Вы находитесь на странице: 1из 10

AHMAD MUKHLIS FIRDAUS Page 1 of 10

RESUME OF
Ahmad Mukhlis Firdaus, ST, MT
Jl. Jalan Raya Bojong Soang Komp. Griya Bandung
Asri (GBA I) Blok K No. 26
Bandung-West Java 40258
phone: +628122402226
e-mail : ahmad_m_firdaus@ocean.itb.ac.id,
ahmadmukhlisfirdaus@gmail.com (alt)

1. FORMAL EDUCATION
University/Institute : Bandung Institute of Technology (ITB)
Major : Ocean Engineering Program, Civil Engineering Department
Year of Graduation : 2004
Title : Bachelor of Engineering

University/Institute : Bandung Institute of Technology (ITB)
Major : Ocean Engineering Graduate Program, Faculty of Civil and
Environmental Engineering
Year of Graduation : Graduate in 24th October 2009
Title : Master of Engineering
2. RESEARCH INTEREST
Marine renewable energy ; Renewable Energy- Tidal Current Energy Conversion, Wave
Energy Conversion, Offshore Wind Energy Conversion
Coastal Process ; Wave, Current, Wave Current Interaction, Sediment,
Thermal Dispersions
Hydrodynamics ; Fluid-Structure Interaction, Floating Bodies, Vortex Induced
Vibration (VIV)
3. PROFESSIONAL QUALIFICATIONS
Strong organizational and planning skills
Ability to work independently or as part of a team
Proven communication skills (language : Indonesian, English with fluent both written and
spoken )
Computer skills
Microsoft Office Software: (Word, Excel, PowerPoint)
Programming: Matlab, Fortran
Ocean Modeling Software: SMS (Surface Water Modeling Software)-All Module
(RMA2, CGWAVE, M2D, STWAVE, Adcirc, etc), Genesis (Generalized Shoreline
Change Software), CEDAS
Offshore and Structure: SACS, SAP (Structure Analyze Program), ETABS.
Other Water Recourses Model: Epanet (software for pipeline design of raw water
supply), HEC RAS, HEC HMS
Other Engineering Software: AutoCAD, MathCad, Mapinfo (GIS Software), Sketchup
Other Software : Adobe Photoshop, Corel Draw

CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 2 of 10
4. WORK EXPERIENCES
Year : 2011-Present
Employer : Bandung Institute Technology
Position : Lecturer
Detail : Junior lecturer in Ocean Engineering Program (CPNS)
Year : 2008-2011
Employer : Bandung Institute Technology
Position : Academic Assistant
Detail : As Assistant in Academic and Research activity of Ocean Engineering
Program
Year : 2005-2006
Employer : Sapta Adhi Pratama Engineering Consultant
Position : Engineer
Year : 2004
Employer : Sapta Adhi Pratama Engineering Consultant
Position : Assistant Engineer
Year : 2003
Employer : Bandung Institute of Technology
Position : Laboratory Assistant
Detail : Technical Drawing Studio Laboratory
5. PUBLICATIONS
2011 Mukhtasor, Ahmad Mukhlis Firdaus Ocean Energy in Indonesia: Policy,
Technology, Market and Institutional Development. World Renewable Energy
Congress (WREC), 5
th
-17
th
Oct 2011, Bali.
2011 Ahmad Mukhlis Firdaus, Hernawan Mahfudz, Dhemi Harland, Ahmad Syafii
Maarif Water system condition modeling due to Reclamation in Upland of
Jakarta. Himpunan Ahli Teknik Hidraulik Indonesia (HATHI) International
Conference on Water Related , 15
th
-17
th
July 2011, Jakarta
2009 Hernawan Mahfudz, Dhemi Harland, Meutia Sistarani, Ahmad Mukhlis
Firdaus, Analisa Hidrolika Penggunaan Pintu Air Pada Proyek Reklamasi
Pantai Utara DKI Jakarta dengan Perangkat Lunak SMS 8.1. Jurnal Teknik
Sipil, Vol. 18, No. 3. December 2009, ISSN 0853-2982
2009 Ahmad Mukhlis Firdaus and Hendra Achiari, Comparative Studi of
Numerical Model Application of Shoreline Change in Sandy Head Land Type
Coast at Matras Beach, Bangka Belitung, Indonesia. Journal Infrastructure
and Built Environment, Volume IV No. 2, December 2009
2009 Ahmad Mukhlis Firdaus, Cross flow Type Tidal Current Turbine
Development for Indonesian Seas, Graduates Thesis Ocean Engineering,
Faculty of Civil and Environment Engineering, Institute Technology Bandung.
(In Bahasa Indonesia).
2008 Ahmad Mukhlis Firdaus, Student Movement; should it anarchy? article of
Media Indonesia (National Newspaper in Bahasa Indonesia)
2005 Ahmad Mukhlis Firdaus, Kartika, Agung Triharjo, Implementation Open
source software for flood model in Indonesia, Open source competition,
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 3 of 10
Ministry of research and technology, Republic of Indonesia (In Bahasa
Indonesia)
2004 Ahmad Mukhlis Firdaus, Design of International Passengers Ferry Terminal
Jodoh, Batu Ampar, Batam, Undergraduates Thesis Ocean Engineering,
Department of Civil Engineering, Institute Technology Bandung. (In Bahasa
Indonesia).
2003 Ahmad Mukhlis Firdaus, Hokkop Tua Immanuel, Tofa Sibarani, Training for
Trainer Modul, Training for Trainer of Civil Engineering Student Union (TFT-
HMS ITB) 2003. (In Bahasa Indonesia).
2003 Ahmad Mukhlis Firdaus, Rony Aditya S, Analysis Project of Dock
Constructions and Reclamation for Containers Park Area of Tanjung Emas
Port, Report of Construction Project in Tanjung Emas Port. (In Bahasa
Indonesia).
2001 Ahmad Mukhlis Firdaus, Jerrias Eko Satrio, Construction Method of Batu
Ampar Port, Batam. (In Bahasa Indonesia)
6. ENGINEERING PROJECT AND RESEARCH EXPERIENCES

YEAR OF 2011
1. RESEARCH ON DEVELOPMENT TIDAL TURBINE IN INDONESIAN WATER
Source of Funding : Marine affair and Fisheries Research Center, Indonesian Ministry of Marine
Affair and Fisheries
Position : Expert Source
J ob Description : Design and develop Prototype

2. STUDY, INVESTIGATION AND DESIGN OF TEMAJ O PORT
Project Term : Mei 2011 September 2011 (5 Month)
Project Location : Temajo, West Kalimantan Provence- Indonesia
Project Owner : Ministry of Communication
Employer : PT. Sasana Patria Agranusa
Position : Ocean Engineer
Length of Assignment : 5 Month
J ob Description : Tidal surveys, tidal forecasting, met ocean data analysis, hydraulic and
hydrodynamic modeling and sedimentation and Deck Design
3. STUDY, INVESTIGATION AND DESIGN OF NAVIGATION CHANNEL IN PALOH
Project Term : J uly 2011 November 2011 (5 Month)
Project Location : Temajo, West Kalimantan Provence- Indonesia
Project Owner : Ministry of Communication
Employer : PT. Raya Surverindo
Position : Ocean Engineer
Length of Assignment : 5 Month
J ob Description : Tidal surveys, tidal forecasting, met ocean data analysis, hydraulic and
hydrodynamic modeling and sedimentation and Dredging Plan

YEAR OF 2010
4. RESEARCH ON TI DAL TURBINE I N I NDONESI AN WATER
Source of Funding : Marine affair and Fisheries Research Center, Indonesian Ministry of Marine
Affair and Fisheries
Position : Ocean Engineer
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 4 of 10
J ob Description : Conduct Laboratory testing and reporting

5. SITE INVESTIGATION OF LOMBOK COAL FI RED POWERPLANT (2X25 MW)
Project Term : April 2010 J une 2010 (3 Month)
Project Location : Lombok, West Nusa Tenggara Provence- Indonesia
Project Owner : PLN J asa Enjiniring
Employer : PT. Kwarsa Hexagon
Position : Ocean Engineer
Length of Assignment : 3 Month
J ob Description : Tidal surveys, tidal forecasting, met ocean data analysis (Storm Surge and
Wave Set up), hydraulic and hydrodynamic modeling and thermal
dispersion model
6. HYDRODYNAMIC MODEL AND DETAIL ENGINEERING DESI GN OF BANGKA
RECLAMATION
Project Term : Maret 2010 May 2010 (3 Month)
Project Location : Bangka- Indonesia
Project Owner : Government of Bangka Belitung Province, Public Work Unit
Employer : PT. Zharsys Amanah Mandiri
Position : Ocean Engineer/Modeler
Length of Assignment : 1 Month
J ob Description : Hydrodynamics Modeling of Bangka Waters according to scenario of
Reclamation Plan in Batu Rusa.

YEAR OF 2009
7. DETAIL DESI GN OF SEMANGKA BAY SHORE PROTECTION
Project Term : April 2009 Octber 2009 (7 Month)
Project Location : Kota Agung, Lampung Provence- Indonesia
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Way Seputih and Way Semangka Planning Unit
Employer : PT. Intimulya Engineering
Position : Ocean Engineer
Length of Assignment : 7 Month
J ob Description : Tidal surveys, tidal forecasting, hydraulic and hydrodynamic modeling of
Semangka Bay, and Designing coastal protection structure of Semangka
Bay Shoreline.
8. SURVEY INVESTIGATION AND DESIGN OF CAPE MODONG SHORE PROTECTION
Project Term : March 2009 November 2009 (7 Month)
Project Location : Belitung, Bangka Belitung Provence- Indonesia
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Bangka Belitung Planning Unit
Employer : PT. Purnatama Geosintek
Position : Ocean Engineer
Length of Assignment : 7 Month
J ob Description : Tidal surveys, tidal forecasting, hydraulic and hydrodynamic modeling of
Cape Modong, and Designing coastal protection structure of Cape Modong
Shoreline.
9. HYDRODYNAMIC STUDY OF KAPUK NIAGA INDAH RECLAMATI ON PROJ ECT EFFECTS
Project Term : February 2009 March 2009 (1 Month)
Project Location : J akarta- Indonesia
Project Owner : Government of J akarta Province, Public Work Unit
Employer : PT. Lapi Ganeshatama
Position : Ocean Engineer
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 5 of 10
Length of Assignment : 1 Month
J ob Description : Hydrodynamics Modeling the J akarta Bay according to scenario of Kapuk
Niaga Indah Reclamation Plan.
YEAR OF 2008
10. REVIEW STUDY OF MATRAS BEACH SHORE PROTECTION
Project Term : J uly 2008 November 2008 (5 Month)
Project Location : Bangka, Bangka-Belitung - Indonesia
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Flood Control And Coastal Protection of Bangka Belitung
Unit
Employer : PT. Sapta Adhi Pratama
Position : Ocean Engineer
Length of Assignment : 5 Month
J ob Description : Tidal surveys, tidal forecasting, hydraulic and hydrodynamic modeling of
Matras Beach, and reviewing existing Matras Beach Shore Protection
11. STUDY COASTAL ZONE MANAGEMENT AND PLANNI NG OF MENTAWAI ISLAND
Project Term : August 2008 December 2008 (5 Month)
Project Location : Mentawai Island, West Sumatra- Indonesia
Project Owner : Government of Mentawai Island Region, Region Urban Planning Bodies
(Bapeda).
Employer : PT. Sapta Adhi Pratama
Position : Ocean Engineer
Length of Assignment : 5 Month
J ob Description : Ocean and Coastal Hydrodynamics Studies and Development Planning
12. FEASIBILITY STUDY OF ROTE NDAO OIL AND GAS DEPO PORT IN EAST NUSA
TENGGARA
Project Term : April 2008 October 2008 (7 Month)
Project Location : Rote Island, East Nusa Tenggara- Indonesia
Project Owner : Ministry of Energy and Mineral Resources, Rote Ndao Government and
Pertamina.
Employer : PT. Lapi Ganesathama
Position : Port Engineer
Length of Assignment : 5 Month
J ob Description : Tidal surveys, tidal forecasting, hydraulic and hydrodynamic modeling of
Rote Ndao Ocean, and designing deck facilities of Rote Ndao Port

YEAR OF 2007
1. DETAIL ENGINEERING DESIGN OF MUARA SABAK PORT IN J AMBI
Project Term : J une 2007 November 2007 (7 Month)
Project Location : Muara Sabak regency, J ambi - Indonesia
Project Owner : Ministry of Communication, Directorate General of Sea Communication -
Government of J ambi Province, Department of communication
Employer : PT. Maxitech Utama Indonesia
Position : Port Engineer
Length of Assignment : 5 Month
J ob Description : Tidal surveys, tidal forecasting, hydraulic and hydrodynamic modeling of
Batang Hari river stream, and designing deck facilities of Muara Sabak
Port
2. DETAIL ENGINEERING DESIGN OF TALAUD FISHERY PORT AND MASTERPLAN OF
DAGHOE FISHERY PORT
Project Term : August 2007 December 2007 (5 Month)
Project Location : Talaud Archipelagos Region, North Celebes - Indonesia
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 6 of 10
Project Owner : Ministry of Marine And Fishery Republic of Indonesia, Directorate General
of Fishing - Government of North Celebes, Department of Marine and
Fishery
Employer : PT. J asakons Putra Utama
Position : Port Engineer
Length of Assignment : 4 Month
J ob Description : Tidal surveys, tidal forecasting, and designing deck facilities of Talaud and
Daghoe Fishery port

YEAR OF 2006
1. SURVEY, INVESTIGATION AND DESIGN BATU BETUMPANG COASTAL PROTECTION
Project Term : May 2006 October 2006 (6 Month)
Project Location : South Bangka Region, Bangka Belitung - Indonesia
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Flood Control and Coastal Protection of Bangka Belitung
Unit (SNVT PBPP Bangka Belitung)
Employer : PT. Sapta Adhi Paratama
Position : Coastal Engineer
Length of Assignment : 4 Month
J ob Description : Coastal processes and aberrations identification between Way Seputih and
Way Sekampung coastline, Hydro-oceanographic surveys, Hydro-
oceanographic data analysis such as wave hindcasting, tidal forecasting,
modeling and analyzing wave transformations.

2. INVESTIGATION AND DESIGN WAY SEPUTIH - WAY SEKAMPUNG COASTAL
PROTECTION
Project Term : May 2006 November 2006 (6 Month)
Project Location : West Lampung Regent, Lampung - Indonesia
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Flood Control And Coastal Protection of Way Seputih -
Way Sekampung Agency (SNVT PBPP)
Employer : PT. Lapi Ganesathama (joint operation with Sapta Adhi Pratama)
Position : Coastal Engineer
Length of Assignment : 4 Month
J ob Description : Coastal processes and aberrations identification between Way Seputih and
Way Sekampung coastline, Hydro-oceanographic surveys, Hydro-
oceanographic data analysis such as wave hindcasting, tidal forecasting,
modeling and analyzing wave transformations.

3. FEASIBILTY STUDY AND MASTERPLAN OF BELINYU BAY FISHERY PORT IN BATU
BETUMPANG DISTRICT, BANGKA REGION
Project Term : August 2006 December 2006 (4 Month)
Project Location : Belinyu Bay, Bangka Belitung - Indonesia
Project Owner : Ministry of Marine and Fishery Republic of Indonesia and Government of
Bangka Belitung Province, Department of Marine and Fishery
Employer : PT. Suwanda Karya Mandiri (joint operation with Sapta Adhi Pratama)
Position : Ocean Engineer
Length of Assignment : 3 Month
J ob Description : Hydro-oceanographic surveys, Hydro-oceanographic data analysis such as
wave hindcasting, tidal forecasting, modeling and analyzing wave
transformations.
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 7 of 10
YEAR OF 2005
1. INVESTIGATION AND DESIGN WAY SEPUTIH WAY SEKAMPUNG RIVER
NORMALIZATION IN SEPUTI H SURABAYA, BANDAR SURABAYA AND ESTUARY OF
WAY SEPUTI H AREAS - CENTRAL LAMPUNG REGION
Project Term : J uly 2005 December 2005 (6 Month)
Project Location : Kabupaten Lampung Tengah
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, Flood Control And Coastal Protection of Way Seputih -
Way Sekampung Unit (Satker PBPP)
Employer : PT. Hary Karya (joint operation with Sapta Adhi Pratama)
Position : Coastal Engineer
Length of assignment : 4 Month
J ob description : Identifications, surveying and data collecting of Way Seputih Flood, Tidal
Forecasting and Analyzing Tidal Impact for back water in Way Seputih
Flood discharge.

2. MASTERPLAN OF RANOYAPOS WATER RESOURCES PLANNING, SOUTH MINAHASA
REGION, NORTH CELEBES.
Project Term : J une 2005 November 2005 (5 Month)
Project Location : South Minahasa Region, North Celebes Province
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, North Celebes Water Resources Development (SatKer
Sementara PPSA Sulawesi Utara)
Employer : PT. Sapta Adhi Pratama
Length of Assignment : 4 Month
Position : Ocean engineer
J ob description : Identification and Data Collecting of Coastline Destruction, aberration
and sedimentation in coastline of Ranoyapos river area, Hydro-
oceanographic Analysis.

YEAR OF 2004
1. DETAIL DESIGN OF PIPE LINE TRANSMITTING SYSTEM FROM SI DOREJ O-DAM
INTAKE TO WATER TREATMENT PLANT, IN PURWODADI, CENTRAL J AVA
Project Term : J une 2004 November 2004
Project Location : Purwodadi Central J ava
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, J ratunseluna Raw Water Supply Project (Proyek Induk
Penyediaan Air baku J ratunseluna), Central java
Employer : PT. Sapta Adhi Pratama
Position : Hydraulic Engineer Assistant
Length of assignment : 4 Month
J ob description : Analyzing and Designing Pipe Line Transmitting System for Raw Water
from intake in Sidorejo Dam to Water Treatment Plant using EPANET
software.

2. SURVEY, INVESTIGATION AND DESIGN OF OLOT RIVER FLOOD CONTROL, IN
BOLAANG MONGONDOUW REGI ON, NORTH CELEBES
Project Term : J une 2004 December 2004
Project Location : Bolaang Mongondouw North Celebes
Project Owner : Ministry of Public Work Republic of Indonesia, Directorate General of
Water resources, North Celebes Flood Control and Coastal protection
(SatKer Sementara PPSA Sulawesi Utara)
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 8 of 10
Employer : PT. Sapta Adhi Pratama
Position : Hydraulic Engineer Assistant
Length of assignment : 4 Month
J ob description : Identifications, surveying and data collecting of Ollot River Flood, Tidal
Forecasting and Analyzing Tidal Impact for back water in Ollot River
Flood discharge, Hydraulic Analyzing of Ollot river Stream


7. COURSE, SEMINAR, TRAINING AND OTHER INFORMAL
EDUCATION
International Conference on Port, Coastal and Ocean Engineer (ICPCO)
Organizer : Ocean Engineer Program
Place : Bandung
Year : December 2007
Length of course : one day
International Nusantara Stratification and Transport (Instant) Training
Organizer : Ministry of Marine and Fishery
Place : Bogor
Year : November 2007
Length of course : one week
Field Trip Observation of Guna Nusa Platform Project
Organizer : Ocean Engineering Program
Place : Serang
Year : April 2003
Length of course : one day
Structure Analysis Program (SAP) Training
Organizer : Civil Engineering Student Union (HMS-ITB)
Place : Bandung
Year : 2003
Length of course : Three Months
Fixed Offshore Platform: A general overview Seminar
Organizer : Totalfinaelf Professours Associes
Place : Bandung
Year : 2002
Length of course : one day
Field Trip Observation of Tanjung Priok Port - Repsol Maxus YPF Offshore Field Guna Nusa
Fabricator Merak port
Organizer : Ocean Engineering Student Union
Place : Jakarta Pabelokan Island Serang
Year : July 2001
Length of course : a week
Leadership and organization Training
Organizer : Civil Engineering Student Union (HMS-ITB)
Place : Bandung
Year : 2001
Length of course : Two Days
Training for trainer
Organizer : Civil Engineering Student Union (HMS-ITB)
Place : Bandung
Year : 2000
Length of course : Two Days

CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 9 of 10
8. ORGANIZATION ACTIVITY
2009 present Member of Indonesian Ocean Energy Association (INOCEAN)
2009 - present Chairman of Ocean Engineering and Maritime Affair in Young Engineer
Forum-Forum Anggota Muda (FAM), Indonesian Engineer Union - Persatuan
Insinyur Indonsesia (PII)
2008 - 2009 Chairman of Student Ocean Engineering Graduate Student Organization,
Bandung Institute of Technology
2003 - 2004 Founders and Chairman of Student Cultural Movement (Student and Villager
Movement), Bandung Institute of Technology
2002 - 2003 External Department Officer of Student Community Council (Student Council
Board), Bandung Institute of Technology
2001 2002 Senator of Student Councils Congress (Civil Engineering Student Union
District), Bandung Institute of Technology
2001 2002 Board of Member Representative, Civil Engineering Student Union (HMS-ITB),
Bandung Institute of Technology (ITB)
2000 2001 External Affairs Division of Civil Engineering Student Union (HMS-ITB),
Bandung Institute of Technology (ITB)
9. COMMITTEE EXPERIENCES
July 2009 Chairman of Committee and Team Leader of Ocean Engineering Graduate
Student Field Trip to Chine and Singapore, Bridging ITB and Asian University
of Research and Academic Collaboration, China and Singapore
2004 Steering Committee, ITB Fair 2004, Student Council Cabinets (KM-ITB),
Bandung Institute of Technology
2003 Chairman of Committee, Training For Trainer of Civil Engineering Student
Union (HMS-ITB) 2003, Bandung Institute of Technology
2002 Chairman of student orientation (OSKM ITB), Bandung Institute of Technology
2002 Indonesia Ocean Expo 2002, Chief of Exhibition, Ocean Engineering Student
Community, Ocean Engineering Program, Bandung Institute of Technology
2000 Indonesia Ocean Expo 2000, Committee of Exhibition, Ocean Engineering
Student Community, Ocean Engineering Program, Bandung Institute of
Technology
2000 TPB Fair 2000, Committee of Exhibition, Student Council Cabinets (KM-ITB),
Bandung Institute of Technology
10. OTHER ACTIVITIES
Dec-09 Moderator in Oceanovolution Offshore Technology Seminar Indonesian
Deepwater Technology , Bandung Institute of Technology.
Dec-09 Moderator in Teaching Grant Seminar, Bandung Institute of Technology.
CURR CULUM VITAE


AHMAD MUKHLIS FIRDAUS Page 10 of 10
2008 Moderator in Indonesia Ocean Expo Seminar The Latest Offshore
Technology , Bandung Institute of Technology.
April-05 Invited Speaker in Leadership and Organization Training of Civil Engineering
Student Union, Purwakarta
2005-2007 Volunteer for handicapped children in AMANDA (NGO for handicapped
children rehabilitation), Bandung
2005 Instructor in Training for Trainer of Civil Engineering Student Union (HMS-
ITB) 2005, Bandung Institute of Technology
January-04 Invited Speaker in Industry Engineering Student Union Members Training,
Bandung Institute of Technology
2004 Instructor in Leadership Training of North Sumatran Culture Club (UKSU-
ITB), Bandung Institute of Technology
2004 Instructor in Training For Trainer Civil Engineering Student Union (HMS ITB)
2004, Bandung Institute of Technology
Aug-03 Invited Speaker in Studium General of Medical Student Union Members
Training, Padjadjaran University, Bandung
Aug-02 Instructor in Training for Trainer of Civil Engineering Student Union (HMS-
ITB) 2002, Bandung Institute of Technology
Sept-93 Indonesian Eagle Scout Contingent, Singapore Malaysia
11. REFERENCES

Dr. Ir. Muslim Muin, MSOE. (Chairman of Ocean Engineering Research Group).
E-mail : m_muin@ocean.itb.ac.id
Phone : 022-2509117

Dr. Ir. Irsan Soemantri Brodjo Negoro, MSc. (Head of Ocean Engineering Master Program).
E-mail : irsansb@ocean.itb.ac.id
Phone : 022-2509117

Krisnaldi Idris, PhD. (Supervisor of Master Thesis/Vice Dean of Human Resources and
Organization of Faculty of Civil Environmental Engineering (FCEE)).
E-mail : krisnaldi@ocean.itb.ac.id
Phone : 022-2509117



I declare the details stated to be true and complete

Yours Sincerely,




Ahmad Mukhlis Firdaus, ST, MT

Вам также может понравиться