Pioneer Park

Pioneer Park
Stormwater
Stormwater

Quality Improvement
Quality Improvement
Project
Project
Stormwater
Stormwater

Pollutant Removal and
Pollutant Removal and
Groundwater Recharge
Groundwater Recharge
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for
stormwater runoff velocity dissipation,
filtration and infiltration
Basin channel stabilization and bank
protection
Filtering and Infiltration trench installed
beneath basin channel
Native and drought tolerant vegetation
planted for erosion protection
Basin levee and pedestrian
walkway
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin forebay
area for first flush runoff velocity
reduction and first stage sediment
containment
Channel bank stabilization and erosion
protection
Native and drought tolerant vegetation
planted for erosion protection and
phytoremediantion
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Underground stormwater storage basin
for runoff infiltration and groundwater
recharge
Bio Swale for stormwater runoff
velocity dissipation and filtering
1200 gallon underground
stormwater storage basin
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio Swale drainage channel for
stormwater velocity dissipation and
filtering
Check dams and rip-rap to allow for
stormwater infiltration
Asphalt removal and chip filled
trenches installed beneath surface
rock for infiltration and recharge
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio Swale drainage channel for
stormwater velocity dissipation and
filtering
Check dams and rip-rap to allow for
stormwater infiltration
Stormwater discharge
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Open space soil surface treatment with
rock ground cover, rock and bolder
placement
Native plantings for phytoremediation
and erosion and sediment protection
Asphalt removal and the installation of
chip basins beneath rock surface for
filtering and infiltration
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Check dam installation for stormwater
runoff velocity dissipation and the
mitigation of sediment transport
Native and drought tolerant vegetative
plantings for soil stabilization and
pollutant removal
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Check dam installation for stormwater
runoff velocity dissipation and the
mitigation of sediment transport
Native and drought tolerant vegetative
plantings for soil stabilization and
pollutant removal
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio Swale drainage channel constructed
with natural rock flow path
Bank stabilization and boulder
reinforcement with check dams
Rip-rap erosion protection and runoff
velocity dissipation border
Native and drought tolerant vegetation
planted for phytoremediation and erosion
protection
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Native vegetation for erosion protection
Check dam for Stormwater runoff
velocity dissipation
Rip rap channel protection and bank
stabilization
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin, rock lined
and rip rap erosion protection
Rip rap basin channel with rock chip
trench below flow line for stormwater
filtration and infiltration
Native and drought tolerant vegatation
Decomposed granite for earth
sabilizaton and erosion protection
Basin levee and pedestrian walkway
Pad for future ramada
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Edge of asphalt parking area constructed
with aggregate base rock to filter
stormwater runoff and prevent sediment
transport
Chip rock trench used to capture
stormwater runoff for filtering and
infiltraton
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Median bio swale with surface rock for
sediment mitigation and pollutant
containment
Filtering and Infiltration trench installed
beneath surface rock for stormwater
runoff containment and recharge
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Median bio swale with surface rock for
sediment mitigation and pollutant
containment
Filtering and Infiltration trench installed
beneath surface rock for stormwater runoff
containment and recharge
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio swale median islands constructed
and surface rock for erosion control
2 wide x 4 deep chip rock trench for
stormwater storage to filter, infiltrate and
recharge aquifer
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Surface rock installed for sediment
dissipation and stormwater runoff
velocity reduction
Bio swale and channel protection
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio swale installed for stormwater runoff
filtering and infiltration
Rock channel will reduce runoff
velocities and eliminate erosion and
sediment transport
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Stormwater runoff will be filtered and
erosion and sediment transport are
eliminated do to grass installation
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Slope re-graded and planted for the
elimination of erosion and sediment
Stormwater will be filtered and infiltration
will take place do to slow runoff velocities
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bank re-graded to lessen slope, planted
grass for erosion and sediment
elimination
Stormwater runoff is now filtered and
will infiltrate prior to entering chip trench
at base of retaining wall
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bank terraced and placed with boulders
and rip rap for back stabilization
Erosion eliminated through bank
terracing
2 wide x 4 deep chip rock trench for
stormwater runoff containment, filtering
and infiltration
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bank terraced and placed with boulders
and rip rap for back stabilization
Erosion eliminated through bank terracing
2 wide x 4 deep chip rock trench for
stormwater runoff containment, filtering
and infiltration
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Existing dirt parking lot graded for slope
reduction, placed with minus rock for
sediment reduction and surface
stabilization
Trees and shrubs planted for pollutant
reduction prior to entering Pioneer Park
Watercourse
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Native and drought tolerant plants and
grass planted for erosion protection
and stormwater runoff velocity
dissipation and filtering
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio swale median islands for
stormwater runoff containment for
filtering and infiltration
2 wide x 4 deep chip rock trench for
stormwater storage to filter and
infiltrate runoff
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Bio swale median island with rock flow
line channel and surface rock for
stormwater filtering and infiltraion
Surface rock for stormwater runoff
veloctiy reduction and stormwater
filtering
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Boulder bank stabilization
Natural channel with rock for erosion
protection and allowing for stormwater
filtering and infiltration
Native and drought tolerant vegetation
for erosion protection and
phytoremediation
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Aggregate base rock for stormwater
runoff from asphalt parking area to
prevent erosion, sediment transport and
allowing for stormwater filtering prior to
entering detention basin
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Rip-rap channel protection and
sediment basin
Check dam for sediment containment
and velocity dissipation
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for
stormwater filtering and infiltration
Stormwater runoff groundwater
recharge basin
Forebay for sediment containment and
stormwater velocity dissipation
Rip rap bank stabilization
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Pioneer Park discharge channel into the
Pioneer Park Watercourse
Rip rap, boulder placement and bank
protection for final stormwater treatment
prior to entering Pioneer Park Watercourse
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Rip rap bank stabilization and erosion
mitigation
Rock lined channel for erosion protection
and stormwater filtering
Vegetation for channel flow line sediment
reduction
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention basin forebay sediment
catchment and velocity dissipation pond
Detention / Retention basin for infiltraton
and groundwater recharge
Basin channel for erosion protection and
stormwater filtering
Channel rock chip trench for filtering and
infiltration
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for stormwater
containment and velocity dissipation
Rock lined flow channel
Rip-rap bank stabilization
Native vegetation and phytoremediation
plants
Basin Forebay
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for stormwater
containment and velocity dissipation
Basin rock lined channel for filtering and
sediment mitigation
Channel trench for stormwater filtering and
infiltration, also groundwater recharge
Fore bay basin for sediment containment
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for stormwater
containment and velocity dissipation
Basin rock lined channel for filtering and
sediment mitigation
Channel trench for stormwater filtering and
infiltration, also groundwater recharge
Native vegetation for phytoremetiation
Forebay basin for sediment containment
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Detention / Retention basin for stormwater
runoff containment and velocity dissipation
Phytoremediantion vegetation and erosion
reduction
Constructed rock basin channel for erosion
protection and sediment mitigation
Trench beneath flow line rock channel for
filtering and infiltration
Basin levee and pedestrian path
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Phytoremediation and native drought
tolerant vegetation
Detention / Retention Basin for
stormwater filtration and infiltraion
Groundwater recharge basin located
in areas with high percolation rates
Basin levee and pedestrian walkway
Best Management Practices
Bio Swale median planted with native vegetation
Filtration / Infiltration trench installed to capture
stormwater runoff for retention and recharge
Surface rock used for runoff velocity reduction
Pioneer Park Today
Before Best Management Practices
Before Best Management Practices
Pioneer Park Today
Best Management Practices
Phytoremediation through natural
drought tolerant vegetation
Natural channel constructed through
detention basin
Filtration and Infiltration trench
constructed under basin channel
Detention Basin
Basin Forebay

Вам также может понравиться