STATUS OF TESTING ACTIVITIES

ALKHAIRAT 400 / 132 / 11 KV GIS S/S


TASK

AC PANELS main distribution board PL3801 & PL3802

100%

100%

100%

5%
Equipment conformity
7%
Busbar contact resistance
4%
Busbar continuity
7%
Busbar insulation
11%
Manual & automatic operation
12%
Secondary injection tests on relays and instruments to check operating characteristics
20%
Tripping test
9%
Current transformer test (polarity, insulation, ratio, knee point, )
6%
Earthing continuity
9%
Alarms reports
10%
Energization
DC subdistribution board SDB1101 SDB1102
100%

0%

0%

14-Mar 21-Mar 28-Mar


0%

0%

0%

4-Apr

11-Apr

18-Apr

25-Apr

2-May

9-May

16-May

23-May

30-May

6-Jun

13-Jun

20-Jun

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

test report
signed by
client? %

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

100%

Not nstalled yet !

100%

Equipment conformity
Insulation
Earthing continuity
Alarms reports
Current limiting
Mode operation
Energization

5%
10%
8%
12%
5%
50%
10%

Batteries 110V Bank BTRY-1101, Bank BTRY-1102, Fuse box FUBX-1, Fuse box FUBX-2
100%
Formation with hourly records
Capacity test
DC battery chargers 48V RECT-481 RECT-482, RECT-483, RECT-484

0%

0%

0%

0%

0%

Equipment conformity
Insulation
Earthing continuity
Alarms reports
Current limiting
Mode operation
Energization

5%
10%
8%
12%
5%
50%
10%

Batteries 48V Bank Bank BTRY-481 Bank BTRY-482 Fuse box FUBX-3 Fuse
box FUBX-4

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

100%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

50%
50%
100%

OK

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

5%
Equipment conformity
7%
Busbar contact resistance
4%
Busbar continuity
7%
Busbar insulation
11%
Manual & automatic operation
12%
Secondary injection tests on relays and instruments to check operating characteristics
20%
Tripping test
9%
Current transformer test (polarity, insulation, ratio, knee point, )
6%
Earthing continuity
9%
Alarms reports
10%
Energization

DC battery chargers 110V RECT-1101, 1102, 1103, 1104

100%

100%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
0%

0%

0%

0%

0%

100%

OK

100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

100%

REMARKS

OK

0%

5%
Equipment conformity
7%
Busbar contact resistance
4%
Busbar continuity
7%
Busbar insulation
11%
Manual & automatic operation
12%
Secondary injection tests on relays and instruments to check operating characteristics
20%
Tripping test
9%
Current transformer test (polarity, insulation, ratio, knee point, )
6%
Earthing continuity
9%
Alarms reports
10%
Energization

DC distribution board PL481 & 482

7-Mar

5%
Equipment conformity
7%
Busbar contact resistance
4%
Busbar continuity
7%
Busbar insulation
11%
Manual & automatic operation
12%
Secondary injection tests on relays and instruments to check operating characteristics
20%
Tripping test
9%
Current transformer test (polarity, insulation, ratio, knee point, )
6%
Earthing continuity
9%
Alarms reports
10%
Energization

DC distribution board PL1101 & 1102

28-Feb

5%
Equipment conformity
7%
Busbar contact resistance
4%
Busbar continuity
7%
Busbar insulation
11%
Manual & automatic operation
12%
Secondary injection tests on relays and instruments to check operating characteristics
20%
Tripping test
9%
Current transformer test (polarity, insulation, ratio, knee point, )
6%
Earthing continuity
9%
Alarms reports
10%
Energization

Auxiliary transformers panels PL3811 & PL3812

Weight 2

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

STATUS OF TESTING ACTIVITIES


ALKHAIRAT 400 / 132 / 11 KV GIS S/S
TASK

Weight 2

Formation with hourly records


Capacity test

50%
50%

Inverter UJX-1

100%

Equipment conformity
Busbar contact resistance
Busbar continuity
Busbar insulation
Manual & automatic operation
Tripping test
Earthing continuity
Alarms reports
Distribution check
Energization

100%

Earthing continuity
Step voltage
Touch voltage

50%
25%
25%

Metering system CAB-101 to CAB-106

100%

GIS400kV diameter 2 to BS2


Current transformer test (polarity, insulation, ratio, knee point, )
Voltage Transformer test (polarity, insulation, ratio.)
Current & Voltage circuits test
Primary injection test
Local control cubicle test
Local operation with interlocking
Mimic operation and indication
Alarms annunciator
Metering / transducer
Protection relays complete test
Protection relays setting and configuration test
Synchronization test
Trip circuit supervision test
Tripping Test
Intertripping test
Scada test ( I/O, analogs )
Energization
On load tests
GIS400kV diameter 6 to 10
Current transformer test (polarity, insulation, ratio, knee point, )
Voltage Transformer test (polarity, insulation, ratio.)
Current & Voltage circuits test
Primary injection test
Local control cubicle test
Local operation with interlocking
Mimic operation and indication
Alarms annunciator
Metering / transducer
Protection relays complete test
Protection relays setting and configuration test
Synchronization test
Trip circuit supervision test
Tripping Test
Intertripping test
Scada test ( I/O, analogs )
Energization
On load tests

100%

100%

15%
50%
25%
10%

400kV Breaker failure system

100%

15%
60%
25%

100%
Current transformer test (polarity, insulation, ratio, knee point, )
Voltage Transformer test (polarity, insulation, ratio.)
Current & Voltage circuits test
Primary injection test
Local control cubicle test
Local operation with interlocking
Mimic operation and indication
Alarms annunciator
Metering / transducer
Protection relays complete test
Protection relays setting and configuration test
Synchronization test

0%

0%

0%

8%
2%
7%
7%
5%
5%
5%
5%
5%
7%
5%
5%

4-Apr
100%
100%

11-Apr

18-Apr

25-Apr

2-May

9-May

16-May

23-May

30-May

6-Jun

13-Jun

20-Jun

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

0%

0%

0%

0%

0%

REMARKS

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
0%

test report
signed by
client? %
OK

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

in progress
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Test Reports will be given to MOE in 1 days

0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

85%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%

0%

0%

0%

0%

0%

5%
5%
7%
7%
5%
5%
5%
5%
5%
7%
5%
5%
5%
7%
7%
5%
5%
5%
100%

GIS132kV

0%

5%
5%
7%
7%
5%
5%
5%
5%
5%
7%
5%
5%
5%
7%
7%
5%
5%
5%

Protection relays setting and configuration test


Secondary injection test
Trip test

0%

14-Mar 21-Mar 28-Mar

20%
20%
20%
20%
20%

400kV Busbar protection system


Protection relays setting and configuration test
Secondary injection test
Stability test
Trip test

7-Mar

10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

Earthing circuit

Current & Voltage circuits test


Primary injection test
metering relay test
Scada test ( I/O, analogs )
totalising station testing

28-Feb

0%

OK
Test Reports will be given to MOE in 2 days

SCS Supervisor gives to reports about this items


OK
After sych.it is possible
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

50%
50%
50%
50%
50%

0%

0%

0%

0%

0%

50%

in progress

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

50%
50%
50%
0%

0%

0%

0%

0%

15%
100%
100%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%

in progress
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%
OK

STATUS OF TESTING ACTIVITIES


ALKHAIRAT 400 / 132 / 11 KV GIS S/S
TASK
Trip circuit supervision test
Tripping Test
Intertripping test
Scada test ( I/O, analogs )
Energization
On load tests

Weight 2

100%

15%
50%
25%
10%

132kV Breaker failure system

100%

15%
60%
25%

Protection relays setting and configuration test


Secondary injection test
Trip test

100%

GSU 1
_
-

Individual tests tan delta & bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test 1 &vector grouptest&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

_
-

Individual tests tan delta & bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test &vector group test&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Individual tests tan delta & bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test 1 &vector grouptest&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Individual tests tan delta & bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test 1 &vector grouptest&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Individual tests tan delta & bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test 1 &vector grouptest&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Individual tests tan delta& bushing capacity


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test &vector grouptest&DC resistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer

0%

8%
8%
12%
8%
8%
15%
10%

4-Apr
0%
0%
0%
0%
0%
0%

11-Apr

18-Apr

25-Apr

2-May

9-May

16-May

23-May

30-May

6-Jun

13-Jun

20-Jun

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

test report
signed by
client? %

REMARKS

0%
0%
0%
0%
0%

0%

0%

0%

0%

0%
0%
0%
0%

0%

0%

0%

0%

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

0%

44%
100%
100%
100%
100%
100%

0%

0%

0%

0%

0%

100%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%
100%

AT1

0%

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%
100%

GSU 5

0%

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%
100%

GSU 4

0%

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%
100%

GSU 3

0%

14-Mar 21-Mar 28-Mar

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%
100%

GSU 2

7-Mar

5%
7%
7%
5%
5%
5%

132kV Busbar protection system


Protection relays setting and configuration test
Secondary injection test
Stability test
Trip test

28-Feb

100%

OK

SCS Supervisor gives to reports about this items


0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

0%

OK

SCS Supervisor gives to reports about this items


0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

STATUS OF TESTING ACTIVITIES


ALKHAIRAT 400 / 132 / 11 KV GIS S/S
TASK
-

Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Weight 2

Individual tests tan delta &bushing capacity test


Current transformer test (polarity, insulation, ratio, knee point, )
Insulation test of core and windings
Ratio test& vector group &Dcresistance
Current circuit test
Diff transfo. relay and stability test
Other protection relays associated to transformer
Voltage regulation
OLTC operation
Alarms report
Scada test ( I/O, analogs )

Station service transformers


-

Equipment conformity
Insulation test
Ratio test
Vector group
Winding temperature test
protection relays secondary injection
Tripping test
Current transformer test (polarity, insulation, ratio, knee point, )
Earthing continuity
Alarms reports
Energization

Earthing transformer
-

Equipment conformity associated outdoor equipment


Insulation test
Current transformer test (polarity, insulation, ratio, knee point, )
Current circuit test
protection relays associated to transformer

91%

100%

9%
9%
9%
9%
9%
9%
10%
9%
9%
9%
9%
100%

Equipment conformity
Insulation
Ratio
Voltage circuit

Equipment conformity
Insulation
Ratio
Voltage circuit

Surge arresters 400kV


-

Equipment conformity
Insulation

Surge arresters 132kV


-

Equipment conformity
Insulation

Surge arresters 11kV


-

Equipment conformity
Insulation

Total

Equipment conformity
Insulation

0%

4-Apr

11-Apr

18-Apr

25-Apr

2-May

9-May

16-May

23-May

30-May

6-Jun

13-Jun

20-Jun

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

0%

0%

0%

0%

test report
signed by
client? %

REMARKS

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

OK

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%
100%
100%
100%
0%

0%

0%

0%

0%

75%

0%

0%

0%

0%

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

50%
50%

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

OK

100%
100%
0%

0%

0%

0%

0%

50%
50%

25%

OK

ALSTOM supervisor supplied more than 200kV to


Line traps and reports can give to MOE

25%
25%

0.00%

0.00%

0.00%

0.00%

0.00%

45.58%

4
OK

100%
100%
0%

8x3

OK

100%
100%
0%

4x3

OK

100%
100%
100%
0%
0%

SCS Supervisor gives to reports about this items

0%

0%

50%
50%
100%

in progress
0%

100%
100%
100%
100%
100%

50%
50%
100%

41%

OK

100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%

25%
25%
25%
25%

100%

Line traps

0%

25%
25%
25%
25%
100%

CVT 132kV

0%

20%
15%
25%
10%
30%
100%

0%

8%
8%
8%
8%
9%
9%
8%
8%
8%
9%
8%

CVT 400kV

0%

14-Mar 21-Mar 28-Mar

8%
8%
12%
8%
8%
15%
10%
8%
6%
9%
8%

Diesel Generator
Equipment conformity
Insulation test
Phase sequence
Tripping test
Mechanical test
Electrical test
Functional test
Engine and generator protections check
On load test
Alarms reports
Energization

7-Mar

8%
6%
9%
8%
100%

AT2

28-Feb

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%