Вы находитесь на странице: 1из 8

1)

1 Minimum Height of contact wire at overline structure:- 4.92 m Dia of contact wire :- 12.24 mm
2 Condemned dia of contact wire on main line:- 8.25 mm
3
4
5
6 Condemned dia of contact wire at loop lines/yard:- 8.00 mm
7
8
9
10 Stagger of contact wire on tangent track :- +- 200 mm
11
12
13
14 Stagger of contact wire on curved track :- +- 300 mm
15
16
17
18 Stagger of catenary on tangent track at support for single cantilever :- 0
19
20
21
22 Gap between two parallel running contact wires at uninsulated overlap :- 200 mm
23
24
25
26 Gap between parallel running contact wires:- 500 mm
27
28
29
30 Height of contact wire of turnout OHE above contact wire of the main line:- 5 cm
31
32
33
34 Track separationa at turnout and cross overat the location of obligatory structure:-150-700mm.
35
36
37
38 Minnimum implantion at obligatory structure/mast supporting more than one OHE:-3.
39
40
41
42 Normal implantation(standard):-2.50m. +, -0.03
43
44
45
46 Minimum implantation (critical) withCEE approval. :- 2.36m.
47
48
49
50 Minimum implation on platform : 4.75 m.
51
52
53
54 Normal encumbrance :-1.4 m.for72m. span
55
56
57
58 Maximum permisible slope of contact wire on main line:-3mm./mtr.
59
60
61
62 Maximum permissible slope of contact wire in yards.:-5mm./mtr.
63
64
65
66 Short time min.vertical electricl clearance:- 270mm.
67
68
69
70 Short time min. Hozrizontal electrical clearance :- 220mm
71
72
73
74 Long time min. horizontal eletrical clearance.:- 320mm.
75
76
77
78 Stagger of contract wire at PTFE neutralsection at support:-0.
79
80
81
82 Earthing resistance of FOB/ROB/Girders/Bridge/Platform shed & other overlinestructures:-10
83
84
85
86 Cross section area and length of C jumper wire:-50mm 1.7m.
87
88
89
90 Cross section and length of F jumper wire :-50mm, 1.6m
91
92
93
94 Cross section area and length of G jumper wire:-105mm, 3.5m.
95
96
97
98 Distance of G jumper from obligatory mast towards overlap side-5.6m.
99
100
101
102 Fixed length of the dropper wire:- 105mm.
103
104
105
106 The distance of the first dropperfrom support:-2.25m.
107
108
109
110 Swept zone clearance of section insulator at trailing side:-1.726m
111
112
113
114 Swept zone clearance of section insulator at facing side:-1.60m
115
116
117
118 For the section insulator, thedistance between contact wire and runner oneitherside shouldnot be less than:-220mm
119
120
121
122 Maximum tension length for regulated OHE:-1500
123
124
125
126 Normal sag of regulated OHE:-100mm.
127
128
129
130 Maximum span length on tangent track for regulated OHE:-2000m.
131
132
133
134 ZY valueof winch type ATD at half tension length(750m) at35 c in mm.:-Z =1250, Y =2500
135
136
137
138 XY value of 3 pulley type ATD at half tension length (750 m.) at 35 c in mm. :- X=750, Y= 2500
139
140
141
142 The difference in length of adjacent spans on mian line should not bemore than:- 18m
143
144
145
146 Minimum length of dropper in the span:- 150mm.
147
148
149
150 In case of overlap type turnout, the turnoutspan should be less than or equal to :- 54m.
151
152
153
154 With crossed type equipment with actual crossings of OHEs at facing turnouts, the anchor span should be restricted to :- 54 m.
155
156
157
158 Leaning of mast should be attended if leaning at tope exceeds:- 15 cm
Minimum Height of contact wire at overline structure:- 4.92 m Dia of contact wire :- 12.24 mm
Track separationa at turnout and cross overat the location of obligatory structure:-150-700mm.
Earthing resistance of FOB/ROB/Girders/Bridge/Platform shed & other overlinestructures:-10
For the section insulator, thedistance between contact wire and runner oneitherside shouldnot be less than:-220mm
XY value of 3 pulley type ATD at half tension length (750 m.) at 35 c in mm. :- X=750, Y= 2500
With crossed type equipment with actual crossings of OHEs at facing turnouts, the anchor span should be restricted to :- 54 m.

Вам также может понравиться