea de drenaje Centro tambin tenemos areas por sub reas de
drenaje entonces:
Sub rea
C1
C2
TOTAL
rea (m)
526662.133
116249.487
642911.6208
Donde:
Qcontribucin ADCentro1 = Caudal de contribucin rea drenaje Centro 1
AADCentro1 = rea del rea de drenaje Centro1
De la misma manera se evala para el sub rea de drenaje Centro 2.
Cuadro de caudales de contribucin por sub reas de drenaje
Ao
Base
-1
0
1
2
3
2011
2012
2013
2014
2015
2016
rea
Q contribucin
(L/s)
Centro
11.09
11.50
12.03
12.56
13.14
13.95
C2
2.01
2.08
2.18
2.27
2.38
2.52
Ao
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
rea
Q contribucin
(L/s)
Centro
14.82
15.66
16.56
17.54
18.51
18.94
19.38
19.80
20.27
20.75
21.22
21.70
22.22
22.73
23.25
23.78
24.30
Fecha: 12/04/12
Pgina 9 de 27
C2
2.68
2.83
2.99
3.17
3.35
3.42
3.50
3.58
3.67
3.75
3.84
3.92
4.02
4.11
4.20
4.30
4.39
En el caso del rea de drenaje Sur, tenemos el rea de las sub reas de drenaje:
Sub rea
S1
S2
S3
S4
S5
S6
S7
S8
TOTAL
rea (m)
167864.5346
1970550.8240
619565.5173
559681.6637
3383557.3233
239322.9838
129532.2635
649464.6650
7719539.7752
Donde:
Qcontribucin ADSur1 = Caudal de contribucin rea drenaje Sur 1
AADSur1 = rea del rea de drenaje Sur1
Fecha: 12/04/12
Pgina 10 de 27
De la misma manera se evala para el sub rea de drenaje sur 2, sub rea de drenaje sur 3,
sub rea de drenaje sur 4, sub rea de drenaje sur 5, sub rea de drenaje sur 6, sub rea de
drenaje sur 7 y sub rea de drenaje sur 8.
Cuadro de caudales de contribucin por sub reas de drenaje
Ao
BASE
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
3.3
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
S1
7.57
7.98
8.41
8.86
9.35
9.92
9.03
8.94
8.78
9.18
9.6
9.83
10.06
10.29
10.53
10.77
11.02
11.28
11.55
11.81
12.09
12.37
12.66
S2
88.86
93.67
98.73
104.06
109.76
116.41
105.95
104.99
103.02
107.76
112.71
115.35
118.05
120.78
123.61
126.46
129.41
132.43
135.53
138.69
141.91
145.23
148.63
S7
10.11
10.27
10.42
10.58
10.73
11.02
9.69
9.29
8.93
9.17
9.41
9.63
9.85
10.08
10.31
10.55
10.79
11.04
11.3
11.55
11.82
12.09
12.37
S8
50.68
51.47
52.22
53.03
53.82
55.24
48.59
46.56
44.79
45.98
47.20
48.28
49.38
50.52
51.70
52.88
54.09
55.35
56.64
57.92
59.28
60.62
62.02
METODOLOGIA EMPLEADA
Fecha: 12/04/12
Pgina 11 de 27
= Pendiente (m/Km)
2
Am = rea mojada (m )
Pm = Permetro mojado
(m)
3.4
Fecha: 12/04/12
Pgina 12 de 27
RESULTADOS
Cmara de inspeccin
Profundidad (m)
Longitud (m)
Dimetro (mm)
Material
Coeficiente de Manning
Pendiente (m/Km)
Caudal total(l/s)
Velocidad (m/s)
Reporte de Descargas
Profundidad (m)
3.5
Fecha: 12/04/12
Pgina 13 de 27
3.5.1
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
B-1
268,147.75
8,692,863.08
176.03
174.57
(N/A)
174.57
99.02
1.46
B-2
268,136.06
8,692,896.49
173.04
171.61
171.61
171.61
99.02
1.43
B-3
268,091.17
8,692,988.33
168.06
166.01
166.01
166.01
99.02
2.05
B-4
268,033.10
8,693,103.20
162.82
161.29
161.29
161.29
99.02
1.53
B-5
267,989.12
8,693,180.35
159.00
157.54
157.54
157.54
99.02
1.46
B-6
267,930.18
8,693,269.40
155.03
153.57
153.57
153.57
99.02
1.46
B-7
267,874.74
8,693,347.13
152.00
150.65
150.65
150.65
99.02
1.35
B-8
267,820.24
8,693,423.55
149.16
147.77
147.77
147.77
153.59
1.39
B-9
267,771.86
8,693,491.97
145.29
144.09
144.09
144.09
153.59
1.20
B-10
267,711.13
8,693,578.84
142.46
141.02
141.02
141.02
153.59
1.44
B-11
267,661.63
8,693,656.47
140.24
138.84
138.84
138.84
153.59
1.40
B-12
267,598.58
8,693,750.28
137.52
136.10
136.10
136.10
153.59
1.42
B-13
267,545.47
8,693,828.40
135.29
133.77
133.77
133.76
153.59
1.53
B-14
267,487.91
8,693,913.05
133.01
131.24
131.24
131.24
153.59
1.77
B-15
267,429.40
8,693,999.11
131.46
129.23
129.23
129.23
157.17
2.23
B-16
267,411.83
8,694,024.96
130.67
127.22
127.22
127.22
157.17
3.45
B-17
267,374.51
8,694,080.51
127.00
125.80
125.80
125.80
157.17
1.20
B-18
267,318.10
8,694,167.30
124.32
123.21
123.21
123.21
157.17
1.11
B-19
267,239.05
8,694,284.15
120.75
119.01
119.01
119.01
157.17
1.74
B-20
267,160.00
8,694,401.00
117.80
114.81
114.81
114.81
157.17
2.99
B-21
267,089.00
8,694,472.00
116.00
113.36
113.36
113.36
157.17
2.64
B-22
267,018.00
8,694,543.00
113.97
111.91
111.91
111.91
157.17
2.06
B-23
266,949.00
8,694,611.00
111.96
110.51
110.51
110.51
157.17
1.45
B-24
266,906.65
8,694,642.77
110.97
109.62
109.62
109.62
157.17
1.35
B-25
266,911.00
8,694,649.00
110.95
109.47
109.47
109.47
157.17
1.48
B-26
266,905.00
8,694,654.00
110.85
109.32
109.32
109.32
157.17
1.53
Pgina 14 de 27
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Fecha: 12/04/12
Flow (Total
Out)
(L/s)
H
(m)
B-27
266,916.00
8,694,685.00
110.65
109.08
109.08
109.08
157.17
1.57
B-28
266,918.00
8,694,697.00
109.97
108.77
108.77
108.77
157.17
1.20
B-29
266,963.00
8,694,766.00
109.73
108.08
108.08
108.08
157.17
1.65
B-30
267,021.00
8,694,856.00
108.77
107.39
107.39
107.39
157.17
1.38
B-31
267,061.00
8,694,932.00
107.79
106.56
106.56
106.56
157.17
1.23
Start
Node
Invert
(Start)
(m)
J-1
B-1
J-2
J-4
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
Material
Manning's
n
Diameter
(mm)
Length
(m)
Slope
(m/km)
Velocity
(Average)
(m/s)
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
174.57 B-2
171.61
True
Concrete
0.013
400.0
35.4
83.9
3.54
42.0
99.02
550.12
B-2
171.61 B-3
166.01
True
Concrete
0.013
400.0
102.1
54.8
3.04
43.6
99.02
444.42
B-4
161.29 B-5
157.54
True
Concrete
0.013
400.0
88.7
42.3
2.77
44.7
99.02
390.69
J-5
B-5
157.54 B-6
153.57
True
Concrete
0.013
400.0
106.7
37.2
2.65
45.2
99.02
366.35
J-3
B-3
166.01 B-4
161.29
True
Concrete
0.013
400.0
128.6
36.7
2.63
45.3
99.02
363.82
J-6
B-6
153.57 B-7
150.65
True
Concrete
0.013
400.0
95.4
30.6
2.47
46.1
99.02
332.46
J-15
B-15
129.23 B-16
127.22
True
Concrete
0.013
400.0
31.4
63.9
3.66
54.7 157.17
480.04
J-8
B-8
147.77 B-9
144.09
True
Concrete
0.013
400.0
83.8
43.9
3.17
56.0 153.59
397.75
J-9
B-9
144.09 B-10
141.02
True
Concrete
0.013
400.0
106.1
28.9
2.72
58.6 153.59
323.03
J-18
B-18
123.21 B-19
119.01
True
Concrete
0.013
400.0
141.1
29.8
2.76
59.1 157.17
327.61
J-19
B-19
119.01 B-20
114.81
True
Concrete
0.013
400.0
141.1
29.8
2.76
59.1 157.17
327.61
J-12
B-12
136.10 B-13
133.77
True
Concrete
0.013
400.0
94.5
24.7
2.56
59.6 153.59
298.47
J-13
B-13
133.77 B-14
131.24
True
Concrete
0.013
400.0
102.4
24.7
2.56
59.6 153.59
298.31
J-11
B-11
138.84 B-12
136.10
True
Concrete
0.013
400.0
113.1
24.3
2.55
59.8 153.59
295.77
J-10
B-10
141.02 B-11
138.84
True
Concrete
0.013
400.0
92.0
23.7
2.52
59.9 153.59
292.18
J-17
B-17
125.80 B-18
123.21
True
Concrete
0.013
400.0
103.6
25.0
2.59
60.3 157.17
300.22
J-27
B-27
109.08 B-28
108.77
True
Concrete
0.013
400.0
12.2
25.4
2.61
61.1 157.17
302.82
J-16
B-16
127.22 B-17
125.80
True
Concrete
0.013
400.0
67.1
21.2
2.43
61.5 157.17
276.35
J-23
B-23
110.51 B-24
109.62
True
Concrete
0.013
400.0
53.0
16.8
2.23
63.4 157.17
246.01
J-24
B-24
109.62 B-25
109.47
True
Concrete
0.013
400.0
7.6
19.7
2.37
63.6 157.17
266.44
J-7
B-7
150.65 B-8
147.77
True
Concrete
0.013
400.0
93.9
30.7
2.47
63.9
99.02
332.51
J-20
B-20
114.81 B-21
113.36
True
Concrete
0.013
400.0
100.3
14.5
2.10
64.7 157.17
228.36
J-21
B-21
113.36 B-22
111.91
True
Concrete
0.013
400.0
100.3
14.5
2.10
64.7 157.17
228.36
J-22
B-22
111.91 B-23
110.51
True
Concrete
0.013
400.0
96.9
14.4
2.10
64.7 157.17
228.23
J-31
B-31
106.56 CR
105.25
True
Concrete
0.013
400.0
123.7
10.6
1.86
67.8 157.17
195.39
J-30
B-30
107.39 B-31
106.56
True
Concrete
0.013
400.0
86.0
9.7
1.80
68.8 157.17
186.61
J-14
B-14
131.24 B-15
129.23
True
Concrete
0.013
400.0
103.9
19.4
2.34
71.5 153.59
264.22
J-25
B-25
109.47 B-26
109.32
True
Concrete
0.013
400.0
7.9
18.9
2.33
72.5 157.17
261.27
J-26
B-26
109.32 B-27
109.08
True
Concrete
0.013
400.0
32.9
7.3
1.60
72.5 157.17
162.15
J-28
B-28
108.77 B-29
108.08
True
Concrete
0.013
400.0
82.3
8.4
1.70
74.5 157.17
173.89
J-29
B-29
108.08 B-30
107.39
True
Concrete
0.013
400.0
107.0
6.4
1.51
74.5 157.17
152.51
Fecha: 12/04/12
Pgina 15 de 27
X
(m)
CR
3.5.2
Y
(m)
266,987.00
Elevation
(Ground)
(m)
8,695,031.00
105.76
Elevation
(Invert)
(m)
Elevation
(Invert in 1)
(m)
105.25
105.25
Flow
(L/s)
H
(m)
157.17
0.51
En el rea Drenaje centro se propone mantener el colector existente dado que el caudal de
aporte por parte de la ampliacin al ao 20 no altera la capacidad de conduccin del colector
existente.
3.5.3
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
1111
268,531.59
8,685,069.72
58.01
55.88
55.88
55.88
50.2
2.13
1112
268,617.31
8,685,027.84
64.28
62.59
62.59
62.59
50.2
1.69
1113
268,585.03
8,685,073.36
59.13
57.63
57.63
57.63
50.2
1.50
1114
268,670.96
8,685,000.32
68.51
67.05
67.05
67.05
38.4
1.46
1115
268,643.99
8,685,010.57
66.42
64.83
64.83
64.83
38.4
1.59
1116
268,803.57
8,684,965.53
77.55
75.90
75.90
75.90
38.4
1.65
1117
268,750.04
8,684,989.61
74.43
72.80
72.80
72.80
38.4
1.63
1118
268,732.43
8,684,982.22
72.90
71.49
71.49
71.49
38.4
1.41
1119
268,715.24
8,684,990.50
71.36
69.97
69.97
69.97
38.4
1.39
1120
268,683.57
8,685,006.09
68.96
67.58
67.58
67.58
38.4
1.38
1121
268,470.77
8,685,057.64
55.25
52.96
52.96
52.96
50.2
2.29
X
(m)
Pgina 16 de 27
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert Out)
(m)
Fecha: 12/04/12
1124
268,459.00
8,685,059.35
54.89
52.09
Elevation
(Invert in
1)
(m)
52.09
Flow (Total
Out)
(L/s)
H
(m)
52.09
50.2
2.80
1125
268,823.24
8,684,955.83
79.72
78.12
78.12
78.12
38.4
1.60
1126
268,859.59
8,684,938.51
82.49
80.65
80.65
80.65
38.4
1.84
1127
268,865.03
8,684,922.29
83.55
82.00
82.00
82.00
32.1
1.55
1128
268,911.04
8,684,903.87
87.72
85.75
85.75
85.75
32.1
1.97
1129
268,911.60
8,684,890.99
88.17
86.07
86.07
86.07
32.1
2.10
1130
268,830.12
8,684,952.43
80.59
78.90
78.90
78.90
38.4
1.69
1131
268,943.97
8,684,879.85
90.22
88.55
88.55
88.55
32.1
1.67
1132
268,974.50
8,684,868.91
92.40
90.87
90.87
90.87
32.1
1.53
1133
268,981.83
8,684,871.08
92.72
91.42
91.42
91.42
32.1
1.30
1134
269,010.03
8,684,859.28
95.45
93.95
93.95
93.95
32.1
1.50
1135
269,030.13
8,684,851.68
97.21
95.56
95.56
95.56
32.1
1.65
1136
269,041.94
8,684,853.97
98.75
97.04
97.04
97.04
32.1
1.71
1137
269,099.77
8,684,826.31
102.05
100.42
100.42
100.42
32.1
1.63
1138
269,127.78
8,684,813.37
105.49
103.64
103.64
103.64
32.1
1.85
1139
269,153.15
8,684,801.65
107.54
106.00
(N/A)
106.00
32.1
1.54
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
Material
Manni
ng's n
Diame
ter
(mm)
Length
(m)
Slope
(m/km)
Velocit
y
(Avera
ge)
(m/s)
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
Label
Start
Node
631
1136
97.04 1135
95.56
True
Concrete
0.013
350.0
11.9
124.5
3.0
27.2
32.1
514.7
640
1138
103.64 1137
100.42
True
Concrete
0.013
350.0
30.8
104.6
2.8
27.5
32.1
471.8
682
1139
106.00 1138
103.64
True
Concrete
0.013
350.0
28.0
84.2
2.6
28.0
32.1
423.2
698
1134
93.95 1133
91.42
True
Concrete
0.013
350.0
30.5
83.0
2.6
28.0
32.1
420.2
653
1128
85.75 1127
82.00
True
Concrete
0.013
350.0
49.7
75.5
2.5
28.3
32.1
400.7
632
1135
95.56 1134
93.95
True
Concrete
0.013
350.0
21.3
75.5
2.5
28.3
32.1
400.7
651
1131
88.55 1129
86.07
True
Concrete
0.013
350.0
34.1
72.6
2.5
28.4
32.1
393.2
650
1133
91.42 1132
90.87
True
Concrete
0.013
350.0
7.6
72.2
2.5
28.4
32.1
391.9
633
1132
90.87 1131
88.55
True
Concrete
0.013
350.0
32.3
71.8
2.5
28.4
32.1
390.9
641
1137
100.42 1136
97.04
True
Concrete
0.013
350.0
64.0
52.8
2.2
29.1
32.1
335.2
694
1121
52.96 1124
52.09
True
Concrete
0.013
400.0
11.9
73.2
2.8
30.0
50.2
563.4
696
1124
52.09 1122
48.98
True
Concrete
0.013
400.0
42.7
72.9
2.8
30.0
50.2
562.2
697
1125
78.12 1116
75.90
True
Concrete
0.013
350.0
21.9
101.2
2.9
30.3
38.4
463.9
683
1130
78.90 1125
78.12
True
Concrete
0.013
350.0
7.6
102.4
2.9
30.3
38.4
466.7
686
1118
71.49 1119
69.97
True
Concrete
0.013
350.0
19.2
79.2
2.7
30.9
38.4
410.4
689
1114
67.05 1115
64.83
True
Concrete
0.013
350.0
29.0
76.7
2.6
31.0
38.4
403.9
652
1129
86.07 1128
85.75
True
Concrete
0.013
350.0
12.8
25.0
1.7
31.3
32.1
230.6
685
1117
72.80 1118
71.49
True
Concrete
0.013
350.0
19.2
68.2
2.5
31.3
38.4
381.0
687
1119
69.97 1120
67.58
True
Concrete
0.013
350.0
35.4
67.6
2.5
31.3
38.4
379.2
655
1126
80.65 1130
78.90
True
Concrete
0.013
350.0
32.6
53.7
2.3
32.0
38.4
337.9
684
1116
75.90 1117
72.80
True
Concrete
0.013
350.0
58.8
52.7
2.3
32.0
38.4
334.8
688
1120
67.58 1114
67.05
True
Concrete
0.013
350.0
13.7
38.6
2.1
32.9
38.4
286.7
691
1112
62.59 1113
57.63
True
Concrete
0.013
350.0
55.8
88.9
3.0
35.1
50.2
435.0
693
1111
55.88 1121
52.96
True
Concrete
0.013
350.0
61.9
47.2
2.4
37.1
50.2
316.9
692
1113
57.63 1111
55.88
True
Concrete
0.013
350.0
53.6
32.6
2.1
38.4
50.2
263.5
654
1127
82.00 1126
80.65
True
Concrete
0.013
350.0
17.1
79.1
2.5
39.3
32.1
410.2
690
1115
64.83 1112
62.59
True
Concrete
0.013
350.0
31.7
70.7
2.6
44.2
38.4
387.8
Fecha: 12/04/12
Pgina 17 de 27
Label
1122
X
(m)
Elevation
(Ground)
(m)
Y
(m)
268,416.76
8,685,065.49
Elevation
(Invert)
(m)
50.48
48.98
Elevation
(Invert in 1)
(m)
Flow
(L/s)
48.98
H
(m)
50.2
1.50
Label
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
1543
268,214.21
8,686,502.66
19.74
18.14
18.14
18.14
76.46
1.60
1556
268,184.02
8,687,091.01
33.87
32.28
32.28
32.28
76.43
1.59
1557
268,204.47
8,686,984.40
31.59
29.94
29.94
29.94
76.43
1.65
1558
268,220.90
8,686,893.24
29.74
27.94
27.94
27.94
76.43
1.80
1559
268,271.35
8,686,598.22
23.39
21.48
21.48
21.48
76.46
1.91
1633
268,243.53
8,686,767.70
26.66
25.19
25.19
25.19
76.43
1.47
1634
268,257.52
8,686,685.37
25.03
23.38
23.38
23.38
76.46
1.65
1635
268,284.57
8,686,516.47
21.69
19.69
19.69
19.69
76.46
2.00
1636
268,261.47
8,686,511.91
21.48
19.17
19.17
19.17
76.46
2.31
1698
268,139.16
8,687,896.48
53.62
49.74
49.74
49.74
76.43
3.88
1699
268,140.57
8,687,777.53
48.80
47.17
47.17
47.17
76.43
1.63
1700
268,143.59
8,687,672.42
46.69
44.89
44.89
44.89
76.43
1.80
1701
268,144.26
8,687,601.63
45.00
43.37
43.37
43.37
76.43
1.63
1702
268,148.27
8,687,498.78
42.74
41.14
41.14
41.14
76.43
1.60
1703
268,151.61
8,687,410.17
40.85
39.23
39.23
39.23
76.43
1.62
1704
268,157.05
8,687,302.73
38.52
36.90
36.90
36.90
76.43
1.62
1705
268,163.01
8,687,214.48
36.59
34.99
34.99
34.99
76.43
1.60
1709
268,171.92
8,687,914.20
54.11
50.55
50.55
50.55
76.43
3.56
1726
268,300.69
8,687,975.15
56.53
53.35
(N/A)
53.35
76.43
3.18
Fecha: 12/04/12
Pgina 18 de 27
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
1727
268,263.94
8,687,958.43
55.73
52.70
Elevation
(Invert in
1)
(m)
52.70
1728
268,222.11
8,687,938.58
55.02
51.60
51.60
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
52.70
76.43
3.03
51.60
76.43
3.42
Label
Start
Node
476
241
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
Material
Manning's
n
Diameter
(mm)
Length Slope
(m)
(m/km)
Velocity
(Average)
(m/s)
Depth
(Averag
e End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
1543
18.14 1574
17.15
True
Concrete
0.013
400.0
11.6
1727
52.70 1728
51.60
True
Concrete
0.013
400.0
46.3
85.47
3.3
36.8
76.46
555.21
23.74
2.1
41.3
76.43
259
1709
50.55 1698
49.74
True
Concrete
0.013
400.0
292.62
37.2
21.78
2.0
41.7
76.43
232
1699
47.17 1700
44.89
True
Concrete
0.013
280.28
400.0
105.2
21.68
2.0
41.7
76.43
236
1703
39.23 1704
36.90
True
Concrete
279.63
0.013
400.0
107.6
21.66
2.0
41.8
76.43
234
1701
43.37 1702
41.14
True
279.46
Concrete
0.013
400.0
103.0
21.65
2.0
41.8
76.43
10611
1705
34.99 1556
32.28
279.40
True
Concrete
0.013
400.0
125.3
21.63
2.0
41.8
76.43
231
1698
49.74 1699
279.31
47.17
True
Concrete
0.013
400.0
118.9
21.62
2.0
41.8
76.43
237
1704
279.23
36.90 1705
34.99
True
Concrete
0.013
400.0
88.4
21.61
2.0
41.8
76.43
452
279.16
1556
32.28 1557
29.94
True
Concrete
0.013
400.0
108.5
21.57
2.0
41.8
76.43
278.88
455
1559
21.48 1635
19.69
True
Concrete
0.013
400.0
82.9
21.59
2.0
41.8
76.46
279.04
235
1702
41.14 1703
39.23
True
Concrete
0.013
400.0
88.7
21.53
2.0
41.8
76.43
278.68
454
1558
27.94 1633
25.19
True
Concrete
0.013
400.0
127.7
21.53
2.0
41.8
76.43
278.67
233
1700
44.89 1701
43.37
True
Concrete
0.013
400.0
70.7
21.50
2.0
41.8
76.43
278.42
513
1634
23.38 1559
21.48
True
Concrete
0.013
400.0
88.4
21.50
2.0
41.8
76.46
278.42
475
1636
19.17 1543
18.14
True
Concrete
0.013
400.0
48.2
21.39
2.0
41.8
76.46
277.73
453
1557
29.94 1558
27.94
True
Concrete
0.013
400.0
94.2
21.24
2.0
41.8
76.43
276.74
240
1728
51.60 1709
50.55
True
Concrete
0.013
400.0
55.8
18.82
1.9
42.4
76.43
260.55
486
1635
19.69 1636
19.17
True
Concrete
0.013
400.0
28.0
18.54
1.9
42.5
76.46
258.61
2137
1726
53.35 1727
52.70
True
Concrete
0.013
400.0
40.2
16.16
1.8
43.1
76.43
241.38
512
1633
25.19 1634
23.38
True
Concrete
0.013
400.0
83.5
21.67
2.0
49.5
76.43
279.57
Label
1574
X
(m)
268,209.01
Y
(m)
8,686,492.26
Elevation
(Ground)
(m)
19.41
Elevation
(Invert)
(m)
17.15
Elevation
(Invert in 1)
(m)
17.15
Flow
(L/s)
76.46
H
(m)
2.26
Fecha: 12/04/12
Pgina 19 de 27
Label
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
1685
268,145.04
8,687,815.56
52.12
49.82
51.02
49.82
129.3
2.30
1686
268,134.65
8,688,118.29
62.82
61.30
61.30
61.30
122.8
1.52
1687
268,138.97
8,688,017.39
58.75
56.52
56.52
56.52
122.8
2.23
1688
268,142.91
8,687,913.53
55.17
52.69
52.69
52.69
122.8
2.48
1689
268,147.64
8,687,722.29
48.86
46.69
46.69
46.69
129.3
2.17
1690
268,151.91
8,687,628.16
45.49
43.69
43.69
43.69
129.3
1.80
1691
268,154.48
8,687,524.28
42.37
40.69
40.69
40.69
129.3
1.68
1692
268,155.77
8,687,424.37
38.95
37.58
37.58
37.58
129.3
1.37
1693
268,160.88
8,687,328.53
36.40
34.69
34.69
34.69
129.3
1.71
1793
268,130.21
8,688,217.18
68.15
66.41
66.41
66.41
122.8
1.74
1794
268,127.53
8,688,318.29
74.01
71.52
71.52
71.52
122.8
2.49
1795
268,125.57
8,688,368.51
78.31
75.52
75.52
75.52
122.8
2.79
1796
268,123.61
8,688,419.06
83.27
78.52
78.52
78.52
122.8
4.75
1797
268,123.12
8,688,454.10
86.01
83.80
83.80
83.80
122.8
2.21
1798
268,121.65
8,688,490.97
89.33
85.60
85.60
85.60
122.8
3.73
1799
268,120.47
8,688,525.53
93.75
90.06
90.06
90.06
122.8
3.69
1800
268,118.76
8,688,575.59
99.41
93.06
93.06
93.06
122.8
6.35
1801
268,116.79
8,688,626.99
104.42
101.13
101.13
101.13
122.8
3.29
1802
268,114.84
8,688,679.00
108.87
104.35
104.35
104.35
122.8
4.52
1803
268,113.86
8,688,726.06
112.91
110.51
110.51
110.51
122.8
2.40
1804
268,113.86
8,688,775.39
116.68
113.37
113.37
113.37
122.8
3.31
1805
268,113.60
8,688,825.10
121.77
116.43
116.43
116.43
122.8
5.34
1806
268,113.84
8,688,861.97
125.73
122.43
122.43
122.43
122.8
3.30
1807
268,113.83
8,688,908.45
130.97
125.70
125.70
125.70
122.8
5.27
1808
268,126.51
8,688,939.22
134.44
129.69
129.69
129.69
122.8
4.75
1809
268,133.90
8,688,959.10
138.30
131.00
131.20
131.00
122.8
7.30
10971
268,371.74
8,689,209.90
162.10
159.05
159.05
159.05
122.8
3.05
10972
268,364.96
8,689,249.53
168.14
162.80
162.80
162.80
122.8
5.34
10973
268,359.42
8,689,280.19
170.88
168.46
168.46
168.46
122.8
2.42
10974
268,354.74
8,689,308.01
173.64
170.44
170.44
170.44
122.8
3.20
10975
268,349.11
8,689,343.99
178.01
173.94
173.94
173.94
122.8
4.07
10976
268,345.29
8,689,368.65
180.94
175.69
175.69
175.69
122.8
5.25
10977
268,341.47
8,689,393.31
185.27
180.90
180.90
180.90
122.8
4.37
10978
268,337.88
8,689,420.45
197.17
184.14
184.14
184.14
122.8
13.03
10979
268,544.84
8,689,682.31
215.99
212.99
212.99
212.99
122.8
3.00
10980
268,526.86
8,689,605.08
210.25
207.00
207.00
207.00
122.8
3.25
10981
268,509.99
8,689,542.10
204.91
201.29
201.29
201.29
122.8
3.62
10982
268,469.54
8,689,497.76
199.97
197.06
197.06
197.06
122.8
2.91
10983
268,415.20
8,689,466.04
196.01
193.46
193.46
193.46
122.8
2.55
10984
268,567.67
8,689,770.16
221.22
218.39
218.39
218.39
122.8
2.83
10985
268,589.00
8,689,855.02
227.88
223.79
(N/A)
223.79
122.8
4.09
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert Out)
(m)
Fecha: 12/04/12
Pgina 20 de 27
11008
268,339.07
8,689,163.51
156.56
155.15
Elevation
(Invert in
1)
(m)
155.15
Flow (Total
Out)
(L/s)
H
(m)
155.15
122.8
1.41
11009
268,262.54
8,689,110.68
150.06
146.85
146.85
146.85
122.8
3.21
11010
268,205.61
8,689,067.78
147.05
142.18
142.18
142.18
122.8
4.87
11011
268,167.02
8,689,027.77
143.89
138.28
138.28
138.28
122.8
5.61
11012
268,139.52
8,688,982.93
139.54
134.00
134.00
134.00
122.8
5.54
Label
Start
Node
Invert
(Start)
(m)
163
1806
158
1801
154
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
122.43 1805
116.43
True
101.13 1800
93.06
True
1797
83.80 1796
78.52
160
1803
110.51 1802
156
1799
165
Material
Manning's
n
Diameter
(mm)
Length
(m)
Slope
(m/km)
Velocity
(Average)
(m/s)
PVC
0.009
328.0
36.9
162.69
PVC
0.009
328.0
51.5
156.66
True
PVC
0.009
328.0
35.1
104.35
True
PVC
0.009
328.0
90.06 1798
85.60
True
PVC
0.009
1808
129.69 1807
125.70
True
PVC
152
1795
75.52 1794
71.52
True
164
1807
125.70 1806
122.43
159
1802
104.35 1801
162
1805
157
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
6.3
54.6 122.8
651.8
6.2
54.7 122.8
639.6
150.63
6.1
54.8 122.8
627.1
46.9
131.23
5.9
55.4 122.8
585.4
328.0
34.4
129.49
5.8
55.4 122.8
581.5
0.009
328.0
33.2
120.10
5.7
55.7 122.8
560.0
PVC
0.009
328.0
50.3
79.54
4.9
57.4 122.8
455.7
True
PVC
0.009
328.0
46.3
70.58
4.7
58.0 122.8
429.3
101.13
True
PVC
0.009
328.0
52.1
61.78
4.5
58.6 122.8
401.6
116.43 1804
113.37
True
PVC
0.009
328.0
49.7
61.59
4.5
58.6 122.8
401.0
1800
93.06 1799
90.06
True
PVC
0.009
328.0
50.0
60.02
4.4
58.7 122.8
395.9
153
1796
78.52 1795
75.52
True
PVC
0.009
328.0
50.6
59.29
4.4
58.8 122.8
393.5
161
1804
113.37 1803
110.51
True
PVC
0.009
328.0
49.4
57.92
4.4
58.9 122.8
388.9
166
1809
131.00 1808
129.69
True
PVC
0.009
328.0
21.3
61.40
4.5
59.4 122.8
400.4
11122
1793
66.41 1686
61.30
True
PVC
0.009
328.0
99.1
51.58
4.2
59.5 122.8
367.0
151
1794
71.52 1793
66.41
True
PVC
0.009
328.0
101.2
50.50
4.2
59.6 122.8
363.1
155
1798
85.60 1797
83.80
True
PVC
0.009
328.0
36.9
48.81
4.1
59.8 122.8
357.0
212
1686
61.30 1687
56.52
True
PVC
0.009
328.0
100.9
47.38
4.1
59.9 122.8
351.7
132
10977
180.90 10976
175.69
True
PVC
0.009
291.0
25.0
208.45
7.0
61.0 122.8
536.2
261
1687
56.52 1688
52.69
True
PVC
0.009
328.0
103.9
36.85
3.7
61.3 122.8
310.2
128
10973
168.46 10972
162.80
True
PVC
0.009
291.0
31.1
182.05
6.7
61.6 122.8
501.1
268
1693
34.69 1694
32.67
True
PVC
0.009
328.0
50.9
39.68
3.9
62.4 129.3
321.9
263
1685
49.82 1689
46.69
True
PVC
0.009
328.0
93.3
33.56
3.6
63.4 129.3
296.0
133
10978
184.14 10977
180.90
True
PVC
0.009
291.0
27.4
118.11
5.7
63.5 122.8
403.6
264
1689
46.69 1690
43.69
True
PVC
0.009
328.0
94.2
31.85
3.6
63.7 129.3
288.4
266
1691
40.69 1692
37.58
True
PVC
0.009
328.0
100.0
31.11
3.5
63.9 129.3
285.0
167
11012
134.00 1809
131.20
False
PVC
0.009
291.0
24.4
114.83
5.6
63.9 122.8
397.9
267
1692
37.58 1693
34.69
True
PVC
0.009
328.0
96.0
30.10
3.5
64.1 129.3
280.3
3349
10983
193.46 10978
184.14
True
PVC
0.009
291.0
89.6
104.00
5.4
64.1 122.8
378.7
265
1690
43.69 1691
40.69
True
PVC
0.009
328.0
103.9
28.86
3.4
64.4 129.3
274.5
130
10975
173.94 10974
170.44
True
PVC
0.009
291.0
36.3
96.50
5.3
64.5 122.8
364.8
127
10972
162.80 10971
159.05
True
PVC
0.009
291.0
40.2
93.21
5.2
64.7 122.8
358.5
171
11008
155.15 11009
146.85
True
PVC
0.009
291.0
93.0
89.28
5.1
64.9 122.8
350.9
3346
10980
207.00 10981
201.29
True
PVC
0.009
291.0
65.2
87.54
5.1
65.0 122.8
347.5
168
11011
138.28 11012
134.00
True
PVC
0.009
291.0
52.7
81.17
5.0
65.4 122.8
334.6
3345
10979
212.99 10980
207.00
True
PVC
0.009
291.0
79.2
75.59
4.8
65.8 122.8
322.9
3347
10981
201.29 10982
197.06
True
PVC
0.009
291.0
60.0
70.45
4.7
66.2 122.8
311.7
169
11010
142.18 11011
138.28
True
PVC
0.009
291.0
55.5
70.30
4.7
66.2 122.8
311.4
10924
10971
159.05 11008
155.15
True
PVC
0.009
291.0
56.7
68.79
4.7
66.3 122.8
308.0
Fecha: 12/04/12
Pgina 21 de 27
Label
Start
Node
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
129
10974
170.44 10973
168.46
True
170
11009
146.85 11010
142.18
True
262
1688
52.69 1685
51.02
131
10976
175.69 10975
3343
10985
3344
3348
Material
Manning's
n
Diameter
(mm)
Length
(m)
Slope
(m/km)
Velocity
(Average)
(m/s)
PVC
0.009
291.0
28.3
69.85
Depth
Flow
(Average (L/s)
End) /
Rise
(%)
4.7
66.5 122.8
Capacity
(Design)
(L/s)
PVC
0.009
291.0
71.3
65.48
4.6
66.6 122.8
300.5
False
PVC
0.009
328.0
100.6
16.60
2.8
66.6 122.8
208.2
173.94
True
PVC
0.009
291.0
25.0
70.02
4.7
66.8 122.8
310.7
223.79 10984
218.39
True
PVC
0.009
291.0
87.5
61.73
4.5
67.0 122.8
291.8
10984
218.39 10979
212.99
True
PVC
0.009
291.0
90.8
59.45
4.4
67.2 122.8
286.3
10982
197.06 10983
193.46
True
PVC
0.009
291.0
62.8
57.33
4.4
67.4 122.8
281.2
Label
X
(m)
1694
Y
(m)
268,165.16
Elevation
(Ground)
(m)
8,687,277.93
34.96
Elevation
(Invert)
(m)
32.67
Elevation
(Invert in 1)
(m)
32.67
Flow
(L/s)
129.3
H
(m)
2.29
Label
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
1545
268,325.20
8,686,568.17
31.43
28.43
28.43
28.43
152.9
3.00
1546
269,647.55
8,687,145.70
81.00
79.32
(N/A)
79.32
21.7
1.68
1547
269,593.92
8,687,134.36
78.92
77.41
77.41
77.41
21.7
1.51
1548
269,517.12
8,687,119.06
76.31
74.67
74.67
74.67
21.7
1.64
1549
269,466.06
8,687,107.38
74.55
72.85
72.85
72.85
152.9
1.70
1550
269,416.88
8,687,094.23
72.77
71.07
71.07
71.07
152.9
1.70
1551
269,367.92
8,687,077.58
70.85
69.26
69.26
69.26
152.9
1.59
1552
269,285.68
8,687,040.31
67.72
66.11
66.11
66.11
152.9
1.61
1553
269,241.46
8,687,015.70
65.95
64.35
64.35
64.35
152.9
1.60
1593
268,359.00
8,686,387.91
25.15
21.81
21.81
21.81
152.9
3.34
1594
268,353.21
8,686,416.77
24.82
22.84
22.84
22.84
152.9
1.98
1595
268,346.13
8,686,426.42
24.80
23.25
23.25
23.25
152.9
1.55
1596
268,338.88
8,686,467.61
26.67
24.71
24.71
24.71
152.9
1.96
310.4
Pgina 22 de 27
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert Out)
(m)
Fecha: 12/04/12
1597
268,329.62
8,686,516.86
28.72
26.46
Elevation
(Invert in
1)
(m)
26.46
Flow (Total
Out)
(L/s)
H
(m)
26.46
152.9
2.26
1598
268,319.42
8,686,566.03
29.88
28.22
28.22
28.22
152.9
1.66
1599
268,330.14
8,686,569.89
30.18
28.61
28.61
28.61
152.9
1.57
1600
268,401.47
8,686,587.85
32.95
31.18
31.18
31.18
152.9
1.77
1601
268,452.64
8,686,597.04
34.73
32.99
32.99
32.99
152.9
1.74
1602
268,522.42
8,686,610.45
37.24
35.47
35.47
35.47
152.9
1.77
1603
268,581.80
8,686,627.55
39.38
37.63
37.63
37.63
152.9
1.75
1604
268,653.67
8,686,669.40
42.26
40.53
40.53
40.53
152.9
1.73
1605
268,726.69
8,686,711.75
45.29
43.48
43.48
43.48
152.9
1.81
1606
268,781.74
8,686,742.96
47.36
45.69
45.69
45.69
152.9
1.67
1607
268,848.61
8,686,780.77
51.74
48.37
48.37
48.37
152.9
3.37
1608
268,910.22
8,686,815.99
52.48
50.85
50.85
50.85
152.9
1.63
1609
268,959.36
8,686,845.72
54.44
52.85
52.85
52.85
152.9
1.59
1619
269,016.79
8,686,881.69
57.55
55.21
55.21
55.21
152.9
2.34
1620
269,070.14
8,686,912.34
58.98
57.36
57.36
57.36
152.9
1.62
1621
269,133.48
8,686,949.63
61.50
59.93
59.93
59.93
152.9
1.57
1622
269,197.60
8,686,986.90
64.07
62.52
62.52
62.52
152.9
1.55
1623
268,301.41
8,686,426.24
22.65
19.40
19.40
19.40
152.9
3.25
1624
268,280.45
8,686,422.34
21.11
18.65
18.65
18.65
152.9
2.46
Label
Start
Node
309
308
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
Material
Manning's
n
Diameter
(mm)
Length Slope
(m)
(m/km)
Velocity
(Average)
(m/s)
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
1547
77.41 1548
74.67
True
Concrete
0.013
350.0
78.3
1546
79.32 1547
77.41
True
Concrete
0.013
350.0
54.9
34.98
1.7
24.8
21.7
248.8
34.81
1.7
24.9
21.7
310
1548
74.67 1549
72.85
True
Concrete
0.013
350.0
248.2
52.4
34.72
1.7
56.9
21.7
510
1623
19.40 1624
18.65
True
Concrete
0.013
247.8
350.0
21.3
35.15
2.9
68.3 152.9
497
1597
26.46 1596
24.71
True
Concrete
249.4
0.013
350.0
50.0
35.01
2.9
68.3 152.9
496
1598
28.22 1597
26.46
True
248.9
Concrete
0.013
350.0
50.3
35.00
2.9
68.3 152.9
507
1621
59.93 1620
57.36
248.8
True
Concrete
0.013
350.0
73.5
34.99
2.9
68.3 152.9
498
1600
31.18 1599
248.8
28.61
True
Concrete
0.013
350.0
73.5
34.99
2.9
68.3 152.9
311
1549
248.8
72.85 1550
71.07
True
Concrete
0.013
350.0
50.9
34.97
2.9
68.3 152.9
508
248.7
1622
62.52 1621
59.93
True
Concrete
0.013
350.0
74.1
34.97
2.9
68.3 152.9
248.7
500
1596
24.71 1595
23.25
True
Concrete
0.013
350.0
41.8
34.96
2.9
68.3 152.9
248.7
2143
1605
43.48 1604
40.53
True
Concrete
0.013
350.0
84.4
34.94
2.9
68.3 152.9
248.6
312
1550
71.07 1551
69.26
True
Concrete
0.013
350.0
51.8
34.93
2.9
68.4 152.9
248.6
511
1624
18.65 1575
16.67
True
Concrete
0.013
350.0
56.7
34.93
2.9
68.4 152.9
248.6
483
1608
50.85 1607
48.37
True
Concrete
0.013
350.0
71.0
34.92
2.9
68.4 152.9
248.6
504
1602
35.47 1601
32.99
True
Concrete
0.013
350.0
71.0
34.92
2.9
68.4 152.9
248.6
506
1620
57.36 1619
55.21
True
Concrete
0.013
350.0
61.6
34.92
2.9
68.4 152.9
248.6
313
1551
69.26 1552
66.11
True
Concrete
0.013
350.0
90.2
34.91
2.9
68.4 152.9
248.5
2141
1603
37.63 1602
35.47
True
Concrete
0.013
350.0
61.9
34.91
2.9
68.4 152.9
248.5
11327
1553
64.35 1622
62.52
True
Concrete
0.013
350.0
52.4
34.91
2.9
68.4 152.9
248.5
484
1609
52.85 1608
50.85
True
Concrete
0.013
350.0
57.3
34.90
2.9
68.4 152.9
248.5
2145
1607
48.37 1606
45.69
True
Concrete
0.013
350.0
76.8
34.89
2.9
68.4 152.9
248.5
505
1619
55.21 1609
52.85
True
Concrete
0.013
350.0
67.7
34.88
2.9
68.4 152.9
248.4
2144
1606
45.69 1605
43.48
True
Concrete
0.013
350.0
63.4
34.86
2.9
68.4 152.9
248.3
Start
Node
2142
502
Invert
(Start)
(m)
Pgina 23 de 27
Length Slope
(m)
(m/km)
Velocity
(Average)
(m/s)
Fecha: 12/04/12
Stop
Node
Invert
(Stop)
(m)
Set
Invert
to
Stop?
Material
Manning's
n
Diameter
(mm)
Depth
Flow Capacity
(Average (L/s) (Design)
End) /
(L/s)
Rise
(%)
68.4 152.9
248.3
1604
40.53 1603
37.63
True
Concrete
0.013
350.0
83.2
34.85
2.9
1594
22.84 1593
21.81
True
Concrete
0.013
350.0
29.6
34.84
2.9
68.4 152.9
248.3
509
1593
21.81 1623
19.40
True
Concrete
0.013
350.0
69.2
34.83
2.9
68.4 152.9
248.2
314
1552
66.11 1553
64.35
True
Concrete
0.013
350.0
50.6
34.78
2.9
68.4 152.9
248.1
503
1601
32.99 1600
31.18
True
Concrete
0.013
350.0
52.1
34.73
2.9
68.4 152.9
247.9
501
1595
23.25 1594
22.84
True
Concrete
0.013
350.0
11.9
34.49
2.9
69.6 152.9
247.0
474
1545
28.43 1598
28.22
True
Concrete
0.013
350.0
6.1
34.45
2.9
71.3 152.9
246.9
499
1599
28.61 1545
28.43
True
Concrete
0.013
350.0
5.2
34.74
2.9
71.7 152.9
247.9
Label
1575
X
(m)
Y
(m)
268,225.10
Elevation
(Ground)
(m)
8,686,410.50
Elevation
(Invert)
(m)
19.02
16.67
Elevation
(Invert in 1)
(m)
16.67
Flow
(L/s)
H
(m)
152.9
2.35
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Flow (Total
Out)
(L/s)
H
(m)
1539
267,510.62
8,687,033.52
15.34
11.50
11.50
11.50
547.3
3.84
1540
267,513.48
8,687,089.27
13.78
11.41
11.41
11.41
547.3
2.37
1541
267,515.40
8,687,115.61
15.38
11.34
11.34
11.34
547.3
4.04
1542
267,468.52
8,687,169.46
13.49
11.24
11.24
11.24
547.3
2.25
1555
268,094.73
8,686,377.44
15.26
13.88
13.88
13.88
547.3
1.38
1577
268,156.08
8,686,384.24
16.22
13.98
(N/A)
13.98
547.3
2.24
1578
268,042.55
8,686,371.77
14.88
13.06
13.06
13.06
547.3
1.82
1579
267,945.27
8,686,408.10
15.15
12.88
12.88
12.88
547.3
2.27
1580
267,940.45
8,686,420.01
15.22
12.86
12.86
12.86
547.3
2.36
1581
267,900.34
8,686,478.31
15.02
12.75
12.75
12.75
547.3
2.27
1582
267,840.63
8,686,575.54
16.20
12.55
12.55
12.55
547.3
3.65
Pgina 24 de 27
X
(m)
Y
(m)
Elevation
(Ground)
(m)
Elevation
(Invert)
(m)
Elevation
(Invert in
1)
(m)
Elevation
(Invert Out)
(m)
Fecha: 12/04/12
Flow (Total
Out)
(L/s)
H
(m)
1583
267,772.79
8,686,596.52
16.44
12.42
12.42
12.42
547.3
4.02
1584
267,725.83
8,686,619.61
15.20
12.33
12.33
12.33
547.3
2.87
1585
267,644.09
8,686,691.36
14.68
12.15
12.15
12.15
547.3
2.53
1586
267,609.55
8,686,738.14
14.36
12.06
12.06
12.06
547.3
2.30
1587
267,566.22
8,686,758.15
14.83
11.98
11.98
11.98
547.3
2.85
1588
267,564.59
8,686,787.96
15.14
11.95
11.95
11.95
547.3
3.19
1589
267,562.14
8,686,819.82
14.88
11.89
11.89
11.89
547.3
2.99
1590
267,586.31
8,686,846.67
14.20
11.85
11.85
11.85
547.3
2.35
1591
267,579.36
8,686,914.46
14.00
11.73
11.73
11.73
547.3
2.27
1592
267,542.50
8,687,008.20
13.87
11.56
11.56
11.56
547.3
2.31
1696
267,480.82
8,687,213.95
13.44
11.16
11.16
11.16
547.3
2.28
1697
267,415.33
8,687,300.37
13.29
11.00
11.00
11.00
547.3
2.29
1710
267,381.95
8,687,344.09
13.21
10.83
10.83
10.83
547.3
2.38
1711
267,317.01
8,687,417.83
12.93
10.67
10.67
10.67
547.3
2.26
1712
267,221.00
8,687,460.07
12.77
10.50
10.50
10.50
547.3
2.27
1713
267,115.98
8,687,459.92
12.59
10.33
10.33
10.33
547.3
2.26
1714
267,019.25
8,687,449.36
12.45
10.17
10.17
10.17
547.3
2.28
1715
266,949.22
8,687,382.39
12.28
10.01
10.01
10.01
547.3
2.27
1716
266,922.71
8,687,316.99
12.10
9.90
9.90
9.90
547.3
2.20
1717
266,874.58
8,687,306.87
12.02
9.82
9.82
9.82
547.3
2.20
1718
266,781.10
8,687,278.68
11.88
9.68
9.68
9.68
547.3
2.20
1719
266,700.30
8,687,304.51
11.80
9.52
9.52
9.52
547.3
2.28
1720
266,661.78
8,687,394.17
11.62
9.36
9.36
9.36
547.3
2.26
1721
266,609.79
8,687,476.23
11.47
9.20
9.20
9.20
547.3
2.27
1722
266,540.39
8,687,555.68
11.31
9.03
9.03
9.03
547.3
2.28
1723
266,452.92
8,687,598.76
11.17
8.87
8.87
8.87
547.3
2.30
1724
266,443.12
8,687,645.45
11.09
8.80
8.80
8.80
547.3
2.29
Start
Node
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Mater
ial
Manning'
sn
Diameter
(mm)
Length
(m)
Slope
(m/km
)
Velocity
(Average
)
(m/s)
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
215
1724
8.80 OF-1
8.73 HD
0.011
1,224.4
39.3
1.8
1.5
33.7
547.3
1,870.6
342
1555
13.88 1578
13.06 HD
0.011
1,224.4
52.4
15.6
3.2
33.8
547.3
5,544.4
461
1539
11.50 1540
11.41 HD
0.011
1,224.4
55.8
1.6
1.4
34.1
547.3
1,780.8
11155
1697
11.00 1710
10.83 HD
0.011
1,224.4
54.9
3.1
1.8
34.1
547.3
2,467.8
341
1577
13.98 1555
13.88 HD
0.011
1,224.4
61.9
1.6
1.4
34.1
547.3
1,782.2
3202
1696
11.16 1697
11.00 HD
0.011
1,224.4
108.5
1.5
1.4
34.6
547.3
1,702.4
462
1540
11.41 1541
11.34 HD
0.011
1,224.4
26.5
2.6
1.7
34.8
547.3
2,277.7
346
1581
12.75 1582
12.55 HD
0.011
1,224.4
114.0
1.8
1.5
35.2
547.3
1,856.9
347
1582
12.55 1583
12.42 HD
0.011
1,224.4
71.0
1.8
1.5
35.3
547.3
1,896.7
221
1718
9.68 1719
9.52 HD
0.011
1,224.4
84.7
1.9
1.5
35.4
547.3
1,926.4
450
1590
11.85 1591
11.73 HD
0.011
1,224.4
68.3
1.8
1.5
35.6
547.3
1,858.6
362
1583
12.42 1584
12.33 HD
0.011
1,224.4
52.4
1.7
1.5
35.8
547.3
1,836.8
345
1580
12.86 1581
12.75 HD
0.011
1,224.4
70.7
1.6
1.4
35.9
547.3
1,748.5
216
1723
8.87 1724
8.80 HD
0.011
1,224.4
47.9
1.5
1.4
36.0
547.3
1,695.6
225
1713
10.33 1714
10.17 HD
0.011
1,224.4
97.2
1.6
1.4
36.0
547.3
1,798.4
222
1717
9.82 1718
9.68 HD
0.011
1,224.4
97.5
1.4
1.4
36.0
547.3
1,679.6
343
1578
13.06 1579
12.88 HD
0.011
1,224.4
103.9
1.7
1.5
36.0
547.3
1,844.9
Start
Node
Pgina 25 de 27
Invert
(Start)
(m)
Stop
Node
Invert
(Stop)
(m)
Mater
ial
Manning'
sn
Diameter
(mm)
Fecha: 12/04/12
Length
(m)
Slope
(m/km
)
Velocity
(Average
)
(m/s)
Depth
(Average
End) /
Rise
(%)
Flow
(L/s)
Capacity
(Design)
(L/s)
220
1719
9.52 1720
9.36 HD
0.011
1,224.4
97.5
1.6
1.4
36.0
547.3
1,795.6
226
1712
10.50 1713
10.33 HD
0.011
1,224.4
105.2
1.6
1.4
36.1
547.3
1,782.5
219
1720
9.36 1721
9.20 HD
0.011
1,224.4
97.2
1.6
1.4
36.1
547.3
1,798.4
218
1721
9.20 1722
9.03 HD
0.011
1,224.4
105.5
1.6
1.4
36.1
547.3
1,779.9
228
1710
10.83 1711
10.67 HD
0.011
1,224.4
98.1
1.6
1.4
36.1
547.3
1,790.0
227
1711
10.67 1712
10.50 HD
0.011
1,224.4
104.9
1.6
1.4
36.2
547.3
1,785.1
224
1714
10.17 1715
10.01 HD
0.011
1,224.4
96.9
1.7
1.4
36.3
547.3
1,801.2
363
1584
12.33 1585
12.15 HD
0.011
1,224.4
108.8
1.7
1.4
36.3
547.3
1,803.1
451
1591
11.73 1592
11.56 HD
0.011
1,224.4
100.6
1.7
1.4
36.3
547.3
1,822.6
217
1722
9.03 1723
8.87 HD
0.011
1,224.4
97.5
1.6
1.4
36.4
547.3
1,795.6
223
1715
10.01 1716
9.90 HD
0.011
1,224.4
70.7
1.6
1.4
36.4
547.3
1,748.5
10814
1542
11.24 1696
11.16 HD
0.011
1,224.4
46.3
1.7
1.5
36.5
547.3
1,842.2
460
1592
11.56 1539
11.50 HD
0.011
1,224.4
40.8
1.5
1.4
36.5
547.3
1,699.2
344
1579
12.88 1580
12.86 HD
0.011
1,224.4
12.8
1.6
1.4
36.5
547.3
1,752.3
445
1585
12.15 1586
12.06 HD
0.011
1,224.4
58.2
1.5
1.4
36.5
547.3
1,743.1
463
1541
11.34 1542
11.24 HD
0.011
1,224.4
71.3
1.4
1.4
36.6
547.3
1,660.0
449
1589
11.89 1590
11.85 HD
0.011
1,224.4
36.3
1.1
1.2
36.8
547.3
1,472.2
229
1716
9.90 1717
9.82 HD
0.011
1,224.4
49.1
1.6
1.4
36.8
547.3
1,790.0
448
1588
11.95 1589
11.89 HD
0.011
1,224.4
32.0
1.9
1.5
37.0
547.3
1,919.5
447
1587
11.98 1588
11.95 HD
0.011
1,224.4
29.9
1.0
1.2
37.1
547.3
1,405.0
446
1586
12.06 1587
11.98 HD
0.011
1,224.4
47.9
1.7
1.4
37.4
547.3
1,812.6
OF-1
3.6
X
(m)
266,421.76
Y
(m)
8,687,678.46
Elevation
(Ground)
(m)
11.04
Elevation
(Invert)
(m)
8.73
Elevation
(Invert in 1)
(m)
8.73
Flow
(L/s)
547.3
H
(m)
2.31
CONCLUSIONES
Fecha: 12/04/12
Pgina 26 de 27
en donde menciona que el estado de conservacin del colector es regular (ref. Carta
N 0062-2012/CC-VK), con signos de un avanzado deterioro interno y externo.
Tomando en cuenta la antigedad del colector, cantidad considerable de empalmes al
colector y un espacio no recomendable para un refuerzo paralelo se concluye que el
colector mencionado se rehabilitara utilizando una tubera de 350 mm PVC NTP. ISO
4435: 2005.
Fecha: 12/04/12