Академический Документы
Профессиональный Документы
Культура Документы
=
100 *
_ _ _ _
_ _
%
Feedwater of ty Conductivi Boiler of ty Conductivi
Feedwater of ty Conductivi
Blowdown
=
September 2008 88
Checklist for General Plant Safety & Reliability
Item Present Y/N
Deaerator Tank Bypass.
Condensate Tank Bypass.
Softener Bypass.
Auxiliary makeup to Deaerator.
Emergency water to Boilers.
High Oil Alarm on Oil Tanks.
High Gas Pressure Cutout on Main Gas
Line Coming into plant.
Emergency Kill Switch (Oil and Gas)
in Office and ALL Points of Egress.
September 2008 89
Sign In Sheet
PRINT Name VA Location