Вы находитесь на странице: 1из 16

FH250 CIRCULAR LOOM

OPERATIONAL MANUAL



Nantong Sentian Fire-Fighting Equipment CO.,Ltd
Add: No.10 Yangsha Road, Huilong Industry zone, Qidong City,
J iangsu Province,P.R.China P.C: 226200
Tel: 86-513-83630902 Fax: 86-513-83636150
Web: http://www.firehose.cn E-mail: peter@firehose.cn




!!b

PREFACE

We are a sino-foreign joint-venture enterprise specialized in manufacturing various specifications and types of fire hose,
FH250 Circular Loom , Extruders and a complete set of hose vulcanization equipment.

We have passed the conformity of International Quality System Certification ISO9001-2000 and national CCC
Certification, and products are manufactured strictly according to the standards to guarantee factory products 100%
eligible.

We insist one principle : Continuously innovate and develop to offer customer with the best products.

We promise that we will offer satisfied service and avoid worry for all consumers.

We wish to extend our warm welcome to our customers no matter new or old, home or abroad for good cooperation and
mutual development.

Nantong Sentian Fire-fighting Equipment co., ltd.













?!b

Operation Instruction for FH250 Circular Loom

I. Brief Introduction
FH250 Circular Loom is a kind of hose loom which is optimized and developed on the basis of introducing foreign
similar- equipment and combining with our own experience summarizing from long-term production practice as well.
1,The host regulates speed by variable frequency. It is convenient and flexible for operation, high security, reliability and
high efficiency.
2, Equipped with automatic stop controls breakage of warp yarn and empty weft bobbins and the indication lights show where
the breakage has occurred or if the weft bobbins are empty. This makes the products quality stable and reduces operators
work .
3, Surface of the fabric is even and equal. More than 4 patterns of weave are available .
4,Hose diameter is from 20mm to 110mm and 250mm can be reached by adding accessories .
5,Compact structure and cover smaller area .

II Main Technical Parameters
1)Shuttle speed : 204 rotation/min (Max) 2)Motor: 5.5KW
3)Control power : 220V AC 24V DC
4)Available weave diameter :20mm250mm
5)Available number of warp ends : 478 single ends or double ends .
6)Time of automatic stop : approx. 2/3 rotation

III Installation
We recommend that the Circular Loom should be installed on a 10m
2
platform of net height approx. 2500mm. By doing
this the equal warp tension is obtained easily and site area of each Loom can be reduced. But it is not objected that
installing the Circular Loom on the same level as the creel . the Loom is required to be horizontally.

IV Adjustment and operation
1,Adjustment: All parts of the Circular Loom have been tested and adjusted when leaving the factory. Customers can use
it directly under normal circumstances except the shuttle gap need certain adjustments during operations, details as
following :
a) Dismantle of shuttle-tang and adjust bolts of bracket 634/3
3!b

b) Loosen 613/3 stop screws of eccentric axis of shuttle stop idler
c) Turn eccentric axis with Hex allen wrench and adjust lengthways gap of shuttles to the best state
d) Fasten stop screws
2, Thread: Distributing hose warp yarn which you design to centre of 12 units ,i.e. 478 guiding needles and shuttle bed
evenly .plain weave intervals 2 levels or multiple of 2, twill weave intervals 3 levels or multiple of 3. It neednt interval if
the warp yarn design is 478 pcs . Detailes in <table 2>and <table 3>.
3,Traction :lead along the warp yarn upon spring hook and stuck the spring hook in the mouth of warp-stop boardcard ;
clamp warp-stop board ; distribute warp yarn into 4 to 6 shares and tie to the prepared traction head , details in <table 2>.
Note: Wave circular has been installed . Drive the clutch off the traction equipment and force the shaking arm fan-shaped
gear to occlude with fan-shaped gear of pan axle , Turn handwheel anticlockwise to tighten lead and warp yarn ,exit
handwheel axis and pull off clutch and making it occlude with pan axle.
4, Adjustment of fan-shaped board t: Fix the fan-shaped board on shuttle-tang and make adjustment by adjusting screw of
shuttle-tang.Turn adjusting screw of shuttle-tang when adjusting and it is suitable to adjust fan-shaped board to the
internal edge of waive circular.
5, Adjustment of weft density : According to the weft density of your designed products, exchange the weft gear(E) to the
one meeting requirements ,details in <table 1>
6,weave by installing weft bobbins: put the weft bobbins finished according to requirements into shuttles . Note: the weft
bobbins should be put the correct place. Insert the weft into the thread hole of fan-shaped board and adjust the head of
shuttles. Press the button after confirmation and make the machine turn slowly ,so that hose will be weaved .
7,Adjustment of weave diameter : After forming fabrics, if there is tolerance between the diameter of fabric and the
required, corresponding adjustments can be made,i.e. turning adjusting screws after loosening locking nuts of shuttle-tang
and adjust corresponding position of fan-shaped board and weave circular ,i.e. daff or furl until satisfaction.
8,Adjustment of distribution disk : the distribution disk must cooperate with guiding needle correctly ,otherwise ,normal
weave is not available . When finding the position is not correct , adjust the distribution disk forward or backward one
case of guiding needle after loosening bolts of distribution disk bracket , then normal weave is available .

V. Lubrication
The lubricated part of the Circular Loom adopt the way of centrifugal splash lubrication .Putting approx.1.5kg of
lubrication into the shuttle-tang and making inspection about it every 2 or 3 months usually or changing the lubrication.
Gear lubrication of good quality is putting into the traction gear box and change it every 6 months . Pay attention to the
lubrication quantity and add it in time when it is lower than the required .
1!b


VI Control
There are 3 buttons fixed on the Circular Loom : the green button is for running ,the yellow one is for spot movement and
the red one is for stop. Shuttle speed is regulated directly by variable frequency. The textile workers can control the
rotation speed of shuttles optionally as long as adjusting the knob for shuttle speed on the control cabinet. It is very
convenient to operate. Breakage of warp yarn and weft automatic stop are both to be controlled by low voltage of 24 V,
details in circuit diagram.

VII. Common Faults and exclusion
Common faults reasons exclusion measures
Skipping stitch , unevenly
distribution of thread disk
the head of guiding shuttle or the position of
thread take-up lever is not correct;
distribution disk is too loose or heavy abrasion:
warp yarn spring is off or stuck:
Too much yarn ;
adjust to the best place;

adjust or changing the distribution
Onto spring, check and adjust;
clean out yarn
breakage of warp yarn, fluff warp tension is too much , bobbins is blocked,
shuttle wheel is stuck;
position of needle board is not correct
There is burr on the tension lever of guiding
needle or shuttle.
check and adjust tension, clean out or
change;
check and adjust
check and grind
Not smooth of surface of
fabric
warp ternsion and weft tension is not same ,too
loose or too tight;
lever pressed out by weft bobbins is stuck or
the spring is too loose;
weft is not in the inside of needle board,
floating on the surface;
much time spending on changing weft bobbins;
abrasion of creel support is too big or creel
bearing is stuck;
check and adjust

check and adjust

check and adjust

skilled slowly
check, clean out and adjust
belt is slippery, cant be led
out
roller spring on the traction is too loose;
some gear-key on the traction equipment is
mangled;
check and adjust ;
check and change
distribution disk doesnt work,
breakage of warp yarn,
automatic stop doesnt work,
only can spot move but
running tension
position of distribution disk is not correct;
spring hook is stuck or one of the two pcs of
warp yarn is broken;
spring hook falls on the warf-stopping board;
check and adjust accordingly;
check and adjust or changing spring
hook;
check spring hook and warp tension

!b
6 / 16
7 / 16

8!

9!b

Weft Density conversion table of FH250 Circular Loom
<table 1>
Passive gear 40 46 60
Active gear weft density/10cm Weft density/10cm weft density/10cm
E40 31.2 36.3 47.6
E39 32.2 37.0 48.8
E38 33.3 38.5 50.0
E37 33.8 39.2 51.3
E36 35.0 40.0 52.6
E35 35.7 40.8 54.0
E34 37.0 42.5 55.5
E33 38.4 43.5 57.1
E32 39.2 45.4 58.8
E31 40.8 46.5 60.6
E30 41.6 47.6 62.5
E29 43.5 50.0 64.5
E28 44.4 52.6 66.6
E27 46.5 54.0 70.0
E26 48.8 55.5 71.4
E25 50.0 57.1 74.0
E24 52.6 59.7 78.1
E23 54.0 62.5 81.3
E22 57.0 65.3 85.0
E21 60.6 68.9 89.3
E20 62.5 72.0 93.9



!0!b

!!!b

!?!b

FH250 Circular Loom Electrical Standard Parts Schedule
No. Name Standard Specifications Qty
(pcs)
Remarks
1 Electronic Control Box 1 600X900X380
2 Transducer 1
3 Control Transformers BK-50 1
4 Voltage Regulation Power Supply PCB 220V-DC24V1A 1
5 Small Relay DC24 4set
6 Voltage Meter 85C 0-450V 1
7 Tachometer DC10 1
8 Indicator Light (white) 220V 1
9 Indicator Light (red) DC24V 6
10 Button Switch NP2 3
11 Start Button (red yellow green) 3 X3
12 BAR 2A 2CZ82 6
13 Terminal 3X1.25
14 Terminal 5X5.5
15 Groove Track 1 cm 1m
16 Slots 2 cm 2m
17 Wires 1cm Multi-wire
18 Wires 4cm Multi-wire
19 Breaker 380V 40A 1
20 Breaker 220V 10A 1
21 Micro-blower 220V 0.14A 2
22 Potentiometer 2.2KW 1



!!b
F1000-G series

Вам также может понравиться